Shri Ravi Shanker S COO, GMR Chhatisgarh Energy Limited Village-Raikheda, Block-Tilda Dist.-Raipur Chhattisgarh

Similar documents
Minutes of 9 th Joint Co-ordination Committee meeting of IPPs granted LTA in WR held on at POWERGRID, Gurgaon

Distribution List - WR:


SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

Minutes of 6 th Joint Co-ordination Meeting of IPPs granted LTA in ER held on at CC, POWERGRID

Agenda for 23 rd Meeting of WR Constituents regarding Connectivity & Long-Term Access applications in Western Region

Agenda Note for 28 th meeting of the Standing Committee on Power System Planning of Northern Region

1. Sh. J Mohan 7. Sh. Vikas Saxena 2. Sh. R. Srinivasan, 8. Sh. H. M. Jain 3. Sh.T.Ramakrishna Rao 9. Sh. C. Narasimha 10. Sh.

HVDC Systems in India

Minutes of the 37 th Meeting of Standing Committee on Power System Planning in Western Region held on at Mumbai

HIGH CAPACITY POWER TRANSMISSION CORRIDOR

Report on the 6 th Joint Co-ordination Meeting of IPPs granted LTA in WR

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I

FAX : Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore FAX :

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

'J!TW ~ / Government of India ~ ~ / Ministry of Power ~ ~ ~1~<t1~UI / Central Electricity Authority ~ ~ ~ 4~~'1\J1-11 ~q;-;y ~

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

Report. the feasibility of

Case No. 163 of In the matter of

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

2. Chairman & Managing Director MPPTCL, Block No. 3 Shakti Bhawan, Rampur, Jabalpur

No. 15/3/2018-Trans-Pt(1) Government of India Ministry of Power Shram Shakti Bhawan, Rafi Marg, New Delhi **** OFFICE MEMORANDUM

~ ~ ~1~ctJ'{UI. 2 ~ ~, 9 ct>1~4i<'1ct> ~ (~~~I~~), ~, ~ 1iif, ~ ~\j\)~q~'1 ~ ct>1~~~, ~-8, ~-24, ~ ~ ~ ~ ~.

Minutes of the 40 th Meeting of Standing Committee on Power System Planning in Western Region held on at NRPC, Katwaria Sarai, New Delhi

11Rij ~ / Government of India ~ ~ / Ministry of Power L ~ ~ ~1~<t>XUI / Central Electricity Authority ~~:~

Transmission System Bottlenecks & Planning for Mumbai Metropolitan Region

fctwr / Ministry of Power fct'wr!.ll ct, 0 1 / Central Electricity Authority m\iat '!, icf>.=t wwr - I Power System Planning & Appraisal Division-I

RFP Corrigendum No. 01

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan: R.K.Puram New Delhi

9 ;J;;fzr;:;/=a ~ Central Electricity Authority ~ ~ ~ ~ ~ ~ 0TI g Western Regional Power Committee ISO:

Scanned by CamScanner

Indian Power System Framework

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Distribution List Chief Engineer (SP & PA) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi FAX :

File No.CEA-PS-11-23(19)/1/2018-PSPA-I Division

TRANSMISSION SYSTEM PLANNING UNDER UNCERTAINTY OF SUPPLY AND DEMAND IN INDIAN CONTEXT. I S Jha Y K Sehgal* Subir Sen

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

EOC, Plot no. A-8A,Sector-24, Raiou r

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

SOLAR PLANT PERFORMANCE IN INDIA

Minutes of the 32 nd meeting of the Empowered Committee on Transmission held on January 17, 2014 at CEA, New Delhi

Business opportunities and major projects in India

Thereafter, the agenda items were taken up.

2. Member Secretary Eastern Regional Power Committee (ERPC) 14, Golf Club Road, Tollygunge Kolkata

Agenda Note for Standing Committee Meeting of Power System Planning in ER

In view of the above list of important grid element & exception list is as below:-

Agenda Note for Long Term Open Access Applications of New Generation in Southern Region

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

List of Participants:

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

List of members of WRPC

Meeting with Commissioner, Kendriya Vidyalaya Sangathan (KVS) New Delhi 11 April 2016

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Solar Energy Corporation of India New Delhi-17

Ensuring adequacy in the planning and development of Inter State Transmission System Central Electricity Authority October 2013

Minutes of the 4 th Meeting of Standing Committee on Power System Planning of North Eastern Region held on 13 th Dec., 2014

Enhancing Grid Stability in India

EDS REPLY. Point No.2 Past-production details duly authenticated by DMG since Reply

IJRASET 2013: All Rights are Reserved

1.0 Revised procedure for allocation of Inter State Transmission Project(s) under Tariff Based Competitive Bidding (TBCB)

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

Employees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India

Before the. Case No. 106 of 2009

Transmission System Planning under Uncertainty in Indian Context

List of Important Grid Elements in Western Region. In compliance with IEGC 5.2(c), May 2013, Rev-0.

PRAGATI ENGINEERING COLLEGE

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

MINUTES OF THE 47 th SLCF MEETING HELD ON

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order :

Power Sector Trends: Focus on States

Sub : In the matter of determination of Parallel Operation Charges. MPERC, Bhopal - Petitioner

CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012

List of Addresses. 1. Sh. V.Ramakrishna Member(Power system),cea, Sewa Bhawan, R.K. Puram, New Delhi 66

Policy & Regulatory Issues : Solar & Wind. Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014

Guidelines for Solar Grid Power Projects

Solar PV systems Roof Tops, Ground Mounted & Floating Platform, Grid Tied & Standalone. Solar PV Rooftop 140 kwp at BCP Mumbai

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR

System Status Briefing

EEL303: Power Engineering - 1 Introductory Lecture

Annexure. Technical Details Package 1

Tender for Consultancy of Grid connected Rooftop Solar PV Power Plant over PGCIL(5MW) & CPRI(800KW) Premises under CAPEX mode

