Installation Guide. Flame Ionization Detector on a 6850 GC Accessory G2621

Similar documents
Installation Guide. Thermal Conductivity Detector on a 6850 GC Accessory G2623A

Installation Guide NPD/ECD Chemical Filters Accessory 19199N

Installation Guide. Flame Ionization Detector on a 6890 GC. Accessories G1561A, G1562A, G1591A, G1598A

Installation Guide. Purged Packed Inlet, Electronic Pneumatics Control on 6890 GC Accessory G1551A

Installing a Purged Packed (PP) Inlet

Installation Guide Thermal Conductivity Detector Accessory 19232E

Installation Guide. Heater Interface Cable for Mass Sensitive Detector Accessory G1590A

Installation Guide. Nitrogen-Phosphorus Detector on 6890 GC Accessories G1575A, G1576A, G1594A, G1599A

Installation Guide. Auxiliary Pressure Control Manifold on 6890 GC Accessory G1570A

Installation Guide. Volatiles Interface for 6890 Gas Chromatograph Accessory G2319A

Nickel Catalyst Tube Accessory 19205A

Installing a PTV Inlet

Installing a Purged Packed Inlet

Installing an Auxiliary Pressure Control Module

Installing a PTV Inlet

Installing a Cool On-Column Inlet

Installing the Flame Ionization Detector EPC Flow Control Manifold

Installing an Auxiliary Pressure Control Module

Installing the CO 2 Cryogenic Oven Cooling Kit

Agilent G1554A On-Column Capillary Inlet with EPC

Nickel Catalyst Tube on a 6820 GC, Accessory G4318A

Installing the G2743A/G2745A Valve Actuator Kits

Agilent G2738A Upstream Capillary Interface

Valve Box and Valve Accessories G4315A, G4316A, G4317A

Agilent G3969A Transfer Line Interface for an Agilent 7697A HS Accessory

Agilent G3510A/G3511A Multimode Inlet

Installing the 6850 Direct Valve Column Connector Kit

Agilent G3348B Flame Photometric Detector

Installation Guide. Agilent 7683 Automatic Liquid Sampler

HP 6890Series Gas Chromatograph. Installation Guide. Flame Ionization Detector. Accessories HP G1561A HP G1562A HP G1591A HP G1598A

29 Installation Step 1. Unpacking the GC Cable diagrams Step 2. Placing the GC system on the benchtop Step 3. Turning the power on

A g i l e n t A G a s C h r o m a t o g r a p h Service Manual

Deans Switch Microfluidics

Agilent 6890 Gas Chromatograph

Agilent 210/218 - Isocratic Pump

DISPLACEMENT PUMP INSTRUCTIONS-PARTS LIST Rev. K. Model , Series A Model , Series B Model , Series A

Alcatel-Lucent 7310 DC Metro Cell AWS (B4) Kit MC-DBR1, MC-DBR2, MC-DBR3, MC-DBR4, MC-DBR5. Installation Manual

Agilent 490 Micro GC Internal and External Mount Genie Filter Brackets

SOS SERIES SOS1 SOS2. Spares On Site Battery Cabinet Installation Guide rEV3

Installation Instructions

Agilent G2647A (Single) and G2648A (Dual) Flame Photometric Detector Update Kits

INSTALLATION INSTRUCTIONS

Altivar 61/71 Adjustable Speed Drives Plastic Kits and Power Terminal Kit

Agilent G2333B (Single) and G2334B (Dual) Flame Photometric Detectors

CAUTION The sensor must always be completely filled with process media in order to measure accurately.

