Similar documents
Wholesale Developer Services Charges

Annual Distribution Pricing Proposal For 1 July 2018 to 30 June 2019 Overview

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

AMAG posts record shipments in 2013; dividend recommendation of 0.60 EUR per share unchanged on last year

QUARTERLY REVIEW OF BUSINESS CONDITIONS: MOTOR VEHICLE MANUFACTURING INDUSTRY / AUTOMOTIVE SECTOR: 4 TH QUARTER 2016

City Transfer Stations: Loading Services and Fees

UNITIL ENERGY SYSTEMS. INC. CALCULATION OF THE EXTERNAL DELIVERY CHARGE

M A N I T O B A ) Order No. 42/14 ) THE PUBLIC UTILITIES BOARD ACT ) April 23, 2014

QUARTERLY REVIEW OF BUSINESS CONDITIONS: NEW MOTOR VEHICLE MANUFACTURING INDUSTRY / AUTOMOTIVE SECTOR: 2 nd QUARTER 2018

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY. LARGE TIME-OF-DAY ELECTRIC SERVICE RATE 58 NON-MANUFACTURERS Page 1 of 5

Statement of Expected Price Trends

MYPD3 tariff restructuring plan use-of-system charges. Brochure

For personal use only

Woodlane Car Parking Policy 2012/2013

Our charging statement for Scotland 2018/19. Non-primary and other charges. 03/04/2018 non-primary charging statement 2018/19 version 5 Page 1

The Holy Family Catholic School

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

Application Guide for Aran Islands Electric Vehicle Programme

Massachusetts Electric Company and Nantucket Electric Company, Docket No. D.T.E

QUARTERLY REVIEW OF BUSINESS CONDITIONS: NEW MOTOR VEHICLE MANUFACTURING INDUSTRY / AUTOMOTIVE SECTOR: 2 ND QUARTER 2017

A Guide to the medium General Service. BC Hydro Last Updated: February 24, 2012

SCC Greenhouse Gas Assessment

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

Standard retail electricity supply

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS

Cost Reflective Tariffs

Springfield Utility Board Net Metering Policy Adopted on February 13, 2008 (Resolution 08-1)

Consolidated Financial Results for 1Q FY2016 July 29, 2016 Fuji Electric Co., Ltd.

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE

Too Good to Throw Away Implementation Strategy

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

Submission on the Wellington Town Belt Bill. Local Government and Environment Select Committee Parliament Buildings Wellington

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

Type Acceptance Report

Tax benefits for ultra low emission vehicles

Simon Stephens, Programme Manager, presented the Thames Skate Park Business Case for Thames Community Board approval.

RESIDENTIAL SOLID WASTE RFP DRAFT

Jemena Electricity Networks (Vic) Ltd

Docket No EI Date: May 22, 2014

AMAG posts record shipments in 2013; dividend recommendation of 0.60 EUR per share

ON-SITE ASSESSMENT REPORT. <Engineering Firm> Presented to: <Customer> <Presentation Date> Funding by: <Report Date>

Irrigation energy efficiency How to analyse your energy costs. Nick Bullock The Energy Guys

New Jersey Solar Roundtable

Introduction to Charging: Which Parties Pay Which Charges?

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

Energy Performance Information Request Timeline

CITY OF BOWLING GREEN, OHIO MUNICIPAL UTILITIES ELECTRIC RATE SCHEDULES

1. How has traffic congestion changed in London in recent years? Are there differences in the amount, time, type and/or location of congestion?

Mr. John Aitken June 6, 2017 Page 2

CITY OF BOWLING GREEN, OHIO MUNICIPAL UTILITIES ELECTRIC RATE SCHEDULES

Explanatory Notes to aid completion of Disclosure Document Template

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

POWER NETWORKS Electricity Network Tariffs and Charges

Tariff Guide - 1st February 2018

CMP271 Initial thoughts on Cost Recovery of GB Demand Transmission Charges

Public Works and Infrastructure Committee. p:/2015/clusterb/tra/northyork/pw15086

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

Xcel Energy s Energy Efficiency Programs. Derek Shockley Trade Relations Manager Commercial and Industrial

