INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER RECYCLE TIMER

Similar documents
INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER TIMER/CONTROLLER

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER FILTER

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER FILTER DRYER

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER CRUDE OIL COLLECTION ASSEMBLY HIGH PRESSURE

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER DEHYDRATION ASSEMBLY

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER INJECTION PUMP

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER PROBE REGULATOR

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER SAMPLE / INJECTION PUMP

Installation, Operation, and Maintenance Manual

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER AUTOMATIC INSERTION PROBE

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER PROBE MOUNTED LIQUID ELIMINATOR

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER INLOOP CRUDE OIL SAMPLER

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER INFLOW ACE CRUDE OIL SAMPLER FIXED INSERTION

Installation, Operation, and Maintenance Manual

Welker Heated Instrument Regulator

Operation, Model MPS-2DA. Installation, responsibility

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER SAMPLE CONDITIONING HEATED SYSTEM

Welker Gas Sampler Model MPS-2

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER INFLOW ACE CRUDE OIL SAMPLER TELESCOPING INSERTION

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER INFLOW ACE CRUDE OIL SAMPLER WITH AI CONTROL

Welker Adjustable Probe with Check Valve and Welker Automatic Insertion Probe with Check Valve

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER FIXED ODORANT MONITOR

Installation, Operation, and Maintenance Manual. Welker Automatic Insertion Corrosion Coupon Device Model AID-1CC

Installation, Operation, and Maintenance Manual

Welker Probe Instrument Regulator with Liquid Eliminator Cartridge

Welker Automatic Insertion Diffusing Probe Model AIP-3DP

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER INFLOW CRUDE OIL SAMPLER WITH AI CONTROL

Welker Sampler. Installation, Operation, & Maintenance Manual. Model GSS-4HP

Welker Jet Insert Model Control Valve

Installation, Operation and Maintenance Manual for Flame Check

OPERATION MANUAL, POWER MODULE-CHARGER SYSTEM. Man Occup. Machine Occup. Cycle Time Setup Time Batch Qty. Equipment Manufacturer Qty

ECON Limit Switch Box Fig

SERVOMEX 335A2014 PURGE ASSY Operator Manual

G72x Series Direct Spark Ignition Controls

Model LA 4400 Time Delay OFF Controller

NEO-DYN MODEL 100P ENCLOSURE 7 ADJUSTABLE EXPLOSION-PROOF PRESSURE SWITCH

Two Channel Remote Shutdown Device

Installation & Set Up Guide

Safe & Secure Series Electric Actuator with Internal Battery Back-up Installation, Operation & Maintenance Manual

Val-Matic Air / Oil Hydraulic Panel Pump Control System. Operation, Maintenance and Installation Manual

TIMER INTERFACE USER MANUAL

Model Combustible Gas Sample Draw Detector Head Operator s Manual

INTELLIVALVE 2-WAY, 3-WAY VALVE ACTUATOR

Installation Operation Maintenance ADDENDUM BULLETIN No. PS-IOM-HYP-0203-H

Installation Operation Maintenance ADDENDUM

E Series CE Approved Intermittent Pilot Ignition Control

Installation, Operation, & Maintenance Manual

Dawson DSM170 Multi-Function Moisture Meter User s Manual

Installation & Operation Manual. IMPORTANT: This manual contains important information. READ AND KEEP FOR REFERENCE.

INSTRUCTION MANUAL INSTALLATION, OPERATION, AND MAINTENANCE ACTUATOR MANIFOLD

FTIR PG28 PURGE GAS GENERATOR OPERATIONS & MAINTENANCE

Series 70 24V On/Off Electric Actuator Operation and Maintenance Manual

Easytork Solenoid Valve IOM

Model Combustible Gas Sample Draw Detector Head Operator s Manual

G76x Direct Spark Ignition Controls

User s Manual Wind/Solar Hybrid Controller

Wind/Solar Hybrid Controller User Manual. Model: HY-C10-24AWM and HY-C10-48AWM

Your Global Flow Control Partner. Series 70 24V On/Off Electric Actuator Operation and Maintenance Manual

Model Combustible Gas Sample Draw Detector Head Operator s Manual

AUTO CHARGE 4000 MODEL #: AUTOMATIC DUAL OUTPUT BATTERY CHARGER INSTRUCTION MANUAL. Ph: Fax:

CIRCLE SEAL CONTROLS

Model GD-K77D4X-XX Supplement to the GD-K77D Operator s Manual

Healy VP Troubleshooting Guide

Programmable Smart Charger

Model LA 4300 Time Delay OFF Controller

SEPARATOR PURGE KIT OPERATION & MAINTENANCE MANUAL

Model DE-3 Air Release Heads Parts List

Eaton Battery Charger Module Models ASY-0652 and ASY-0675 User s Guide

Operating Instructions Mechanical Temperature Switches ML1H,MT1H,L2H,T2H,L1X/L1X-EX,T1X/T1X-EX,T2X/T2X-EX

ATEX/IECEx Coil Manual Type 200 and 300 Series Coils for EH70 Series Solenoid Valves Issue , Released December 13, 2017

GFM-40ac COMPLIANCE WESTUSA. Ground Circuit Tester. Instruction Manual

Model GD-70D4A-XX Supplement to the GD-70D Operator s Manual

G821L/G822L Series Integrated Function Direct Spark Ignition Controls

Product Manual. EX40, Version Last Updated: 11/7/16. Product Description:

Installation Instructions

Installation, Operation & Maintenance Manual Control Panels for Automatic Self-Cleaning Strainers Model 596 and Model 2596

Model LA 4100 Time Delay OFF Controller

Installation Manual. E-design A Transfer Switches A

PUMP PLUS 2000 PLC MODEL #: PP AUTOMATIC DUAL OUTPUT BATTERY CHARGER INSTRUCTION MANUAL

UNIVERSAL SOLAR SYSTEM (USS) USER MANUAL. For Millennium Low Power Gas Detectors or other continuous loads less than 0.

Guardian Battery Charger Series. Installation and Operations Manual Section 75

SAFE & SECURE ACTUATOR PRODUCT MANUAL

3ATS & 3NTS J-design 600 A 3ADTS & 3NDTS A Transfer Switches. Installation Manual. Installation A DANGER. Table of Contents WARNING

LS0512R Solar Light Controller

Operating and Installation Instructions

www. hydrofuse.com Installation Manual Fertilizer Machine V1.3

BT403. A Geno Technology, Inc. (USA) brand name. BT-300 Power Supply. Cat. No. BT

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS

CIVACON GROUND VERIFICATION RACK MONITOR SYSTEM and ASSOCIATED EQUIPMENT

AUTOMATION. Operator s Manual. NLS Series. Pneumatic Level Sensors. Rev. A1, 4/07

24-48 HP250II Butterfly Valve. Operation and Maintenance Manual. Job Name: Contractor: Date: Document #: 2448HP250OOOM Revision Date: 1/10/11

General Description. Product Specification. Document Digital Temperature Interlock

Installation and Operation Instructions

348002K/348012K Manifold Block Style Service Manual 12/2000

Differential Pressure Transmitter

Airflow Controller. Installation and Operation Manual Installation, Operation, Service and Replacement Parts Information. IOM AD Revision 1

33 CENTERVILLE ROAD LANCASTER, PA

BlinkerBeam Solar Controller

LANDFILL GAS ELEVATED (CANDLESTICK) FLARE SYSTEM

SFA275 USER MANUAL PLEASE READ THIS USER MANUAL COMPLETELY BEFORE OPERATING THIS UNIT AND RETAIN THIS BOOKLET FOR FUTURE REFERENCE

Transcription:

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER RECYCLE TIMER MODEL 5T DRAWING NUMBERS EL016.6 EL016.7 EL902 MANUAL NUMBER IOM-130 REVISION Rev. 0, 8/8/2016

TABLE OF CONTENTS SAFETY 3 1. PRODUCT INFORMATION 4 1.1 Introduction 4 1.2 Product Description 4 1.3 Specifications 4 1.4 Equipment Diagrams 5 2. INSTALLATION & OPERATION 7 2.1 Before You Begin 7 2.2 Installation 7 2.3 Setting the Unit 8 2.4 Operation 10 2.5 Troubleshooting 10 APPENDIX 11 A: Referenced or Attached Documents 11 Welker, Welker Jet, WelkerScope, and OdorEyes are Registered Trademarks owned by Welker, Inc. 2 IOM-130 MODEL: 5T REV: 0 13839 West Bellfort Street, Sugar Land, TX 77498 welker.com Service Department 281.491.2331