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE

Scaling Successful Mini-grid Programs: Experience of Bangladesh

RPO-REC Framework: Emerging Challenges and way forward. Background Presentation

Technology Innovation Leadership TRAINING CALENDAR

PCDO. Jan Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India

The Electric Power System

GOVERNMENT OF INDIA MINISTRY OF HEAVY INDUSTRIES AND PUBLIC ENTERPRISES DEPARTMENT OF HEAVY INDUSTRY

Case Nos. 12 & 48 of 2009

enincon consulting llp, 2018 Visit: httpss://enincon.com E-REP Market Research Series

Intra-State Availability Based Tariff (ABT)

Bangladesh s Power Sector : At a Glance

Draft Results and Recommendations

Transmission Planning Attachment K Public Input Meeting

Transcription:

Distribution List - WR: 1. Sh. J Mohan GM (Planning) R.K.M. Powergen Pvt. Ltd. 14, Dr. Giriappa Road, T. Nagar, Chennai - 600 017 E-mail: j.mohan@rkmpowergen.in Mob: 09176792020 Sh. T Rajesh Kumar Manager R.K.M. Powergen Pvt. Ltd. 14, Dr. Giriappa Road, T. Nagar, Chennai - 600 017 E-mail: t.rajeshkumar@rkmpowergen.in Mob: 08435000779 3. Sh. R. Srinivasan Vice President (Corp.) Athena Chhattisgarh Power Pvt Ltd #7-1-24/1/RT. G-1. B-Block 1 st Floor, "Roxana Towers", Greenlands, Begumpet, Hyderabad - 500 016 E-mail: rsrinivasan@ath.chhattisgarh.in Mob: 09910833929 5. Sh. N. Ramakrishnan, Sr. GM Business Development / Sh. C. Narasimha, Manager KSK Mahanadi Power Company Ltd. 8-2/293/82/A/431/A, Road No 22, Jubilee Hills, Hyderabad - 500 033 Emall: narasimha@ksk.co.in Mob: 9959444903 7. Sh. Anil Sharma Sr. GM (Comml) Lanco Amarkantak Power Pvt Ltd. Plot No-397, Udyog Vihar, Phase-3, Gurgaon 122 016 E-mail: anil.sh@lancogroup.com Mob: 9560258009 9. Sh. R K Gupta CEO (Power Business) DB Power (Chhattisgarh) Ltd. 3 rd Floor, Naman Corporate Link, G block, Bandra Kurla Complex, Bandra East, Mumbai - 4000051 Email: himanshu.sharma@dbcorp.in Mob:9818325495 2. Sh. Ajaya Kumar Nathani Head Transmission (GMR Energy Ltd.) GMR Chhattisgarh Energy Pvt. Ltd. Building # 302, New Shakti Bhawan, New Udaan Bhawan Complex, IGI Airport, New Delhi 110 037 E-mail: ajaya.nathani @gmrgroup.in Mob: 8826830027 Shri Ravi Shanker S COO, GMR Chhatisgarh Energy Limited Village-Raikheda, Block-Tilda Dist.-Raipur Chhattisgarh- 493225 ravishanker.s@gmrgroup.in 4. Sh. N.M. Ambade General Manager (Project Finance) SKS Power Generation (Chhattisgarh) Ltd. 501 B, Elegant Business park, Andheri Kurla Road, J. B. Nagar, Andheri (E). Mumbai - 400 059 Email: rk@sksispat.com Mob: 9967981551 6. Sh. P. Bhaskar Technical Director Karnataka Power Corporation Ltd. 82, Shakti Bhavan, Race Course Road, Bengaluru - 560 001 (Karnataka) E-mail: tatotd@karnatakapower.com ; kpclre@gmail.com Mob: 080-22254545 /9560798049 8. Sh. Ramesh kumar Managing director Essar Power Gujarat Ltd. 44 Km Stone, Jamnagar-Okha Highway P.O. Box -07, Devabhumi, Dwarka, Khambalia, Gujarat - 361 305 E-mail : sandeep.sahay@essar.com Mob : 9819731331 10. Shri H M Jain Vice President (Power) TRN Energy Ltd., 7th Floor, Corporate Tower, Ambience Mall, NH-8, Gurgaon 122 002 Email : trnenergy@acbindia.com

11. Sh. Subrato Trivedi Managing Director VISA Power Limited Visa House, 8/10 Alipore Road, Kolkata - 700 027 Email: subrato.trivedi@visapower.net Mob: 9836447744 13. Chief Engineer (Transmission) / Sh. K.P. Singh Associate Director, Nuclear Power Corporation of India Ltd. 9-S-30, V.S. Bhavan, Anushaktinagar, Mumbai - 400 094 Email: nkjain@npcil.co.in Ph: 022-25992248 Mob: +91 9969482792 15. Sh.Vinod Agrawal Director / Sh. R. V. Mathe, VP (Comml.) Vandana Vidhyut Ltd Vandana Bhawan, M.G. Road, Raipur, Chhattisgarh E-mail:vvl@vandanavidhyut.com/ corpaff@vandanavidhyut.com/ md@vandanavidhyut.com Mob: +91 8329992001 12. Sh. T. P. Vijayasarathy Executive Director (Corporate) Torrent Energy Ltd, Torrent House, Off Ashram Road, Ahmedabad - 380 009 14. Sh. A. K. Garg, Director, Chhattisgarh State Power Trading Co. Ltd. 2 nd Floor, "Vidyut Seva Bhavan", Dangania, Raipur 492 013 Email: cg.techcell@gmail.com Ph: 0771-2574300/ 0771-2574117 Mob: +91 9425584512 16. Sh.S.S.Mishra Addl. General Manager / Smt. Suchitra Maggon Addl. General Manager NTPC Limited (Lara) NTPC Bhavan. Core-7, Scope Complex, 7. Institutional Area, Lodhi Road, New Delhi - 110 003 Email: ssmishra@ntpc.co.in smaggon@ntpc.co.in Mob: +91 9650991556 17. Sh. Madan Gopal Gupta MD Essar Power MP Ltd. 2 nd Floor, Essar House, Mahalaxmi, Mumbai 400034 Madan.gupta@essar.com Soumya.parida@essar.com

