Automatic concealed bollards 275 H600 and 275 H800 Control station

Similar documents
Automatic concealed bollards 275 H600 and 275 H800 with pit

Automatic hidden traffic bollards 275 H600 and 275 H800 with pit

EC DECLARATION OF CONFORMITY

Installation Manual. Swing Gate System. Leading the way...

Contents. EC DECLARATION OF CONFORMITY FOR MACHINES... p. 10. WARNINGS FOR THE INSTALLER... p. 10

EC DECLARATION OF CONFORMITY FOR MACHINES (DIRECTIVE 98/37/EC) WARNINGS FOR THE INSTALLER

EC MACHINE DIRECTIVE COMPLIANCE DECLARATION

EC MACHINE DIRECTIVE COMPLIANCE DECLARATION

EC DECLARATION OF CONFORMITY FOR MACHINES WARNINGS FOR THE INSTALLER

FORCE SPD 800/1500/2000

CE DECLARATION OF MACHINE CONFORMITY

EC DECLARATION OF CONFORMITY FOR MACHINES (DIRECTIVE 98/37/EC)

INDEX CE DECLARATION OF CONFORMITY FOR MACHINES... 2 WARNINGS FOR THE INSTALLER DESCRIPTION AND TECHNICAL SPECIFICATIONS...

Index. 4 DESCRIPTION... p. 5 5 PRELIMINARY CHECKS... p. 5 6 ASSEMBLY... p. 6

Automation Swing Gate Opener

Index. 4. DESCRIPTION... p PRELIMINARY CHECKS... p ASSEMBLY... p. 6

Index. 4. DESCRIPTION... p PRELIMINARY CHECKS... p ASSEMBLY... p. 6

IMPORTANT NOTICE FOR THE INSTALLER

Typical Installation Schematic

CE DECLARATION OF CONFORMITY OF MACHINES. Warnings for the installer General safety obligations

SLIDE NEW CONTROL BOARD

Instruction Manual for the

INSTRUCTIONS FOR INSTALLATION

IRREVERSIBLE OPERATOR FOR SWING GATES AND DOORS

UNDERGROUND OPERATOR FOR SWINGING GATES. WARNING!! Before installing, thoroughly read this manual that is an integral part of the pack

Instruction Manual for the. E-SL 1800 Series. Warning! Read all instructions before beginning installation or use of this door opener.

BARRY BARRIER GATE AUTOMATION

JOINT INSTALLATION MANUALS AND SAFETY INFORMATION

Instruction Manual for the. Heavy Duty Series Carriage Door Instructions. Warning!

Control panel installation manual for 230 V~ automation with one or two motors D5 S5 JT RF ON TC RP TR R1 OM J7. Electric lock. Flashing light.

Instruction Manual for the

Featuring. Manufactured by

BAYT 980. Oil-hydraulic OIL-HYDRAULIC BARRIER FOR TRAFFIC CONTROL INSTALLATION MANUAL. code 4425 Post with fixing base. POLO 44 - optional -

The House of Gate Automation

J275/600 HA J275/800 HA

TECHNICAL DATA HYDRAULIC UNIT

RETRACTABLE BOLLARD PILOMAT PASS PM 127/P-800 A TECHNICAL INSTRUCTIONS. Manuale tecnico PILOMAT 127P-800 A PZ.doc Pagina 1 di 22

Table of Contents. General Safety Preparation for Installation Parts List Optional Accessories Part List... 5

L /2013 rev 0 BISON 35 OTI UNIONE NAZIONALE COSTRUTTORI AUTOMATISMI PER CANCELLI, PORTE SERRANDE ED AFFINI

IMPORTANT NOTICE FOR THE INSTALLER

ALIEM USER MANUAL R. Bocconi. REV. DATE Checked and Approved R. T.

Ditec LUXO Swing gates automation (Original instruction)

Installation Manual. Door Automation. Leading the way...