SAFETY IMPORTANT SAFETY INFORMATION READ ALL INSTRUCTIONS Notes emphasize information and/or provide additional information to assist the user. Caution messages appear before procedures that could result in damage to equipment if not observed. Warning messages appear before procedures that could result in personal injury if not observed. This manual is intended to be used as a basic installation and operation guide for the Welker Recycle Timer, 5T. For comprehensive instructions, please refer to the IOM Manuals for each individual component. A list of relevant component IOM Manuals is provided in Appendix A of this manual. The information in this manual has been carefully checked for accuracy and is intended to be used as a guide for the installation, operation, and maintenance of the Welker equipment described in this manual. Correct installation and operation, however, are the responsibility of the end user. Welker reserves the right to make changes to this manual and all products in order to improve performance and reliability. BEFORE YOU BEGIN Read these instructions completely and carefully. IMPORTANT - Save these instructions for local inspector's use. IMPORTANT - Observe all governing codes and ordinances. Note to Installer - Leave these instructions with the end user. Note to End User - Keep these instructions for future reference. Installation of this Recycle Timer is of a mechanical and electrical nature. Proper installation is the responsibility of the installer. Product failure due to improper installation is not covered under the warranty. If you received a damaged Recycle Timer, please contact a Welker representative immediately. Phone: 281.491.2331 Address: 13839 West Bellfort Street Sugar Land, TX 77498 3 IOM-130 MODEL: 5T REV: 0 13839 West Bellfort Street, Sugar Land, TX 77498 welker.com Service Department 281.491.2331

SECTION 1: PRODUCT INFORMATION 1.1 Introduction We appreciate your business and your choice of Welker products. The installation, operation, and maintenance liability for this equipment becomes that of the purchaser at the time of receipt. Reading the applicable Installation, Operation, and Maintenance (IOM) Manuals prior to installation and operation of this equipment is required for a full understanding of its application and performance prior to use.* If you have any questions, please call Welker at 1-281-491-2331. *The following procedures have been written for use with standard Welker parts and equipment. Assemblies that have been modified may have additional requirements and specifications that are not listed in this manual. 1.2 Product Description The Welker 5T Recycle Timer is a simple recycle timer used to control sample pumps. The 5T operates a solenoid for timing. The cycle time is set using two (2) banks of ten (10) switches. When supply voltage is applied, the 5T cycles off/on, energizing the solenoid, which in turn actuates the connected pump according to the switch settings until the supply voltage is removed. Welker may custom design the 5T to suit the particular application and specifications of each customer. 1.3 Specifications The specifications listed in this section are generalized for this equipment. Welker can modify the equipment according to your company's needs. Please note that the specifications may vary depending on the customizations of your equipment. Applications Temperature Range Power Input Output Terminal Strip Features Option Table 1: 5T Specifications Control of Sample Pumps; Timer -20 F to 140 F (-28 C to 60 C) 3 W AC 110 V AC 240 V DC 24 V 8-Pin DPDT, 4 A @ AC 120 V 6-Point Dwell Time Adjustable Between 1 1023 Seconds Explosion-Proof Enclosure LED Status Indicator Light Solenoid Valve 4 IOM-130 MODEL: 5T REV: 0 13839 West Bellfort Street, Sugar Land, TX 77498 welker.com Service Department 281.491.2331

1.4 Equipment Diagrams Figure 1: 5T Diagram 5 IOM-130 MODEL: 5T REV: 0 13839 West Bellfort Street, Sugar Land, TX 77498 welker.com Service Department 281.491.2331

Figure 2: 5T Connections Diagram 6 IOM-130 MODEL: 5T REV: 0 13839 West Bellfort Street, Sugar Land, TX 77498 welker.com Service Department 281.491.2331

SECTION 2: INSTALLATION & OPERATION 2.1 Before You Begin After unpacking the unit, check the equipment for compliance and any damage that may have occurred during shipment. Immediately contact a Welker representative if you received damaged equipment. When sealing fittings with PTFE tape, refer to the proper sealing instructions for the brand used. 2.2 Installation 1. Mount the enclosure to the desired location. Ensure that there is enough room for cables and conduits to exit. The enclosure can be mounted directly to the pump, on a nearby wall, or to a mounting bracket. 2. As necessary, install a customer-supplied solenoid to the explosion-proof enclosure (Figure 2). 3. Connect the incoming supply voltage to the 6-point terminal strip (Figure 3). Figure 3: Wiring Diagram For systems used in hazardous locations, sealing compound is required to seal all fittings to restrict the passage of gases, vapors, or flames. 7 IOM-130 MODEL: 5T REV: 0 13839 West Bellfort Street, Sugar Land, TX 77498 welker.com Service Department 281.491.2331