Minutes of 14 th JCC Meeting of IPPs granted LTA in WR Draft Minutes of the 14 th Joint Co-ordination Committee meeting of Generation projects granted Connectivity/LTA in Western Region (WR) held on 27.12.2016 at POWERGRID, Gurgaon 1. The 14 th Joint Co-ordination Committee meeting of generation projects in Western Region was held at POWERGRID Office, Gurgaon on 27 th December, 2016. The list of participants of the meeting is enclosed at Annexure-I. 2. After welcoming the participants, it was informed that Minutes of the 13 th meeting of the Joint Co-ordination Committee of generation projects which were granted LTA in Western Region, held on 30.09.2016, were issued vide letter ref. no. C/CTU/WR/OA/13JCC dated 19.10.2016. As no observations/comments were received on the minutes, the minutes were confirmed as circulated. 3. It was re-iterated that JCC forum has been created for co-ordination purposes to attempt matching of generation schedules with the associated transmission system, and accordingly, the information given by generation developers/applicants is being taken into cognizance for co-ordination purpose which can be achieved only if the applicant/generation developers provide realistic schedule & other status of generation project /dedicated line. However, for any substantial issue, it may be kindly submitted through official correspondence addressed to CTU, by clarifying the nature of issue to be dealt therein, as per the Regulatory framework. It was further informed that some letters are being sent by LTA customers related to relinquishment which are not clear in the content; therefore it was advised that such communication should strictly follow CERC Regulatory provisions (Regulation 18) specifically regarding notice, mentioning the relinquishment quantum, date of relinquishment and consent for payment of applicable relinquishment charges. 4. CTU emphasized that generation developers should ensure completion of their dedicated transmission lines to match with the commissioning of transmission network in order to prevent bottling up of power. It was further stated that interim arrangements through LILO of existing lines were provided only as a contingency measure and the generation developers need to implement the final dedicated transmission system as the matter has been very seriously looked into by Hon ble CERC in Petition no. 112/TT/2013. 5. All information exchanged, discussions/decisions taken in the JCC meeting shall be subject to the CERC Regulations and Detailed procedure made therein. Page 1 of 22

Minutes of 14 th JCC Meeting of IPPs granted LTA in WR 6. It is noted that some of the generation developers/ applicants have been repetitively not attending the JCC Meetings. All such generation developers/ applicants were requested to attend the future meetings so as to have a better co-ordination. 7. All those generation projects that have achieved COD and their respective dedicated transmission lines have also been commissioned, may not be required to attend JCC as the coordination work has already been over. Therefore they are not being called for further JCC meetings (Details of all such generation projects as per Table T1(i), T1(ii) & T1(iii)) 8. The LTA customers were requested to update the progress of their generation projects and the discussion are summarised below : of the Generation Projects HIGH CAPACITY TRANSMISSION CORRIDOR IV (Transmission System Associated with IPPs near Bilaspur complex in Chhattisgarh & MP projects) All the generation projects in Corridor-IV are commissioned /abandoned and their corresponding dedicated/connectivity transmission lines have also been commissioned. LTOA / LTA LTOA Quantum (MW) RAIGARH (KOTRA) COMPLEX 1 2 RKM Powergen Ltd (4X360) Athena Chhattisgarh Power Ltd. (2X600) Target Beneficiaries HIGH CAPACITY TRANSMISSION CORRIDOR V (Transmission System Associated with Chhattisgarh IPPs) WR NR SR 819 419 200 200 Firm beneficiary UP 350 MW Telangana 200 MW (Under process) 683 342 341 NIL schedule (13 th JCC) U1: Nov 15 U2: Feb 16 U3: Feb 17 U4: Apr 17 U1: Sep 17 U2: Mar 18 schedule (14 th JCC) U1/U2: COD U3: Apr 17 U4: Jun 17 U1: Sep 17 U2: Mar 18 Dedicated / Connectivity line & 400kV RKM- Raigarh PS (Near Kotra) D/c (Quad) line 28.10.16 () 400kV Athena - Raigarh PS (Near Kotra) D/c (Quad) line near completion (4 towers pending) Representative informed that 92% works of the generation plant are completed. However presently the construction works stalled due to financial constraints. Page 2 of 22

3 4 LTOA / LTA SKS Power Gen. (Ch) Ltd. (4X300) Visa Power Ltd. (1X600+1X660) LTOA Quantum (MW) Target Beneficiaries WR NR SR Firm beneficiary 683 319 364 NIL 678 478 200 RAIGARH (TAMNAR) COMPLEX CSPTCL: 424 MW West Bengal: 200 MW with option to increase to 510 MW schedule (13 th JCC) Not Attended U1 : Oct 16 U2 : Dec 16 U3 : Dec 18 U4 : Mar 19 U-1: 19.8.16 (COD) U-2: Nov 16 schedule (14 th JCC) Not attended Not attended Uncertain Minutes of 14 th JCC Meeting of IPPs granted LTA in WR Dedicated / Connectivity line & 400kV SKS - Raigarh PS (Near Kotra) D/c line (Quad) - was submitted through email for the 13 th JCC M/s Visa Power vide its letter dtd 26.12.2016 informed that it is not in a position to commit any fresh date for COD as it is still making efforts for alternate source of coal. They further informed that they will approach CERC for suitable order. 5 TRN Energy Pvt. Ltd (2X300) 393 243 3 150 + 240 UP : 390 MW U-1: 19.8.16 (COD) U-2: Nov 16 U-1: 19.8.16 (COD) U-2: Jan 17 400kV TRN - Raigarh PS (near Tamnar) D/c line JANJGIR-CHAMPA COMPLEX 6 7 8 KSK Mahanadi Power Co. Ltd. (6X600) Lanco Amarkantak Power Pvt. Ltd. (2X660) Vandana Vidyut Ltd. (2X135 + 1X270) 2340 2340 840 0 1000 0 500 Tamil Nadu: 500 MW UP: 1000 MW Gujarat : 1010MW 858 858 NIL 265 165 100 CSPTCL : 25 MW Telangana : 120 MW U-1/2: Aug'13/Aug'14 (COD); U-3/4: Dec 16/Apr 17 U-5/6: Sep/Dec 17 U-3: Feb 17 U-4: May 17 Not Attended (10th JCC U-1:Apr 14 (COD) U-2:Mar 16 U-3:Apr 19 U-3/4: U-1/2: Mar 18/Mar'17 (COD); U-5/6: Jun 17/Jun 18 U-3: Mar 17 U-4: May 17 Not attended U3: on hold 400kV KSK Champa Pooling Station 2xD/c (Quad) 1 st D/c line commissioned in Oct 16; 2 nd line by Jul 17 LANCO Champa PS 400kV D/c (Quad) line - expected by Mar 17 Vandana Vidhyut Dharamjaygarh PS 400kV D/c line : Mar 17 (as per 10th JCC) Both dedicated line and pooling station bays are under construction. TSA may be signed at the Earliest VVL vide letter dated 24.12.2016 has informed that Unit-I & Unit-II are under forced shutdown due to non- Page 3 of 22

