Installation and Operation Manual

Similar documents
WSO Mist Collector WSO 20, 25-1, 25-2 and 25-3

Installation and Operation Manual

Airflow Controller. Installation and Operation Manual Installation, Operation, Service and Replacement Parts Information. IOM AD Revision 1

Replacement Parts List

Installation and Operation Manual

Mini-Mist Air Filter MM 500 and MM 1200

WSO Mist Collector WSO 20, 25-1, 25-2 and 25-3

IOM AK (ENG) Revision 3

Dryflo Machine Mountable Mist Collectors MMA and MMB

Installation and Operation Manual

Unimaster Dust Collector UMA 40, 70, 100, 150 and 250 Built After August 2005 UMA 450 and 750 Built After March 2006

Installation and Operation Manual

Torit PowerCore TG 2, 4, 6, 8, and 12

Torit PowerCore TGP. Installation and Operation Manual Installation, Operation, and Service Information TG4 TG12

Ambient Collection System AT-3000

Torit Easy-Trunk. Installation and Operation Manual Installation, Operation, and Service Information. English Master Language

Vibra-Shake VS-550, VS-1200, VS-1500, VS-2400 and VS-3000

Installation and Operation Manual

Cabinet Collector Series Models 54, 64, 66, 75, 81, 84, 90

Torit PowerCore CPV-After November 2008

Downdraft Bench DB-2000 and DB-3000

Torit PowerCore CPV-1, -2, -3, -4, -6, -8, and -12 After November 2008

Installation and Operation Manual

Modular Baghouse Top Access MBT and MBTH

Torit PowerCore TG 2, 4, 6, 8, and 12

READ AND SAVE THESE INSTRUCTIONS. Air Boss MP600M Vertical Air Flow Mist Precipitator Industrial Applications. TRION

Installation and Operation Manual

Torit PowerCore CPC-3, -4, -6, -8, -12, -16, -24, -32, -40 and -48 Hopper Inlet After November 2008

NSGV PT-1000 PORTABLE WELDING STATION I, O & M MANUAL

Torit Weld Bench WB-2000 and WB-3000

Downflo DFO 2-4 and 3-6

Torit PowerCore VH 1-4, 1-6, 2-8, 2-12, 2-16, 2-20, 3-18, 3-24, 3-30 VL 1-4, 1-6, 2-8, 2-12, 2-16, 2-20, 3-18, 3-24, 3-30

Downflo Oval DFO 1-1, 2-2 and 3-3

Downflo II DFT 2-4 and 3-6 (Units Built After July 2003)

Modular Baghouse Top Access MBT and MBTH

BK-75 BK-75 INSTRUCTION MANUAL DUST COLLECTOR BURR KING MFG. CO., INC

TD Collector TD-162 and TD-573

Torit PowerCore VH 1-4, 1-6, 2-8, 2-12, 2-16, 3-18, Installation and Operation Manual Installation, Operation, and Service Information

TABLE OF CONTENTS SPECIFICATIONS 3 INSTALLATION 4. Direct Mount 4. Ducted Installations 5. Installing Plenum 5. Machine Mount Stand 5.

HP Baghouse Collectors

Downflo Evolution DFE 2-4 and 3-6

Installation and Operation Manual

Bin Vent TBV-2, TBV-4 and TBV-6

Downflo Oval DFO 2-8, 2-12, 2-16, 2-24, , 3-12, 3-18, 3-24, 3-36, 3-48, 3-60, 3-72, 4-16, 4-32, 4-48, 4-64, 4-80, 4-96, 4-112, and 4-128

Modular Baghouse Top Access

Dryflo Mist Collectors

SUPERIOR PERFORMANCE

Downflo Evolution DFE 2-8, 2-12, 3-12, 3-18, 3-24, 3-36, 3-48, 3-60, 3-72, 4-16, 4-24, 4-32, 4-48, 4-64, 4-80, 5-20, 5-30, 5-40, 5-60 and 5-80

Replacement Parts List

Downflo Workstation DWS 4-1, 4-2, 4-3, 4-4 and DWS 6-1, 6-2, 6-3 and 6-4

WSO Mist Collectors. cáäíê~íáçå=qéåüåçäçöó Ñçê=jáëí=`çääÉÅíáçå

MODEL MC1500 Installation and Operation Manual Important:

Installation and Operation Manual

RF Baghouse Dust Collector RFT, RFW, and RFWH (All Welded or Knock Down)

Downflo Evolution DFE 2-4 and 3-6

Empire Abrasive Equipment Company

Installation and Operation Manual Installation, Operation, and Service Information. English Master Language. IOM AD (ENG) Revision 4

AIR CLEANERS. Model MX 6000 OWNER S MANUAL CAUTION. Read complete instructions before operating. Please file for future reference.

Owner s manual for installation, usage and maintenance

RF Baghouse Dust Collector Models RFWP and RFWPH

Operating Manual PFB-2500

DESIGN-AIRE SL-RSR-EC. Installation and Operations Manual


Owner s manual for installation, usage and maintenance

READ AND SAVE THESE INSTRUCTIONS. High Velocity Restaurant-Duty Utility Set Belt Driven for Roof Mounting

OWNER'S MANUAL. OX1100 Series. Installation and Service Manual

MODEL MA4210 Installation and Operation Manual Important:

Installation & Service Manual for Portable Fume Collector. Model PFC-800

OWNER'S MANUAL. CL3000 Series. Installation and Service Manual

Installation & Service Manual for VM-10 Series Collectors. Models VM-10 VMH-10

CLEAN AIR WORKSTATION REVERSE FLOW. Installation and Operations Manual

GETZ EQUIPMENT INNOVATORS SYSTEM DUST 120V ECONOMY PART NUMBER: 4G59542 OPERATING AND INSTRUCTION MANUAL

Self Cleaning Hood System Installation, Operation, and Maintenance Manual

GETZ EQUIPMENT INNOVATORS SYSTEM DUST 120V ECONOMY PART NUMBER: 4G59542 OPERATING AND INSTRUCTION MANUAL

OWNER S MANUAL. Installation and Service Manual

OWNER S MANUAL. OX3500C Series. Installation and Service Manual

Packaged Downflo Evolution

PHANTOM (PH10 and PH12) COMMERCIAL AND INDUSTRIAL SERIES

READ AND SAVE THESE INSTRUCTIONS. Centrifugal Upblast Exhaust Fan (Standard & High Pressure Exhaust) Belt Driven for Roof & Wall Mounting

Installation & Service Manual for Vertical Media (VM) Series Collectors

MICRO-AIR AIR CLEANER INSTALLATION AND OPERATION MANUAL. MX3510 Includes Installation, Operation, and Service Instructions CAUTION

DESIGN-AIRE SL-RSR-EC. Installation and Operations Manual

FJS Continuous Cleaning Cartridge Series Installation and Operation Manual

WELDING FUME EXHAUSTERS & ARMS

Air Boss CA3000C & CA6000C. Installation Operation Maintenance Manual. Cartridge Air Cleaners

NECO Pumping Systems

MICRO-AIR DUST COLLECTOR Installation and Operation Manual MODEL RP6-2, RP-3, RP8-2 & RP-3

D-Series Blowers and Exhausters

Air Boss Model M3000. Industrial Air Cleaner READ AND SAVE THESE INSTRUCTIONS. TRION

Operations & Maintenance Manual DFH-1000 DUCTLESS FUME HOOD

Hazardous Location Direct-Drive Exhaust Fans. Operating Instructions & Parts Manual

READ AND SAVE THESE INSTRUCTIONS. Centrifugal Downblast Exhaust Fan Belt Driven for Roof & Wall Mounting

FAN POWERED HEPA FILTER UNIT

Installation & Service Manual for Horizontal Cartridge Filtration Systems

User s Manual D-Series Blowers and Exhausters

MODULAR BAGHOUSE DUST COLLECTORS POWERED BY

Downflo workstation DuSt ColleCtorS

PRODUCT NUMBERING SYSTEM SERIES PHASE. 1: Single Phase 3: Three Phase

After installing the HEPA filters the discharge air should be monitored to ensure proper filtering efficiency. HEPA Filters

