Installer: START HERE

Similar documents
User s Guide. EZ-Bar Livestock Scale WEIGH BARS AND DIGITAL INDICATOR. WB-40 Weigh Bars TS-700 WB Digital Indicator. Guide version 1.

UNPACK AND IDENTIFY THE FOLLOWING PARTS.

Summit 3000 Low-Profile Floor Scale. Installation Manual

McDonalds Installation Guide

SUT-250-S (These instructions are used for SUT-250-SCLC also)

AL625 & AL625HD INSTALLATION & OWNER S MANUAL

accqpulse Velocity Profiler Sensor Installation Guide

INFINITY MULTA SERIES

Lankota, INC. LAN Installation Instructions

2030 OUTLAW SPRINTER HARDWARE I.D. BUTTON HD. CAP SCREW BAG H1 CHASSIS KIT BAG H3 HARDWARE BAG L2 REAR AXLE PARTS BAG L4 FRONT TIRES

Safe-T-element Installation Instructions

INSTALLATION INSTRUCTIONS

Woda-Sci System Installation Parts Set

Part # Mopar LX Level 1 Air Suspension System

INSTALLATION INSTRUCTIONS

Automatic Transfer Switch FT-10 Network Control Communications Module (CCM-T) Kit

Part # Galaxie Level 1 Complete Air Suspension System

Pole Mount COD Installations (PMCOD)

TOYOTA FJ CRUISER 2007 AUXILIARY LIGHTS Preparation

48in Sbach-342. Instruction Manual. Specifications

Model: PSB100. Rear Parking Sensor System. Installation Manual TABLE OF CONTENTS

LED Downlight Ceiling Fixtures

INSTALLATION INSTRUCTIONS

PROVEX Installation Guide. Version 1.0

INSTALLATION INSTRUCTIONS

920i Programmable HMI Indicator/Controller Deep Enclosure Installation Instructions PNs 82455, 82456, 82457, 82458, 82459, 82460

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks INSTALLATION GUIDE

2015+ S550 MUSTANG Battery Relocation Kit WR-BTRYRELOKIT-LH WR-BTRYRELOKIT-RH

Procenter Delivery, Console Mounted on an Elevance Chair Installation Guide

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks INSTALLATION GUIDE

WPS-104 Heater. Installation Instructions

RoughDeck Low Profile Floor Scale SS, HE, HP*, HP-H*, HC* and ALTRALITE*

TOYOTA AVALON EC REARVIEW MIRROR

Part # Lincoln Level 2 Air Suspension Package

Installation Instructions: HYPERION R-Lite SYSTEM

SUT-450-I ASSEMBLY REQUIREMENTS

JMCB-2003-CASPY. Complete Kit For CAN-AM Spyder

UNPACK AND IDENTIFY THE FOLLOWING PARTS.

Operating Guide TSFS-300 Air Parcel Conveyor Scale With automatic totalizing

INSTALLATION INSTRUCTIONS

HydroCycle Vertical NFT Lettuce & Herb Systems

TOYOTA YARIS (HB) CARGO NET Preparation

Electric Vehicle Charging Station

SCION xd INTERIOR LIGHTING UPGRADE Preparation

IceZone -X Installation Instructions for Scotsman HID312 Meridian Ice and Water Dispensers

Sport Clips Central Vacuum

INSTALLATION INSTRUCTIONS TRAILER HITCH MAIN HARNESS KIT

INSTALLATION AND OWNER S MANUAL Side Illumination Lights Z5150 for use with K 1200 LT

IL500 Sierra Inclined Platform Lift

Table of Contents. CLS-420 Wireless Version. CLS-920i Wired Version. CLS-920i Wireless Version. lift truck CLS-420 Wired Version

Part # C-10 Level 1 Air Suspension System

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

CUMMINS 6.7L EXHAUST BRAKE PRXB EXHAUST BRAKE KIT FOR 2007½-2015 TRUCKS EQUIPPED WITH 6.7L CUMMINS ISB DIESEL ENGINES. C Kit C Kit

Instruction Manual. Specification:

INSTALLATION INSTRUCTIONS

Switch and Fuse Installation... 1 Awning LED Layouts... 2 Small Box and Marquee LED Layouts... 2 Big Box LED Layouts... 3

Air Conditioner for M915 A0/A1 Truck

INSTALLATION INSTRUCTIONS

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks INSTALLATION GUIDE

REARSIGHT PART NUMBER: Code: MC1 RECOMMENDED SEQUENCE OF APPLICATION

DeckHand TM. Portable Floor Scale. Installation and Service Manual

TOYOTA im INTERIOR LIGHT KIT Preparation

Model HT Microplate Orbital Shaker With Manual Adjustment Knobs. Product Manual

Build an electric Scoot-car

OWNERS MANUAL. ULTRA Single-Station Strength G7-S34 Seated Row

Adding Additional Vacuum Circuits

ELECTRO-MECH SCOREBOARD CO.

GENUINE PARTS INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Table of Contents. Tail Wheel Assembly Installation.. page 01. Stabilizer Installation.. page 02. Fin Installation.. page 03

306 WEST OVERLY DRIVE LAKE DALLAS, TX

Conflicts Note: Toyota Tacoma 2015 LED Bed Lights Preparation. Part Number: Accessory Code: BU1000

Preparation Part Number: PT Kit Contents Item # Quantity Reqd. Description 1 1 Rear Spoiler 2 1 Hardware Kit. Hardware Bag Contents

Table of Contents HAVE A QUESTION? WE RE HERE TO HELP. CALL US AT OR VISIT JACOINC.COM/SUPPORT

L5000 Plus. Installation & Setup Guide

If technical support is required, please contact Advent Technical Support at

INSTALLATION INSTRUCTIONS

***THE OWNER'S MANUAL MUST BE GIVEN TO THE END USE CUSTOMER AFTER COMPLETING THE INSTALLATION.***

OWNERS MANUAL. ULTRA Single-Station Strength G7-S13 Chest Press

2005+ Drag Race Roll Bar (Mm5RB-20)

Trimline Car and Sling

riderite.com INSTALLATION INSTRUCTIONS

General Information. Notations and Conventions. Compatibility Check. Kit Description. Call-Outs. Part Lists Great Plains Manufacturing, Inc.

INSTALLATION INSTRUCTIONS

Model Description Vac. Max rating Pedestal Only: 36 Utility Pedestal W/O Disconnect General Duty Series:

2005+ Roll Bar (Mm5RB-20.1 to -20.6) Recommended Center punch 1/8" pilot drill 1-3/4" Hole saw 2" Hole saw

Z1 Motorsports 370Z/G37 Oil Cooler Kit Installation Manual

Series 1000 Room Temperature Sensors, 1K Ω Platinum (375α) RTD (MBC/RBC/MEC/UC)

Inteli-Lift GEN II DUMBWAITER

\\,, I l- m.. -=_!:~ /20/93 G W-W/O PS SERIES FORD V8-351, :-- REV B FISHER ENGINEERING, ROCKLAD, ME HPS i '&.

BEFORE BEGINNING INSTALLATION

Gentex Homelink Installation Instructions

TOYOTA FJ CRUISER AIR DAM/LIGHT BAR Preparation

M9/D (-020 thru -022) M11/D (-020 thru -022)

Part # Series RidePro 4 Way Compressor System 3 Gallon Tank Analog Gauges

WARNING. When installed in accordance with these instructions, the front protection bar does not affect operation of the SRS airbag.

TOYOTA RAV4/HV INTERIOR LIGHT KIT Preparation

~~ / ~ ~ ~) \.~ I 00 \ 'i \ ~/~ \ vi 'I I.. iii I ~ \ ~ i ~ I. \ \ i / I \ III / 1/ " ~ ~ ~,I. /1 &) \\:~.- , / . \ /,/ '\.

