Similar documents
Minutes of 9 th Joint Co-ordination Committee meeting of IPPs granted LTA in WR held on at POWERGRID, Gurgaon

Shri Ravi Shanker S COO, GMR Chhatisgarh Energy Limited Village-Raikheda, Block-Tilda Dist.-Raipur Chhattisgarh

Distribution List - WR:

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

Agenda for 23 rd Meeting of WR Constituents regarding Connectivity & Long-Term Access applications in Western Region

Report on the 6 th Joint Co-ordination Meeting of IPPs granted LTA in WR

Minutes of 6 th Joint Co-ordination Meeting of IPPs granted LTA in ER held on at CC, POWERGRID

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon

HVDC Systems in India

Minutes of the 37 th Meeting of Standing Committee on Power System Planning in Western Region held on at Mumbai

1. Sh. J Mohan 7. Sh. Vikas Saxena 2. Sh. R. Srinivasan, 8. Sh. H. M. Jain 3. Sh.T.Ramakrishna Rao 9. Sh. C. Narasimha 10. Sh.

Agenda Note for 28 th meeting of the Standing Committee on Power System Planning of Northern Region

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

HIGH CAPACITY POWER TRANSMISSION CORRIDOR

List of Participants:

Case No. 163 of In the matter of

RFP Corrigendum No. 01

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

Report. the feasibility of

No. 15/3/2018-Trans-Pt(1) Government of India Ministry of Power Shram Shakti Bhawan, Rafi Marg, New Delhi **** OFFICE MEMORANDUM

Minutes of the 40 th Meeting of Standing Committee on Power System Planning in Western Region held on at NRPC, Katwaria Sarai, New Delhi

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

Guidelines for Solar Grid Power Projects

Indian Power System Framework

'J!TW ~ / Government of India ~ ~ / Ministry of Power ~ ~ ~1~<t1~UI / Central Electricity Authority ~ ~ ~ 4~~'1\J1-11 ~q;-;y ~

fctwr / Ministry of Power fct'wr!.ll ct, 0 1 / Central Electricity Authority m\iat '!, icf>.=t wwr - I Power System Planning & Appraisal Division-I

2. Chairman & Managing Director MPPTCL, Block No. 3 Shakti Bhawan, Rampur, Jabalpur

FAX : Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore FAX :

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

2. Member Secretary Eastern Regional Power Committee (ERPC) 14, Golf Club Road, Tollygunge Kolkata

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

SOLAR PLANT PERFORMANCE IN INDIA

Transmission System Bottlenecks & Planning for Mumbai Metropolitan Region

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India

Minutes of the 32 nd meeting of the Empowered Committee on Transmission held on January 17, 2014 at CEA, New Delhi

Renewable Regulatory Fund (RRF) Mechanism : -

In view of the above list of important grid element & exception list is as below:-

Scanned by CamScanner

~ ~ ~1~ctJ'{UI. 2 ~ ~, 9 ct>1~4i<'1ct> ~ (~~~I~~), ~, ~ 1iif, ~ ~\j\)~q~'1 ~ ct>1~~~, ~-8, ~-24, ~ ~ ~ ~ ~.

11Rij ~ / Government of India ~ ~ / Ministry of Power L ~ ~ ~1~<t>XUI / Central Electricity Authority ~~:~

CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

9 ;J;;fzr;:;/=a ~ Central Electricity Authority ~ ~ ~ ~ ~ ~ 0TI g Western Regional Power Committee ISO:

File No.CEA-PS-11-23(19)/1/2018-PSPA-I Division

Before the. Case No. 106 of 2009

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order :

Thereafter, the agenda items were taken up.

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA

1.0 Revised procedure for allocation of Inter State Transmission Project(s) under Tariff Based Competitive Bidding (TBCB)

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)

MINUTES OF THE 47 th SLCF MEETING HELD ON

Indian Energy Exchange December For Public Use

Enhancing Grid Stability in India

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan: R.K.Puram New Delhi

Solar Energy Corporation of India New Delhi-17

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

Agenda Note for Standing Committee Meeting of Power System Planning in ER

List of members of WRPC

CASE No. 35 of In the matter of

TRANSMISSION SYSTEM PLANNING UNDER UNCERTAINTY OF SUPPLY AND DEMAND IN INDIAN CONTEXT. I S Jha Y K Sehgal* Subir Sen

PCDO. Jan Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project

GOVERNMENT OF ANDHRA PRADESH ABSTRACT

EOC, Plot no. A-8A,Sector-24, Raiou r

uploaded shortly and can be downloaded from

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators

Policy & Regulatory Issues : Solar & Wind. Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Intra-State Availability Based Tariff (ABT)

SUBSIDY SCHEME FOR GRID CONNCTED SOLAR ROOFTOP POJECT IN ASSAM UNDER THE 14 MW RESCO AND CAPEX MODEL

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Uttar Pradesh Electricity Regulatory Commission, Lucknow

Ensuring adequacy in the planning and development of Inter State Transmission System Central Electricity Authority October 2013

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE

Frequently Asked Questions for Grid Connected Solar Rooftop Systems

Sub : In the matter of determination of Parallel Operation Charges. MPERC, Bhopal - Petitioner

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

EDS REPLY. Point No.2 Past-production details duly authenticated by DMG since Reply

26 Compendium of Policies, Regulations, Technical Standards & Financing Norms for Solar Power Projects

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

Bangladesh s Power Sector : At a Glance

enincon consulting llp, 2018 Visit: httpss://enincon.com E-REP Market Research Series

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Scaling Successful Mini-grid Programs: Experience of Bangladesh

Employees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

List of Important Grid Elements in Western Region. In compliance with IEGC 5.2(c), May 2013, Rev-0.

SOLAR PV INTEGRATION: ISSUES & CHALLENGES with NET METERING

The Electric Power System

Investor Presentation. For Official Use

Agenda of 11 th System Studies Meeting in NER

PRAGATI ENGINEERING COLLEGE

List of exemptions from compliance with the Technical Rules granted by Western Power after 1 July 2007

Distribution List Chief Engineer (SP & PA) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi FAX :

(i) COO (CTU), POWERGRID, Saudamini, Plot No.2, Sector 29, Gurgaon (Haryana)

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India

Transcription:

Minutes of the 19 th Joint Co-ordination Committee meeting of Generation projects granted Connectivity/LTA in Western Region (WR) held on 28.03.2018 at POWERGRID, Gurgaon 1. The 19th Joint Co-ordination Committee meeting of generation projects in Western Region was held at POWERGRID Office, Gurgaon on 28th Mar, 2018. The list of participants of the meeting is enclosed at Annexure-I. 2. After welcoming the participants by CTU, it was informed that Minutes of the 18th Meeting of the Joint Co-ordination Committee of generation projects which were granted LTA in Western Region held on 20.12.2017, were circulated vide letter ref. no. C/CTU/WR/OA/18JCC dated 21.02.2018. As no observations/comments are received, the minutes were confirmed as circulated. 3. It was re-iterated that JCC forum has been created for co-ordination purpose to attempt matching of generation s with the associated transmission system, and accordingly, the information given by generation developers is being taken into cognizance for co-ordination purpose which can be achieved only if the applicant/generation developers provide realistic & other status of generation project /dedicated line. However, for any substantial issue, it may kindly be submitted by official correspondence addressed to CTU, by clarifying the nature of issue to be dealt therein, as per the Regulatory framework. It was further informed that some letters are being sent by LTA customers related to relinquishment which are not clear in the content; therefore it was advised that such communication should strictly follow CERC Regulatory provisions (Regulation 18) specifically regarding notice, clearly therein mentioning the relinquishment quantum, date of relinquishment and consent for payment of applicable relinquishment charges. An advisory in this regard is available at CTU website. 4. It was also emphasized that Joint Coordination Committee meetings were institutionalized by the Hon ble Central Electricity Regulatory Commission to enable better coordination of generation and transmission projects in terms of the applicable CERC Regulations, Detailed Procedure and BPTAs/LTAAs. In this regard, it is also pertinent to mention that the BPTAs/LTAAs executed with the generation project developers/companies monitored hereunder provides that if any of the developers fail to construct the generating station/dedicated transmission line or makes an exit or abandons its project, then POWERGRID shall have the right to collect the transmission charges and/or damages as the case may be in accordance with the CERC Regulations, Orders etc. Further, as per the BPTAs/LTAAs, the construction phase bank guarantee submitted by the project developers/lta customers is also encashable in case of adverse progress of individual generations project(s)/unit(s) assessed during the Joint Coordination Committee meetings. It was also informed that in light of a number of recent CERC orders, wherein the Hon ble Commission has emphasized upon stricter implementation of the various Regulations, Procedures and statutory Agreements, CTU shall assess the progress of various generation projects and take appropriate actions in terms of the applicable provisions/clauses of the Regulations/Procedure/Agreements. Page 1 of 31

