Electrical Ground Support Equipment Schedule and Cost. EGSE Schedule and Cost

Similar documents
GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule Review 01/05/06

GLAST LAT Project Subsystem Managers Meeting, May 13, Introduction. Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager

GLAST LAT Project Monthly Status Review, September 30, Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager

Monthly Cost/Schedule/Mission Review. GLAST LAT Calorimeter May 24, Gamma-ray Large Area Space Telescope. GLAST Calorimeter.

GLAST Mission - LAT Project DOE/NASA Review, March 31, 2004

GLAST Large Area Telescope:

GLAST Large Area Telescope: Cost/Schedule Review June 30, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6

GLAST LAT Project 3-4 May MGSE Design. LAT Environmental Test PDR 1

GLAST Large Area Telescope: Planning Meeting September 3, 2003 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6

GLAST Large Area Telescope:

Operations and and Logistics

Solar Electric Propulsion Benefits for NASA and On-Orbit Satellite Servicing

GLAST Large Area Telescope:

Calorimeter Subsystem. Status and Issues. W. Neil Johnson Naval Research Laboratory. Gamma-ray Large Area Space Telescope

Copyright 2016 Boeing. All rights reserved.

NASA Glenn Research Center Intelligent Power System Control Development for Deep Space Exploration

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

GLAST Large Area Telescope: Planning Meeting December 10, 2003 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6

CLASSIFICATION: UNCLASSIFIED. Exhibit P-40, BUDGET ITEM JUSTIFICATION CLASSIFICATION: UNCLASSIFIED. P-1 Item No. 46. Page 1 of 17. DATE: February 2011

The CU Beam Test at CERN Status Report and highlights from workshop II

Exhibit R-2, RDT&E Budget Item Justification

GLAST Large Area Telescope:

National Aeronautics and Space Administration! Leonard Dudzinski RPS Program Executive RPS Status for VEXAG

SGT5-8000H/SCC5-8000H 1S. First experience of Commercial Operation at Irsching 4. Russia Power Moscow, March

Cibola Flight Experiment

CAL EMI/EMC Testing History and Plans 14 April 2004

CALL FOR IDEAS FOR THE RE-USE OF THE MARS EXPRESS PLATFORM PLATFORM CAPABILITIES. D. McCoy

THE KOREASAT5 PROGRAM

Enabling Electric Propulsion for Flight. and LEAPTech

Boeing CST-100. Commercial Crew Transportation System. Keith Reiley, The Boeing Company. February, 2011

Pathfinder Technology Demonstrator

GLAST Large Area Telescope:

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

Overview of Intelligent Power Controller Development for the Deep Space Gateway

UNCLASSIFIED UNCLASSIFIED

Formation Flying Experiments on the Orion-Emerald Mission. Introduction

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

ELECTRON LOSSES AND FIELDS INVESTIGATION U.S. AIR FORCE. Ground Support Equipment Mission PDR. Michael Anderson

UNCLASSIFIED UNCLASSIFIED

Comprehensive and Cross-domain Vehicle Simulation for Electrification

The DoD Space Test Program Standard Interface Vehicle (ESPA) Class Program

CS2 Fast Rotorcraft NGCTR Objectives

1. Trends in the current fiscal year and previous fiscal year 3. Business overview 2. Secular trends in first quarter financial results

Routine Scheduled Space Access For Secondary Payloads

NASA LEAPTech and X-57 Prototyping

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

System Testing by Flight Operators the Rosetta Experience

The Advanced Instrumentation and Technology Centre (AITC)

Monthly Progress Report January 2005

The Role of PHEV/BEV in Outage/Asset and Demand Side Management

UNCLASSIFIED CLASSIFICATION: DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SURFACE SHIP TORPEDO DEFENSE

UNCLASSIFIED UNCLASSIFIED

FY2/18 2Q(March 2017~August 2018)

MONTHLY PERFORMANCE DASHBOARD

Results of annual simulation

Exhibit R-2, RDT&E Budget Item Justification

Radha Krisha (Pos. Doc.), M. A. Awal, Siyuan Chen, Hao Tu, Likhita Ravuri

Camera Electronics Systems

M234 / M235 / M236 SELF-DESTRUCT FUZES

DDG 51 Program. Sea, Air, Space Exposition Washington, DC 04 April Presented by: CAPT Casey Moton, USN DDG 51 Program Manager PMS 400D

MONTHLY PERFORMANCE DASHBOARD

Energy & Power Community of Interest March 21, 2018

MONTHLY PERFORMANCE DASHBOARD

SPARTAN. Date: All rights reserved 2011, Thales Alenia Space. Business Unit Space Infrastructures & Transportation

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Aviation S&T: Future Vertical Lift & JMR Tech Demonstrator

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Integrated Surveillance System FY 2012 OCO

NanoRacks External Payload Platform

Continuing Research and Development of Linac and Final Doublet Girder Movers

Space Telescope User s Committee

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Lane Community College Energy Use, Tracking, Feedback - Year Reported: 2015/2016. Summary Data

Holistic 1D-Model for Cooling Management and Engine Analysis of a Heavy-Duty Truck

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

PDR Energy Baseline Alternative. Proposal for Discussion October 27, 2015

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

Glendale Water & Power Smart Grid Project

NJ Solar Market Update As of 6/30/15

PRACE Virtual Prototyping at BMW Group.