QUARTERLY REVIEW OF BUSINESS CONDITIONS: NEW MOTOR VEHICLE MANUFACTURING INDUSTRY / AUTOMOTIVE SECTOR: 3 rd QUARTER 2018

United Nations Environment Programme

AOBA Utility and Energy Market Update DC, Maryland, and Virginia May 6, 2015

RATE APPLICATION MANUAL. Kansas City Board of Public Utilities

Electricity and Gas Retail Markets Report Q Information Paper

Aaren Healy, 20 September 2017 / 1

Recharge Kick-off Meeting Recharge Activity Review Process for

Airport Operating Standard. Spill Prevention and Response

NATIONAL ASSOCIATION OF AUTOMOBILE MANUFACTURERS OF SOUTH AFRICA

Delaware Electric Cooperative

M.P.S.C. No. 2 Electric Third Revised Sheet No. 65 (Rate Case) Cancels Second Revised Sheet No. 65

EL PASO ELECTRIC COMPANY SCHEDULE NO. 99 MISCELLANEOUS SERVICE CHARGES

MPSEZ Utilities Private Limited Truing up for FY and Determination of Tariff for FY

Cork Airport Miscellaneous Fees and Charges 2017

Addressing ambiguity in how electricity industry legislation applies to secondary networks

Citizens Advice financial capability

Consolidated Edison Company of New York, Inc.

INDEX RATE SCHEDULES

ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL BACKGROUND

Volvo Group THIRD QUARTER 2015 JAN GURANDER. Volvo Group Headquarters Third quarter

ELECTRONIC FAN REGULATORS

Three ULTra Case Studies examples of the performance of the system in three different environments

THE PUBLIC UTILITIES BOARD ACT April 22, Graham F. J. Lane, C.A., Chairman Monica Girouard, C.G.A., Member Mario J. Santos, B.A., LL.B.

VALE Cost Reduction Opportunities

Electric Vehicle Charge Ready Program

GAZIFÈRE INC. Prime Rate Forecasting Process 2017 Rate Case

Fund and 2015 revenue bonds Est. State and Local Taxes: $2,810,000

Notice of proposed amendment to Service Charges for Regulatory Year ending 31 March 2019

Garden waste charging: implementation and impact mitigation measures

March 18, Samira Monshi Seungwon Noh Wilfredo Rodezno Brian Skelly

Energetics Gas Limited Metering Charges Statement. From 1 st May Page 1 of 8 Energetics Gas Metering Charges

Implementation of Directive (EU) 2015/719 concerning vehicle weights and dimensions in Ireland

National Grid's Electric Revenue Decoupling Mechanism ("RDM") Reconciliation Filing for the Year Ending March 31, 2013 Docket No.

Quarterly Activities Report

POLICY NUMBER: SUPERSEDES: C462A. Planning and Development Department DATE: Business Revitalization Zone Establishment and Operation

Distribution Charging Update

ELECTRICITY SERVICE PRICE LIST

The Gambia National Forum on

N.H.P.U.C. No ELECTRICITY GRANITE STATE ELECTRIC COMPANY DBA LIBERTY UTILITIES. SUPERSEDING N.H.P.U.C. No. 17 TEMPORARY RATES

Capacity Analysis Report. For. William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683

Temporary Adjustments to Rates for Low-Income Programs.

Review of Fees for Accident Tows and Tows from Private Property

Transcription:

General Notice ------------------------------------------------------------------------------------------------------------------- Date: 19 th March 2008 GN: 03/08 Subject: TARIFFS WITH EFFECT FROM 1 ST APRIL 2008: - ELECTRICITY - FIXED ELECTRICAL GROUND POWER - WATER AND SEWERAGE - GAS - STAFF ID CARDS AND VEHICLE APRON PASSES - STAFF CAR PARKING - BAGGAGE - CHECK-IN DESKS - AIRPORT WASTE SERVICES - LOW TEMPERATURE HOT WATER - DOMESTIC HOT WATER - CHILLED WATER - PRE CONDITIONED AIR INTRODUCTION This Notice sets out the revised charges for the above activities and services at Heathrow Airport effective from 1 st April 2008. Some of the above are Specified Activities as prescribed by the Civil Aviation Authority (CAA). In these cases, the CAA sets out the method and process of price assessment. The method of price setting is prescribed as cost related and pricing must be supported by transparency on costs and externally audited annual trading statements. Others are not designated as Specified Activities but the method of price calculation is similar. This Notice follows the completion of formal consultation on 2008/9 prices for these activities and services through the Heathrow Non Regulated Charges Group (NRCG). The NRCG operates under the Constructive Engagement framework set out by the CAA and its membership includes airline representatives and the Heathrow AOC. Through this process, HAL has identified expected costs and consumption for each activity in 2008/9 and used this data to calculate unit prices. Significant factors impacting on prices in 2008/9 include the following: The costs of raw materials, particularly utilities. The introduction of T5 into the Heathrow estate. The planned Airline relocation programme. The planned closure of T2. Additional investment in supporting infrastructure. Prices set to target full cost recovery (in previous years, Specified Activities have