Page 2 of 31 5. CTU emphasized that generation developers should ensure completion of their dedicated transmission lines to match with the commissioning of transmission network in order to avoid bottling up of power. It was further stated that interim arrangements through LILO of existing lines were provided only as a contingency measure and the generation developers need to implement the final dedicated transmission system as the matter has been very seriously looked into by Hon ble CERC in Petition no. 112/TT/2013. 6. CTU informed that recently in no of cases, generation developers have submitted online additional details in respect of Connectivity (CON-4) only when the generation projects are on the verge of commissioning. Thus, a very short period of time is available for processing and issuance of Connection Offer (CON-5) and subsequent signing of Connection Agreement. As per the CERC Connectivity Regulations/ Detailed Procedure, 2009, the CON-4 details are to be furnished to CTU at least 2 (two) years prior to physical interconnection which may be noted by all the applicants. 7. All information exchanged, discussions/decisions taken in the JCC meeting shall be subject to the CERC Regulations and Detailed procedure made therein. 8. It was noted that some of the generation developers / applicants have been repetitively not attending the JCC Meetings. All such generation developers / applicants were requested to attend the future meetings so as to have a better co-ordination. 9. All those generation projects that have achieved COD and their respective dedicated transmission lines have also been commissioned, may not be required to attend JCC as the coordination work has already been over. Therefore they are not being called for further JCC meetings (Details of all such generation projects as per Table T1(i), T2(ii) & T3(iii)). 10. It was clarified that in terms of the recent CERC Orders and directions, the liability to pay transmission charges shall commence irrespective of opening of LC and signing of TSA. In default thereof, necessary action in terms of CERC Regulations including curtailment of STOA may be taken. Regardless of the said CERC Orders, all DICs are duty bound to establish payment security mechanism (LC) under Regulation 12 (8) of CERC (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010. 11. Regarding execution of TSA, it was informed that under the applicable provisions of CERC (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010 and CERC Orders pronounced thereupon, TSA notified under Regulation 13 is the default transmission agreement and mandatorily applies to all DICs. 12. Further, it was also brought to the attention of all the participants that CERC vide Order in Petition 229/RC/2015 wherein inter alia it has been emphasized that all Designated ISTS Customers (DICs) of ISTS are bound to establish payment security mechanism (LC) and pay transmission charges from the date of commissioning of associated transmission system or

Page 3 of 31 d date under BPTA, whichever is later. In case of default in payment of transmission charges and/or maintaining LC, the DICs TSA shall be liable for termination/suspension and shall thus be ineligible to inject power into the ISTS. 13. The participants of the meeting were informed that as per a recent order of Hon ble CERC in petition no. 229/RC/2015 (dated 08.03.18), the commission has held that where the entire transmission system has been commissioned but the generator has not established payment security mechanism and/or the generating station has not been commissioned, CTU shall operationalize the LTA from the date of the commissioning of the entire transmission system and raise the bills as per Regulations in vogue. In case, a particular generator has carried out certain transactions under STOA / MTOA after the date of commencement of LTA i.e. date of commissioning of entire transmission system, the charges already paid towards such transactions shall be offset from the bills to be raised for LTA. If the generator does not open the LCs, it shall be denied medium term open access and short term open access till the LCs are opened. Thereafter the LTA customers were requested to update the progress of their generation projects and the discussion are summarised below: Status of the Generation Projects HIGH CAPACITY TRANSMISSION CORRIDOR IV (Transmission System Associated with IPPs near Bilaspur complex in Chhattisgarh & MP projects) All the generation projects in Corridor-IV are commissioned /abandoned and their corresponding dedicated/connectivity transmission lines have also been commissioned. Sl. / LTA RAIGARH (KOTRA) COMPLEX 1 RKM Powergen Ltd (4X360) 819 550 350 Target Beneficiaries HIGH CAPACITY TRANSMISSION CORRIDOR V (Transmission System Associated with Chhattisgarh IPPs) WR NR SR 419 150 200 200 0 UP 200MW (18 th JCC) U1/U2: commissioned U3: synchronized, COD Nov 17 U4: Mar 18 (19 th JCC) U1/U2: commissioned U3: synchronized, COD Nov 17 U4: Apr 18 Dedicated / Connectivity line & Status 400kV RKM- Raigarh PS (Near Kotra) D/c (Quad) line 28.10.16 () 200 MW (NR) already operational since 30.11.2016. Further LTA for 819 MW operationalized with effect from 01.10.2017. Based on M/s RKMPL s successive requests for relinquishment of LTA, 819MW

Sl. 2 3 4 / LTA Athena Chhattisgarh Power Ltd. (2X600) SKS Power Gen. (Ch) Ltd. (4X300) Visa Power Ltd. (1X600+1X660) Target Beneficiaries WR NR SR 683 342 341 NIL 683 319 364 NIL (18 th JCC) Not attended U1: Mar 18 U2: Sep 18 (as per 16 th JCC) Not attended (U1: 06.10.17 U2: Dec 17 U3:Dec 21 U4:Mar 22 as per letter dt. 15.12.17) Page 4 of 31 (19 th JCC) Not attended U1: Mar 18 U2: Sep 18 (as per 16 th JCC) Not attended (U1: 06.10.17 U2: Dec 17 U3:Dec 21 U4:Mar 22 as per letter dt. 15.12.17) 678 478 200 NIL Not attended Not attended Dedicated / Connectivity line & Status has been reduced to 550MW vide CTU letter dtd 15.11.17 w.e.f. 01.11.17 and further to 350MW vide CTU letter dtd. 05.01.18 w.e.f. 01.01.18. 400kV Athena - Raigarh PS (Near Kotra) D/c (Quad) line works completed and test charged during April 16 400kV SKS - Raigarh PS (Near Kotra) D/c line (Quad) - 400kV Visa Power - Raigarh PS (Near Kotra) D/c (Triple) line - Jun 17 As per 15th JCC, 92% of the generation project is completed. However, project is facing financial constraint for which the project developer is making efforts. Consistent absence from JCC meetings. Accordingly, there is no update on the progress of the project. Action on account of adverse progress may be taken in terms of BPTA/Regulations. Consistent absence from JCC meetings. Accordingly, there is no update on the progress of the project. Action on account of adverse progress may be taken in terms of BPTA/Regulations. However, Petition 169/MP/2017 and 253/MP/2017 filed before CERC for relinquishment of 170MW & 513MW respectively. Consistent absence from JCC meetings. Accordingly, there is no update on the progress of the project available. Action towards the adverse progress may be taken in terms of