LTOA / LTA LTOA Quantum (MW) Target Beneficiaries WR NR SR Firm beneficiary schedule (13 th JCC) schedule (14 th JCC) Minutes of 14 th JCC Meeting of IPPs granted LTA in WR Dedicated / Connectivity line & availability of PPA and Unit-III is on hold due to present power market scenario and non-tie-up of already installed capacity of the project. In was informed that VVL is required to make payment of transmission charges as per CERC order in 107/TT/2012. 1 LTOA / LTA Mahan (Essar power Ltd.(2X600) LTOA Quantu m (MW) Other Generation Projects in Chhattisgarh & Madhya Pradesh Target Beneficiaries WR NR ER SR 1200 1200 0 0 0 Firm benefic iary MP: 150 MW schedule (13 th JCC) U-1: Apr 13 (COD) U-2: Mar 17 schedule (14 th JCC) U-1: Apr 13 (COD) U2: Mar 17 Dedicated / Connectivity line & Mahan TPS WR PS 400kV D/c line - expected by Jun 17 The representative informed that the dedicated Transmission line is getting delayed on account of numerous issues. The matter was also discussed in the recently held LTA meeting held on 21.12.16 wherein it has been decided that the dedicated line to be completed by June 17. Representative informed that they have made a request for relinquishment of 750 MW LTA. CTU observed that the relinquishment request in the said letter is conditional and shall be suitably replied. Page 4 of 22

2 3 4 LTOA / LTA Karnataka Power Corporation Ltd (2X800) Essar Power Gujarat Ltd. NPCIL (Kakrapar) LTOA Quantu m (MW) 5 NTPC (Lara-I) 1586.51 Target Beneficiaries WR NR ER SR Firm benefic iary 763 0 0 0 763 NIL 250 0 0 0 250 NIL 1400 1400 0 0 0 ** 1586. 51 0 0 0 NIL schedule (13 th JCC) Not attended U1: 36 months after receipt of approvals and confirmation of viability of Project and is estimated by Sept 20. U2: Nothing Specified U3 & U4: Project on Hold U5, U6, U7, U8: Project on hold U1: Apr 17; U2: Oct 17 U1: Apr 17; U2: Oct 17 schedule (14 th JCC) U-1 : 48 months U-2 : 52 months, after approval of MoEF clearance U1: 36 months after receipt of approvals and confirmation of viability of Project and is estimated by Sept 20. U2: Nothing Specified U3 & U4: Project on Hold U5, U6, U7, U8: Project on hold Not attended U1: Apr 17; U2: Oct 17 Minutes of 14 th JCC Meeting of IPPs granted LTA in WR Dedicated / Connectivity line & KPCL - Champa PS 400kV D/c (Quad) line: to match with Generation project Salaya TPS - Bachau 400kV D/c (Triple) line - advanced stage of completion KAPP Vapi 400 kv D/c line - Lara - Raigarh PS (Kotra) 400 kv D/c line - MOEF clearance still awaited. After award, U-1 expected in 48 months and U-2 in 52 months. Coal Block is yet to be allocated. Essar Power representative informed that they have sent a request for relinquishment of entire 250 MW LTA. However, CTU stated that the request is conditional and shall be suitably replied. As per the information available, the generation from Kakrapar plant is expected in Nov 2017 For supply of start-up power. Page 5 of 22

Minutes of 14 th JCC Meeting of IPPs granted LTA in WR Generation Projects granted only Connectivity Connectivity Connectivity Quantum (MW) Schedule (TA/Intimation) schedule (14th JCC) 1 Adani Green Energy Ltd. 300 Dec 2017 Not attended Dedicated / Connectivity line & a) AGEL - Sami (Adani) 220 kv D/c line along with associated line bays at both ends 2 Srijan Energy System Pvt. Ltd. 300 20 MW 31.03.2018 120 MW 30.09.2018 120 MW 31.03.2019 Not attended b) 1x500 MVA, 400/220 kv ICT at Sami (Adani) substation Transmission System for Connectivity for Srijan Wind Farms, Bhuj (Gujarat): 1. SESPL switchyard Bhuj PS 220kV D/c line along with line bays at both ends 3 Gujarat Fluoro Chemicals Ltd. 300 40 MW 31.05.2019 100 MW 01.03.2012 GFL WPP-Bachau (PG) 220 kv D/c (Twin conductor) Line 100 MW 01.09.2012 100 MW 01.03.2013 Page 6 of 22

