PERFORMER RPM Camshaft/Lifters/Lube Kit CATALOG #7194 MODEL: c.i.d. Chrysler V8, 1968 & later

Similar documents
PERFORMER-PLUS Camshaft/Lifters/Lube Kit #2177 MODEL: c.i.d. Chrysler V8, 1967 & later (Not for 1985 & later 318 V8 with roller lifters)

PERFORMER RPM Camshaft/Lifters/Lube Kit CATALOG #7122 MODEL: c.i.d. Ford V8 (not for Boss 302 or 1985 & later roller lifter engines)

TORKER-PLUS Camshaft/Lifters/Lube Kit Part #5022 MODEL: c.i.d. Ford V8 (not for Boss 302 or 1985 & later roller lifter engines)

1-3/4" or 1-7/8" headers Aftermarket/re-curved distributors

PERFORMER-PLUS CAMSHAFT / LIFTERS / LUBE KIT MODEL: 351-M/400 c.i.d. Ford V8 CATALOG #2172 INSTALLATION INSTRUCTIONS

TORKER-PLUS Camshaft/Lifters/Lube Kit CATALOG #5002 MODEL: c.i.d. Chevrolet V8

Performer-Plus Camshaft/Lifters/Lube Kit Part #2182 For 351-Windsor Ford V8 Engines Installation Instructions

PERFORMER RPM Camshaft/Lifters/Lube Kit CATALOG #7112 MODEL: c.i.d. Oldsmobile V8, 1967 & later

PERFORMER-PLUS Camshaft/Lifters/Lube Kit CATALOG #2157 MODEL: c.i.d. Pontiac V8, 1965 & later

PERFORMER RPM Camshaft/Lifters/Lube Kit CATALOG #7102 MODEL: c.i.d. Chevrolet V8, 1957 & later

Performer RPM Camshaft/Lifters/Lube Kit CATALOG #7106 MODEL: c.i.d. Ford V8

PERFORMER RPM Camshaft/Lifters/Lube Kit CATALOG #7102 MODEL: c.i.d. Chevrolet V8, 1957 & later

Performer-Plus 5.0L Hydraulic Roller Lifter Camshaft only CATALOG #3722 MODEL: 5.0 Litre Ford V8, 1985 & later INSTRUCTIONS

PERFORMER-PLUS CAMSHAFT / LIFTERS / LUBE KIT CATALOG # 2103 MODEL: 400 c.i.d. Chevrolet V8 engines GENERAL INSTRUCTIONS

GENERAL INSTRUCTIONS. PERFORMER-PLUS CAMSHAFT / LIFTERS / LUBE KIT MODEL: c.i.d. Chevrolet V8 Engines CATALOG #2117

INSTALLATION INSTRUCTIONS

BEFORE BEGINNING INSTALLATION

BEFORE BEGINNING INSTALLATION

Edelbrock E-Force RPM Carburetor Supercharger Chevrolet LS Engines

Edelbrock E-Force RPM Carburetor Supercharger C.I.D. Small-Block Chevy

PERFORMER RPM 460 MANIFOLD CATALOG #7166 MODEL: Ford 429/460 V8 INSTRUCTIONS

CARBURETOR REFERENCE PARTS REQUIRED FOR INSTALLATION

CARBURETOR REFERENCE PARTS REQUIRED FOR INSTALLATION. Performer #1407 (750 cfm) A, I, K, L, N, O #1481 Chrysler Throttle Lever Kit for auto trans.

