Pretest Module 24 Three-phase Service Entrance

Similar documents
CHAPTER V RESIDENTIAL WIRING

Volume 2 Charts, Formulas, and Other Useful Information

ADVANCED CALCULATIONS

2. DEFINITIONS. 2.3 APPROVED Acceptable to the authority enforcing the National Electric Code

9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc.

Spring Test 10 due 05/11/2013

Solar PV Standard Electrical Plan

Generator Fire Safety: Generator assemblies should be located outside the building.

Electrical Design/Build Guide

Electrical Tech Note 105 Agricultural Engineering Department Michigan State University

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

(The actual state exam will be closer to 50 questions in 4 hours time) Master Electrician Practice Test

Spring Test 7 due 05/03/2013

NEC 2014 Code Changes

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES

TRANSMISSION SYSTEMS

SINGLE PHASE WIRING SPECIFICATIONS

THREE PHASE WIRING SPECIFICATIONS

Pretest Module 21 Units 1-3 AC Generators & Three-Phase Motors

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections

Electrical Tech Note 106

Chapter 1 Electrical Theory...1

TABLE OF CONTENTS CHAPTER 1 ELECTRICAL THEORY About This Textbook...xi. Passing Your Exam...xiv. How to Use the National Electrical Code...

TABLE OF CONTENTS. About the Mike Holt Enterprises Team... xviii CHAPTER 1 ELECTRICAL THEORY... 1

Service Entrance Methods

Western Section 101 st Annual Meeting Hot Springs, Arkansas September 21, 2005 Charlie Trout Code Breakfast

Mecklenburg County Common Code Defects

Overcurrent Protection According to the 2011 NEC

90.2 Scope. The installation of electrical conductors, equipment and raceways for:

AMENDMENT ELECTRIC SERVICE MANUAL 2014

PROTECTION OF THE BRANCH CIRCUIT

Pretest Module 29 High Voltage Unit 1

Installing a Downstream Distribution Panelboard

Section 6 Electric Metering: Residential

grounded in service wired to innovate STABILOY Type XHHW-2 and USE-2/RHH/RHW-2

PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5

Approved Meter Sockets and Cabinets

UNIT 1 ELECTRICIAN S MATH AND BASIC ELECTRICAL FORMULAS...1 Introduction...1. UNIT 2 ELECTRICAL CIRCUITS...49 Introduction...49

2016 Photovoltaic Solar System Plan Review List

Have You Been Grounded Lately

Photovoltaic Solar Plan Review

SOLAR PV STANDARD PLAN - COMPREHENSIVE Central/String Inverter Systems for One and Two Family Dwellings

Chapter 2 Wiring and Protection Article 200 Use and Identification of Grounded Neutral Conductor Chapter 1 General...9

Pretest Module 21 Units 1-4 AC Generators & Three-Phase Motors

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

Microinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV.

SECTION 27 - PAD-MOUNTED TRANSFORMERS TABLE OF CONTENTS

PART A General Conductor Requirements

FROM B.C. HYDRO ENCLOSURE (SEE NOTE 4) RIGID CONDUITS (SEE NOTE 8) ALTERNATIVE TO LOAD BARRIER (SEE NOTE 7) SERVICE ENTRANCE ENCLOSURE

NEC 2011 Code Changes

Fee $20 Course: NEC Changes 1 This course is valid for these credentials: Credential Description Cred Code Credit Hours

ECET 211 Electric Machines & Controls Lecture 8 Motor Control Circuits (1 of 2) Lecture 8 Motor Control Circuits

9. Non-Residential Services (Commercial, Industrial, and Agricultural)

Electrical Tech Note 111 Biosystems & Agricultural Engineering Department Michigan State University

Water to Water Geothermal Heat Pump 3-Phase Models Both 208 & 480

Overcurrent Protection (2014 NEC) (Homestudy)

Construction Electrician Apprenticeship Program Level 3 Line G: Install Low-Voltage Distribution Systems. Learning guide G-2

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

5. What is the maximum number of#18 TEW control conductors permitted to be installed into a 6 inch rigid metal conduit? a. 196 b. 138 c. 259 d.