substantially under recovered on costs incurred). Some structural changes in the pricing structure relative to the 2007/8 approach, particularly baggage and check-in. The prices set out in this Notice are intended to apply for the entire year ending 31 st March 2009. The only exception is in the case where a material change arises during the course of the year which significantly changes the assumptions on which prices are assessed. In this event, any proposed changes would be subject to consultation in advance through the NRCG. The trading statements at the end of the year will show any under or over recoveries and these will be taken into account when setting prices for individual activities in the following year. The prices for 2008/9 are set out in the attached schedule, together with some supporting notes. All prices exclude VAT. ELECTRICITY The price of both High Voltage (HV) & Medium Voltage (MV) will be increased by 12.35%. This increase is primarily impacted by the increased cost of electricity buy-in, the addition of Terminal 5 and the elimination of a predicted under recovery, based on the most recent trading statements. FIXED ELECTRICAL GROUND POWER The price of Fixed Electrical Ground Power (FEGP) will be 3.02 per quarter hour, an increase of 16.06% 0n 2007/8. This price increase is primarily impacted by the change in the price of electricity, the cost of additional infrastructure supporting new stands and the elimination of a predicted under recovery based on the most recent trading statements. There are no changes to the terms and conditions of the supply of FEGP. These are summarised overleaf for your information. WATER AND SEWERAGE CHARGES The price will be increased by 25.52% to 2.67 per cubic metre with effect from 1 st April 2008. Where a trade effluent consent exists, the price of water only will be 2.06 per cubic metre. A separate charge for trade effluent will then be made by Thames Water who will bill customers directly. This replaces the sewerage charge currently included within the water and sewerage price. Please note, the price of 2.06 will only apply where a trade effluent consent exists. GAS With effect from 1 st April 2008, the price of gas will rise to 4.77 pence per kwh for those customers billed on a consumption basis. This price increase is primarily impacted by the increase in the cost of gas buy-in and the elimination of a predicted under recovery based on the most recent trading statements. This price increase does not relate to Heating Rents. STAFF ID CARDS AND VEHICLE APRON PASSES The prices of all Staff ID Cards and Vehicle Apron Passes will increase by 15.00% with effect from 1 st April 2008. This increase is not predicted to achieve full cost recovery but HAL has

restricted the level of increase to reflect targeted efficiency improvements. STAFF CAR PARK PRICES Please find attached details of charges for Staff Car Parking. Prices will increase by 22.38% with effect from 1 st April 2008. The 2008/9 prices partly reflect the predicted cost base for 2008/9 but have also been impacted by forecast decreases in consumption; the HAL car parking team have been working with users, identifying passes that are not utilised and this has resulted in a reduction of the number of passes in issue. The price includes a 12 levy on each pass, in order to help fund Public Transport initiatives. This levy is not included as part of the transparent costing. BAGGAGE Following a process of formal Constructive Engagement, a new charging structure for Baggage will be introduced from 1 st April 2008. A protocol for this model has been circulated to all Airlines and the charging metric is detailed within that protocol. In summary the total operating expenses for the Airport s arriving, transferring and departing baggage systems will be forecast each year and used alongside predicted departing bag numbers to generate an estimated cost per departing bag. This will be used to charge each Airline for its usage of the system. The charge will be levied on estimated departing bags. Any overall surplus or deficit will then be recognised, when the following year s charges are forecast. The capital element will be remunerated by Aircraft charges. The forecast cost for 2008/09 is 2.12 per departing bag but HAL has agreed to restrict billing to 1.99 per departing bag. Any under or over recovery will be assessed at the year end and will be reflected in prices for 2009/10. Each Airline has already been advised of its estimated bag numbers for 2008/9 to enable its individual cost for 2008/9 to be assessed. CHECK-IN DESKS Following a process of formal Constructive Engagement, a new charging structure for Check-in will be introduced from 1 st April 2008. A protocol for this model has been circulated to all Airlines and the charging metric is detailed within this protocol. In summary, all check-in desks will be CUTE d and charges will be assessed on time in occupation of a desk. The charge for 2008/9 is assessed at an average of 17.14 per desk per day, assuming all desks across the airport are fully utilised. In practice, this rate may vary depending on the actual rate of utilisation across the airport. CHILLED AND HEATED WATER In order to recognise the additional costs incurred in heating or cooling the water product. HAL and the AOC have agreed to reflect these costs by charging for these products at a rate that reflects the true cost of provision. Low temperature hot water (LTHW) and chilled water will attract a 15% addition to the price of the basic water product as agreed earlier and will be charged at 2.37 per cubic meter. Domestic hot water will attract a further addition of 33% to reflect the additional costs incurred in creation it will be charged at 3.15 per cubic meter.