Connectivity 4 Renew Power Ventures Pvt. Ltd. Connectivity Quantum (MW) Schedule (TA/Intimation) 400 100 MW 15.12.2017 100 MW 15.03.2018 schedule (14th JCC) 100 MW 31.03.2018 100 MW 30.09.2018 Minutes of 14 th JCC Meeting of IPPs granted LTA in WR Dedicated / Connectivity line & RPVPL switchyard - Bhachau 220kV D/c line along with associated line bays at both ends (to be constructed by RPVPL) * * Line bays at Bhachau end to be implemented as GIS on account of space constraint at Bhachau 100 MW 15.09.2018 100 MW 31.03.2019 5 Ostro Kutch Wind Pvt. Ltd. 300 100 MW 15.03.2019 Mar 2018 100 MW 31.03.2019 Mar 18 OKWPL switchyard - Bhachau 220kV D/c line along with associated line bays at both ends (to be constructed by OKWPL)* Generation Projects granted LTOA/LTA 1. LTOA / LTA Rewa Ultra Mega Solar Ltd. LTOA Quantu m (MW) Target Beneficiaries NR ER WR SR Firm beneficiary schedule (14 th JCC) 750 200 550 NIL Nov 17 Dedicated / Connectivity line & Transmission system for Connectivity RUMS Ltd. switchyard Rewa PS 220kV 3xD/c line along with associated bays at Solar Park (to be implemented by generation developer) Establishment of 400/220kV, 1x500 MVA Pooling station at Rewa M/s RUMSL vide it s letter dated 04.12.2016 has requested that the Connectivity & LTA start date may be revised to 31.10.2017 as project timelines have been postponed. Page 7 of 22

Minutes of 14 th JCC Meeting of IPPs granted LTA in WR LILO of 1st circuit of Vindhyachal STPS-Jabalpur 400kV 2nd D/c line (ckt- 3&4) at Rewa PS 6 Nos. 220kV Line bays at Rewa PS (for RUMS-Rewa PS 220kV 3xD/c) 2. SEI Sunshine Power Private Ltd. 180 180 Tata Power Delhi Distribution Ltd. 180 MW Jun 17 Page 8 of 22

Minutes of 14 th JCC Meeting of IPPs granted LTA in WR List of generation projects commissioned along with the dedicated/connectivity lines and further coordination not required HIGH CAPACITY TRANSMISSION CORRIDOR IV (Transmission System Associated with IPPs near Bilaspur complex in Chhattisgarh & MP projects) Table T1 (i) LTOA / LTA CHATTISGARH IPP 1 2 3. Maruti Clean Coal (1X300) Dheeru Power Gen Chhattisgarh State Power Trading Co. Ltd LTOA Quantum (MW) 171 250 Target Beneficiaries WR NR 126 0 45 250 Firm beneficiary Rajasthan: 250 MW CSPTCL : 14 MW 450 367.5 82.5 NIL 432 14 MADHYA PRADESH IPP 4. 5. 6 Jaiprakash Power Ventures Ltd. (2X660) Aryan MP Power generation Pvt. Ltd (2X600) Bina Power Supply Company 1240.8 465.3 260 14 853.5 465.3 172 NIL 387.3 0 MP-465.3 MW (Operational) 1122.0 841.5 280.5 NIL 265.35 132.68 132.67 NIL Last updated status U-1:, COD in Jul 15 9 th JCC : Uncertain Approached CERC for relinquishment 9 th JCC U-1/2 : 9 th JCC: Abandoned 10 th JCC: Dedicated / Connectivity line & LILO of one ckt of ACB TPS - WR PS(Bilaspur) 400kV D/c line is Dheeru gen - WR PS (Bilaspur) 400kV D/c line Jaiprakash - Satna 400kV D/c (High Capacity) line commissioned Aryan MP - Vindhyachal Pooling station 400kV D/c (High Capacity) Bina TPS - Bina (PG) / Bina (MPPTCL) 400kV D/c line - Matter on issue of payment of Transmission charges for alleged force majure is pending before APTEL Matter is sub judice in High Court CERC vide its ROP dated 28.6.2016 in the CSPTrCL Petition 84/MP/2016 has directed CTU to utilized the relinquished capacity for grant of pending LTA applications and CTU as per the direction has utilized the relinquished capacity for grant of LTA to the pending applications. 465.3 MW under operation to MP on firm basis and balance quantum of 775.5 MW has been relinquished as per JPVL s prayer in Petition no. 293/MP/2015 Order reserved w.r.t. relinquishment charges. Petition no. 69/MP/2014 filed for relinquishment of 1122 MW. Order reserved. Matter in CERC for relinquishment of LTA for full quantum. Page 9 of 22

LTOA / LTA Ltd (2X250) LTOA Quantum (MW) Target Beneficiaries WR NR Firm beneficiary Last updated status Dedicated / Connectivity line & Minutes of 14 th JCC Meeting of IPPs granted LTA in WR HIGH CAPACITY TRANSMISSION CORRIDOR V (Transmission System Associated with Chhattisgarh IPPs) Table T1 (ii) LTOA / LTA LTOA Quantu m (MW) RAIGARH (KOTRA) COMPLEX Target Beneficiaries WR NR SR Firm beneficiary Last updated status Dedicated / Connectivity line & 1. Korba West Power Co. Ltd. (1X600) 240 140 100 CSPTCL: 5% U-1: Mar'14 (COD) 400kV Korba (W)- Raigarh PS (near Kotra) D/c line 2. DB Power Ltd. (2X600) 705 530 322 247 175 250 0 208 Tamil Nadu: 208 MW Rajasthan-250 U-1: Feb 14 U-2: Mar 15 (COD) DB Power Raigarh PS (near Kotra) 400kV D/c (Quad) line - commissioned RAIGARH (TAMNAR) COMPLEX 3. 4. Jindal Power Ltd. (4X600) Jindal Power Ltd. (400 MW) 1400 700 110 700 557.5 0 732.5 Tamil Nadu : 400 MW Kerala: 190 & 142.5 MW 400 400 NIL 10th JCC: U-1/2: Mar 14 (COD) U-3: Jan 15 (COD) U-4: JPL Raigarh PS (near Tamnar) 2xD/c 400kV (Quad) 3 ckts commissioned, 4th circuit expected by Oct 15 (as informed in 10 th JCC) 400 MW to Tamil Nadu under operation Page 10 of 22