SECTION PANELBOARDS

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

10 Commercial, Industrial, Agricultural Services

CONTENTS BY CHAPTER. Chapter 2: COMPANY EQUIPMENT ON CUSTOMER PREMISES

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Solar PV Standard Plan Simplified Microinverter and ACM Systems for Oneand Two-Family Dwellings

A WORD ABOUT PROPER GROUNDING

National Marine Manufacturers Association Product Compliance Specialist Examination D.C. Electrical (2013 MY) ABYC E-11 (08 Amended 09)

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST

CHAPTER 10 ELECTRICAL. Notes:

Grounding Systems. Equipment Grounding & Grounded Conductors

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

Solar PV Standard Electric Plan

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 03/05/09 TSEWG TP-11: UFC N BEST PRACTICES

SECTION 500 METERING AND ASSOCIATED EQUIPMENT

SOLAR PV INSTALLATIONS

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE

The Reliable Choice. Field Pocket Guide

STOUGHTON UTILITIES ELECTRIC SERVICE RULES AND INFORMATION

Data Bulletin. Wire Temperature Ratings and Terminations INTRODUCTION WHY ARE TEMPERATURE RATINGS IMPORTANT?

PEU reserves the right to determine all meter locations. Only authorized PEU personnel will determine this location.

Alternating Current (AC) Electricity

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

ELECTRICIAN S THEORY EXAMINATION 20 June 2015 QUESTION AND ANSWER BOOKLET

Approved Contractor Construction e-guide Residential Commercial

Transmission & Distribution Glossary of Electrical Terms

Freedom FlashGard Motor Control Center Instruction Manual IM E

TECHNICAL GUIDELINE. Medium Voltage Conductor Ampacities ALUMINUM COPPER. Single Conductor 5kV - 35kV

ENGINEERING SPECIFICATION

Western Section IAEI Code Panel Questions

Motors " GRUNDFOS GROUNDWATER SERVICE MANUAL CONTENTS. Grundfos Motor Specifications... Page 2

201 S. Anaheim Blvd. Page No Anaheim, CA RULE NO. 2 DESCRIPTION OF SERVICE

Customer Requirements Downtown Secondary Network Service

Underwriters Laboratories Inc. Marking Guide. Panelboards. July 2004

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Transcription:

Pretest Module 24 Three-phase Service Entrance 1. What is the most widely used three-phase service entrance system? 2. What are the three most common voltage combinations for three-phase, four-wire systems? 3. How much less copper is required to supply the same load power with a threephase, four-wire system compared to a single-phase system? 4. What are the two color choices for the conductor connected to the star point of a wye system? 5. Identified circuit conductors up to what size are required to be identified throughout the entire length? 6. What is the most common use for the three-wire, delta connected distribution system? 7. What are two distinct advantages of the three-wire, delta connected system? 8. What are the four requirements of grounding? 9. What is the main purpose of grounding? 10. How is a circuit protected from accidental contact with another system? 11. Where must service entrance equipment be located? 12. What is a service box? 13. When are service conductors considered to be outside the building when actually they are inside? 14. What are some of the most common sizes for service entrance switches? 15. What are some advantages of using a circuit breaker instead of a fused disconnect for a main switch in a service entrance?

16. What is the maximum size three-phase service entrance that does not require current transformers? 17. What is the minimum size meter cabinet for current transformers? 18. At what point is the system neutral conductor to be grounded? 19. What CEC table is used to calculate the size of a system grounding conductor? 20. What CEC table is used to determine the size of an equipment bonding conductor? 21. When is it necessary to remove the bonding screw from a main switch or panel board? 22. What value is used to determine the size of the grounding conductor for an ungrounded, three-wire, delta system? 23. What value is used to determine the size of a bonding conductor? 24. What is a ground detection device for a three-wire, delta system? 25. How is a fault indicated on a ground detection device? 26. How is the line side of a current transformer indicated? 27. Should the neutral conductor be bonded to the current transformer enclosure? 28. What size grounding conductor is required for a 600 A, three-phase service entrance? (Four-wire) 29. What size bonding conductor is required for a 200 amp motor control center? 30. Equipment not marked as to percentage of load may be loaded to what percentage of the rated amperage? 31. Why is it important to balance the loads on each phase of a three-phase system?