Sl. / LTA JANJGIR-CHAMPA COMPLEX 5 KSK Mahanadi Power Co. Ltd. (6X600) 2340 1900 Target Beneficiaries WR NR SR 2340 840 400 0 1000 0 500 Tamil Nadu: 500 MW UP: 1000 MW (18 th JCC) U-3/4: U1: Sep 18 U2: 31.12.2017 (COD) U-5/6: 31.07.2018/ 31.12.2018 (19 th JCC) U-3/4: U1: Jan 19 U2: U-5/6: 31.07.2018/ 31.12.2018 (status of U5/6 was not updated by KSKMPCL) Dedicated / Connectivity line & Status BPTA/Regulations. In the order dated 28.02.2018 in petition 61/MP/2017, CERC has rejected that the delay in commissioning of the generation project of the Petitioner due to cancellation of coal block is affected by force majeure. And has held that the Petitioner shall be liable to pay the transmission charges from the dates of commissioning of the transmission assets within the scope of POWERGRID. Further, Hon ble CERC has disallowed VISA to relinquish without liability. 400kV KSK Champa Pooling Station 2xD/c (Quad) 1 st D/c line commissioned in Oct 16; 2 nd D/c by Dec 18 Representative informed that 54 out of 83 foundations are completed. LTA for 1900MW had been operationalized. In the 18th JCC Meeting, representative had stated that they will open the requisite LC by 31.12.2017. However, the LC has not yet been opened. As per CERC order in 229/RC/2015, KSK is required to open LC within 30 days of CERC order, otherwise necessary actions as per applicable CERC regulations including curtailment of MTOA/STOA may be taken. 6 Lanco Amarkantak Power Pvt. Ltd. 858 858 0 0 NIL Not attended (U-3: Sept 18 U-4: Dec 18) Not attended. (Status submitted LANCO Champa PS 400kV D/c (Quad) As per status submitted on 28.03.2018, the promotor and EPC Contractor of the project, Page 5 of 31

Sl. 7 Sl. 1 / LTA (2X660) Vandana Vidyut Ltd. (2X135+1X270) / LTA Mahan (Essar power Ltd.(2X600) Target Beneficiaries WR NR SR 265 165 100 1200 450 CSPTCL : 25 MW (18 th JCC) U1&2:Under forced shutdown since Jan 15 U3: Held up as per status sent vide letter dt. 18.12.17) Page 6 of 31 (19 th JCC) through email dtd 28.03.2018: U3 & U4: 84% overall progress) U1&2:Under forced shutdown since Jan 15 U3: unit dropped considering the nonavailability of power demand/ppa for already commissioned capacity (as per status sent vide letter dt. 26.03.18) Other Generation Projects in Western Region Target Beneficiaries WR NR ER SR 450 0 0 0 ESIL : 450 MW PPA with ESIL has (18 th JCC) U-1: U-2: synchronized (19 th JCC) U-1: U-2: synchronized Dedicated / Connectivity line & Status line - (Status LITL was admitted to NCLT in submitted through August 2017 for Corporate email dtd Insolvency Resolution Process 28.03.2018: (CIRP) initiated by LITL Total Tower : 144 lenders, at present the work is Foundation suspended. Project Lenders Completed: 119 are taking steps required for Erection Completed : restart and completion at the 108 earliest. Stringing 11.5 Action on account of adverse Kms) progress may be taken in terms of BPTA/Regulations. Vandana Vidhyut Dharamjaygarh PS 400kV D/c line : construction work of line is presently on hold due to financial hurdles Dedicated / Connectivity line & Status Mahan TPS WR PS 400kV D/c line Work has been Project is presently disconnected from the Grid as the interim LILO connectivity of Korba-Birsinghpur line has been discontinued since Apr 17. M/s VVL has been deregistered as a user of WRLDC w.e.f. 01.05.2017. Appropriate action may be taken in terms of BPTA/Regulations. The representative of Essar informed that as per the status submitted by EPTCL :

Sl. 2 3 / LTA Karnataka Power Corporation Ltd (2X800) Essar Power Gujarat Ltd. (4X660 + 4 X150) Target Beneficiaries WR NR ER SR been terminated 763 0 0 0 763 NIL 250 0 0 0 0 250 0 NIL (18 th JCC) Page 7 of 31 (19 th JCC) (04.08.17) (04.08.17) Extension granted by CERC for COD by 04.05.18 Not attended As per 15 th JCC : U-1 : 48 months U-2 : 54 months (from the date of issue of LOA for BTG package) U1: 36 months after receipt of approvals and confirmation of viability of Project which is expected by Project is uncertain. Project is on hold due to pending approvals and no power offtake beneficiaries Dedicated / Connectivity line & Status started by Essar Power Transmission Co Ltd. Expected completion by Jun 18. KPCL - Champa PS 400kV D/c (Quad) line: to match with Generation project Salaya TPS - Bachau 400kV D/c line by EPTL - advanced stage of completion 942 out of 942 foundations and 942 out of 942 towers have been erected and stringing has been done for 298km out of 337km (i.e. 39km remaining) APTEL in its order in DFR 1052 of 2018 dated 27.03.2018 has granted extension to complete the dedicated line till 30.06.2018 with no further extensions to be entertained. EPMPL is yet to open the requisite LC and sign supplementary agreement. MOEF clearance still awaited. Coal Block is yet to be allocated. No progress since last JCC. Essar Power Gujarat is before APTEL in an appeal 237 of 2017 against CERC order in Petition 440/MP/2014 regarding encashment of the bank guarantee

Sl. 4 / LTA NPCIL (Kakrapar) (2X700) Target Beneficiaries WR NR ER SR (18 th JCC) Sept 20. U2: Nothing Specified U3 & U4: Project on Hold U5, U6, U7, U8: Project on hold (19 th JCC) 1400 1400 0 0 0 ** Not attended Not attended Dedicated / Connectivity line & Status in place. on account of the adverse progress of the generating station in terms of the Transmission Service Agreement. Relinquishment for 250MW requested by EPGL vide letter dtd. 11.04.17. Request to be dealt with based on outcomes in above petition. Further, petition 122/MP/2017 filed for KAPP S/W is ready. Both ckt of KAPP- Navsari & Kapp- Vapi connected at KAPP S/W as contingency arrangement. relinquishment of 250MW without liability in CERC. TSA has not been signed by Essar Power Gujarat Ltd. yet. Developer neither attended the meeting nor forwarded progress report. Developer is required to submit the progress report as per the format attached with the meeting notice (also available on website). 5 NTPC (Lara-I) (2X800) 1586.51 1586.5 1 0 0 0 NIL U1 : synchronized (09.09.17), Not attended. Status submitted on Lara - Raigarh PS (Kotra) 400 kv D/c line - Page 8 of 31

Sl. 6 7 / LTA NTPC (Khargone) (2X660) NTPC (Gadarwara) (2X800) 1244.10 1507.99 Target Beneficiaries WR NR ER SR 1244.1 0 1507.9 9 (18 th JCC) Commissioning Jan 18 U2 : Dec 18 (19 th JCC) 27.03.2018 as below: U1 : synchronized (09.09.17), Commissioning Mar 18 U2 : Jun 19 Not attended Not attended Dedicated / Connectivity line & Status Khargone STPP switchyard - Khandwa pool 400kV D/c (Quad) line - Jul'19 LILO of one circuit of Rajgarh Khandwa 400kV D/c line at Khargone (interim) - Feb'18 Gadarwara STPS - Jabalpur Pool 765kV D/c line Generation Projects granted Connectivity and LTA (LTA Agreement signed) Sl. 1. / LTA Inox Wind Infrastructure Services Ltd., Dayapar (500 MW) Target Beneficiaries NR ER WR SR 500 400 100 0 0 PPA has been signed for 250MW through PTC (UP :100MW, Bihar : (18 th JCC) 100 MW: Aug 18 100 MW: Sept 18 50 MW: Oct 18 50 MW: (19 th JCC) Not attended Dedicated / Connectivity line & Status IWISL (Dayapar) - Bhuj PS 220kV D/c line (high capacity conductor enabling at least 500MW power transfer at nominal voltage) along with associated line bays at both ends June 18. Section 68 obtained. As per 18 th JCC: Land for 16 acres obtained and applied for 157 hectares. Bay implementation agreement has been signed Advance towards Page 9 of 31