PERFORMER RPM 2-O & 2-R MANIFOLDS CATALOG #7161 & #7163 MODEL: Chevrolet c.i.d.v8, 1965 & later, Non-EGR INSTRUCTIONS

Edelbrock E-Force rpm carburetor Supercharger c.i.d. Small-Block chevy

DUAL QUAD F-28 MANIFOLD CATALOG #5435 For Ford c.i.d. V8 (not Boss 302) Non-EGR INSTRUCTIONS

Installation Instructions

Performer #1407 (750 cfm) A, I, K, O OEM (Quadrajet)* A, F, H, K,

PERFORMER T.B.I. CATALOG #3713 MODEL: CHEVROLET 4.3 Litre 90 V6 T.B.I. (1987 and later) INSTRUCTIONS

EDELBROCK THUNDER SERIES AVS CARBURETORS Part #1801, 1802, 1803, 1804, 1805, 1806, 1812, 1813, 1825, 1826 INSTALLATION INSTRUCTIONS

WEIAND STREET WARRIOR INTAKE MANIFOLD P/N s 8125, 8125P, 8126, & 8126P SMALL BLOCK CHEVROLET

WEIAND INTAKE MANIFOLD P/N 7550 SMALL BLOCK CHEVROLET 3x2 BBL

WEIAND X-CELerator Intake Manifold P/N 7516

1983 BMW 320i. 1.8L 4-CYL 1983 Engines - 1.8L 4-Cylinder Engines - 1.8L 4-Cylinder

Edelbrock Enforcer EFI Supercharger C.I.D. Small-Block Chevy

PERFORMER TRUCK 5.0 MANIFOLD #3841 MODEL: Ford 5.0 Litre V8 (trucks only), 1987 to 1996, EGR INSTRUCTIONS

PERFORMER AND PERFORMER RPM CYLINDER HEADS For Small-Block Chevrolet V8 Engines INSTALLATION INSTRUCTIONS CATALOG #S

PERFORMER AND PERFORMER RPM CYLINDER HEADS For Small-Block Chevrolet V8 Engines INSTALLATION INSTRUCTIONS

1999 Nissan Altima GLE

REMOVAL & INSTALLATION

Edelbrock EFI Universal Fuel Sump System - Adjustable Part #36031, INSTALLATION INSTRUCTIONS

1 of 12 11/20/2016 9:32 PM

1991 Nissan 240SX. 2.4L 4-CYL - VINS [F,M,S] 1991 ENGINES Nissan 2.4L 4-Cylinder

DESCRIPTION MECHANICAL FUEL PUMP FUEL FILTER HIGH PRESSURE (35-90 PSI) HIGH PRESSURE (35-90 PSI) (STEEL/INCLUDED)

DrVanos.com Stage II Installation Instructions. Tool rental is available with the purchase of a vanos kit *See website for more info*

REMOVAL & INSTALLATION

State of California AIR RESOURCES BOARD. EXECUTIVE ORDER D 289 Relating to Exemptions Under Section of the Vehicle Code

2000 Nissan Altima SE

1989 Nissan 300ZX. 3.0L V6 - VIN [H] & 3.0L V6 TURBO - VIN [C] 1989 Engines - 3.0L & 3.0L Turbo V6

BEFORE BEGINNING INSTALLATION

FREE $15 Gift Card for every $100 spent on Ship To Home orders. Find Out How

Roller Camshaft Installation

Disassembly and Assembly

2001 Dodge Dakota ENGINES 4.7L V8

2003 Nissan-Datsun Truck Frontier 4WD V6-3.3L (VG33E)

1995 Aerostar/Ranger/Explorer

The spacers can be made out of.750 round aluminum bar with a.3125 to.318 hole drilled in center.

255 Liter/Hr, In Tank Fuel Pump For Chrysler Front Wheel Drive Vehicles Catalog # INSTALLATION INSTRUCTIONS

2003 Saturn Vue. SATURN 3.0L V6 DOHC - L-Series After VIN & Vue


Holley GM BBC Single-Plane EFI Intake Manifold Kits

FORD V8 ENGINES 209. the treated area, the block is cracked and should be replaced.

Timing Chain: Service and Repair With 2 Piece Tensioner (TSB A) Precaution. Removal This article has been updated with bulletin No A.