Installation Manual for Heavy Duty Carriage Door Opener

INSTALLATION MANUAL FOR SWING SHUTTERS KAF212. FACE S.r.l. Viale delle Industrie, Dosson di Casier Treviso Italy

INSPECTIONS AND MAINTENANCE

Ditec BOX Balanced up and over doors

Installation and Maintenancee Manual

Instruction Manual for the. E-SC 1600 / E-SC 1602 Series. Manufactured by

BISON 20 OM BISON 25 OTI

WARNINGS FOR THE INSTALLER

NYOTA 115. Electro-mechanical sliding gate operator. Instruction manual

ACC Series Power Conditioner OPERATION & INSTALLATION MANUAL

FLÄKTGROUP PM-MOTOR WITH INTEGRATED FC 106 FREQUENCY CONVERTER

Instructions manual. Below ground oil-hydraulic operator for swinging gates. pages 17-32

Ditec EL31R Installation Manual for control panel for 24V automations with built-in radio.

BULL 424 ESA BULL 624 ESA

CE DECLARATION OF CONFORMITY FOR MACHINES

Ditec E1A. IP2045EN Technical manual. Control panel installation manual for one motor automation with built-in radio.

Ditec DOD Industrial sectional door automations

KVM 25 OPERATION MANUAL / INSTALLER

ISTRUCTION MANUAL Italian Movements Italian Movements

940SM-SMD. para la naturaleza 100% papel reciclado. ist umweltfreundlich. 100% Altpapier. papier recyclé 100% pour la nature. recycled paper 100%

SWING GATE OPENERS 24V DC GEAR MOTOR

OPERATING AND MAINTENANCE MANUAL. Primary Current Injection Test Set. 750ADM-H mk2

Ditec CUBIC Swing gates automation

L /2012 rev 0 BISON 45 OTI UNIONE NAZIONALE COSTRUTTORI AUTOMATISMI PER CANCELLI, PORTE SERRANDE ED AFFINI

PW320/PW330 USER MANUAL SWING GATE OPENERS 24V DC GEAR MOTOR FOR RESIDENTIAL. Flashing Light. Push Button. Control box. Gate 2.

GENERAL SAFETY... 3 PARTS LIST...

CE DECLARATION OF CONFORMITY INSTALLATION WARNINGS

FITTING AND CONNECTION INSTRUCTIONS

PW150/PW200 USER MANUAL SWING GATE OPENERS 24V DC GEAR MOTOR

Product Overview. Product Identification. Amps One CT Two CTs Three CTs

EC DECLARATION OF CONFORMITY

ECONOMISER SERIES E2T USER MANUAL

DOCUMENT TYPE = FITTING INSTRUCTIONS ORIGINAL LANGUAGE = ENGLISH. Maximum door weight = 40kg per leaf total system 80kg

Installation manual ASTER AUTOMATION FOR SWING GATES 11_16

L /2012 rev 0 BISON 30 OTI UNIONE NAZIONALE COSTRUTTORI AUTOMATISMI PER CANCELLI, PORTE SERRANDE ED AFFINI

Axpert-CSS AMTECH DRIVES Axpert-CSS Amtech

3 Phase Smart Controller

Mod: KLD6-12/35XLAS-N

SERIES 940. Automations for sliding doors

TITANO 400V SLIDING GATE OPENER

Whad 0.8, 1, 1.5 kva. Manuel d installation Installation manual. Part. LE05733AA-07/12-01 GF

CE DECLARATION OF CONFORMITY IMPORTANT NOTICE FOR THE INSTALLER

Installation, Operation and Maintenance Manual. EVC Controller (from February 2007)

Observe all necessary safety precautions when controlling the soft starter remotely. Alert personnel that machinery may start without warning.

PowerOhm Installation Manual for BM R Series Braking Modules

Ditec SPRINT Swing doors drive unit

AA4006 Speed Sensitive Trip Unit. User Manual

UMPETHA U / Domestic sliding gate operator by ET SYSTEMS. USER GUIDE

KV4-300 mk2. KV5-200 mk2. KV5-100T mk2. KV3-250 mk2

ADDENDUM MODEL S3 OPERATORS Models: SL/540/570/580/590 & SW420/470/490

ELECTRONIC CONTROL PANEL FOR ONE 230VAC MOTOR TECHNICAL INSTALLATION MANUAL FOR AUTOMATIC GATES

Ditec QIK80EH Electromechanical barrier. IP2085EN Technical Manual. (Original instructions)