Sl. 2. / LTA Srijan Energy System Pvt. Ltd. (300MW) Target Beneficiaries NR ER WR SR 50MW, Jharkhand : 50MW & BSES Rajdhani : 50MW) 300 150 0 90 60 Nil (18 th JCC) Jan 19 100 MW: Feb 19 100 MW: Mar 19 20 MW: 31.03.19 120 MW : 30.09.19 120 MW : 31.03.20 40 MW : 31.05.20 (19 th JCC) 20 MW: 31.03.19 120 MW : 30.09.19 120 MW : 31.03.20 40 MW : 31.05.20 Dedicated / Connectivity line & Status SESPL switchyard Bhuj PS 220kV D/c line along with line bays at both ends. Route finalized. Forest application approved from State Govt., under process at MoEF. bay implementation has been made. 250 MW bid secured in SECI-I & 250 MW in SECI-II. Revenue land for 259 locations (for about 518 MW) under possession. Defence NOC obtained for 181 locations (362MW). State Nodal Agency s developer permission obtained for 118 locations (236MW). Stage-1 forest clearance received for 297 hectares. Bay implementation agreement has been signed and consultancy fee paid. POWERGRID has provided draft bid documents, discussions clarifications ongoing. & Page 10 of 31

Sl. 3. / LTA Gujarat Power Corporation Limited, Radhanesda (700MW) Target Beneficiaries NR ER WR SR (18 th JCC) 700 0 0 700 0 NIL Dec 19 (19 th JCC) Not attended As per status submitted through letter dtd 26.03.18: Dec 19 Dedicated / Connectivity line & Status Banaskantha (Radhanesda) Solar Park Banaskantha (Radhanesda) [GIS] pooling station 220kV 2xD/c line alongwith associated line bays at Solar Park As per status submitted through letter dtd 26.03.18: Total land (1407Hactor) acquired. Pollution clearance & financial closure pending Route survey for the line begin soon M/s GPCL shall be liable for payment of transmission charges from the date of commissioning of transmission system as per CERC Regulations. 4. Renew Power Ventures Pvt. Ltd., Bhuvad (400MW) 300 200 50 50 0 250MW: May 19 150 MW: Jun 20 Page 11 of 31 250MW: May 19 150 MW: Jun 20 RPVPL switchyard - Bhachau 220kV D/c line along with associated line bays at both ends (to be constructed by RPVPL) * Route survey completed. Line (43kms) is not passing through any forest land. Approval under section 68 of CEA has been obtained. Approval u/s 164 is yet to be obtained. 260 acres out of 370 acres land has been acquired. DILR for 150 locations obtained. Demand note from collector for 12 locations has been received. Joint MoU has been signed along with Ostro for sharing of common infrastructure for entry into the GIS substation. Bay implementation agreement has been signed and

Sl. 5. / LTA Ostro Kutch Wind Pvt. Ltd., Bachau (300MW) Target Beneficiaries NR ER WR SR 300 300 0 0 0 (18 th JCC) Ph I (150MW) : Jun 18 Ph II (100MW): Sept 18 (19 th JCC) Ph I (150MW) : Jun 18 Ph II (100MW): Sept 18 Dedicated / Connectivity line & Status OKWPL switchyard - Bhachau 220kV D/c line along with associated line bays at both ends (to be constructed by OKWPL)* Approval under section 68 and 164 is available. The line survey is completed. 256 towers are to be erected, 232 tower foundations completed, 232 tower erection completed. 44.2 km out of 69 km stringing done. Pooling substation construction has been completed & testing in progress. GIS civil activity completed. consultancy fee paid. Work awarded to Siemens. 250 MW bid secured in SECI-II. PSA between SECI & buying DISCOMs signed on 24.11.17. PPA b/w seller & SECI signed on 02.01.18. LTA Agreement signed on 29.01.2018. 62 out of 125 Machine foundations completed and 8 erected. DILR obtained for 260 locations. Demand note for 56 locations (~112MW) received from district collector. Bay implementation agreement has been signed and consultancy fee paid. PPA signed for 250 MW through PTC through SECI-I bids. Page 12 of 31

Sl. 6. 7. / LTA Rewa Ultra Mega Solar Ltd. SEI Sunshine Power Private Ltd. (180MW) 750 Target Beneficiaries NR ER WR SR 200 99 0 550 651 0 180 180 0 0 0 MPPMCL (651 MW) DMRC (99 MW) subject to submission of Delhi STU NOC Tata Power Delhi Distribution Ltd. 180 MW (18 th JCC) Not attended As per 17 th JCC: Feb 18 (part commissio ning) Sep 18 (19 th JCC) 5MW by end of April 18 and entire 750MW progressiv ely by Jan 19 Not attended Dedicated / Connectivity line & Status Transmission system for Connectivity RUMS Ltd. switchyard Rewa PS 220kV 3xD/c line along with associated bays at Solar Park (to be implemented by generation developer) Establishment of 400/220kV, 1x500 MVA Pooling station at Rewa LILO of 1st circuit of Vindhyachal STPS-Jabalpur 400kV 2nd D/c line (ckt- 3&4) at Rewa PS 6 Nos. 220kV Line bays at Rewa PS (for RUMS-Rewa PS 220kV 3xD/c) Connected at STU grid - 220kV Shivpuri(MPPTCL) Section 68 yet to be applied. STU connectivity obtained. Sep 18. The representative was requested to sign the LTA Agreement as per revised intimation dated 28.03.2018 at the earliest. Representative was informed about liability of payment of transmission charges upon commissioning of associated tr system. As per 18 th JCC, Section 68 approval not yet obtained. 700 acres of land secured and under possession. EPC contact awarded. Work on connectivity line (8-10 Km) is yet to be started. Page 13 of 31

Generation Projects granted only Connectivity Sl. Connectivity 1 Adani Green Energy Ltd., Sami (300MW) 2 BLP Vayu (Project 2) Pvt. Ltd., Bololi (100MW) 3 Wind World (India) Ltd. Mumbai (WWIL) (500MW) Connectivity Schedule (TA/Intimation) (18 th JCC) Page 14 of 31 (19 th JCC) Dedicated / Connectivity line & Status 300 Dec 2017 Dec 19 Dec 19 AGEL - Sami (Adani) 220 kv D/c line along with associated line bays at both ends (under developer scope) yet to be started 1x500 MVA, 400/220 kv ICT at Sami (Adani) substation 100 31 Aug 2018 Dec 18 Dec 18 500 31 Sep 2018 U-1: Mar 19 U-2: Jul 19 U-3: Nov 19 U-4: Mar 20 U-5: Jul 20 Project is uncertain as of now U-1: Mar 20 U-2: Jul 20 U-3: Nov 20 U-4: Mar 21 U-5: Jul 21 BLPVPL (Bololi)-Kolhapur (GIS) 220kV S/c line along with associated line bays at both ends along-with Installation of 1*500MVA, 400/220kV ICT at Kolhapur GIS yet to be started WWIL (Walka Mota)-Bhuj PS 220kV D/c (Twin ACSR moose equivalent conductor) line along with associated line bays at both ends Sec-68 received from CEA. No physical progress on transmission line. 62.7 acres pvt. land out of 1500 acres required land in possession. Implementation of the generation project is dependent on the future of SECI bids/state bids. No action towards implementation of generation project as well as dedicated connectivity system. No land acquired. No work started. Applied lease for revenue land. Approval from collector is awaited. Land for 55 locations out of 250 has been acquired. DILR NOC received for all 250 locations. Stage 1 ín-principle forest clearance for 25 locations obtained. Implementation of the generation project is dependent on the future of SECI bids/state bids.