1.6L 4-CYL - VIN [E]

MSD Pro-Billet Ready-to-Run Chrysler Distributor PN /354 Early Hemi PN Early Hemi

Engine - Timing Chain/Front Cover Revised Procedure Classification: EM98-009

2005 Saturn L ENGINE Engine Mechanical - 3.0L (L81) - L300

M-6007-Z363 Crate Engine Specifications and Owner's Manual

Precision Degree Wheel Kit

Lower Intake Manifold Replacement

BUILD YOUR OWN HIGH PERFORMANCE ENGINE

2.2L 4-CYL - VIN [S]

1998 Saab 900 SE ENGINES Saab 2.0L & 2.3L 4-Cylinder

SMALL BLOCK CHEVROLET SUPERCHARGER SYSTEM

EDELBROCK THUNDER SERIES AVS CARBURETORS Part #1801, 1802, 1803, 1804, 1805, 1806, 1812, 1813, 1825, 1826 INSTALLATION INSTRUCTIONS

14-6. TSB Revision ENGINE COOLING ON-VEHICLE SERVICE

GM 6-Cylinder Cam Tool Set 3.0L and 3.2L Operating Instructions

jegs.com

MSD Pro-Billet Chrysler Distributor PN Early Hemi


SPECIFICATIONS TEST AND ADJUSTMENT SPECIFICATIONS SPECIFICATIONS ENGINE FD620D, K SERIES

Do-It-Yourself Crate Engine Performer Performer RPM E-Tec

INTRODUCTION E-TUNER SOFTWARE UPDATES IMPORTANT WARNINGS

CAUTIONS AND WARNINGS


REMOVAL & INSTALLATION

Installation Instructions

ENGINE MECHANICAL SPECIFICATIONS

ENGINE TUNE-UP INSPECTION OF ENGINE COOLANT INSPECTION OF ENGINE OIL INSPECTION OF BATTERY. INSPECTION OF AIR FILTER (Paper Filter Type)

TIMING CHAIN. TIMING CHAIN Removal and Installation EM-35 PFP:13028 EBS00I2X KBIA2511E

122 Fasola Road, Sequim Wa (360) Morgan +4 Engine Rebuild Brochure

MSD Pro-Billet Ready-to-Run Ford Flathead, PN 8573

TIMING BELT COMPONENTS EM 15

Classification: Reference: Date: VE30DE CAM TIMING

INSTALLATION INSTRUCTIONS FOR ELECTRIC CHOKE KIT P/Ns , S, &

460cc Do-It-Yourself Assembly Guide

SPECIFICATIONS TEST AND ADJUSTMENT SPECIFICATIONS SPECIFICATIONS ENGINE FD620D, K SERIES

Typical Install Instructions

MSD Pro-Billet Digital E-Curve Distributor PN U.S. Patent

Remove Air Cleaner Cover and. Filter

Transcription:

PERFORMER RPM Camshaft/Lifters/Lube Kit MODEL: 413-426-440 c.i.d. Chrysler V8, 1968 & later PLEASE study these instructions carefully before installing your new camshaft. If you have any questions, do not hesitate to contact our Technical Hotline at: 1-800-416-8628, from 7am-5pm Monday-Friday, Pacific Standard Time or via e-mail at: Edelbrock@Edelbrock.com. CAMSHAFT: Edelbrock Performer RPM camshafts are ground specifically for use with the corresponding Performer RPM manifold. The Performer RPM manifold #7193, and Performer RPM camshaft #7194, are designed to work as a team to give you better driveability and performance. They are dyno-matched and street-proven. For best results, use the Edelbrock manifold/camshaft package with the carburetor and headers we recommend. The Performer RPM camshafts are designed for use with modified or high performance cylinder heads and valve train components only. High Performance adjustable rocker arms or adjustable pushrods must be used. NOTE: Maximum performance is achieved only when the Edelbrock Performer RPM Power Package components are used with the following equipment: Performer RPM manifold/camshaft/timing set/valve springs Performer Series carburetor #1407 (750 cfm) fuel delivery system of sufficient capacity 1-7/8" headers aftermarket/re-curved distributors IMPORTANT: This instruction sheet provides general installation guidelines which can affect your warranty. Read it carefully. It is not our intent to cover each detail of installation here; a step-by-step procedure manual would be far too lengthy. We want to caution you that installing a camshaft is a complicated procedure that requires a good general knowledge of automotive engines. If you are not confident that you can complete the camshaft installation successfully, we suggest you consider having it installed by an experienced mechanic. CAUTION: Proper installation is the responsibility of the installer. Improper installation will void warranty and may result in low mileage, poor performance, costly reinstallation and engine or vehicle damage. TO AVOID THESE PROBLEMS YOU MUST DO THE FOLLOWING: Carefully study and understand all instructions. Examine the camshaft for possible shipping damage (if damaged contact your dealer immediately). PREPARATION CHECKLIST TOOLS AND EQUIPMENT Use the following checklist for items needed. box and open-end wrenches socket set distributor wrench pliers (channel locks & hose clamp) screw drivers (regular and phillips) torque wrench hammer gasket scraper or putty knife timing light vacuum gauge rags water bucket harmonic balancer puller INSTRUCTIONS FOR ENGINE PARTS REMOVAL BEFORE CAMSHAFT INSTALLATION 1. Disconnect battery. 2. For ease of installation, keep all parts in some sort of order. WARNING: Do not remove radiator cap or radiator hose if engine is hot. HARDWARE & PARTS TO BUY Edelbrock Gasgacinch, #9300 RTV Silicone Sealer Edelbrock Performer-Link True-Rolling Timing Chain and Gear Set #7804 Edelbrock Sure Seat Valve Springs, #5792 Edelbrock Valve Spring Retainers, #9734 Edelbrock Manifold bolt kit #8594 pipe plugs, if needed chalk paper and pencil radiator coolant Intake gaskets- Fel-Pro Printoseal #1215 or equivalent 3. Drain radiator coolant, move fan shroud back and remove fan and spacer from water pump. On air conditioned vehicles, remove bolt, lower idler pulley and compressor-to-water pump mount. Disconnect hoses and brackets. Most vehicles will require radiator removal prior to cam removal. Remove water pump. 2008 Edelbrock Corp. page 1 Brochure #63-7194