If there is additional labor or other costs above the 4 hrs labor you must call VMAC for approved coverage

Installation Instructions. PowerFlex 700 Drive - Frame 8 Components Replacement

In addition to this instruction sheet, the following are included in this kit (some additional parts are included for future maintenance):

Replacing the Batteries in the Fortress LI 660

ROUSH Active IO Exhaust. Installation Instructions P/N: (R LITE) Fastback GT Convertible GT V8

Agilent 210/218 - Binary Pump

Prodigy HDLV Generation II Pump Panel

SITRANS F Coriolis Flowmeters SITRANS FCS400 sensor Quick Start

Electrically Held to Mechanically Latched Contactor

Customer Information. Service Engineer s Responsibilities. Additional Instruction Notes GC Preventive Maintenance Checklist Standard

Replacing the Battery in the Patriot SPS 250, SPS 300 and SPS 450

5000TOC Sensor Service Manual

Model 4430 Photoionization Detector (PID) Operator s Manual

Switching DC Power Supply

Agilent SD-1 Purification System ml/min

MK7 GTI Electronic Folding Mirror Conversion

Instruction Manual. Labnet Spectrafuge 16M Microcentrifuge

SITRANS F. Ultrasonic Flowmeters. Hi-Precision Mounts. Operating Instructions. Answers for industry.

ES25 Battery-powered ACSR Cutter with 120 V Charger with 220 V Charger

Catalyser Introduction. 3. Hazard Information. 2. Area of Application. 3.1 Symbology

18SP653 EPA04 and EPA98 MBE 4000 High Pressure Fuel Line and Transfer Tube Installation

N-084M and N-069M-DV Series Heat Exchanger Replacement

Customer Information. Service Engineer s Responsibilities. Additional Instruction Notes GC Preventive Maintenance Checklist Standard

FlexJet Carriage Circuit Board (PCB) Replacement

260 Solvent Vapor Exit Accessory

Upgrading the Sure Coat Modular Gun Control System

Users Manual. Accessories Motor and Phase Rotation Indicator ships with the following items: 3 test leads 3 test probes 3 alligator clips 9 V battery

Altivar 61/71 Adjustable Speed Drives Spare Parts Kits

BATTERY REPLACEMENT GUIDE

NPD to FID conversion on SRI 8610C or 310C GC July2012

Mustang V-6 Cold Air Intake P/N: ( A600) Application: Ford Mustang 3.7L Manual or Automatic Transmission

190M. Medical ScopeMeter. Safety Information

RT Series Step Down Transformer for RT Series UPS 6-10kVA UL Input Vac Output Vac User Guide

Battery Replacement. Installation Instructions. Summary of Changes. Catalog Number 2711P-RY2032. Original Instructions

For more information about Agilent Technologies services please visit our web site using the following URL

Feeder Circuit Breaker Units Secure Support Pan and Change Door Latch

System 3 ZB1PS Device Chassis. Operator s Manual

Model Fixed Rack-Mount Kit

HOYMILES MICRO-IVERTER MI-250

M-9603-SVT mm Cold Air Kit w/premium Calibration INSTALLATION INSTRUCTIONS

Ford 7.3L SuperDuty Cold Air Intake

Installation instructions

Pump Sentry. Models 812 PS & 1612 PS INSTALLATION INSTRUCTIONS

S4M Pulley and Gears Maintenance Kit

BEFORE USING THE PRODUCT

INSTALLATION & PART S MANUAL

PET UNIT DOSE CABINET

Installation Manual. AutoSteer. Gleaner Combine. AutoGuide 2 Steer Ready. Supported Models A66 A76 R66 R76 S67 S77 PN: A

SAFETY INSTRUCTIONS Before installation and operation, read these instructions carefully and use this product only in the manner described by the manu

Model TC-20. Tube Cut-Off Machine. Operator s Manual REV H

INSTALLATION INSTRUCTIONS

ELECRAFT KX3 Application Note

Installation Note for Solvent Selection Valve Upgrade Kit (G1360A)

NANOPAC-300 & 500 Power Supply. Instruction manual NANOPAC-300 & NANOPAC-500

Forbidden Diesel Performance Ford 6.7L Powerstroke EGR Delete Instructions 6.7L EGR DELETE BY FORBIDDEN DIESEL PERFORMANCE. Page 1

Transcription:

Installation Guide Flame Ionization Detector on a 6850 GC Accessory G2621

2

Agilent Technologies 2007 All Rights Reserved. Reproduction, adaptation, or translation without permission is prohibited, except as allowed under the copyright laws. Part number G2621-90108 Replaces G2621-90107 First Edition, DEC 2000 Second Edition, Feb 2007 Replaces Part No. G2621-90100 Operating and Service Manual. HP is a registered trademark of Hewlett-Packard Co. Printed in USA Safety Information The Agilent Technologies Flame Ionization Detector meets the following IEC (International Electrotechnical Commission) classifications: Safety Class 1, Transient Overvoltage Category II, and Pollution Degree 2. This unit has been designed and tested in accordance with recognized safety standards and designed for use indoors. If the instrument is used in a manner not specified by the manufacturer, the protection provided by the instrument may be impaired. Whenever the safety protection of the Agilent G2621 has been compromised, disconnect the unit from all power sources and secure the unit against unintended operation. Refer servicing to qualified service personnel. Substituting parts or performing any unauthorized modification to the instrument may result in a safety hazard. Disconnect the AC power cord before removing covers. The customer should not attempt to replace the battery or fuses in this instrument. Safety Symbols Warnings in the manual or on the instrument must be observed during all phases of operation, service, and repair of this instrument. Failure to comply with these precautions violates safety standards of design and the intended use of the instrument. Agilent Technologies assumes no liability for the customer s failure to comply with these requirements. WARNING A warning calls attention to a condition or possible situation that could cause injury to the user. CAUTION A caution calls attention to a condition or possible situation that could damage or destroy the product or the user s work. Sound Emission Certification for Federal Republic of Germany Sound pressure Lp < 68 db(a) During normal operation At the operator position According to ISO 7779 (Type Test) Schallemission Schalldruckpegel LP < 68 db(a) Am Arbeitsplatz Normaler Betrieb Nach DIN 45635 T. 19 (Typprüfung) Agilent Technologies, Inc. 2850 Centerville Road Wilmington, DE 19808-1610 USA

Installing a Flame Ionization Detector on an Agilent 6850 Gas Chromatograph These instructions are divided into three parts: Part 1 to prepare the Electronic Pressure Control ("EPC") module for later installation into the Agilent 6850 Gas Chromatograph ("GC") Part 2 to prepare the FID Signal board for later installation Part 3 to perform the actual Accessory installation into the GC Part 1: Preparation of the FID EPC module Locate the following item found in your Accessory kit: Covers Kit G2630-60080 consisting of: Qty. Front EPC cover 1 Back EPC cover 1 Hex nuts, 7/16-inch 3 Grommet, 7/16-inch 1 Screw, M4 x12 mm, pan head 3 Copyright 2007 Agilent Technologies Printed in USA Feb 2007 Agilent Part No. G2621-90108 1

2

Caution Some of these assemblies contain printed circuit boards so standard ESD precautions must be followed: use a static control wrist strap (supplied) connected to a suitable ground in handling the assemblies. The following tools are required for this assembly: Tools Required Torx T-20 driver 7/16-inch open end wrench or nut driver Procedure 1. Prepare a suitable clean, dry, static-free work area. 2. Place the detector system assembly such that its EPC module is centered in your work area with its tubes oriented away from you and its ribbon cable extending to the right. 3. Remove dust caps from the gas connection fittings. 3

4. Install the back cover onto the three gas fittings making sure the label passes through slot provided. Loosely secure the cover using 7/16-inch hex nuts, one onto each fitting. 5. Reorient the module such that the ribbon cable is upwards and gas fittings are to the left. 6. Fold the cable first to the left and gently crease it at the PC board to maintain the direction. Then fold the cable back on itself to the right and make a gentle crease such that the second fold is just inside the justinstalled back cover. 4

7. Next, fold and gently crease the cable back on itself again, but at an angle such that it now extends at 90-degrees away from you (in the direction of tubing from the module). 5

If correctly done, the cable and its folds will be entirely within the body of the module, and the free end of the cable and its connector will extend from the module in the direction of the tubing. 8. Fit the front cover onto the previously-installed back cover, securing it loosely using three screws provided, two in the gas fittings side and one in the PC board side. Make sure the ribbon cable and its connector exit through the slot provided. 6

9. Finally, firmly secure all cover screws and hex nuts on the gas connection fittings. Then replace protective dust caps onto the gas connection fittings to maintain cleanliness. 7

This completes EPC module preparation for this Accessory. Part 2: Preparation of the FID Signal Board Locate the FID Signal board. Procedure Using a small, sharp pair of diagonal wire cutters, remove and discard the small bracket from the location shown: This completes preparation of the FID Signal board. 8