Model 8309WC Barrier Free Shower & Eye/Face Wash

Transcription:

Installation and Operation Manual Installation, Operation, and Service Information Modular MediaFilter - Vertical Series Collector Models MDV-1, MDV-2, and MDV-3 Throughout this manual statements indicating precautions necessary to avoid equipment failure are referenced in a Note. Statements indicating potential hazards that could result in personal injury or property damage are referenced in a box. MDV-1 MDV-3 This manual is property of the owner. Leave with the unit when set-up and start-up are complete. Donaldson Company reserves the right to change design and specifications without prior notice. IOM AD3298602

Donaldson Company, Inc. Application of Mist Control Equipment Combustible materials such as buffing lint, paper, wood, aluminum or magnesium dust, weld fume, or flammable solvents represent a fire or explosion hazard. Use special care in the selection and operation of all mist collection equipment when combustible materials are present to protect workers and property from damage due to fire and/or explosion. Consult and comply with National and Local Codes relating to fire or explosion, and all other appropriate codes when determining the location and operation of mist collection equipment. When combustible materials are present, consult with an installer of fire extinguishing systems familiar with these types of fire hazards and local fire codes for recommendations and installation of fire extinguishing and explosion protection systems. Donaldson Dust/Mist Collection equipment is not equipped with fire extinguishing or explosion protection systems. DO NOT allow sparks, cigarettes, or other burning objects to enter the hood or duct of any mist control equipment as these may initiate a fire or explosion. For optimum collector performance, use only Donaldson replacement parts. Warning Improper operation of a mist control system may contribute to conditions in the work area or facility that could result in severe personal injury and product or property damage. Check that all collection equipment is properly selected and sized for the intended use. 2

Modular MediaFilter - Vertical Series Collector, Models MDV-1, MDV-2, and MDV-3 Contents Description... 4 Purpose and Intended Use... 4 Operation... 5 Inspection on Arrival... 6 Installation Codes and Procedures... 6 Installation... 6 Site Selection, Grade-Mounted Units... 6 Unit Location... 6 Electrical Wiring... 7 Rigging Instructions... 7 Hoisting Information... 7 Standard Equipment... 8 Inlet Collar Installation... 9 Electrical Connection... 9 Optional Equipment... 10 HEPA/95% DOP Filter... 10 Sprinkler Installation... 11 Preliminary Start-Up Check... 12 Service Information... 12 Operational Checklist... 12 Prefilter Cleaning and Replacement... 13 Primary Filter Replacement... 13 Optional HEPA/95% DOP Filter Replacement... 14 P-Trap Service... 15 P-Trap with Y- Strainer, Screen Cleaning... 15 Troubleshooting... 16 Warranty... 20 This manual contains specific precautionary statements relative to worker safety. Read thoroughly and comply as directed. Discuss the use and application of this equipment with a Donaldson representative. Instruct all personnel on safe use and maintenance procedures. Data Sheet Model Number Serial Number Ship Date Installation Date Customer Name Address Filter Type Accessories Other 3

Donaldson Company, Inc. Description The Modular MediaFilter - Vertical Series Collector collects airborne mist such as oil, water-soluble, and synthetic coolant from machining operations. Three stages of filtration, plus an additional prefilter and HEPA or 95% DOP filter, provides a cleaner work environment as well as a more cost-effective means of mist collection. With a nominal airflow capacity of 1,000/2,000 cfm for Model MDV-1; 2,000/4,000 cfm for Model MDV-2; and 3,000/6,000 cfm for Model MDV-3, the Modular MediaFilter collector is a strategic component to meeting industrial and government air-quality standards. The high efficiency filters allow air and coolants to be recycled, and the filter efficiency remains constant as the unit operates. A variety of prefilter options specifically designed for mist collection, from heavy liquid-load to heavy particulate-load applications, are available to increase the versatility of the unit. Purpose and Intended Use Airborne mists are small droplets of liquid suspended in the air. Modular MediaFilter - Vertical Series Collectors are used in machine tool operations using metalworking fluids. Metalworking fluids include straight oil, watersoluble coolants, synthetic coolants, and semisynthetic coolants. These fluids perform a variety of functions such as lubricating or cooling the part or the tool, flushing chips away from the part, and suppressing dust and smoke. Oils and coolants allow machines to operate faster and tools to last longer resulting in high quality parts. Mist is created in two ways: mechanical action or thermal effects. Mechanical action refers to aerosol used for light lubrication and generally creates mist greater than one micron in size. Thermal effects occur when heat vaporizes the coolant, the vapor cools and recondenses into a mist. Thermal effects create mist from 0.01 to 1 micron in size. Other contaminants, such as dust from the part or the tool, or smoke from the combustion of the oil or coolant are also generated when using metalworking fluids. The Modular MediaFilter - Vertical Series Collector is specifically designed to collect and filter mist from the air. With a properly selected prefilter and the high-loft vee-bag (primary filter), the Modular MediaFilter can also be used on applications ranging from mist with high volumes of dust to wet and sticky contaminants. 4