Sl. Connectivity Connectivity Schedule (TA/Intimation) (18 th JCC) (19 th JCC) Dedicated / Connectivity line & Status 4 Orange Rajkot Wind Power Pvt. Ltd. (ORWPL) (Hajapar) 100 Ph-1 : 31 Oct 2018 Ph-2 : 31 Mar 2019 Ph-1 : Jun 19 Ph-2 : Sept 19 Sep 19 to Dec 19 ORWPL (Hajapar) - Bhuj PS 220kV S/c line along with associated line bays at both ends.- line survey completed Yet to apply for Section 68. Collector Allotment for 39 locations has been received. Further, for 42 locations DILR NOC received. Implementation of the generation project is dependent on the future of SECI bids/state bids. 5 Suzlon Power Infra Ltd. (SPIL) (Baranda) 250 Ph-1 : 31 Mar 2019 Ph-2 : Not provided Ph-3 : 31 Mar 2020 Ph-1 (125MW) : Mar 19 Ph-2 (62.5 MW): Jun 19 Ph-3 (62.5 MW) : Sep 19 Ph-1 (125MW) : Mar 19 Ph-2 (62.5 MW): Jun 19 Ph-3 (62.5 MW) : Sep 19 (vide email) SPIL (Baranda) Bhuj PS 220 kv S/c (single ACSR moose equivalent conductor) line along with associated line bays at both ends Feasibility check work in progress. Acquired 90 hectares out of 120 hectares. Substation land under acquisition.. 6 Suzlon Power Infra Ltd. (SPIL) (Fulra) (1X50 + 2X100) 250 Ph-1 : 31 Mar 2019 Ph-2 : Not provided Ph-3 : Not provided Ph-1 (126 MW) : Oct 18 Ph-2 (63 MW) : Dec 18 Ph-3 (63 MW) : Feb 19 Ph-1 (126 MW) : Oct 18 Ph-2 (63 MW) : Dec 18 Ph-3 (63 MW) : Feb 19 (vide email) SPIL (Fulra) Bhuj PS 220 kv S/c (single ACSR moose equivalent conductor) line along with associated line bays at both ends Feasibility check work in progress Acquired 50 hectares out of 120 hectares. Substation land under acquisition. 7 M/s Inox Wind Infrastructure Services Ltd (Kotda) 500 Ph-1 : 31 Mar 2019 Ph-2 : 30 Jun 2019 Ph-3 : 30 Sep 2019 Ph-4 : 31 Oct 2019 150 MW: Mar 19 150 MW: Jun 19 150 MW: Sep 19 50 MW: Oct 19 Page 15 of 31 Not attended IWISL (Kotda) - Bhuj PS 220kV D/c line (high capacity conductor enabling at least 500MW power transfer at nominal voltage) along with associated line bays at both ends No land is under possession. Representative informed that Implementation of the generation project is dependent on the future of SECI bids/state bids.

Sl. Connectivity Connectivity Schedule (TA/Intimation) (18 th JCC) (19 th JCC) Dedicated / Connectivity line & Status No action towards implementation of generation project as well as dedicated connectivity system has been undertaken. 8 M/s Adani Green Energy Limited (AGEL) 9 M/s Adani Green Energy Limited (AGEL) 10 M/s Adani Green Energy Limited (AGEL) 11 Ostro Kutch Wind Pvt. Ltd. (OKWL), Bhuj 500 - Dec 19 Dec 19 AGEL Khavda (500MW Wind Farm) Bhuj PS 400 kv S/c line along with associated line bays at both ends 750 - Dec 19 Dec 19 AGEL Khavda (750MW Solar Farm) Bhuj PS 400 kv S/c line along with associated line bays at both ends 1000 - Dec 19 Dec 19 AGEL Khavda (1000MW Wind Farm) Bhuj PS 400 kv D/c line along with associated line bays at both ends 300 Ph-1 : 31 Mar 2019 Ph-2 : 30 Sep 2019 Ph-3 : 31 Mar 2020 Mar 19 Mar 19 OKWL Bhuj Switchyard Bhuj PS 220 kv S/c (twin ACSR zebra equivalent conductor) line along with Page 16 of 31 No land is under possession. Defense NOC not received yet. It was insisted that subject to the facilitations that may be incorporated in the new Wind Connectivity procedure, AGEL should sign the LTAA w/o any further delay. Accordingly, CTU shall take action as per extant procedure or CERC order received in the mean-time. Petition no. 18/MP/2018 filed before CERC to allow time extension for signing of LTA & TSA. 146 hec of land (292MW) acquired. Representative informed that

Sl. Connectivity Connectivity Schedule (TA/Intimation) (18 th JCC) (19 th JCC) Dedicated / Connectivity line & Status associated line bays at both ends. No physical progress on transmission line. Implementation of the generation project is dependent on the future of SECI bids/state bids. Page 17 of 31

List of generation projects commissioned along with the dedicated/connectivity lines and further coordination not required HIGH CAPACITY TRANSMISSION CORRIDOR IV (Transmission System Associated with IPPs near Bilaspur complex in Chhattisgarh & MP projects) Table T1 (i) Sl. / LTA CHATTISGARH IPP 1 2 3. Maruti Clean Coal (1X300) Dheeru Power Gen Chhattisgarh State Power Trading Co. Ltd MADHYA PRADESH IPP 4. Jaiprakash Power Ventures Ltd. (2X660) 171 250 Target Beneficiaries WR NR 126 0 45 250 Rajasthan: 250 MW 450 367.5 82.5 NIL 432 14 1240.8 465.3 260 14 853.5 465.3 172 387.3 0 14 MW (from MCCPL) MP-465.3 MW (Operational) Last updated status U-1:, COD in Jul 15 9 th JCC : Uncertain Approached CERC for relinquishment 9 th JCC U-1/2 : Dedicated / Connectivity line & Status LILO of one ckt of ACB TPS - WR PS(Bilaspur) 400kV D/c line is Dheeru gen - WR PS (Bilaspur) 400kV D/c line Jaiprakash - Satna 400kV D/c (High Capacity) line commissioned Matter on issue of payment of Transmission charges for alleged force majeure is pending before APTEL Matter is sub judice in Dwarka Court. In one of the pleadings, project developer has informed the Court that project is abandoned. CERC vide its ROP dated 28.6.2016 in the CSPTrCL Petition 84/MP/2016 has directed CTU to utilize the relinquished capacity for grant of pending LTA applications and CTU as per the direction has allocated the relinquished capacity for grant of LTA to the pending applications. 465.3 MW under operation to MP on firm basis and balance quantum of 775.5 MW has been relinquished as per JPVL s prayer in Petition no. 293/MP/2015. Relinquishment charges to be determined in accordance with outcome in Petition no. 92/MP/2015. JPVL has filed appeal in APTEL. Page 18 of 31