Lithium Ion Medium Power Battery Design

CLASSIFICATION: UNCLASSIFIED. DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SUBMARINE TACTICAL WARFARE SYSTEM

Dual Spacecraft System

Crew integration & Automation Testbed and Robotic Follower Programs

Real-Time Hardware-In-The- Loop Simulator Testbed Toolkit. Samuel Fix Space Department JHU/APL

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE

University of Michigan Eco-Driving Index (EDI) Latest data: October 2017

LITHIUM-ION BATTERY FOR SPACECRAFT APPLICATIONS

EVLA Front-End CDR. EVLA Front-End Budget

Virginia Tech Research Center Arlington, Virginia, USA. PPT slides will be available at

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SHIP PRELIMINARY DESIGN & FEASIBILITY STUDIES

NASA Electric Aircraft Testbed (NEAT) Overview

Ampd Silo. Energy Storage System. Maintenance-free Li-ion energy storage for mission critical backup. Power to Empower

Petrobras. Nelson Silva Chief Strategy and Performance Officer April, 2017

Centerwide System Level Procedure

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

NJ Solar Market Update

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Transcription:

Electrical Ground Support Equipment Schedule and Cost Scott Williams Stanford University scott.williams@stanford.edu S. Williams 1

Schedule The schedule is driven by the delivery of electronics hardware units. EM1 EM2 FSW Testbed Qualification Unit Flight Unit Each provides increasing complexity and capability. Other major duties are Support for FSW development Support for T&DF development Support for I&T activities S. Williams 2

Evolutionary Development TKR CAL ACD EM1 EM1 EM1 Subsystem Development LOF SDP IOC/SAS Interface GSE Interfaces GLAST GSE Interfaces Sims ACD TKR CAL T&DF EP GTM SIU AEM TEM T&DF Development EM2 IOC LOF SAS SDP GLAST Flight Interfaces Sims ACD TKR CAL S/C FSW Testbed S/C GSE Flight Software Testbed EM2 Integration & Test FU Mission Systems Integration & Test FU MOC IOC IOC IOC LOF LOF LOF SSC SAS SAS SAS SDP SDP SDP Large Area Telescope GSE Ground Support Equipment Electrical GSE EM1 Engineering Model 1 EM2 Engineering Model 2 FU Flight Unit QU Qualification/Calibration Unit AEM ACD Electronics Module EP Event Processor FSW Flight Software GTM Global Trigger Module IOC Instrument Operations Center LOF Operations Facility MOC Mission Operations Center S/C Spacecraft SAS Science Analysis Software SSC Science Support Center SDP Science Data Production SIU Spacecraft Interface Unit T&DF Trigger and Dataflow System TEM Tower Electronics Module S. Williams 3

T&DF Integration & Test, I&T T & D F Integration & Test Plan Design & Engineering Proto-Flight Qual Production Delivery DAQ-EM DAQ-PS EMI/Elect Perf Tests Vibe/Elect Func Tests DAQ-EM DAQ-PS Vibe/Elect Func Tests Integration SIU-EM SIU-EM SIU-PS SIU-PS ACD-EM ACD-PS GT-EM Test Bed T/V Elect Func/ Perf Tests ACD-EM ACD-PS GT-EM T/V Elect Func/ Perf Tests Beam Test EP-EM GT/EP-PS EMI/Elect Perf Tests EP-EM GT/EP-PS EMI/Elect Perf Tests PDU PDU Patch Box Patch Box Hardware Engineering Models Proto-Flight Qualification Units Flight Units Flight Units Proto-Flight Units become flight spares after beam test Software Test Flight Build 0 Flight Build 0 Flight Build 0 Additional flight builds will be available as development on test bed continues Flight Build 1 S. Williams 4