Modular MediaFilter - Vertical Series Collector, Models MDV-1, MDV-2, and MDV-3 Operation Misuse or modification of this equipment may result in personal injury. Do not misuse or modify. During normal operation, contaminated air enters the unit through one of the dirty-air inlets located on each side, toward the bottom of the unit. The incoming air slows and turns upward, causing large mist droplets and particles to fall out of the airstream and into the hopper. The incoming air passes through the prefilters first. The prefilters are designed to reduce the liquid- and particulate-load to the primary filter. Smaller mist droplets pass to the primary filter where the small droplets collect and drain. Clean, mist-free air is discharged through the top of the unit. A Magnehelic gauge, mounted on the side of the unit, monitors the pressure drop across the prefilters and primary filter. Magnehelic is a registered trademark of Dwyer Instruments, Inc. final filter second-stage filter dirty-air inlet first-stage filter Unit Operation, Model MDV-1 Shown 5

Donaldson Company, Inc. Inspection on Arrival 1. Inspect unit on delivery. 2. Report any damage to the delivery carrier. 3. Request a written inspection report from the Claims Inspector to substantiate claim. 4. File claims with the delivery carrier. 5. Compare unit received with description of product ordered. 6. Report incomplete shipments to the delivery carrier and your Donaldson representative. 7. Remove crates and shipping straps. Remove loose components and accessory packages before lifting unit from truck. Installation Codes and Procedures 1. Safe and efficient operation of the unit depends on proper installation. 2. Authorities with jurisdiction should be consulted before installing to verify local codes and installation procedures. In the absence of such codes, install unit according to the National Electric Code, NFPA No. 70-latest edition. 3. A qualified installation and service agent must complete installation and service of this equipment. Installation Site Selection, Grade-Mounted Units 1. The unit can be located on a reinforced concrete foundation. 2. Provide clearance from heat sources and interference with utilities when selecting the location. Unit Location 1. When hazardous conditions or materials are present, consult with local authorities for the proper location of the collector. 2. Foundation must be sized to accommodate the entire weight of the unit, plus the weight of the collected material, piping, and ductwork. 3. Prepare the foundation in the selected location. Install anchor bolts to extend a minimum of 1-1/2-inches above foundation unless otherwise indicated on the Specification Control drawing. 4. Locate the collector to ensure the shortest and straightest inlet duct length, easy access to electrical connections and routine maintenance. Combustible materials such as buffing lint, paper, wood, aluminum or steel dust, weld fume, and flammable solvents represent fire or explosion hazards. Use special care when selecting and operating all collection equipment when combustible materials are present to protect workers and property from damage due to fire and/or explosion. Consult and comply with National and Local Codes relating to fire or explosion, and all other appropriate codes when determining the location and operation of mist collection equipment. Donaldson equipment is not equipped with fire extinguishing or explosion protection systems. OSHA may have requirements regarding recirculating filtered air in your facility. Consult with the appropriate local authorities to ensure compliance with all codes regarding recirculating filtered air. 6

