Maintenance Information

Similar documents
Maintenance Information

Safe Operating Practices & Maintenance Manual

Product Information Z-Rail Pneumatic Air Supply Kit Save These Instructions Form MHD56409 Edition 1 August Ingersoll Rand Company

PARTS, OPERATION AND MAINTENANCE MANUAL for JIB CRANE MODELS 700J 800J 900J

Maintenance Information

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012

Racing Jack Max. Capacity: 3,000 lbs. (1,361 kg)

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

PO Box 645, Stockton, Missouri, FAX superiorgearbox.com W D0446-A 4/1/05 1

Provided by: Operating, Maintenance & Parts Manual

ASSEMBLY & OPERATION INSTRUCTION MANUAL

Exhaust System Installation for Corvette, C6 or Z06 PN s , 11811, 11812, 11814, 11815, 11816, 11917

Maintenance Information

A. Adapter A metal component that fastens the caliper to the knuckle. Some brake systems do not use adapters.

PO Box 645, Stockton, Missouri, FAX superiorgearbox.com

X-Tractor Series. Cutters INSTRUCTION MANUAL

TC Series Cooling Systems

CHESTER HOIST AIR LOW HEADROOM CHAIN HOISTS AL-680 SECTION A

Maintenance Information

HEAVY DUTY TROLLEY JACK. Operation Manual

By installing your Borla Performance Exhaust System, you indicate that you have read this document and you agree with the terms stated below.

ACI Hoist & Crane. Festoon System. 689 S.W. 7th Terrace Dania, FL (954) Fax (954) Toll Free A-HOIST ( )

Product Parts Information. Manual Chain Hoist. KM Series. Save These Instructions. Form Edition 2 December Ingersoll-Rand, plc

Responsible Unit: Facilities Management

Lincoln Hoist. Web Hoist Operating Manual. Lincoln Hoist

Hydraulic Immediate Need Power Pack

Air Assist Bottle Jack Max. Capacity: 12 Tons (4313C) & 20 Tons (4321C) Operating Range: psi

Thank you for purchasing a Borla Performance Cat-Back Exhaust System.

BOLT-ON AND WELD-ON FLUSH FLOOR SLIDEOUT SYSTEMS OPERATION AND SERVICE MANUAL

HYDRAULIC PALLET TRUCK. MODEL No: PTE550 PART Nos OPERATION & MAINTENANCE INSTRUCTIONS

HOIST ARMY TYPE HOIST IMPORTANT

Bray/ VAAS Slurry Series Knife Gate Valve 760/762/765/766/767/768 Series Operation and Maintenance Manual

UNPACKING SAFETY GUIDELINES GENERAL SAFETY INFORMATION. Operating Instructions & Maintenance Manual

On-A-Roll Lifter Instruction Manual for Standard Models Read Before Use!

Jet Fans. Instruction Manual READ AND SAVE THESE INSTRUCTIONS WARRANTY

Polypropylene Piston Drum Pumps

Installation for Chevrolet Silverado/GMC Sierra PN s ,

Hydraulic PTO Flow Device

Installation for Chevrolet Malibu 2.0L Turbo PN-11936

Cooling System. Table of Contents

Thank you for purchasing a Borla Performance Cat-Back Exhaust System.

HYDRAULIC PALLET TRUCK MODEL NO: PT540M/BM/CM & PT685BM/CM PART NO: , , , ,

82V LITHIUM-ION BATTERY CHARGER GC 400

Ford Mustang GT Long Tube Header Installation

Hydraulic Hand Pallet Trucks

Embedded Rack Slide-out System

Maintenance Information

LNG Screw Down Non-Return Valve Installation, Operation and Maintenance Manual

Snapshot LX5 USER MANUAL. OK on Dimmer Outdoor OK Sound Activated DMX512 Master/Slave 115V/230V Switch Replaceable Fuse User Serviceable Duty Cycle

2,000 Lbs Heavy-Duty Engine Stand

Please take time to read and understand the following

Thank you for purchasing a Borla Performance Rear Section Exhaust System.

Before installing your Roush Performance Product(s), read through the entire installation procedure and check to make sure all items are present.

RolsplicerTM. Maintenance Manual And Illustrated Parts List

LED Pinspot 2. Snapshot. User Manual

Package Contents Part A (3) I-Beam (1) Base (2) Other parts

Routine Compressor Maintenance

Thank you for purchasing a Borla Performance Cat-Back Exhaust System.

LED Pinspot 2. Snapshot. User Manual

Forklift Jack. Scissors Max. Capacity: 4 ton Scissors Low Height: 2-5/32 in. (55 mm) Scissors High Height: 17-29/32 in. (455 mm)

MODEL L401 & L404 Four-Post Lift

Maintenance Information

INSTALLATION AND MAINTENANCE MANUAL

Sofa Slideout Assembly OWNER'S MANUAL. Rev: Page 1 Sofa Slideout Owners Manual

Thank you for purchasing a Borla Performance Cat-Back Exhaust System.

Thank you for purchasing a Borla Performance Cat-Back Exhaust System.