4. Disconnect all linkage from carburetor such as throttle, throttle springs, transmission, cruise control and automatic choke. 5. Tag and remove vacuum lines. 6. Remove valve covers. 7. Remove distributor cap and wires, rotate engine until rotor points towards number 1 terminal in cap and pointer on front cover is on Top Dead Center (TDC) and remove distributor. Note the approximate position of the vacuum advance canister in relation to the manifold to assist in getting the distributor properly located during re-installation. 8. Remove carburetor and intake manifold. Remove fuel pump. 9. Remove rocker arms and pushrods. 10. Remove hydraulic valve lifters. 11. Remove crankshaft pulley and, using a suitable puller, crankshaft dampener. 12. Remove front cover. NOTE: The front cover oil seal should be replaced before the front cover is re-installed. 13. Rotate engine until timing marks are aligned as shown in Figure 2. 14. Remove cam sprocket bolt, washer, and fuel pump eccentric. Slide sprocket and timing chain forward to remove. 15. Remove camshaft thrust plate noting location of oil tab. Install a long bolt in front of camshaft to facilitate removal and carefully remove camshaft. Using appropriate gear puller, remove crank sprocket. VALVE SPRINGS CAUTION: WARNINGS ABOUT YOUR WARRANTY In order for this Performer RPM cam and lifter kit to be covered under ANY WARRANTY you MUST use the correct Edelbrock Sure Seat Valve Springs. Failure to install new Edelbrock valve springs with your new Performer RPM cam could cause the cam lobes to wear excessively and could cause additional engine damage. 1. This camshaft is designed to function with Edelbrock Sure Seat valve springs #5792. Do not use dual valve springs with this camshaft. Edelbrock retainers #9734 may be necessary with your installation for proper spring height. Do not use rotator type valve springs or retainers for this application. LIFTERS 1. New lifters must be used with new camshaft. Use only the high rev lifters supplied with this kit. 2. Check to be sure that all lifters fit freely in the lifter bores and that the factory did not install oversized lifters in your block to compensate for machining errors. INSTALLATION INSTRUCTIONS 1. Coat cam lobes and bottoms of each lifter with MoS2 lube (supplied) to prevent cam lobe and lifter wear from occurring during initial startup. 2. Install new camshaft with new sprockets, timing chain and lifters. CAUTION: Use Edelbrock Performer-Link True Rolling Timing Chain and Gear Set #7804. Do not use late model timing chain & gear sets that are designed in a retarded position and are not recommended for this camshaft installation. Edelbrock Timing Sets feature three keyways for specific timing selection. Use locking compound material on the bolt threads holding timing gear to cam. Torque to factory recommendations specified in motor repair manual. Install camshaft with timing marks lined up as recommended by factory specifications. See Figure 2. When using Performer-Link Timing Chain and Gear Sets with Edelbrock cam and lifter kits, straight up timing alignment is achieved. If any other timing gear set is used, it is necessary to check cam position for correct timing alignment. This requires indexing the camshaft with a degree wheel to verify timing alignment. O.E.M. or non-edelbrock timing gear sets are not recommended for use with Edelbrock camshafts. INSTALLING PUSHRODS AND ROCKER ARMS High performance pushrods and rocker arms are recommended for this installation. After the cam is installed and timed correctly (see Figure 2), it will be necessary to check each pushrod for correct lifter preload. VALVE ADJUSTMENT 1. Turn the engine over until the No. 1 cylinder exhaust lifter starts to move up. Adjust intake rocker arm to zero clearance between rocker arm and valve tip. From this point turn adjusting nut down (clockwise) 1/4 turn more for final adjustment. 2. Turn the engine over again until the intake lifter just stops coming down. Adjust exhaust rocker arm to zero clearance between rocker arm and valve tip. From this point turn adjusting nut down (clockwise) 1/4 turn more for final adjustment. 3. The above procedure assures correct hydraulic lifter preload. Repeat this procedure for each of the other seven cylinders. 4. Re-install front cover, fuel pump, and water pump using new gaskets. 5. Install intake manifold using new intake gasket set and torque manifold bolts to 25 ft./lbs. CAUTION: Remove front and rear seal dowel pins in block if so equipped. 6. Install crankshaft dampener and torque to factory specifications. INSTALLING DISTRIBUTOR AND TIMING ENGINE NOTE: Before installing your distributor, check the gear drive on the distributor and oil pump for any signs of wear. If worn, be sure to replace with new or you may wear out your camshaft prematurely. This is especially true when rebuilding your engine and a high performance oil system is used, which generates a heavier load on the camshaft gear system. Edelbrock camshafts are designed to use OEM-type gears only. 1. Turn the engine over in the direction of rotation until the No. 1 intake valve closes and continue until the pointer on the front cover is approximately 5 degrees BTDC. 2. Re-install the distributor with the rotor pointing towards No. 1 terminal in the cap, and with the vacuum advance canister in its original position. 3. Lightly tighten the hold-down clamp so that the distributor can still be turned to determine final setting using a timing light with the engine running. 4. Replace valve covers, carburetor linkage and remaining vacuum and electrical connections. 5. Re-install air conditioner, if so equipped. 6. Refill radiator with coolant and re-connect battery. 7. Double check all connections, fuel lines, etc. before starting engine. 2008 Edelbrock Corp. page 2 Brochure #63-7194