Modular MediaFilter - Vertical Series Collector, Models MDV-1, MDV-2, and MDV-3 Electrical Wiring Electrical installation must be performed by a qualified electrician and comply with all applicable national and local codes. Lock out electrical power sources before performing service or maintenance work. Do not install in classified hazardous atmospheres without an enclosure rated for the application. 1. All electrical wiring and connections, including electrical grounding, should be made in accordance with the National Electric Code, NFPA No. 70-latest edition. 2. Check local ordinances for additional requirements that apply. 3. The appropriate wiring schematic and electrical rating must be used. See unit s rating plate for required voltage. 4. If the unit is not furnished with a factorymounted or shipped loose disconnect switch, an electric disconnect switch having adequate amp capacity shall be installed in accordance with Part IX, Article 430 of the National Electrical Code, NFPA No. 70-latest edition. Check unit s rating plate for voltage and amperage ratings. 5. Refer to the wiring diagram for the number of wires required for main power wiring and remote wiring. Rigging Instructions Suggested Tools & Equipment Crane or Forklift Pipe Wrenches Slings, Spreader Bars, Socket Wrenches and Clevis Pins End Wrenches Clamps Large Crescent Wrench Screwdrivers Drill and Drill Bits Pipe Sealant Hoisting Information 1. Use all lifting points provided. 2. Use clevis connectors, not hooks, on lifting slings. 3. Use spreader bars to prevent damage to the unit s casing. 4. Check the Specification Control drawing for weight and dimensions of the unit, subassemblies, and components to ensure adequate crane capacity. 5. Allow only qualified crane operators to lift the equipment. 6. Refer to applicable OSHA regulations and local codes when using cranes, forklifts, and other lifting equipment. 7. Lift unit and accessories separately, and assemble after unit is in place. Failure to lift the collector correctly can result in severe personal injury or property damage. Use appropriate lifting equipment and adopt all safety precautions needed for moving and handling the equipment. A crane or forklift is recommended for unloading, assembly, and installation of the collector. Location must be clear of all obstructions, such as utility lines or roof overhang. 7

Donaldson Company, Inc. Standard Equipment The collector has a high center-of-gravity and may overturn if not secured properly. Secure the collector to the lifting device. Use care when moving the unit. The Modular MediaFilter collector is shipped in two sections; an inlet plenum and a filter cabinet section with power pack. 1. Prepare the foundation in the selected location. Install customer-supplied 3/8-16 anchor bolts to extend a minimum of 1 1/2-inches above foundation. 2. Using a crane or forklift, lift the inlet plenum into position over the anchor bolts and lower slowly. 3. Level inlet plenum and secure to anchor bolts. 4. Apply the gasket shipped with the unit to the inlet plenum's top flange. 5. Using a crane or forklift, lift the filter cabinet with power pack into position over the inlet section, lower slowly, and align bolt holes. 6. Secure the filter cabinet to the inlet section with the hardware supplied. 7. Remove crane. filter cabinet gasket inlet plenum 3/8-16 hex nut 3/8-in flat washer 3/8-16 anchor bolt Typical Installation, Model MDV-1 Shown 8

Modular MediaFilter - Vertical Series Collector, Models MDV-1, MDV-2, and MDV-3 Inlet Collar Installation 1. Install the inlet collar to the desired inlet location using the gasket and hardware supplied. 2. Install the inlet blank to the inlet opposite the inlet collar using the gasket and hardware supplied. Electrical Connection Electrical installation must be performed by a qualified electrician and comply with all applicable national and local codes. Lock out electrical power sources before performing service or maintenance work. Do not install in classified hazardous atmospheres without an enclosure rated for the application. Modular MediaFilter collectors must be equipped with a customer-supplied safety disconnect with short circuit protection, contactors, and overload protection. Complete the wiring as shown in Motor Starter Wiring. Disconnect gasket inlet collar 1L1 1L2 1L3 1FU 2FU 3FU 1M 1OL 1T1 1T2 1T3 fan motor 208/230/460/575/60/3 Motor Starter Wiring Inlet Collar Installation, Model MDV-1 Shown 9