Transcription:

accurate s around the world Installer: START HERE in ce 189 7 Model 600LP NTEP Cert # 03-099 Baggage Scale Installation Guide For Southwest Airlines Check-in Counters Document No.BSIG_SW_020405

PLAN VIEW Bag well with stainless steel surface Customer s counter top Agent s Computer (typical) Agent s counter top Base & platform ELEVATION VIEW A Control Module VIEW A Keypad Display Displays Base & platform STYLE VARIATION OF BAG WELL SIDE WALL Side View OPTIONAL KEYPAD LOCATION Keypad Display Display Control Module Keypad Customer Area 1

MATERIALS AND TOOLS REQUIRED BY INSTALLER Materials Required: NOTE: ALL MATERIALS ARE TO BE ACQUIRED AT HOME DEPOT Electrical Department Materials (located in the wire area) 1) Conduit Canal - CHANNEL - plastic with surface mount adhesive snap close after installation Barcode # 86698 84121 2) Flat Elbow RIGHT ANGLE Barcode # 86698 84122 3) Mounting base for tie wraps - with surface mount adhesive Barcode# 2849 151100 4) Tie wraps, thin NOTE: all tie wraps must be trimmed after mounting and turned NO SHARP EDGES Hardware Department Materials 1) Screw Tops/Screw Protectors #8 Rubber Cap - Slides on to end of screw studs on the display box and the keypad box NO SHARP EDGES 2) Industrial-duty or Grip-Lock Velcro, adhesive-backed Tools Required - Supply of SHARP 1/8 drill bits for drilling into stainless steel - Heavy-duty electric drill(s) - 9/32 nut driver - Hole saw or paddle bit to make 1 1/2 or larger hole in cabinets - Standard electrical tools - Shop vac for clean up 2

STEPS REQUIRED TO INSTALL THE 600LP 1) Unpack and check parts against part list 2) Attach feet to scale base 3) Open up front of check-in counter cabinet 4) Position the control module and run wiring 5) Position scale base, display modules and keypad module 6) Connect wiring, power up and test 7) Mount scale base and connect ground wire 8) Mount display modules and keypad module 9) Secure all wiring 10) Place stainless platform on scale base and perform final test of system 11) Detail installation and clean up area NOTE: This Installation Guide applies to models with tube style base and plate style base 27 3/4 27 3/4 23 3/4 23 3/4 Tube style base Plate style base 3

1) Unpack And Check Parts Against Part List Main components Scale base (tube style or plate style)! CAUTION: Heavy Use caution when lifting scale base 27 3/4 27 3/4 23 3/4 23 3/4 Tube style base or Plate style base Stainless steel platform Display modules (2) Keypad module (1) Control Module (1) List of All Components and Parts PART NO. DESCRIPTION QTY SC105 SCALE BASE (tube style or plate style) 1 SSCOV STAINLESS STEEL PLATFORM COVER 1 CMOD-1 SCALE CONTROL MODULE 1 FOOT03 3 LEVELING FOOT, CUSHION RUBBER MOUNT 4 WITH.20 JAM NUT DMOD-1 DIGITAL DISPLAY MODULES 2 KMOD-1 KEYPAD MODULE 1 DCBL-1 12 DIGITAL DISPLAY CABLES 2 KCBL-1 12 KEYPAD CABLE 1 WGSCR-1 WING SCREWS (LONG) 6 WGSCR-2 WING SCREWS (SHORT) 6 WDSCR-2 SCALE ANCHOR WOOD SCREWS (#8 x 1 PHL HD) 12 RCBL-1 OPTIONAL DISPLAY RIBBON CABLE ADAPTER 2 WITH GROUND STRAP RCBL-2 OPTIONAL KEYPAD RIBBON CABLE ADAPTER 1 WITH GROUND STRAP LBKT OPTIONAL L BRACKET 1 WDSCR-2 OPTIONAL L BRACKET WOOD SCREWS (#8 X 1 PHL HD) 2 AC00 120-240 VAC INPUT, 12 VDC OUTPUT (800 Ma) AC ADAPTER 1 4

2) Attach Feet To Scale Base (at four load cells) Screw in each foot, all the way to stop, but DO NOT TIGHTEN Foot and load cell Foot screwed in to stop 5

3) Open Up Front Of Check-in Counter Cabinet Access check-in counter by opening front panel(s). Consult with airline personnel for method of access and any special considerations regarding the access method. Locate 110 VAC power supply.! IMPORTANT Consult airline personnel for method of accessing cabinet front! CAUTION! Securely brace any opened panels!! Accessing counter (typical) 6