Sl. 5. 6 / LTA Aryan MP Power generation Pvt. Ltd (2X600) Bina Power Supply Company Ltd (2X250) Target Beneficiaries WR NR 1122.0 841.5 280.5 NIL 265.35 132.68 132.67 NIL Last updated status 9 th JCC: Abandoned 10 th JCC: Dedicated / Connectivity line & Status Aryan MP - Vindhyachal Pooling station 400kV D/c (High Capacity) Bina TPS - Bina (PG) / Bina (MPPTCL) 400kV D/c line - Petition no. 69/MP/2014 filed for relinquishment of 1122 MW. CERC has ordered that relinquishment is subject to payment of relinquishment charges. The bank guarantee of Rs.56.1 Crores has been encashed. Aryan has approached the Central commission by filing petition 242/MP/2017. Entire LTA relinquished by BPSCL in Petition no. 98/MP/2015 filed before CERC. Relinquishment charges to be payable in terms of outcome in Petition no. 92/MP/2015. Appeal filed before APTEL. HIGH CAPACITY TRANSMISSION CORRIDOR V (Transmission System Associated with Chhattisgarh IPPs) Table T1 (ii) Sl. / LTA Quantu m Target Beneficiaries WR NR SR Last updated status Dedicated / Connectivity line & Status RAIGARH (KOTRA) COMPLEX 1. Korba West Power Co. Ltd. (1X600) 240 140 100 CSPTCL: 5% U-1: Mar'14 (COD) 400kV Korba (W)- Raigarh PS (near Kotra) D/c line KWPCL has filed petition 269/MP/2017 to defer the operationalization of LTA. Generation has met a major accident and is not generating. 2. DB Power Ltd. (2X600) 705 530 322 247 175 250 0 208 Tamil Nadu: 208 MW Rajasthan- 250 U-1: Feb 14 U-2: Mar 15 (COD) DB Power Raigarh PS (near Kotra) 400kV D/c (Quad) line - commissioned Page 19 of 31

Sl. / LTA Quantu m RAIGARH (TAMNAR) COMPLEX 3. 4. 5. Jindal Power Ltd. (4X600) Jindal Power Ltd. (400 MW) TRN Energy Pvt. Ltd (2X300) RAIGARH COMPLEX 6. 7. GMR Chhattisgarh Energy Pvt. Ltd. (2X685) Chhattisgarh State Power Trading Co. Ltd 1400 1100 Target Beneficiaries WR NR SR 700 110 0 700 557.5 367.5 0 732.5 Tamil Nadu : 400 MW Kerala: 190 & 142.5 MW Last updated status 10th JCC: U-1/2: Mar 14 (COD) U-3: Jan 15 (COD) U-4: 400 400 NIL 393 243 3 150 + 240 UP : 390 MW 816 386 430 NIL 5900 604 3542 1207 604 2358 412 274 MW U-1: 19.8.16 (COD) U-2: commissioned U-1: Jun 15 (COD); U-2: Mar 16 Dedicated / Connectivity line & Status JPL Raigarh PS (near Tamnar) 2xD/c 400kV (Quad) all 4 ckts commissioned. 400kV TRN - Raigarh PS (near Tamnar) D/c line GMR - Raipur PS 400kV D/c (Quad) line - commissioned (Jan 14) LTA of 400 MW to Tamil Nadu and 190MW to Kerala are under operation. Relinquishment of 110MW from WR & 190MW from NR wef 01.02.18 communicated vide letter dated 31.01.18. LTA for 393 MW had been operationalized in terms of CERC Orders in Petition 84/MP/2016. Petition filed before CERC in Petition No: 11/MP/2017 regarding relinquishment of 386MW in WR and balance 430 MW to be kept in abeyance. Delhi High court vide order dated 03.11.17 has stayed any coercive action against applicant. As per CERC orders dated 28.06.16 in Petition84/MP/2016, relinquishment of 4699 MW (Corridor IV & V) LTA to CSPTrCL has been approved. JANJGIR-CHAMPA COMPLEX 8. Bharat Aluminium Co. Ltd. (BALCO- 4X300) 295 100 0 100 0 0 295 Tamil Nadu : 200 MW Kerala : 95 MW U-1/2:, U-3/4: commissioned Balco Dharamjaygarh / Korba PS 400kV D/c line Page 20 of 31

Other Generation Projects in Chhattisgarh & Madhya Pradesh Table T1 (iii) Sl. 1 2. / LTA PTC(Lanco-II) (1X300) MB Power Madhya Pradesh Ltd (2X600) Target Beneficiaries WR NR ER SR 300 0 300 0 0 392 200 192 0 0 Haryana 300 MW UP-192 MW (Operational) Latest updated status U-1: May 15 (COD) U-2: Mar 16 Dedicated / Connectivity line & Status Pathadi TPS - Bipalspur PS (near Sipat) 400kV D/c (Quad) line - commissioned MB TPS - Jabalpur PS 400kV D/c (Triple) line LTA of 300 MW to Haryana operational. LTA of 392 MW operational 3. 4 5 6 7 Dhariwal Infrastructure Ltd. NTPC (Vindhyachal - V) (1X500) Jhabua Power Ltd (Ph I 1X600) MP Power Management Company Ltd. Torrent Energy Ltd. (3X400) 300 270 495.78 210 246 197.5 150 120 20 495.7 8 210 0 246 197.5 150 +20 0 0 100 Tamil Nadu: 100 MW UP: 170 MW 0 0 0 GoI Allocation Oct 15 (COD) 0 0 0 204.25 Kerala: 204.25 MW U-1: May 16 (COD) 0 0 0 NIL U-1: May 16 800 400 400 0 0 NIL Commissi oned LILO of one ckt of Bhadravati - Parli 400kV line at Dhariwal TPS - Interconnection at 400kV Bus of Vindhyachal TPS-IV switchyard Jhabua TPS - Jabalpur PS 400kV D/c (Triple) line - Jhabua TPS - Jabalpur Pool 400kV D/c (Triple) line: TEL(DGEN) TPS Navsari 400kV D/c (Triple) line commissioned LTA for 100 MW to Tamil Nadu and 34MW to NPCL (UP) are operational Balance LTA of 5.75 MW relinquished 197.5 MW LTA under operation and balance LTA of 48.5 MW relinquished TSA signed on 19.12.2016 by the Developer. Lead LTTC (M/s Torrent Energy Ltd.) to take relevant action as per TSA as M/s DGENTCL has confirmed that they are not taking up the project. Page 21 of 31

Status of the Transmission System HIGH CAPACITY TRANSMISSION CORRIDOR IV (Transmission System Associated with IPPs near Bilaspur complex in Chhattisgarh & MP projects) Transmission System under the Scope of POWERGRID: All elements have been commissioned. The details of elements are as below Sl. Scope of Transmission System 1 Indore- Vadodara 765kV S/c 2 Vadodara Pirana 400kV D/c (Quad) 3 Establishment of 765/400kV, 2x1500 MVA substation at Vadodara Status of other associated transmission lines All elements have been commissioned. The details of elements are as below Sl. Scope of Transmission System 1 765 KV S/C Bina - Gwalior line (3rd Ckt) 2 765KV S/C Gwalior-Jaipur line (2nd Ckt) 3 765 KV S/C Jaipur - Bhiwani line Transmission System under the Scope of POWERGRID HIGH CAPACITY TRANSMISSION CORRIDOR V (Transmission System Associated with Chhattisgarh IPPs) Establishment of Pooling Stations at Raigarh (Near Kotra) and Raipur for IPP Generation Projects in Chhattisgarh Part-1 All elements of part-1 have been commissioned. The details of elements are as below: Page 22 of 31