4. Using appropriately sized customer-supplied tubing, connect the customer-supplied regulated instrument air supply to the instrument air inlet on the solenoid. 5. Using appropriately sized customer-supplied tubing, connect from the solenoid outlet ports to the corresponding motor actuation ports on the customer sample pump (Figure 2). Refer to the Installation, Operation, and Maintenance (IOM) Manual for the sample pump for tubing instructions. 2.3 Setting the Unit 1. Calculate the desired sampling frequency using the provided equations (Figure 4). Figure 4: Sampling Actuation Equations for Timed Collection Never fill the container above 80% of its capacity. Allow at least 20% room for product expansion should the container be exposed to increased temperatures. Note the 0.8 in Equation 1 represents the 80% volume limit for liquid sampling. 2. Set the "ON" time to the calculated "ON" time (Figure 4). Beginning with the largest value, add the values of the "ON" dip switches until their added value equals the required "ON" time. As necessary, round the calculated length of the "OFF" and "ON" time down to the nearest whole number. 8 IOM-130 MODEL: 5T REV: 0 13839 West Bellfort Street, Sugar Land, TX 77498 welker.com Service Department 281.491.2331

Ensure that the "ON" time is greater than the minimum amount of time required by the customer-supplied sample pump to inject or collect a sample. 3. Turn on the dip switches whose added values equal to the "ON" time (Figure 5). Figure 5: Example Setting the "ON" and "OFF" Time 4. Set the "OFF" time to the calculated "OFF" time (Figure 4). Beginning with the largest value, add the values of the "OFF" dip switches until their added value equals the calculated "OFF" time. As necessary, round the calculated length of the "OFF" and "ON" time down to the nearest whole number. Ensure that the "OFF" time is greater than the minimum amount of time required by the customer-supplied sample pump to inject or collect a sample. 5. Turn on the dip switches whose added values equal to the "OFF" time (Figure 5). 9 IOM-130 MODEL: 5T REV: 0 13839 West Bellfort Street, Sugar Land, TX 77498 welker.com Service Department 281.491.2331

2.4 Operation 1. Turn ON electrical power to the 5T. 2. The 5T will cycle off/on according to the programmed settings until electrical power is turned OFF. The LED indicator will: glow green when energized; glow red when de-energized; and flash green or red when timing. 2.5 Troubleshooting If an issue is encountered that is not described below, please contact Welker for service options. Table 2: 5T Troubleshooting Issues Possible Causes Solutions Electrical power has not been supplied Verify that electrical power has been to the 5T or is turned off. supplied to the 5T and is turned on. Nothing is happening. The 5T was not wired correctly. The set cycle time is shorter than the actual cycle time of the sample pump. Verify that the wiring to the terminal strip is correct (Figure 3). If the wiring is correct but the 5T is still not working, the 5T needs to be replaced. Verify the minimum actuation time of the sample pump and ensure that it is less than the length of the "OFF" and "ON" time. The cylinder is not filling properly. The sample pump may be set at a slower sampling frequency than desired. Check the calculations to ensure that the settings were calculated correctly (Figure 4). The dip switches are in the off position. Ensure that the correct dip switches have been turned on. 10 IOM-130 MODEL: 5T REV: 0 13839 West Bellfort Street, Sugar Land, TX 77498 welker.com Service Department 281.491.2331

APPENDIX A: REFERENCED OR ATTACHED DOCUMENTS Welker Installation, Operation, and Maintenance (IOM) Manuals suggested for use with this unit: None Other Installation, Operation, and Maintenance (IOM) Manuals suggested for use with this unit: ASCO Valve, Inc. General Service Solenoid Valves Series 8342 (Welker IOM-V139) Signaline Model 338 & Model 368 Recycle Timers "Off Time First" (Welker IOM-V130) Welker drawings and schematics suggested for use with this unit: Electrical Drawing: EL016.6 (Standard 5T) Electrical Drawing: EL016.7 (5T With Optional 4-Way Solenoid) Electrical Drawing: EL902 (Standard Wiring Diagram) 11 IOM-130 MODEL: 5T REV: 0 13839 West Bellfort Street, Sugar Land, TX 77498 welker.com Service Department 281.491.2331

NOTES 13839 West Bellfort Street Sugar Land, TX 77498 Phone: 281.491.2331 welker.com 12 IOM-130 MODEL: 5T REV: 0 13839 West Bellfort Street, Sugar Land, TX 77498 welker.com Service Department 281.491.2331