LTOA / LTA LTOA Quantu m (MW) Target Beneficiaries WR NR SR Firm beneficiary Last updated status Dedicated / Connectivity line & Minutes of 14 th JCC Meeting of IPPs granted LTA in WR RAIGARH COMPLEX 5. GMR Chhattisgarh Energy Pvt. Ltd. (2X685) 816 386 430 NIL U-1: Jun 15 (COD); U-2: Feb 16 GMR - Raipur PS 400kV D/c (Quad) line - commissioned 6. Chhattisgarh State Power Trading Co. Ltd 5900 3542 1207 2358 412 NIL M/s CSPTCL has filed a petition at CERC seeking relinquishment of 4699 MW (Corridor IV & V) JANJGIR-CHAMPA COMPLEX 7 Bharat Aluminium Co. Ltd. (BALCO- 4X300) 200 100 0 100 0 0 200 Tamil Nadu : 200 MW Kerala : 95 MW Chhattisgarh: 55 MW U-1/2:, U-3/4: commissioned Balco Dharamjaygarh / Korba PS 400kV D/c line Other Generation Projects in Chhattisgarh & Madhya Pradesh Table T1 (iii) 1 2. LTOA / LTA PTC(Lanco-II) (1X300) MB Power Madhya Pradesh Ltd (2X600) LTOA Quantum (MW) Target Beneficiaries WR NR ER SR 300 0 300 0 0 392 200 192 0 0 Firm beneficiary Haryana 300 MW UP-192 MW (Operational) Latest updated status U-1: May 15 (COD) U-2: Mar 16 Dedicated / Connectivity line & Pathadi TPS - Bipalspur PS (near Sipat) 400kV D/c (Quad) line - commissioned MB TPS - Jabalpur PS 400kV D/c (Triple) line 392 MW operational; Page 11 of 22

LTOA / LTA LTOA Quantum (MW) Target Beneficiaries WR NR ER SR Firm beneficiary Latest updated status Minutes of 14 th JCC Meeting of IPPs granted LTA in WR Dedicated / Connectivity line & 3. 4 5 6 Dhariwal Infrastructure Ltd. NTPC (Vindhyachal - V) Jhabua Power Ltd MP Power Management Company Ltd. 300 270 495.78 210 246 197.5 150 120 20 495.7 8 210 0 246 197.5 150 +20 0 0 100 Tamil Nadu: 100 MW 0 0 0 GoI Allocation Oct 15 (COD) 0 0 0 204.25 Kerala: 204.25 MW 0 0 0 NIL U-1: May 16 (COD) U-1: May 16 (COD from Jhabua Power) LILO of one ckt of Bhadravati - Parli 400kV line at Dhariwal TPS - Interconnection at 400kV Bus of Vindhyachal TPS-IV switchyard Jhabua TPS - Jabalpur PS 400kV D/c (Triple) line - Jhabua TPS - Jabalpur Pool 400kV D/c (Triple) line: LTA for 100 MW to Tamil Nadu is operational Balance LTA of 5.75 MW relinquished 197.5 MW LTA under operation and balance LTA of 48.5 MW relinquished 7 Torrent Energy Ltd. 800 400 400 0 0 NIL Commissi oned TEL(DGEN) TPS Navsari 400kV D/c (Triple) line commissioned TSA need to be signed by the Developer. Page 12 of 22

Minutes of 14 th JCC Meeting of IPPs granted LTA in WR HIGH CAPACITY TRANSMISSION CORRIDOR IV (Transmission System Associated with IPPs near Bilaspur complex in Chhattisgarh & MP projects) Transmission System under the Scope of POWERGRID: Transfer of power from generation projects near Bilaspur complex in Chhattisgarh & MP projects Tr. System (as per 14 th WR JCC) 1 Indore- Vadodara 765kV S/c 2 Vadodara Pirana 400kV D/c (Quad) 3 Establishment of 765/400kV, 2x1500 MVA substation at Vadodara of other associated transmission lines Transmission System (as per 14 th WR JCC) 1 765 KV S/C Bina - Gwalior line (3rd Ckt) 2 765KV S/C Gwalior-Jaipur line (2nd Ckt) 3 765 KV S/C Jaipur - Bhiwani line Transmission System under the Scope of POWERGRID HIGH CAPACITY TRANSMISSION CORRIDOR V (Transmission System Associated with Chhattisgarh IPPs) Establishment of Pooling Stations at Raigarh (Near Kotra) and Raipur for IPP Generation Projects in Chhattisgarh Part-1 Transmission System (as per 14 th WR JCC) 1 Raigarh Pooling Station (Near Kotra) Raipur Pooling Station 765kV D/c 2x240 MVAR line reactors at each end on both circuits 2 Raigarh Pooling Station (Near Kotra) Raigarh 400kV D/c 3 Raipur Pooling Station Raipur 400kV D/c Page 13 of 22

4 Establishment of 765/400kV 4x1500MVA Raigarh Pooling Station (near Kotra) (1x240 MVAR B/R) at 765kV, 1x80 MVAR bus reactor (charged at 400kV) 5 Establishment of 765/400kV 1x1500MVA Raipur Pooling Station (1x240 MVAR B/R) Minutes of 14 th JCC Meeting of IPPs granted LTA in WR Establishment of Pooling Stations at Champa and Raigarh (Near Tamnar) for IPP Generation Projects in Chhattisgarh Part-2 Transmission System 1 Champa Pooling Station Raipur Pooling Station 765kV D/c -150 KM - 2x240 MVAR line reactors at Raipur 2 Raigarh Pooling station(near Kotra) Raigarh pooling station(near Tamnar) 765kV D/c 3 Champa Pooling Station Dharamjaygarh/Korba 765kV S/c 4 Raigarh Pooling Station (near Kotra) Champa Pooling Station 765kV S/c 5 Establishment of 765/400kV 6x1500MVA Champa Pooling Station (1x240 MVAR B/R) 1x80 MVAR bus reactor when charged at 400kV) 6 Establishment of 765/400kV 3x1500MVA Raigarh Pooling Station(near Tamnar) (1x240 MVAR B/R) (as per 14 th WR JCC) Integration of Pooling Stations in Chhattisgarh with Central part of WR for IPP Generation Projects in Chhattisgarh Part-3 No Transmission System (as per 14 th WR JCC) 1 Raipur Pooling Station Wardha 765kV D/c - 2x240 MVAR line reactor at Raipur Pooling Station and 2x330 MVAR line reactor at Wardha 2 Wardha bus reactor 1x330 MVAR Page 14 of 22