4) Position The Control Module And Run Wiring Position the control module generally in the area indicated in the diagram below. Attach wires for the 2 displays, the keypad and the AC adapter to the Control Module (load cell lead to be connected later) Display Display Base/load cell Control Module Keypad 110 VAC PLAN VIEW Bag well with stainless steel surface Customer s counter top Agent s Computer (typical) Agent s counter top ELEVATION VIEW A Control Module VIEW A 7

5) Position Scale Base, Display Modules And Keypad Module Unwrap signal cable from scale base Position scale base in center (left/right and front/back) of bag well opening Position displays and key pad in their general area of mounting (as indicated below) PLAN VIEW Bag well with stainless steel surface Customer s counter top Agent s Computer (typical) Agent s counter top Base & platform ELEVATION VIEW A Control Module VIEW A Keypad Display Displays Base & platform 8

6) Connect Wiring, Power Up And Test Connect wires leading from the Control Module to: - Displays - Keypad - 110 VAC Connect signal cable from the load cell to the Control Module Power up at the keypad Check system for: - both displays illuminated - place weight on scale and observe displays - at keypad, test for lb/kg function Zero Scale function Accumulated weight function 9

7) Mount Scale Base and Connect Ground Wire Confirm that the scale base is centered in the bag well Adjust the feet to level the platform, making sure it does not rock Drill two shallow 1 8 holes at each foot location. MAKE SURE TO AVOID CONTACTING THE LOAD CELLS WHILE DRILLING! CONNECT GROUND WIRE: Attach the green grounding wire from the summing junction box to one of the mounting screws securing the feet, making sure that a solid connection is made from the ground wire to the stainless steel bag well.! ATTENTION!! A SOLID GROUNDING CONNECTION MUST BE MADE! Centering the scale base in the bag well! CAUTION! LOAD CELL DESTRUCTION! Contacting a load cell with the electric drill while mounting will DESTROY THE LOAD CELL! AVOID CONTACTING THE LOAD CELL WITH THE ELECTRIC DRILL. Mounting the scale base in the bag well 10

8) Mount Display Modules And Keypad Module Keypad mounting requires use of the included angle bracket, as shown below. Use pliers to turn back bracket after installation as shown below. Displays can be mounted using brackets as shown, or by industrial-strength adhesive back Grip-Lock Velcro on underside of display and on top of bag well wall.! NOTE! Use #8 rubber caps to cover the ends of the two screw studs on the displays. NO SHARP EDGES. Mounting detail for keypad and display NOTE: keypad mounting bracket turned back, leaving NO SHARP EDGES EXPOSED 11

9) Secure All Wiring Use adhesive back pads and tie wraps to secure wiring to the counter surfaces. Wiring being secured, before trim off of tie wraps NOTE: photo shows scale base wiring routed on surface of bag well and secured with tie wraps and mounting pads. Many locations will allow wiring to be routed under the bag well, which is preferred. Also, if surface mounting is required, use of the plastic conduit is preferred over the example shown. Examples of wiring secured with adhesive back mounting bases and tie wraps. NO SHARP EDGES. 12

10) Place Stainless Platform On Scale Base And Perform Final Test Of System Place the stainless steel platform on the scale base. Test all functions of the scale system: - on/off - displays illuminate - lbs/kg - zero scale - accumulated weight 11) Detail the Installation And Clean Up Area - Trim all tie wraps and turn so NO SHARP EDGES ARE EXPOSED - Check that all exposed screw studs have been covered with rubber caps, so NO SHARP EDGES ARE EXPOSED - Check that surfaces have not been damaged cosmetically - Using shop vac, vacuum all areas - Clean surfaces of any debris - Check area for unused parts, remove Triner Scale and Manufacturing Company, Inc. 2842 Sanderwood Road Memphis, TN 38118 Tel: (901) 795-0746 Fax: (901) 363-3114 Toll Free (800) 238-0152 Email: info@trinerscale.com www.trinerscale.com accurate s in ce around 1897 the world 13