Donaldson Company, Inc. Optional Equipment Motor Starter Control Box Mount the motor starter control box in a convenient location. An electrical knockout, sized for 1/2-in fittings, is provided on the left-hand side of the blower cabinet. Increase knockout size using a drill as required. 1. Using the wiring diagram supplied inside the control box and the instructions on the motor decal, make the connections to the blower motor. Note: If the unit is supplied with an optional junction box, wire the motor starter to the terminal strip located inside the junction box according to the wiring diagram supplied with the junction box. 2. Turn the fan-motor ON then OFF and check for proper rotation. Proper rotation is clockwise. To reverse rotation, three-phase power supply: Turn electrical power OFF at source and switch any two leads on the output-side of the fanmotor starter. 3. Ground cabinet according to local electric codes. HEPA/95% DOP Filter If a HEPA or 95% DOP Filter module was ordered with this collector, a Minihelic gauge comes factory installed for measuring the pressure drop across this filter. Minihelic is a registered trademark of Dwyer Instruments, Inc. Do not look into fan outlet to determine rotation. Check that the exhaust plenum is free of tools or debris before checking blower/fan rotation. Stand clear of exhaust to avoid personal injury. Minihelic gauge (HEPA/ 95% DOP filter) Magnehelic gauge (primary filter and prefilter) Magnehelic and Minihelic Gauge Configurations with HEPA/95% DOP Module 10

Modular MediaFilter - Vertical Series Collector, Models MDV-1, MDV-2, and MDV-3 Sprinkler Installation Optional fire control sprinklers are available for the Modular MediaFilter collector. Model MDV-1 uses one sprinkler and Models MDV-2 and MDV-3 use two sprinklers. Each Donaldson Torit-supplied sprinkler requires 20 to 60 psig water pressure with a 1-in supply line. The volume of water discharged per sprinkler head at 20-psig is 6.3 gallons per minute. Note: Sprinkler systems place a large quantity of water in the mist collector when activated. Provide adequate drainage to remove water. Excess water weight can cause the leg structure to collapse. Consult with local authorities when installing fire control systems on collection equipment. 1. Remove or open the final filter access door (primary filter or HEPA/95% DOP access door) and remove the final filter to access the sprinkler tap located in the blower chamber. 2. Remove the 1/2-in pipe plug from the sprinkler tap. 3. Apply pipe sealant to the sprinkler threads. 4. Thread the sprinkler into the 1/2-in sprinkler tap so the sprinkler is located above the final filter as shown and tighten securely. Each sprinkler requires a 1-in supply line at 20 to 60 psi water pressure. blower access door final filter access door; remove final filter to access sprinkler tap 1/2-in pipe plug; remove and replace with sprinkler head sprinkler head Sprinkler Installation, (Blower Cabinet) Model MDV-1 Shown Sprinkler Installation, Model MDV-3 Shown 11

Donaldson Company, Inc. Preliminary Start-Up Check 1. Check all electrical connections for tightness and contact. 2. Check for and remove all loose items in or near the inlet and outlet of the unit. 3. Check that all service switches are in the OFF position. 4. Check that all optional accessories are installed properly and secured. 5. Check that all filters are properly installed and filter access doors are closed and latched. 6. Fill P-Trap or ensure other type of drain is properly installed. 7. Turn power ON at source. 8. Turn the fan motor ON then OFF to check for proper rotation by referencing the rotation arrow. To reverse rotation, three-phase power supply: Turn electrical power OFF at source and switch any two leads on the output-side of the fanmotor starter. Do not look into fan outlet to determine rotation. Check that the exhaust plenum is free of tools or debris before checking blower/fan rotation. Stand clear of exhaust to avoid personal injury. Service Information Lock out electrical power sources before performing service or maintenance work. Operational Checklist 1. Monitor overall performance of the collector. 2. Monitor exhaust. Exhaust should remain visually clean throughout filter life. If leaks are visible, check the filters for positive gasket seals. 3. Monitor hopper drainage. If slow or stopped, check hopper for obstructions and clean as necessary. 4. Check that the P-trap is full. Refill if low or dry. 5. Check the prefilter and clean or replace as required. 6. Monitor pressure drop on the Magnehelic gauge and Minihelic gauge (if unit is supplied with 95% DOP or HEPA). If the reading is significantly higher than initial clean filter reading, filter replacement or prefilter cleaning may be required. Note: Do not operate the unit without the prefilters in place. Significant reduction in primary filter life can result. 12