GTS 15/25/40/50/60/75/90/120A

Power thyristor units. 460 series. Control of single-phase resistive and inductive loads. User Manual

INSTRUCTION MANUAL H WELDER INTERLOCK

SLIDE & OL USER'S AND INSTALLER'S MANUAL V1.0 REV. 06/2017

J SERIES BOLLARDS Solutions for vehicle access control and city traffic

Transcription:

Automatic concealed bollards 275 H600 and 275 H800 Control station

Technical installation manual CE Declaration Warnings for the installer Bollard electrical connection Technical specifications for control station Control station lay-out Dip-switches on control board Connection terminal boards for control boards

CE DECLARATION OF CONFORMITY FOR MACHINES (DIRECTIVE 98/37/CE) Manufacturer: FAAC S.p.A. Address: Via Benini, 1-40069 Zola Predosa BOLOGNA - ITALIA Declares that: Faac City Master and Faac City Slave equipment conform to the essential safety requirements of the following EEC directives: 73/23/EEC and subsequent amendment 93/68/EEC. 89/336/EEC and subsequent amendment 92/31/EEC and 93/68/EEC Additional information: These products underwent tests in a typical, uniform configuration (all products manufactured by FAAC S.p.A.). Bologna, 01 January 2005 The Managing Director A. Bassi

WARNINGS FOR THE INSTALLER - GENERAL SAFETY OBLIGATIONS 1 IMPORTANT! To ensure the safety of people, it is important that all the instructions be carefully observed. Incorrect installation or incorrect use of the product could cause serious harm to people. 2 Carefully read the instructions before beginning to install the product. 3 Packing materials (plastic, polystyrene, etc.) must not be left within the reach of children, because these materials are potential danger sources. 14 Make sure that the earthing system is workmanlike built and connect the metal parts to it. 15 The automated system consists of an intrinsic anti-crushing safety device controlling the torque. However, you must check its action threshold as mentioned in the Regulations in point 10. 16 Safety devices (EN 12978 standard) protect possible danger areas against Mechanical movement risks. e.g. crushing, carrying away and shearing. 4 Keep the instructions for future reference. 17 Use of at least one warning light is recommended for every system (e.g. a built-in flashing light on the bollard head), a warning sign, in addition to the devices mentioned in point "16". 5 This product was designed and built exclusively for the use indicated in this documentation. Any other use not expressly indicated could compromise the integrity of the product and/or be a source of danger. 6 FAAC S.p.A. declines any responsibility due to improper use or use other than the use for which the automated system is intended. 7 Do not install the equipment in an explosive atmosphere. the presence of gas or inflammable fumes is a serious danger to safety. 8 For non-eu countries, to achieve an adequate safety level, the above mentioned standards must be observed in addition to the national standard references. 9 FAAC S.p.A. is not responsible for the non-observance of good workmanship in installing FAAC CITY products and the relevant accessories, or for any deformation which may occur through use. 10 The installation must be carried out by observing the current regulations in force. 11 Before attempting any action on the system, cut out the electrical power supply. 12 Install an all-pole switch on the electricity supply line for the automated system, with contact opening distance of 3 mm or more. We advise you to use a 6A differential thermal breaker with all-pole switching. 13 Make sure that a differential switch with a threshold of 0.03A is installed upstream of the system. 18 For maintenance, strictly use original FAAC S.p.A. parts. 19 FAAC S.p.A. declines all responsibility on the safety and efficient operation of the automated system, if system components not produced by FAAC S.p.A. are used. 20 Do not in any way modify the components of the FAAC CITY automated system. 21 The installer must supply to the user Customer, all the information about the manual lowering of the bollard in case of an emergency, and must hand over to the System User the warning handbook which accompanies the product. 22 Do not allow children or persons to stay near the bollard, especially while it is in operation. 23 Keep radio controls or other pulse generators away from children, to prevent the automated system from being activated involuntarily. 24 The FAAC CITY bollard must be transited over only when the device is completely lowered. 25 The User must not in any way attempt to repair or to take direct action and must contact qualified authorised personnel only. 26 Anything not expressly specified in these instructions is not permitted.