32. Calculate the minimum demand wattage for each apartment with the following information. 12 Units with living space of 80 sq meters and 14 kw range. House panel with 2-5 kw dryers, 3 kw lighting load, and a 10 kw water heater. All suite and house loads are 120/208 single-phase. Main service is 120/208 three-phase. 33. Calculate the demand wattage for the house panel in the information above. 34. Calculate the minimum allowable ampacity for the service conductors for the apartment building above. What size R90 wire is required if in a conduit? Unit 2 1. What is the CEC definition of a ground? 2. What is the definition of a branch circuit? 3. What is an isolating switch? 4. What is a neutral? 5. What is a splitter? 6. What is a code fuse? 7. What is an integral device? 8. What is service factor? 9. What is a tap conductor? 10. What do the letters DP indicate on a motor nameplate? 11. What size copper conductor is required for a load of 78 amps if the insulation is R90 and there are three conductors in a conduit?

12. What size aluminum conductor is required for a load of 120 amps if the insulation is TW75 and there are three conductors in a conduit? 13. What is the maximum amperage rating for each No. 3 TW75 copper conductor if there are 3 in a pipe? 14. What is the maximum amperage rating for each No. 3 R90 copper conductor if there are 4 in a pipe? 15. Is the neutral conductor in a conduit counted for de-rating purposes? 16. What size aluminum conductor (R90) is required when the load is 149 amps, the ambient temperature is 40 0 C, and there are three conductors in a pipe? 17. What is a neutral conductor called when it is used with two phase conductors to supply a load? 18. What size aluminum conductor (R90 in conduit) is required to feed a three-phase 125 kva, 120/208 V, demand load with an ambient temperature of 30 0 C. 19. How is the size of the neutral conductor determined in a three-phase system? 20. What is the standard color code for a three-phase system? 21. What is the definition of a supply service? 22. Do the demand factors of section 8 apply to motors and transformers? 23. When must a three-phase system be grounded? 24. What are the exceptions to the rule that a grounding conductor must be without joint or splice throughout the entire length? 25. What is the requirement for bare conductors, larger than No.8 AWG run in concrete?

26. A commercial building has a demand load of 190 kva, 120/208 V, three-phase. What is the minimum allowable amperage for the service conductors? 27. What size service is required? (Above) 28. What size conductors (R90 copper) are required for the service? (In pipe) (Above) 29. What size grounding conductor is required? (Above) 30. Which parts of an electrical system must be bonded together? 31. What is the minimum size bonding conductor for gas pipes and metallic sewer lines? 32. What are three methods for providing mechanical protection for underground conductors? 33. What is the main advantage of paralleling conductors? 34. What precautions must be taken when paralleling conductors? 35. What is a raceway? 36. What size conduit is required for 13 No.10 AWG (TW75) copper conductors? 37. What size conduit is required for 10 No.8 AWG (R90) copper conductors? 38. What size conduit is required for 3 No. 6 AWG (R90) copper conductors and 3 No. 3 AWG (R90) copper conductors? 39. What is the demand wattage for a hospital with outside measurements of 100 M long and 50 M wide? Intensive care units total 500 M 2 inside the total area. 40. What is the watts-per-meter for the question above? 41. What is the demand wattage for an apartment with an area of 110 M 2, 3 kw water heater, 5 kw dryer, and 15 kw of electric heat? (Individual room control)

42. What is the minimum allowable ampacity for the feeder conductors if the system is 120/208 V single-phase? (Above) 43. What is the demand wattage for 10 of the apartments above in a single building?