Modular MediaFilter - Vertical Series Collector, Models MDV-1, MDV-2, and MDV-3 Prefilter Cleaning and Replacement All prefilters except the multi-vee can be cleaned and reused. Remove the prefilter through the lower access door. Wash prefilter in an appropriate wash tank, rinse, dry, and re-install. Replace the multi-vee prefilter as necessary. The high efficiency and multi-vee prefilters have a 1-in mesh screen on the inlet side. This screen is designed to reduce the particulate load to the high efficiency and multi-vee prefilters extending their life. The impinger has a 1-in mesh screen on the outlet side to reduce particulate load and evenly distribute the airflow to the primary filter. When servicing prefilters, always clean the 1-in mesh screen. Check that all particulate is removed. Replace the screen if particulate cannot be removed by cleaning. Use proper safety and protective equipment when removing contaminants and filters. Dirty filters may be heavier than they appear. Use care when removing filters to avoid personal injury. Do not drop filters. Primary Filter (Vee-Bag) Replacement Note: The vee-bag filter must be replaced. Do not wash. 1. Open the filter access door. 2. Remove the filter support rods by lifting the rods from the retaining brackets. 3. Pull rods from the bag hoops. 4. Slide the vee-bag out through the door opening to remove it from the filter cabinet. Dispose of the filter. 5. Install a new vee-bag in the cabinet by sliding the filter into the filter retention slot. Ensure that the pile gasket on the bottom of the filter retention slot is secure. Replace if necessary. 6. Place a support rod through the 10 filter loops on the right and left sides of the filter. 7. Place the support rods in the retention bracket at the top of the filter module. 8. Inspect the door gaskets and replace as necessary. 9. Close and secure the filter access door. 13

Donaldson Company, Inc. Optional HEPA/95% DOP Filter Replacement Note: The final filter must be replaced. Do not wash. 1. Open the final filter access door and lower the retention handles to release the filter. 2. Remove the filter. Note: Dirty filters may be heavier than they appear. Provide a support platform or have two people, one on each side of the filter, and pull the filter out. 3. Install the replacement filter gasket-side up. 4. Seal the filter in place by lifting the retention handles to the upright position. Install filters gasket side up. optional final filter (95% DOP or HEPA) filter support rod primary filter (vee-bag) impinger assembly multi-vee assembly high efficiency prefilter Filter Removal and Replacement, Model MDV-1 Shown 14

Modular MediaFilter - Vertical Series Collector, Models MDV-1, MDV-2, and MDV-3 P-Trap Service 1. Place a suitable container under the P-trap, turn the collector OFF, and remove the pipe plug. 2. Allow fluid and particulate to drain. 3. Use thread sealant and replace pipe plug. 4. Refill the P-trap with suitable fluid before restarting the collector. pipe plug P-Trap P-Trap with Y-Strainer, Screen Cleaning 1. Place a suitable container under the screen clean-out valve, turn the collector OFF, close the P-trap valve, then open the screen clean-out valve. 2. Allow fluid and particulate to drain. 3. With the clean-out valve open, slowly open the P-trap valve. This allows fluid still trapped in the hopper to drain. Note: A substantial amount of fluid may be trapped in the hopper and could exceed the container capacity. Open the P-trap valve slowly. P-Trap with Y-Strainer, Screen Removal 1. Close the P-trap valve. 2. Unscrew the screen cap and pull the screen out. 3. Clean the screen and the inside of the Y-strainer body and re-assemble taking care to seat the screen in the body and cap. 4. Close the clean-out valve. 5. Refill the P-trap with suitable fluid before restarting the collector. P-trap valve strainer screen screen clean-out valve P-Trap with Y-Strainer 15