TECHNICAL SPECIFICATIONS FOR CONTROL STATION Electronic control circuit A microprocessor with specific software for controlling FAAC CITY bollards Enclosure for control station Wall fitting Dimensions of enclosures According to system configuration Protection class IP 55 Operating temperature -15 C 70 C Control station power supply 6/-10% 50Hz Protective switch (not supplied) Differential thermal breaker 1P N 6 A 16 A - 30 ma 6 KA Service transformer 230/24Vac - 100 VA Maximum number of FAAC CITIES Max 10 FAAC CITIES with simultaneous connectable to the control station movement - the 1 st FAAC CITY is connected to the master unit -- the others are connected to additional slave units - the enclosure dimension depends on the quantity of FAAC CITIES WALL FITTING ENCLOSURES FOR STATIONS CONTROLLING THE MOVEMENT OF FAAC CITY BOLLARDS Dimensions L x H x D Material System configuration 300 X 380 X 160 GW PLAST 120 C - For basic system with 1 FAAC CITY 308 x 460 x 160 GW PLAST 120 C - For system with 1 accessory FAAC CITY - For basic system with 2 FAAC CITIES 405 X 650 X 250 POLYESTER - For system with 3 accessory FAAC CITIES - For basic system with 5 FAAC CITIES 515 X 650 X 250 POLYESTER - For system with 5 accessory FAAC CITIES - For basic system with 8 FAAC CITIES

LAY-OUT OF FAAC CITY MASTER AND FAAC CITY SLAVE EQUIPMENT Lay-outs of the Master and Slave equipment follow, with an indication of the function of the signalling LEDs and of the protective fuses. L1 - Pressure Sensor Input L2 L3 - Out Acustic Bollard L4 - Out Bollard (mobile) L5 - Out Bollard (fix) L6 - Out Closed (up) L7 - Out Solenoid Valve L8 - Out Opened (down) L9 - Out Running L10- Out Green Traffic Lights L11 - (Out) 12V d.c. OK L12 - (Out) 24V d.c. OK L13- Start Input L14 - Detector Input PF1 - Transformer Protection PF2- Clock Protection PF3- Traffic Lights Protection PF4- Solenoid Valve Protection PF5- Aux Protection PF6- Aux Protection 24V START BUTTON ELECTRONIC CIRCUIT DIP-SWITCH FUNCTIONS Master equipment - Lay-out and components

Master/Slave Slave/Slave Connection L1 L2 L3 PF1 PF2 - Pressure Sensor Input - Opening Limit Switch Input - (Out) 24V c.c. OK - AUX. Protection - Transformer Protection Slave/Slave Connection Slave equipment - Lay-out and components

PR POWER SUPPLY FOR FAAC CITY MASTER AND FAAC CITY SLAVE EQUIPMENT The following are lay-outs of power supply connection to the Master board and to the Master board with one or more Slaves connected in cascade mode. The transformers are usually connected in the factory. Note: FAAC Cities connected to the Slave boards perform the same movements of the FAAC City connected to the Master board. If it is necessary to have different movements performed by various bollards, a Master board for every type of movement to be controlled must be installed. ac Line C6 Id 30mA 54 53 55 56 57 58 59 230 V Prearrangement N.C. Optional Emergency Button Trasformer 100 VA G R G R COM NO NC POWER STOP 52 51 50 49 48 47 46 45 44 43 42 41 40 1AT 24 V 16 V 0 V 12V 0 12V A B C 0V 12 24 24~ 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 5AT 1AT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 A B C M COM Faac City Connection 20 Prearrangement N.C. Optional Induttive Detector START AUT IN LOOP PR1 PR2 1 2 3 4 5 Master equipment - Power supply

100 VA B PR 54 53 55 56 57 58 59 POWER 52 51 1AT STOP 50 49 ac Line Prearrangement N.C. Optional Emergency Button COM NO NC 48 47 46 45 C10 Id 30mA 230 V Transformer G R G R 12V 012V A B C 0V 12 24 24~ 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 5AT 1AT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 A B C M PR COM Faac City 1 connection 21 20 START Prearrangement N.C. Optional Induttive Detector AUT IN LOOP PR1 PR2 1 2 3 4 5 A 28 C 12V 0 12V 27 26 25 24 23 22 21 20 19 18 5AT L3 L1 L2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 17 M A B C COM 15 Faac City 2 connection Master and Slave equipment - Power supply