Air-Assist Service Jack Max. Capacity: 10 Tons

Maintenance Information

Installation, Operation, & Maintenance Manual

Long Tube Header Installation For Ford Mustang GT

Installation Guide for Chevrolet Camaro ZL1 PNs ,

1000-lb Hydraulic Truck Crane

HYDRAULIC PALLET TRUCKS

Installation for Honda Accord PN s 11840, 11853, 11949

Installation Instructions for Scion FR-S, Toyota FT86, or Subaru BRZ PN-11839, 11937

Exhaust System Installation for Audi S4, S5 & S5 Sportback PNs ,

SPECIFICATIONS Horsepower: 1.5 HP Running Maximum PSI: 125 PSI Tank Capacity: 15 Gallons CFM: 6 40 PSI 5 90 PSI

Installation for Dodge Challenger & Charger HellCat PN s , , , , , , ,

WALKIE HIGH LIFT HYDRAULIC SYSTEM

Convertible - Rated 3 4-Ton /2-Ton Nylon Strap Hoists Refer to any questions about the use, application, repair or testing of this hoist to:

2000-LB. ENGINE STAND

Lineman s Hoist. Operating, Maintenance & Parts Manual. Follow all instructions and warnings for LMST680-2

Thank you for purchasing a Borla Performance Cat-Back Exhaust System.

Telescoping. Rams INSTRUCTION MANUAL

OPERATOR S MANUAL Model 60010

Product Parts Information

TXJ0500/RR500 1,000-lbs. Truck Bed Roller Dolly

2000 lb Adjustable Gantry Crane

Parallel Lift Rack MODEL RM

OPERATIONS MANUAL LEVER CHAIN HOIST

Installation, Operation and Maintenance Manual

Service Instructions. SYNTRON Rotary Vibrator Screen

Thank you for purchasing a Borla Performance Cat-Back Exhaust System.

End Trucks 325 Series

ETA-5 RAIL SYSTEMS. , Unified Industries, Inc. All Rights Reserved.

Thank you for purchasing a Borla Performance Stainless Steel Header.

Maintenance Information

LC I LIPPERT COMPONENTS HYDRAULIC FULL WALL SLIDEOUT SYSTEM OPERATION AND SERVICE MANUAL

User s Manual. Table of Contents CAUTION. Model No. MTSC11700

50 TONNE HYDRAULIC PRESS MODEL NO: CSA50FP

Transcription:

(Dwg. MHP1539) 16600470 Edition 1 May 2007 Z Rail Aluminum and Steel Overhead Rail System Maintenance Information Save these Instructions

The minimum maintenance required for a rail system requires inspection of suspension hardware and all bolted connections. CAUTION Any operating problems such as a change in rolling effort or unusual noises must be identified and corrected immediately. Retighten all bolt connections (suspension hardware, trolleys attaching hardware, etc.) two weeks after installation and again after two months of operation. The maintenance schedule below is provided to minimize problems and identify component wear. This chart should be used based on system use and/or local requirements for safe operation. This schedule does not contain daily inspections that may be required by local regulations. If there are problems with the rail system (worn or damaged components) and replacement is required, refer to appropriate parts list to order replacements. Some components can only be ordered as complete assemblies. If parts are worn or damaged, the complete assembly must be replaced, not just the worn parts. Trolley wheels have anti-friction bearings which are lubricated for life and only require replacement parts under extreme conditions. If these wheels must be replaced, they can be ordered separately - there is no need to replace the entire assembly. MAINTENANCE INFORMATION WARNING Never perform maintenance on the system while it supports a load. CAUTION During maintenance, tag system: CAUTION - DO NOT OPERATE - EQUIPMENT UNDER REPAIR. Do not attempt to repair system parts. Replace part or consult an authorized Ingersoll Rand service center. Do not re-use locknuts, install new locknuts. Only allow personnel trained in operation and maintenance of the system to perform service. NOTICE Visually inspect system before each shift for wear or damage. Advise supervisor or maintenance personnel, according to company policy or procedure, of any needed maintenance. Replace all damaged system components. Record all inspection, cleaning, maintenance and repair. After performing maintenance, test system to its rated capacity before returning to service. Component Inspect For Maintenance Procedure 6 months Interval 12 months General condition (roll resistance, rough Clean and realign system Complete rail system X operation). components. Loose mountings, wear or damage. Tighten or replace mountings. X Rail system suspension Loose bolted connections. Tighten bolts. X Loose bolted clamp connections. Tighten clamp bolts. X Loose bolted rail clamping connections. Tighten connections. X Runway rails and bridge rails Suspension wear. Replace worn components. X Loose connections. Tighten connections. X Loose bolted connections. Tighten splice and end stop bolts. X Rail system splices and end stops Improper joint alignment. Realign joints. X CLEANING It is important to schedule a periodic cleaning of the Overhead Rail System and its parts. Frequency of cleaning cycles will depend on the use of the system, the personnel operating the system, and the environment the system is installed in. Protecting the system and its surfaces from abuse, wear, decay, or other harm, will improve its appearance and service life. In very harsh environments moisture and contaminants can quickly destroy the integrity of the system. Although the system is made mostly of precision 6005 class T-5 strength corrosion resistant aluminum and high impact flair resistant nylon, moisture, humidity, and chemicals in time take their toll. The maintenance and preservation of the bridges, rails and suspension devices are just as necessary as the maintenance of any equipment whether it be electrical or mechanical. Use the following procedures to clean the components of the Overhead Rail System. 1. Clean all hanger assemblies with LUBRI-LINK-GREEN or spray-on WD40 and dry with compressed air. 2. Clean all trucks and trolleys using suitable cleaner. Dry using low-pressure, filtered, compressed air. 3. Remove accumulated dirt, sediment, and corrosion on the metal plates, bushings, rollers and pins. 4. Clean or replace air filter if used with the system. WARNING Solvents and certain cleaning solutions may be hazardous to your health. Beware of mixing cleaners or solvents and the vapors they produce. Use adequate ventilation. Wear protective clothing, goggles, gloves and other appropriate safety wear. 2 16600470_ed1