Donaldson Company, Inc. Troubleshooting Problem Probable Cause Remedy _lower Ñan and motor do not start Improper motor wire size Rewire using the correct wire gauge as specified by national and local codes. Not wired correctly Check and correct motor wiring for supply voltage. See motor manufacturer's wiring diagram. Follow wiring diagram and the National Electric Code. Unit not wired for Correct wiring for proper supply voltage. available voltage Input circuit down Check power supply to motor circuit on all leads. _lower Ñan and motor start, but do not stay runninö Clean-air outlet discharöinö oil mist Electrical supply circuit down Overload relay tripped Defective overload heater or overload assembly Incorrect motor starter heater elements installed Access doors are open or not closed tight Electrical circuit overload Filters not installed correctly Filter or filter gasket damage Check power supply circuit for proper voltage. Check for fuse or circuit breaker fault. Replace as necessary. Reset. Check amp draw on motor leads. Replace as necessary. Check for proper heater elements and replace if necessary. Close and tighten access doors. Check that the power supply circuit has sufficient power to run all equipment. See Service Information on Page 12. Replace filters as necessary. Use only genuine Donaldson replacement parts. See Service Information on Page 12. InsuÑÑicient airñlow Fan rotation backwards Proper fan rotation is clockwise when looking down at the blower motor. See Preliminary Start- Up Check on Page 12. Access doors open or not Check that all access doors are in place and secure. closed tight Fan exhaust area restricted Check fan exhaust area for obstructions. Remove material or debris. Prefilter plugged Remove and clean or replace. Filters need replacement Remove and replace using genuine Donaldson replacement filters. Plugged ducting Check ducting for obstructions and check that dampers in ducting are not closed. InsuÑÑicient hopper Plugged P-trap Clean P-Trap. See P-Trap Service on Page 15. discharöe iièuid leaâinö Ñrom collector door Plugged P-trap Clean P-Trap. See P-Trap Service on Page 15. 16

Limited Warranty Donaldson warrants to the original purchaser that the major structural components of the goods will be free from defects in materials and workmanship for ten (10) years from the date of shipment, if properly installed, maintained and operated under normal conditions. Donaldson warrants all other Donaldson built components and accessories including Donaldson Airlocks, TBI Fans, TRB Fans, Fume Collector products and Donaldson built Afterfilter housings for twelve (12) months from date of shipment. Donaldson warrants Donaldson built filter elements to be free from defects in materials and workmanship for eighteen (18) months from date of shipment. Donaldson does not warrant against damages due to corrosion, abrasion, normal wear and tear, product modification, or product misapplication. Donaldson also makes no warranty whatsoever as to any goods manufactured or supplied by others including electric motors, fans and control components. After Donaldson has been given adequate opportunity to remedy any defects in material or workmanship, Donaldson retains the sole option to accept return of the goods, with freight paid by the purchaser, and to refund the purchase price for the goods after confirming the goods are returned undamaged and in usable condition. Such a refund will be in the full extent of Donaldson s liability. Donaldson shall not be liable for any other costs, expenses or damages whether direct, indirect, special, incidental, consequential or otherwise. The terms of this warranty may be modified only by a special warranty document signed by a Director, General Manager or Vice President of Donaldson. Failure to use genuine Donaldson replacement parts may void this warranty. THERE EXIST NO OTHER REPRESENTATIONS, WARRANTIES OR GUARANTEES EXCEPT AS STATED IN THIS PARAGRAPH AND Aii OTHER WARRANTIES INCiUDING MERCHANTA_IiITY AND FITNESS FOR A PARTICUiAR PURPOSE, WHETHER EXPRESS OR IMPiIED ARE HERE_Y EXPRESSiY EXCiUDED AND DISCiAIMED. Parts and Service For genuine Donaldson Torit replacement filters and parts, call the Parts Express Line 800-365-1331 USA 800-343-3639 within Mexico www.donaldsontorit.com For faster service, have unit s model and serial number, part number, description, and quantity available. Donaldson Company, Inc. Industrial Air Filtration P.O. Box 1299 Minneapolis, MN 55440-1299 dustmktg@mail.donaldson.com Donaldson Company, Inc. is the leading designer and manufacturer of dust, mist, and fume collection equipment used to control industrial-air pollutants. Our equipment is designed to help reduce occupational hazards, lengthen machine life, reduce in-plant maintenance requirements, and improve product quality. 2004 Donaldson Company, Inc. Printed in USA IOM AD3298602 April 2004