Minutes of 14 th JCC Meeting of IPPs granted LTA in WR Transmission System strengthening in Western part of WR for IPP Generation Projects in Chhattisgarh Part-4 No Transmission System (as per 14th WR JCC) 1 Wardha Aurangabad (PG) 765kV D/c - 2x330 MVAR line reactors at Wardha and 2x240 at Aurangabad 2 Aurangabad(PG) Boisar 400kV D/c (Quad)-300 km - 2x63 MVAR line reactors at each end on both circuits Jun 17 3 Establishment of 765/400kV 2x1500MVA Aurangabad (PG) S/s (1x240 MVAR B/R) 4 Augmentation of transformation capacity at Boisar by 1x500MVA System strengthening in North/West part of WR for IPP Projects in Chhattisgarh Part-5 Severe RoW issues in Nashik Dist. due to grape garden Transmission System 1 Padghe Padghe(PG) 400kV D/c (Quad)-25 km (as per 14th WR JCC) Jun 17 2 Vadodara Asoj 400kV D/c(Quad)-15 km - 3 Aurangabad (PG) Padghe(PG) 765kV 1 D/c - 2x240 MVAR line reactors at each end on both circuits 4 Establishment of 765/400kV 2x1500MVA Padghe(PG) S/s [GIS] (1x240 MVAR B/R) Jun 17 Jun 17 The LILO of under construction 400 kv Tarapur-Padghe line (MSETCL) bypassing Kudus substation is not workable as the work of LILO of 400 kv Tarpur- Padghe line is stopped for the past 3 years due to severe RoW & n0n-avavilability of forest clearance. (Unless Kudus Substation of MSETCL is constructed, Power cannot be evacuated from Padghe) Page 15 of 22

Minutes of 14 th JCC Meeting of IPPs granted LTA in WR System strengthening in Raipur-Wardha corridor for IPP Projects in Chhattisgarh Part-6 Transmission System No 1 Raipur Pooling Station Wardha 765kV 2nd D/c-380 km - 2x240 MVAR line 2 Reactor at Raipur Pooling Station and 2x330 MVAR line reactor at Wardha (as per 14th WR JCC) Mar 17 System strengthening in Wardha-Aurangabad corridor for IPP Projects in projects in Chhattisgarh Part-7 Transmission System No 1 Wardha Aurangabad (PG) 765kV 2nd D/c 2x330 MVAR line reactor at Wardha and 2x240 line reactor at Aurangabad (as per 14th WR JCC) WR-NR HVDC interconnector for IPP Projects in Chhattisgarh Part-9 No Transmission System 1 Establishment of 3000MW 800KV HVDC bipole terminal each at Champa Pooling station and Kurukshetra (NR) 2 Kurukshetra(NR) - Jallandhar 400kV D/c(Quad) one ckt. via 400/220kV Nakodar S/s 3 LILO of Abdullapur Sonepat 400kV D/c(triple) at Kurukshetra 4 Establishment of 3000MW 800KV HVDC bipole terminal each at Champa Pooling station and Kurukshetra(NR) respectively: to be upgraded to 6000MW (as per 14th WR JCC) (i) 1500 MW Jan 17 (ii) Addl. 1500 MW- Mar 17 Mar 18 5 Establishment of 400/220kV 2x500 MVA S/s at Kurukshetra Page 16 of 22

Minutes of 14 th JCC Meeting of IPPs granted LTA in WR Transmission elements being implemented by transmission licensee through tariff based competitive bidding process. Part-10 [TBCB award placed to succesful bidder Sterlite in Mar 12 with commissioning schedule of 39 months(june 15)] Transmission System No (as per 14th WR JCC) 1 Aurangabad(PG) Dhule (IPTC) 765kV S/c line 2 Dhule (IPTC) Vadodara (PG) 765kV S/c line 3 Dhule (IPTC) Dhule (MSETCL) 400kV D/c Quad line 4 Establishment of 765/400kV, 2x1500MVA Dhule(IPTC) S/s of other Transmission Lines Transmission System No (as per 13 th JCC) (as per 14 th JCC) 1 400KV D/C Kurukshetra - Jind line (Q) Mar 18 Mar 18 2 765 KV D/C Jabalpur Pooling Station - Bina line Line commissioned in Dec'13. 3 Jabalpur PS-Bhopal 765kV S/c TBCB 4 Bhopal- Indore 765kV S/c TBCB 5 TEL(DGEN) TPS- Vadodara 400kV D/c TBCB (SPV transferred) 6 220kV Navsari- Besthan TBCB 7 765KV D/C Jabalpur Poolin Stn. - Orai line Apr 18 Apr 18 8 765kV Orai- Aligarh Apr 18 Apr 18 9 765KV D/C Narendra (New Kudgi) - Kolhapur line (initialy charged at 400KV) * 10 400KV D/C Kakrapar APP - Vapi line Line is charged under anti-theft Nov 16 Construction completed measure. 11 Vindhayachal PS- Jabalpur PS 765kV D/c Jun 18 Jun 18 TBCB 12 400KV D/C Lara STPS - Raigarh (Kotra) line For supply of start-up power. 13 400 kv D/c Kakrapar APP Navsari D/c Line Nov 16 Feb 17 Page 17 of 22

No Transmission System 14 765/400 KV Champa Pooling Station (as per 13 th JCC) Minutes of 14 th JCC Meeting of IPPs granted LTA in WR (as per 14 th JCC) 15 765/400KV Jabalpur Pooling station (2x1500MVA) 16 1x1500 MVA 765/400kV ICT at Vindhayachal PS Jul 17 Jul 17 of other Transmission System associated with LTA customers No LTA Transmission System (as per 14th JCC) 1. Rewa Ultra Mega Solar Ltd. Transmission system required for LTA for transfer of 750 MW of power from REWA UMS, Madhya Pradesh to WR & NR which is under implementations as part of different schemes Work in progress. Generation of Rewa Solar park is delayed and is expected by Nov 17. (i) Inter-Regional System Strengthening Scheme in WR and NR (Part-B) Jabalpur PS - Orai 765kV D/C line Orai - Aligarh 765kV D/C line Orai - Orai 400kV D/C (Quad) line LILO of one ckt of Satna - Gwalior 765kV 2xS/C line at Orai LILO of Agra - Meerut 765kV S/C at Aligarh LILO of Kanpur - Jhatikara 765kV S/C at Aligarh Dec 17 (ii) Transmission System Strengthening in Page 18 of 22