Sl. Scope of Transmission System 1 Raigarh Pooling Station (Near Kotra) Raipur Pooling Station 765kV D/c 2x240 MVAR line reactors at each end on both circuits 2 Raigarh Pooling Station (Near Kotra) Raigarh 400kV D/c 3 Raipur Pooling Station Raipur 400kV D/c 4 Establishment of 765/400kV 4x1500MVA Raigarh Pooling Station (near Kotra), 1x240 MVAR B/R at 765kV & 1x80 MVAR bus reactor at 400kV 5 Establishment of 765/400kV 1x1500MVA Raipur Pooling Station (1x240 MVAR B/R) Establishment of Pooling Stations at Champa and Raigarh (Near Tamnar) for IPP Generation Projects in Chhattisgarh Part-2 All elements of part-2 have been commissioned. The details of elements are as below: Sl. Scope of Transmission System 1 Champa Pooling Station Raipur Pooling Station 765kV D/c - 2x240 MVAR line reactors at Raipur 2 Raigarh Pooling station(near Kotra) Raigarh pooling station(near Tamnar) 765kV D/c 3 Champa Pooling Station Dharamjaygarh/Korba 765kV S/c 4 Raigarh Pooling Station (near Kotra) Champa Pooling Station 765kV S/c 5 Establishment of 765/400kV 6x1500MVA Champa Pooling Station, 1x240 MVAR B/R at 765kV and 1x80 MVAR bus reactor at 400kV 6 Establishment of 765/400kV 3x1500MVA Raigarh Pooling Station(near Tamnar) (1x240 MVAR B/R) Integration of Pooling Stations in Chhattisgarh with Central part of WR for IPP Generation Projects in Chhattisgarh Part-3 All elements of part-3 have been commissioned. The details of elements are as below: Sl. No Scope of Transmission System 1 Raipur Pooling Station Wardha 765kV D/c - 2x240 MVAR line reactor at Raipur Pooling Station and 2x330 MVAR line reactor at Page 23 of 31

Sl. No Wardha 2 Wardha bus reactor 1x330 MVAR Transmission System strengthening in Western part of WR for IPP Generation Projects in Chhattisgarh Part-4 All elements of part-4 have been commissioned. The details of elements are as below: Transmission System 1 Wardha Aurangabad (PG) 765kV D/c - 2x330 MVAR line reactors at Wardha and 2x240 at Aurangabad 2 Aurangabad(PG) Boisar 400kV D/c (Quad)- 2x63 MVAR line reactors at each end on both circuits 3 Establishment of 765/400kV 2x1500MVA Aurangabad (PG) S/s (1x240 MVAR B/R) 4 Augmentation of transformation capacity at Boisar by 1x500MVA System strengthening in North/West part of WR for IPP Projects in Chhattisgarh Part-5 All elements of part-5 have been commissioned. The details of elements are as below: Sl. Transmission System 1 Padghe Padghe(PG) 400kV D/c (Quad) 2 Vadodara Asoj 400kV D/c(Quad) 3 Aurangabad (PG) Padghe(PG) 765kV 1 D/c - 2x240 MVAR line reactors at each end on both circuits 4 Establishment of 765/400kV 2x1500MVA Padghe(PG) S/s [GIS] (1x240 MVAR B/R) System strengthening in Raipur-Wardha corridor for IPP Projects in Chhattisgarh Part-6 All elements of part-6 have been commissioned. The details of elements are as below: Sl. No Scope of Transmission System 1 Raipur Pooling Station Wardha 765kV 2nd D/c- - 2x240 MVAR line Page 24 of 31

Sl. No Scope of Transmission System 2 Reactor at Raipur Pooling Station and 2x330 MVAR line reactor at Wardha System strengthening in Wardha-Aurangabad corridor for IPP Projects in projects in Chhattisgarh Part-7 All elements of part-7 have been commissioned. The details of elements are as below: Sl. No Sl. No Scope of Transmission System 1 Wardha Aurangabad (PG) 765kV 2nd D/c 2x330 MVAR line reactor at Wardha and 2x240 line reactor at Aurangabad WR-NR HVDC interconnector for IPP Projects in Chhattisgarh Part-9 All elements of part-9 have been commissioned. The details of elements are as below: Transmission System 1 Establishment of 3000MW +800KV HVDC bipole terminal each at Champa Pooling station and Kurukshetra (NR) 2 Kurukshetra(NR) - Jallandhar 400kV D/c(Quad) one ckt. via 400/220kV Nakodar S/s 3 LILO of Abdullapur Sonepat 400kV D/c(triple) at Kurukshetra 4 Establishment of 400/220kV 2x500 MVA S/s at Kurukshetra Transmission elements being implemented by transmission licensee through tariff based competitive bidding process. Part-10 [TBCB award placed to succesful bidder Sterlite in Mar 12 with commissioning of 39 months(june 15)] All elements of part-10 have been commissioned. The details of elements are as below: Sl. No Scope of Transmission System 1 Aurangabad(PG) Dhule (IPTC) 765kV S/c line 2 Dhule (IPTC) Vadodara (PG) 765kV S/c line Page 25 of 31

3 Dhule (IPTC) Dhule (MSETCL) 400kV D/c Quad line 4 Establishment of 765/400kV, 2x1500MVA Dhule(IPTC) S/s Status of other Transmission Lines Sl. Transmission System Status Status No (as per 18 th WR JCC) (as per 19 th WR JCC) 1 Kurukshetra - Jind line (Q) 400KV D/C 2 Jabalpur Pooling Station - Bina 765 KV D/C line 3 Jabalpur PS-Bhopal 765kV S/c TBCB 4 Bhopal- Indore 765kV S/c TBCB 5 TEL(DGEN) TPS- Vadodara 400kV D/c - - ISTS licensee not taking 6 Navsari- Besthan 220kV - - up the implementation of line. 7 Jabalpur Poolin Stn. - Orai 765KV D/C line Apr 18 in Mar 18 8 Orai- Aligarh 765kV D/C Apr 18 1 st Ckt commissioned in Mar 18 and 2 nd Ckt commissioned in Apr 18. 9 Narendra (New Kudgi) - Kolhapur 765KV D/C line (initialy charged at 400KV) * 10 Kakrapar APP - Vapi line 400KV D/C 11 Vindhayachal PS- Jabalpur PS 765kV D/c Jun 18 Jun 18 TBCB 12 Lara STPS - Raigarh (Kotra) 400KV D/C line For supply of start-up power. 13 Kakrapar APP Navsari 400 kv D/c Line 14 765/400 KV Champa Pooling Station ( 6x1500MVA ) 15 765/400KV Jabalpur Pooling station (2x1500MVA) 16 765/400kV ICT at Vindhayachal PS(1x1500 MVA) 17 Lara- I TPS Champa Pooling Station 400kV D/c (Quad). 18 Up-gradation of +800kV, 3000MW HVDC bipole between Champa Pooling station Kurukshetra (NR) to 6000MW Dec 18 Dec 18 Page 26 of 31

Status of other Transmission System associated with LTA customers Sl. No LTA Transmission System Status (as per 18 th JCC) 1. Rewa Ultra Mega Solar Ltd. Transmission system required for LTA for transfer of 750 MW of power from REWA UMS, Madhya Pradesh to WR & NR which is under implementations as part of different schemes (i) Inter-Regional System Strengthening Scheme in WR and NR (Part-B) Jabalpur PS - Orai 765kV D/C line Orai - Aligarh 765kV D/C line Orai - Orai 400kV D/C (Quad) line LILO of one ckt of Satna - Gwalior 765kV 2xS/C line at Orai LILO of Agra - Meerut 765kV S/C at Aligarh LILO of Kanpur - Jhatikara 765kV S/C at Aligarh Apr 18 Status (as per 19 th JCC) in Mar 18/Apr 18 (ii) Transmission System Strengthening in WR-NR Transmission Corridor for IPPs in Chhattisgarh Up-gradation of ± 800kV, 3000MW HVDC bipole between Champa PS Kurukshetra (NR) to 6000MW Kurukshetra (NR) Jind 400kV D/c (Quad)- commissioned (iii) Additional Transmission system required for LTA Addition of 400/220kV, 2x500 MVA ICT at Rewa PS LILO of 2nd circuit of Vindhyachal STPS-Jabalpur 400kV 2nd D/c line (ckt-3&4) at Rewa PS 1x125 MVAr, 420 kv Bus Reactor at Rewa PS Page 27 of 31 Dec 18 Feb 18 (Matching with solar park generation) Dec 18 Line & S/s along with 2X500MVA, 400/220kV ICT charged in Mar 18. Balance 1 500MVA, 400/220kV ICT is anticipated to be ready by Sep 18