CAMSHAFT/LIFTER RUN-IN CAUTION: Change the engine oil and filter before start-up and again after the initial break-in. Do not allow the engine to run under 2000 rpm for the first 1/2 hour. Vary engine speed between 2000 rpm and 2500 rpm. Slow idle speeds may result in severe cam and lifter wear. 1. Start the engine and bring to break-in rpm. IMPORTANT INSTRUCTIONS AFFECTING YOUR WARRANTY CAM LOBE WEAR- Cam lobe wear is almost non-existent unless mismatched parts are used or installation of the cam and lifters is done improperly. Most cam damage is caused by the timing gear coming loose due to improper torque on bolt. The bolt holding gear to camshaft should be torqued to 35 ft./lbs. and a locking compound applied to threads of bolt. CAM GEARS AND CAMSHAFT END PLAY- If cam gear becomes loose, the cam will slide back in the block, causing the lifters to hit the lobes next to them and also the cam bearing journals. If the engine is run after this happens, the bottom of the lifters and the sides of the lobes will become clipped. When installing a camshaft, it is always important to check for proper operating clearances, especially when high performance components are used. Things to look for that can cause failure and damaged parts are as follows: 1. Improper valve-to-piston clearance (this should be no less than 0.080"). 2. Rocker arm to retainer clearance (both ends; valve closed and open). 3. Proper spring settings (see dimensions with spring instruction sheet; correct dimensions mean maximum performance and longer engine life). SPECIAL INSTRUCTIONS With the Edelbrock manifold and camshaft package plus a header installation, a carburetor jet change may be required for best performance. Due to the varied applications of year and model of vehicles, no one combination could suffice for all installations. The following procedure is only a guideline and in many cases, the manufacturing specifications for recommended carburetors or timing may be best. IGNITION TIMING Ignition timing for this package may vary with each application. A good starting figure would be between 10 degrees to 14 degrees initial timing at idle with vacuum advance disconnected. Total advance should not exceed 32 degrees to 36 degrees with initial and centrifugal weights combined and should be at full advance by 3000 rpm. After timing is adjusted, re-connect the vacuum advance line. NOTE: The best combination for any particular vehicle or application must be determined by trial and error using the above information as a guideline. HEADERS For best performance, headers are recommended. For this application, they should be 1-7/8" diameter, approximately 31" long and terminating into a 3-1/2" collector. The remainder of the exhaust system should consist of dual exhaust and tail pipes, at least 2-1/4" diameter with low back-pressure mufflers such as Edelbrock RPM Series stainless steel mufflers. WARNING In order for this Performer RPM cam and lifter kit to be covered under ANY WARRANTY you MUST use the correct Edelbrock Sure Seat Valve Springs. The end flap or label from your Sure Seat Valve Spring box must be sent in with your camshaft warranty card. Failure to install new Edelbrock Sure Seat Valve Springs with your new Performer RPM cam and lifter kit could cause the cam lobes to wear excessively and could cause additional engine damage. IF YOU HAVE ANY QUESTIONS ABOUT THIS APPLICATION, PLEASE CONTACT OUR TECHNICAL DEPARTMENT IMMEDIATELY. Gear Set #7804. Do not use late model timing chain and gear sets that are designed for emission-controlled engines. These timing sets are machined in a retarded position and are not recommended for this camshaft installation. Edelbrock Timing Sets feature three keyways for specific timing selection. TIMING MARKS Figure 1- Chrysler 413-426-440 c.i.d. V8 Firing Order 1-8-4-3-6-5-7-2 Turn distributor counter-clockwise to advance timing. Figure 2- Timing Chain Sprocket Alignment 2008 Edelbrock Corp. Brochure #63-7194 page 3

Edelbrock Corporation 2700 California St., Torrance, CA 90503 Tech Line: 1-800-416-8628 Office: (310) 781-2222 E-Mail: Edelbrock@Edelbrock.com 2008 Edelbrock Corp. Brochure #63-7194

WARNING: In addition to the break-in procedure described in the main installation instructions, you must use Edelbrock break-in oil PN 1070 or equivalent. If using your own engine oil, use Edelbrock Zinc Additive PN 1074 or equivalent. Failure to use proper engine break-in oil or zinc additive can permanently damage the new camshaft and void manufacture warranty. Engine break-in oil and zinc additive is NOT included with this camshaft and must be purchased separately. PN 1070 PN 1074 Edelbrock LLC 2700 California Street Torrance, CA 90503 Tech Line: 1-800-416-8628