I&T Plan Design & Engineering Tower Integration Integration Environmental Characterization & Calibrations Delivery 8/2002 11/2003 1/2004 7/2004 4/2005 3/2006 Radiator Grid Integration & Test Plan TKR CAL ACD DAQ-EM ACD-EM Integrate TKR/CAL with Grid & EM's Flt Harness Thermal Vac Vibration Characterization Event Proc. Global Trig. SIU Sub System Interconnect Acoustic Calibration Subsystem & component Qualification 8/2003 Beam Test Calibration & Characterization EMI/EMC Configuration Testing Vib- Random & Sine Sweep Thermal Vac Thermal Cycle @ 1Am Acoustic EMI Characterization & Calibration Hardware Engineering Models Qual Proto Flight Qual Flight Flight Spares Software Engineering Aliveness Tests Characterization & Calibration FlightTKR/CAL/TEM/Grid ACD-EM GT-EM Flight SIU Event-EM SIU Simulator Flight Harness Test Harness ACD Simulator Test Flt Build 0 Aliveness Tests Abbr. Functional Pre Environmental Functional Characterization & Calibration Flt Build 1 Test Functional Liveness Tests Reference Comprehensive Performance Alignments Characterization & Calibration Flight Flt Build 2 Test IOC (v1) Engineering Operations Characterization (Final) Calibration (Ship) Flight Flt Build 3 IOC (v2) Liveness Tests Functional Comprehensive Performance (Final ) Flight Flt Build 3 Adtl. Flt Builds IOC (v3) Adtl. IOC Builds GSE Sets ACD (1) E TKR (3) M Hot / Cold Plates Calibration Detector Calibration Detector Stand DAQ (2) ACD (1) Calorimeter (1) (1) IOC (v0) (1) (1) (1) Calorimeter (2) TKR (1) Test Bed DAQ (1) Test Bed Test Bed Test Bed Test Bed Test Bed Grid Support Grid Mounting Stand Calibration detector Integration Support Cart Cooling Plates Vibration Test Mount Structure T/V Test Mount Structure Hot / Cold Plates Thermal Blanket Misc. Transport Figures Cart Lifting Rigging S. Williams 5

Development & Test Legend Subsystem Product Activity EM1 Development EM1 EM1 Interface Tests EM2 Development EM2 EM2 Interface Tests A Subsystem Hardware Simulators B Qual Unit Qual Unit Calibration & Test Ground Sys Compatability Tests A Flight Unit I&T - Func, TV, Calibration and GSE Delivery Observatory Environmental Testing B FSW Testbed FSW Development Support Testbed V&V CMD, FSW, Param Uploads S. Williams 6

Deliverables Function Version Number Need Date TEM Development EM1 2 Nov-01 Subsystem I&T EM1 6 Mar-02 I&T EM1 2 Apr-03 T&DF Development EM2 1 Sep-02 FSW Tesbed EM2 1 Dec-02 Qual/Cal Unit QU 1 Apr-03 Flight Unit FU 1 Aug-03 Total Systems Engineering Model 1-10 Engineering Model 2/Qual Unit/Flight Unit - 4 S. Williams 7

Milestones PDR (Concept Review) 08/17/01 Instrument PDR 10/24/01 DAQ Engineering Model 1 Development - EM1 Delivery 11/01 Subsystem Development - EM1 deliveries 03/02 Instrument CDR 08/05/02 DAQ Engineering Model 2 Development - EM2 delivery 09/02 Flight Software Testbed Development - FSTB Delivery 12/02 Qualification Unit Delivery 05/03 Flight Unit Delivery 8/03 Transition to IOC Maintenance 10/03 Calibration Unit Beam Test 10/03 Environmental Testing 05/04 MSI&T Support 03/05 S. Williams 8

Schedule S. Williams 9

Schedule S. Williams 10

Schedule S. Williams 11

Schedule S. Williams 12

Labor Loading HEPL Staffing for IOC/ includes hiring profile of 1 FTE staff in FY02, FY03 and FY04 until stabilizing at 5 FTEs in FY04. Total staffing is approximately 2 FTEs in FY02/03 /IOC Staffing FTE 8.0 7.0 6.0 5.0 4.0 3.0 2.0 1.0 0.0 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FIscal Year Students IOC Staff /SLAC /NRL /HEPL S. Williams 13

Level 4 Budget by FY labor estimate is low and does not include configuring multiple systems S. Williams 14

Issues & Mitigations Multiplicity of systems required to support parallel development efforts Enforce commonality of basic infrastructure. Provide data distribution over ethernet to support subsystem specific and engineering data displays. Use COTS hardware and software as much as possible to control cost. KISS. Leverage RTOS interface systems development off flight software development. Leverage out-years maintenance from IOC. Initial need date of 11/01 is aggressive Begin development immediately. Leverage recent Balloon Flight development. Obtain subsystem buy-in via IPT. Trade studies delayed by Balloon Flight Perform in parallel to EM1 development S. Williams 15