Sl. No LTA Transmission System Status (as per 18 th JCC) 2. SEI Sunshine Power Private Ltd. Inter-Regional System Strengthening Scheme in WR and NR (Part-B) Jabalpur PS - Orai 765kV D/C line Orai - Aligarh 765kV D/C line Orai - Orai 400kV D/C (Quad) line LILO of one ckt of Satna - Gwalior 765kV 2xS/C line at Orai LILO of Agra - Meerut 765kV S/C at Aligarh LILO of Kanpur - Jhatikara 765kV S/C at Aligarh Apr 18 Status (as per 19 th JCC) in Mar 18/Apr 18 3. Inox Wind Infrastructure Services Ltd. Transmission System Strengthening in WR-NR Transmission Corridor for IPPs in Chhattisgarh Up-gradation of ± 800kV, 3000MW HVDC bipole between Champa PS Kurukshetra (NR) to 6000MW Kurukshetra (NR) Jind 400kV D/c (Quad) - commissioned Common Transmission System requirement for transfer of power from Western Region to Northern Region & Eastern Region for IWISL- Dayapar (500MW) wind farm and AGEL - Khavda generation projects (500MW & 1000MW wind farms and 750MW solar park) A. Under implementation as part of Green Energy Corridor ISTS: i) Bhuj PS - Banaskantha PS 765kV D/c line#-sep 18 ii) Banaskantha Sankhari 400kV D/c line# -Sep 18 iii) Banaskantha PS - Chittorgarh PS 765kV D/c line#- Sep 18 iv) Chittorgarh PS - Chittorgarh (RVPN) 400kV D/c (quad) line# - commissioned #under implementation as part of Green Energy Corridors B. Additional Transmission System for LTA to ER & NR for IWISL- Dayapar (500MW) wind farm: i) Installation of 2x500MVA, 400/220kV ICT at Bhuj P.S.* *The ICTs are also required under Common Transmission System for LTA of M/s SESPL to WR, NR & SR Dec 18 Jul 18 Jul 18 Dec 18 Sep 18 Sep 18 Page 28 of 31

Sl. No LTA Transmission System Status (as per 18 th JCC) 4. Srijan Energy System Pvt. Ltd. (300MW) Common Transmission System for LTA to WR, NR & SR (i)installation of 2x500MVA, 400/220kV ICT at Bhuj PS Transmission System for LTA to WR (90 MW) (i)bhuj PS - Banaskantha PS 765kV D/c line - Sep 18 (ii)banaskantha Sankhari 400kV D/c line - Sep 18 Transmission System for LTA to NR (150 MW) (i)bhuj PS - Banaskantha PS 765kV D/c line - Sep 18 (ii)banaskantha PS - Chittorgarh PS 765kV D/c line - Sep 18 (iii)chittorgarh PS - Chittorgarh (RVPN) 400kV D/c (quad) line - commisisoned Transmission System for LTA to SR (60 MW) (i)wardha Nizamabad 765kV D/c line along with Nizamabad Dichpally 400kV D/c line (HTLS) (ii)nizamabad Hyderabad (Maheshwaram) 765kV D/c line along with associated 400kV transmission system. Jul 18 Mar 17 Jul 17 Status (as per 19 th JCC) Sep 18 Page 29 of 31

Annexure-I List of Participants in the 19 th Joint Co-ordination Committee meeting of Generation projects granted LTA in WR held on 28.03.2018 Sl. Name Designation Organization E-mail 1. Shiva Suman Dy. Director Central Electricity Authority shivvasuman@nic.in 2. Manoj Panda AGM Wind World India Ltd. manoj.panda@vaayuenergy.com 3. M Krishna Kumar Sr. Advisor Wind World India Ltd. krishna.kumar.m@vaayuenergy.com; mmkkpgrid@gmail.com 4. Dipak Panchal Manager Adani Green Energy Ltd. dipak.panchal@adani.com 5. Somil Garg Manager Ostro Kutch Wind Pvt. Ltd somil.garg@ostro.in 6. Ankushrao Dhane AGM Projects Orange Rajkot Wind Power Pvt. Ltd ankushraodhane@orangerenewable.net 7. Rajat Bhutani Manager Orange Rajkot Wind Power Pvt. Ltd rajatbhutani@orangerenewable.net 8. T. Rajesh Kumar Manager RKM Power Pvt. Ltd. t.rajeshkumar@rkmpower.in 9. Ajay Kumar Sr. Manager (Commercial) Essar Power M.P. Ltd. & Essar Power ajay.kumar22@essar.com Gujarat Ltd. 10. Vivek Gupta Manager Renew Power Ventures Pvt. Ltd. vivek.gupta@renewpower.in 11. S Vinod AVP Projects Renew Power Ventures Pvt. Ltd. vinod@renewpower.in 12. 13. Ujjwal Surana Sr. Manager-Regulatory & Project Developement Srijan Energy Systems Pvt. Ltd. ujjwal.surana@continuumenergy.in Ankit Kumar Manager KSK Mahanadi Power Co. Ltd. ankitkumar@ksk.co.in 14. S.N. Sharma Engineer Karnataka Power Corporation Ltd. kpclre@gmail.com 15. Ashish Ranjan Sr. Manager BLP Energy Pvt. Ltd. ashish.ranjan@enel.com 16. Balakishore Kollabathula AVP BLP Energy Pvt. Ltd. Balakishore.kollabathula@enel.com Page 30 of 31

Sl. Name Designation Organization E-mail 17. Avaneesh Shukla Executive Engineer Rewa Ultra Mega Solar Ltd. rumsinfo@mpnred.com; avaneesh.shukla3@gmail.com 18. Mukesh Khanna GM (CTU-Plg) Power Grid Corporation of India Ltd. mkhanna@powergridindia.com 19. P.S. Das Asst. GM (CTU-Plg) Power Grid Corporation of India Ltd. psdas@powergridindia.com 20. Jyoti Prasad DGM (CTU-Plg.) Power Grid Corporation of India Ltd. nishantjyoti@yahoo.com 21. Prahlad Saraswat DGM (Commercial) Power Grid Corporation of India Ltd. psaraswat@powergridindia.com 22. K K Jain CM (Commercial) Power Grid Corporation of India Ltd. kkjain@powergridindia.com 23. Anita A. Srivastava Manager (Commercial) Power Grid Corporation of India Ltd. anitas@powergridindia.com 24. Swapnil Verma Officer (Law) Power Grid Corporation of India Ltd. swapnilverma@powergridindia.com 25. Trupti Panigrahi Manager (BDD) Power Grid Corporation of India Ltd. trupti@powergridindia.com 26. Deepak Kumar Engineer (BDD) Power Grid Corporation of India Ltd. kumar.deepak@powergridindia.com 27. K.K. Thakur AGM POWERGRID WR-II kk.thakur@powergridindia.com 28. Pratyush Singh Sr. Engineer (CTU-Plg) Power Grid Corporation of India Ltd pratyush.singh@powergridindia.com 29. Shashank Shekhar Engineer (CTU-Plg) Power Grid Corporation of India Ltd shashankshekhar@powergridindia.com Page 31 of 31