No LTA Transmission System (as per 14th JCC) WR-NR Transmission Corridor for IPPs in Mar 18 Chhattisgarh Up-gradation of ± 800kV, 3000MW HVDC bipole between Champa PS Kurukshetra (NR) to 6000MW Kurukshetra (NR) Jind 400kV D/c (Quad) Minutes of 14 th JCC Meeting of IPPs granted LTA in WR (iii) Additional Transmission system required for LTA Addition of 400/220kV, 2x500 MVA ICT at Rewa PS LILO of 2nd circuit of Vindhyachal STPS- Jabalpur 400kV 2nd D/c line (ckt-3&4) at Rewa PS 1x125 MVAr, 420 kv Bus Reactor at Rewa PS Apr 17 2. SEI Sunshine Power Private Ltd. Transmission system required for LTA for transfer of 180 MW of power from SSPPL, Madhya Pradesh to Delhi which is under implementations as part of different schemes Inter-Regional System Strengthening Scheme in WR and NR (Part-B) Jabalpur PS - Orai 765kV D/C line Orai - Aligarh 765kV D/C line Orai - Orai 400kV D/C (Quad) line LILO of one ckt of Satna - Gwalior 765kV 2xS/C line at Orai LILO of Agra - Meerut 765kV S/C at Aligarh LILO of Kanpur - Jhatikara 765kV S/C at Aligarh Page 19 of 22

No LTA Transmission System (as per 14th JCC) Transmission System Strengthening in WR- NR Transmission Corridor for IPPs in Chhattisgarh Up-gradation of ± 800kV, 3000MW HVDC bipole between Champa PS Kurukshetra (NR) to 6000MW Kurukshetra (NR) Jind 400kV D/c (Quad) Minutes of 14 th JCC Meeting of IPPs granted LTA in WR Page 20 of 22

Minutes of 14 th JCC Meeting of IPPs granted LTA in WR Annexure-I List of Participants in the 14 th Joint Co-ordination Committee meeting of Generation projects granted LTA in WR held on 27.12.2016 Name Designation Organization E-mail 1. Nitin Deswal Asst. Director Central Electricty Authority nitindeswal@nic.in 2. Vikas Sachan Asst. Director Central Electricty Authority Vikas.cea@gov.in 3. Subir Sen COO (CTU-Plg.) Power Grid Corporation of India Ltd subir@powergridindia.com 4. Avinash Pavgi GM (Commercial) Power Grid Corporation of India Ltd. apavgi@powergridindia.com 5. D N Rozekar AGM (CTU-Plg.) Power Grid Corporation of India Ltd. drozekar@powergridindia.com 6. B P Kundu AGM (BDD) Power Grid Corporation of India Ltd. bpkundu@powergridindia.com 7. Jyoti Prasad DGM (CTU-Plg.) Power Grid Corporation of India Ltd. nishantjyoti@yahoo.com 8. Ramchandra DGM (CTU-Plg) Power Grid Corporation of India Ltd. ramachand@powergridindia.com 9. Rajesh Verma CDE (CTU-Plg.) Power Grid Corporation of India Ltd. rverma@powergridindia.com 10. Anil Kumar Meena CDE (CTU-Plg.) Power Grid Corporation of India Ltd. anilsehra@powergridindia.com 11. Laxmi Kant Manager (CTU-Plg) Power Grid Corporation of India Ltd. laxmikant@powergridindia.com 12. Manish Pareta Sr. Engineer (CTU-Plg.) Power Grid Corporation of India Ltd manish.pareta@powergridindia.com 13. Ankush Patel Engineer (CTU Plg.) Power Grid Corporation of India Ltd ankush.patel@powergridindia.com 14. Dwaipayen Sen Engineer (CTU Plg.) Power Grid Corporation of India Ltd dwaipayen@powergridindia.com 15. Suman Kumar Director SEI Sunshine Pvt. Ltd. skumar@sunedison.com 16. Rakesh Garg Asst. Vice President Renew Power Ltd. rakesh@renewpower.in 17. S. Vindod Asst. Vice President Renew Power Ltd. vinod@renewpower.in Page 21 of 22

Minutes of 14 th JCC Meeting of IPPs granted LTA in WR Name Designation Organization E-mail 18. Alok gupta GM- PE Inox Wind Infra. Pvt. Ltd. alok@inoxwind.com 19. Manoj Kumar AGM (Power) TRN Energy Pvt. Ltd. acbpower@acbindia.com 20. S. N. Sharma Resident Engineer Karnataka Power Corp. Ltd. acbpower@acbindia.com 21. T. Rajesh Kumar Manager RKM Power Pvt. Ltd. t.rajeshkumar@rkmpower.in 22. B. Sudarshan Reddy Dy. Manager KSK Mahanadi Power Pvt. Ltd. sudarshanreddy.ksk.co.in 23. S K Bhardwaj Sr. DGM Lanco Amarkantak Pvt. Ltd. sk.bhardwajelancogroup.com 24. rsrinivasan@ath.chhattisgarh.in R. Srinivasan Vice President (Corp.) East Coast Energy Pvt. Ltd. sherrysrini@gmail.com 25. Sr. Manager Ajay Kumar (Commercial) Essar Power Ltd. ajay.kumar22@gmail.com 26. Dy. Manager Rohit Ladha (Commercial) NTPC Ltd. rohitladha@ntpc.co.in 27. Pratik Poddar Head - PD Ostro Energy Pvt. Ltd. pratik.poddar@ostro.in Page 22 of 22