100 VA A B A PR A B PR 54 53 55 56 57 58 59 POWER 52 51 1AT STOP 50 49 ac Line 230 V Prearrangement N.C. Optional Emergency Button Trasformer COM NO NC G R G R 48 47 46 45 44 43 42 41 40 C10 24 V 16 V 0 V Id 30mA Prearrangement N.C. Optional Induttive Detector 12V 012V A B C 0V 12 24 24~ START AUT IN LOOP PR1 PR2 12V 0 12V A B C C 12V 0 12V 28 27 26 25 24 23 22 21 20 19 18 28 27 26 25 24 23 22 21 20 19 18 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 1 2 3 4 5 5AT 5AT 5AT 1AT L3 L3 L1 L2 L1 L2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 17 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 A B C M PR COM B C COM C M COM M 15 Faac City 3 Connection Faac City 2 Connection Faac City 1 Connection Master and 2 Slave equipment - Power supply

CONNECTION: BOLLARD TO CONTROL UNIT The following lay-out shows the colours of the wires of the connection cable supplied with the bollard, and how they are connected to the FAAC City Master equipment. 4 8 7 CABLE 4G1 4G1,5 SHIELDED CABLE 6 5 4 1-6 13 3 16 4 15 2 CABLE 5G0,5 5G0,5 SHIELDED CABLE 14 11 PR CABLE 2x1 12 9 CABLE 2x1 10 1 CABLE 2x1 6G0,7 SHIELDED CABLE Control board terminals 2 POWER CONNECTION - MODEL 275

FUNCTIONS OF DIP-SWITCHES OF FAAC CITY MASTER EQUIPMENT Dip-switch No. 1 on the FAAC City Master board enables you to select the system's function logic (automatic or semi-automatic). Dip-switches 2, 3, 4, and 5 were fitted to facilitate diagnostic operations during repair/maintenance of the systems. In fact, if faults occur, instead of disconnecting the wires from the terminal boards, you can exclude part of the circuits by suitably positioning the dip-switches. DIP-SWITCH IN OFF POSITION DS No DIP-SWITCH IN ON POSITION AUTOMATIC RISE ENABLED 1 AUTOMATIC RISE DISABLED CONTROLS ENABLED 2 CONTROLS DISABLED SAFETY DEVICES ENABLED 3 SAFETY DEVICES DISABLED RISE TRAVEL-LIMIT PRESSURE SWITCH 4 RISE TRAVEL-LIMIT PRESSURE SWITCH ENABLED DISABLED REVERSING PRESSURE SWITCH ENABLED 5 REVERSING PRESSURE SWITCH DISABLED DIP SWITCH 1 position to be defined depending on the system's use and configuration (if the safety devices are not used, it must be positioned to ON): OFF Position = AUTOMATIC RISE ENABLED: a bollard, which is normally in high position, moves to low position following a command. When the vehicle has transited through the controlled gate (and therefore trips and releases the safety devices), the bollard returns to its high position. If the vehicle does not transit, the bollard automatically returns to high position after 30". If the opening command is maintained, the bollard stays in low position until release (timer function). ON Position = AUTOMATIC RISE DISABLED: following a first command, the bollard moves from high position to low position. Following another command, it returns to high position.