WASTE Waste charges have not been increased since 2004. During this period costs have increased and new costs incurred such as landfill duties and enhanced re-cycling activities undertaken. The predicted costs for 2008/09 reflect the historic increases and the additional costs associated with delivering this service across five Terminals. No reflection has been made to recover the previous years shortfalls. Waste is charged to customers based on waste units where one waste unit is the occupation of 250 Sq. Ft. It has been agreed that the price per waste unit, will be increased to 51.29 per quarter from 1 st April 2008. QUERIES Should you have any queries concerning the new charges, please contact HAL s Commercial Team on 020 8745 5114, who will be pleased to assist. For and on behalf of Managing Director Distribution: Enc Full

HEATHROW AIRPORT LIMITED PRICING MATRIX EFFECTIVE FROM 1 ST APRIL 2008 2007/08 Price Increase % 2008/09 Price Electricity MV 11.52 12.35% 12.94 pence per KWH Electricity HV 7.86 12.35% 8.83 pence per KWH Availability 1.83 2.06 per month per KVA available capacity Max Demand: Nov & Feb 4.83 12.35% 5.43 per KVA per month Dec & Jan 15.61 12.35% 17.54 per KVA per month WATER & SEWERAGE 2.13 25.52% 2.67 per cubic meter WATER Only 1.64 25.52% 2.06 per cubic meter FEGP per Qtr Hour 2.60 16.06% 3.02 per 1/4 hour STAFF CAR PARKS - Perimeter 571 22.38% 698.80 per pass p.a STAFF CAR PARKS - CTA 908 22.38% 1111.23 per pass p.a ID PASSES (Standard) Machine Readable ID Pass - Issue 83.27 15.00% 95.76 per pass Machine Readable ID Pass - Re-Issue 71.78 15.00% 82.55 per pass Machine Readable ID Pass - Amendment 28.65 15.00% 32.95 per pass Non-Machine Readable Pass - Landside 14.31 15.00% 16.46 per pass Temporary Photographic ID Pass 28.65 15.00% 32.95 per pass Application 'No Show' 83.27 15.00% 95.76 per 'no show' Liveried Vehicle Airside Pass - Annual 43.14 15.00% 49.61 per pass Liveried Vehicle Airside Pass - Temporary 10.61 15.00% 12.20 per pass Private Vehicle Airside Pass 1248.87 15.00% 1436.2 per pass Private Vehicle Airside Pass - Temporary 23.88 15.00% 27.46 per pass Gas 4.11 16.00% 4.77 pence per KWH Baggage N/A N/A 1.99 per departing bag Check-In N/A N/A 17.14 per desk per day * Low Temperature Hot Water N/A N/A 2.37 per cubic meter Domestic Hot Water N/A N/A 3.15 per cubic meter Chilled Water N/A N/A 2.37 per cubic meter Pre Conditioned Air 20.00 25.00% 25 pence per KWH Airport Waste 24.60 108.00% 51.29 per assessed unit per Qtr * Assuming all Airport check-in desks are fully utilised

FIXED ELECTRICAL GROUND POWER CONDITIONS OF USE (SUMMARY) The service is limited to aircraft with 115/200 volt, 400Hz electrical systems. Mobile transformers/rectifiers between FEGP outlets and aircraft with 28V DC systems may be used subject to HAL approval. Use of FEGP service constitutes prior acceptance of the charges in this notice. Chargeable use of the service begins at the time of occupying the stand. Charges are made for the total number of quarter hours that an aircraft is parked on a stand. Whether or not the FEGP service is used. However, in any 24 hours of stand occupancy, there is a maximum charge of 6 hours at the full rate. If any aircraft is moved from one stand to another at HAL's request, charges are made as though it had not been moved. No charges are made for aircraft types unable to accept the FEGP system. The standard charge is reduced by 50% between 10 pm and 5.59 am.