CAUTION Clean up all excess cleaning fluids or spills immediately after they occur. NOTICE During routine cleaning always check for worn, damaged or broken parts needing replacement. CAUTION If stainless steel parts or rail are stored with other types of metal the properties of the stainless steel are subject to change and could compromise the integrity of the rail. Aluminum and Steel Rail System Store in clean and dry environment to avoid corrosion. Storage Stainless Steel Rail System Storage for the stainless steel rail system should be in clean and dry environment. This should not be stored with any other type of metals. GENERAL SYSTEM DISASSEMBLY Never disassemble components or assemblies further than necessary to accomplish the needed repair. If excess force is used, a good part can be damaged during the course of disassembly. Do not use heat to free parts unless they are already worn or damaged beyond repair, and no additional damage will occur to other parts. As a general rule the channel that makes up the rail and bridge sections should be removed by disassembling the separate pieces at the spliced joints. In instances where the rail or bridge sections must be removed in complete assemblies, use a safety cable or chain to restrict the distance a section may fall when removed. Review all safety procedures listed in the preceding chapters to familiarize yourself with safety issues and precautions. For your safety follow these steps and use due care and caution in the disassembly of the system. CAUTION Never disassemble the system alone. Always have someone help you. 1. Shut off and bleed down air supply. 2. Disconnect the air supply from the bridge air stanchion and runway air regulator. 3. Remove one end stop from the bridge section. 4. Remove the festooning, hoist, positioner or lifting device from the bridge section. 5. Remove an end stop from one end of each runway. 6. Remove the bridge section and festooning trolleys. 7. Remove safety cables from the runways. 8. Loosen mounting tabs on I-Beam clamp. 9. Remove rail section. 10. Repeat for opposite side. TROUBLESHOOTING This section provides the basic troubleshooting information. Specific causes to problems are best identified by through inspections performed by personnel instructed in safety, operation and maintenance of this equipment. The chart below provides a brief guide to common rail symptoms, probable causes and remedies. Symptom Cause Remedy Change in rolling effort or erratic operation. Unusual noises. Load creeping. Hoist, positioner or handling device malfunctioning. Dirt or obstruction in rail. Damaged or bent rail. Misaligned bridge or runway. Worn or damaged trolley wheels and/or guide rollers. Spliced sections misaligned. Broken guide roller and/or wheel. Dirt or obstruction in rail. Runway or bridge not level. Runway or bridge overloaded. Leaking or damaged air hose, fittings or electrical cable. Clean all parts and inspect for wear. Inspect all parts and replace those damaged. Determine cause of damage prior to operation. Check for loose or broken fasteners. Tighten if loose or replace if broken. Check alignment. Inspect wheels and rollers. Replace damaged parts. Ensure inside running surfaces at the splice are flush and aligned. Inspect and replace damaged parts. Clean all parts and inspect for wear. Level components to specifications. Reduce load to within rated capacity. Check and repair leaks. Tighten fittings if loose. Replace electrical cable. Refer to hoist, positioner or handling device service manual for additional repair instructions. 16600470_ed1 3

INSPECTION RECORD Ingersoll Rand Z Rail Overhead Rail System Inspection Form Item No. Description Quantity Good condition Fair condition Poor condition Return to Service Center for repair Destroy or recycle If the equipment condition is due to normal wear and tear, state so; if not, state circumstances. Required Action: Company: Operator Date: Inspector Date: Supervisor Date: Clean and inspect as per maintenance schedule. Clean and inspect as per maintenance schedule. Halt operation. Remove system from service and repair or replace affected parts. Tag system: Caution. Do not use. System under repair. Send parts to authorized repair center. Clean parts and destroy, or recycle. Replace parts. Department: Date: Time: This page may be photocopied and used by inspectors or maintenance personnel. 4 16600470_ed1

Overhead Rail System Safety Information Manual 16600454. Overhead Rail System Product Information Manual 71341101. Overhead Rail System Parts Information Manual 16600462. RELATED DOCUMENTS 16600470_ed1 5

NOTES

NOTES

www.irtools.com 2007 Ingersoll Rand Company