DIP SWITCH 2 Default position: OFF OFF Position = CONTROLS ENABLED: the bollard movement controls connected to terminals 24/25 26/27 58/59 are in operation. ON Position = CONTROLS DISABLED: the bollard movement controls connected to terminals 24/25 26/27 58/59 are disabled. If the FAAC CITY bollard does not rise, you may temporarily disable the external control devices and use the push-button on the board (START) to carry out the test. Default position: OFF DIP SWITCH 3: OFF Position = SAFETY DEVICES ENABLED: the inputs for the safety devices (terminals 20/21) are enabled. If no safety devices are installed, jumper connect terminals 20 and 21 to each other. ON Position = SAFETY DEVICES DISABLED: the input for the safety devices (terminals 20/21) is disabled. If the FAAC CITY bollard does not rise, you may temporarily disable the safety devices to check if they are to blame for the fault. Note: for the installation of metal mass detection devices, consult the bollard instructions and those for the individual devices. Default position: OFF DIP SWITCH 4: OFF Position = TRAVEL LIMIT RISE PRESSURE SWITCH ENABLED: during the final lifting stage, the pressure switch symbol is used as a rise limit-switch. ON Position = TRAVEL LIMIT RISE PRESSURE SWITCH DISABLED: the function described above is disabled. The rise command is maintained during time out (it cannot be modified)

DIP SWITCH 5: Default position OFF OFF Position = REVERSING PRESSURE SWITCH ENABLED: during the lifting stage, if a weight of over 50 Kg is detected, this trips the pressure switch, which is used as a safety device to stop the bollard and return it to its low position. ON Position = REVERSING PRESSURE SWITCH DISABLED: the function described above is disabled. If the FAAC CITY bollard does not rise or, if during the rise stage, the bollard re-descends for no apparent reason, you may temporarily exclude this function to check if the pressure switch is to blame for the fault.

MASTER BOARD CONNECTION TERMINAL BOARD Terminals 1-2-3= passing connection to 33-32-31 with protective fuse Terminals 4-5-6-7-8 = connection for hydraulic power pack Terminals 9-10 = Connection for automatic lowering device in the event of a power cut Terminals 11-12 = connection to safety pressure switch Terminal 13 = common contact for limit-switch - buzzer - flashing light Terminal 14 = connection to FAAC CITY low limit-switch Terminal 15 = connection for FAAC CITY intermittent buzzer Terminal 16 = connection for flashing light incorporated into the head of FAAC CITY Terminal 17 = common contact for limit-switch - buzzer - flashing light Terminals 18-19 = connection for flashing lighted sign (24 Vac intermittent output) Terminals 20-21-22-23 = connection for safety inductive detector Terminals 24-25 = lowering command input Terminals 26-27-28-29-30= connection for lowering command device Terminals 31-32-33= passing connection to 3-2-1 with protective fuse Terminals 34-35-36-37-38-39= connection for service transformer Terminals 40-41-42 = connection to 'traffic lights' 1 Terminals 43-44-45 = connection to 'traffic lights' 2 Terminals 46-47-48= 'traffic lights' remote repetition (freed contact) Terminals 49-50 = connection for emergency lowering push-button Terminals 51-52= connection to electronic circuit Terminal 53 = not used Terminal 54 = earth connection Terminals 55-56-57-58-59 = connection for weekly/annual clock

SLAVE BOARD CONNECTION TERMINAL BOARD Terminals 1-2-3= passing connection to 28-27-26 with protective fuse Terminals 4-5-6-7-8 = connection for hydraulic power pack Terminals 9-10 = connection for automatic lowering in the event of a power cut Terminals 11-12 = connection to safety pressure switch Terminal 13 = common contact for limit-switch - buzzer - FAAC CITY flashing light Terminal 14 = connection to FAAC CITY low limit-switch Terminal 15 = connection for FAAC CITY intermittent buzzer Terminal 16 = connection for flashing light incorporated into the head of FAAC CITY Terminal 17 = common contact for limit-switch - buzzer - FAAC CITY flashing light Terminals 18-19-20 = connection to service transformer Terminal 21 = not used Terminals 22-23= connection to electronic circuit Terminal 24 = not used Terminal 25 = earth connection Terminals 26-27-28= passing connection to 3-2-1 with (protective fuse)

FAAC S.p.A. Via Benini, 1 40069 Zola Predosa (BO) - ITALIA Tel.: 051/61724 - Fax: 051/758518 www.faac.it Distributor s Stamp: The descriptions and illustrations contained in the present manual are not binding. FAAC reserves the right, whilst leaving the main features of the equipments unaltered, to undertake any modifications it holds necessary for either technical or commercial reasons, at any time and without revising the present publication. 732868 rev. A