Part 3: Installation of the FID Accessory This kit contains: Kit G2621-64000 Qty. Flame ionization detector system 1 Performance evaluation sample kit 1 Nut warmer cup assembly 1 Nut warmer insulation 1 Wrist strap, disposable, large 1 Screw, M4 x12 mm, pan head 3 Installation sheet (this document) 1 9

The FID detector assembly is a factory-assembled, tested, and calibrated unit. Disassembly of the unit is not required for installation. Ribbon cable Heater/sensor cable FID assembly Ignitor cable Nutwarmer Insulation (3 pieces) Screws Flow module cable Flow module FID signal board Tools Required Torx T-20 driver Flat blade screwdriver Open end wrenches Safety Information Before continuing, read the safety information on your Agilent 6850 Gas Chromatograph User Information CD-ROM. 10

BNC BNC To Base - T To Base - T Local Talk Local Talk Installing a Flame Ionization Detector on an Agilent 6850 Gas Chromatograph Prepare for Installation WARNING Hydrogen gas is flammable and potentially explosive. Before replacing the manifold, turn off the hydrogen gas at the source. WARNING Before proceeding, turn off the oven and any heated zones and let them cool down. Turn off all detector gases at their supply, then turn off the main power switch and unplug the power cord. 10. Open the lid. If a column is installed, disconnect it at the detector end. Remove the nut warmer, insulation, and capillary adapter, if present. Close the lid. 11. Turn all gases off at their sources. Disconnect the carrier and detector gas tubing from the back panel of the instrument. Disconnect gas supply tubing from these fittings 11

Remove the Lid Top Cover Remove vent tubing, if present Lid top cover, without valve box accessory Remove T-20 Torx screws (8 places) Remove detector cover, if desired Remove the lid top cover. Disconnect the Heater/Sensor Cable 1. Trace the detector heater/sensor cable to the wiring harness near the injection part cooling fan. 2. Disconnect the cable at the connector. Raise the Lid to the Service Position 1. Open the lid. Locate the counterbalance cam in the left rear corner under the lid. Loosen the screw on the right side of the cam. This allows the stop plate to drop down. 12

Cam follower Stop plate Screw Counterbalance cam 2. Raise the lid until it is stopped by the safety cable. 3. Raise the stop plate and tighten the screw to lock the lid in the upright service position. WARNING The lid is heavy. Always lock the lid when it is in the service position. 13

Remove the Detector Electronics Cover 1. Loosen the two bottom screws on the detector electronics cover. Remove screw Detector electronics cover Loosen screws 2. Remove the top screw on the cover. 3. Lift and remove the detector electronics cover. 14

4. Loosen the signal board clamp. Ribbon cable Signal board (FID shown) Signal board clamp 5. Unplug the signal board from the A/D converter board. 6. Disconnect the wiring from the signal board. A/D converter board FID Disconnect the ribbon cable. Unplug the ignitor cable. Pass both cables through the hole to the top side of the lid. The ribbon cable connector will not pass through the rubber grommet in the hole. Use a small screwdriver to push the grommet to the top of the lid. The cables will now fit through the hole. 15

Ribbon cable connector Ignitor cable connector TCD Unplug the two-wire switching valve cable at the connector. To release the PRT and filament wires, press down on the orange tabs. Pass the disconnected wires through the hole to the top side of the lid. Switching valve cable connector PRT wires Filament wires 7. Lower the stop plate on the lid cam. Pull the lid forward until the cam follower rests on the curved surface of the cam. Leave the stop plate in the "down" position. 8. Close the lid. 16

Remove the Existing Detector and Flow Manifold 1. On the top of the lid, loosen the connector cover plate screws and remove the plates. Cover plate screws (4) Gas manifold (FID shown) Manifold mounting screws Gas fittings 2. Disconnect the gas fittings. The figure shows the FID manifold; the TCD manifold is similar but has only one gas connection. 3. Trace the ribbon cable from the flow manifold and disconnect it from the harness. 4. Remove the three manifold mounting screws. 5. Remove the screws holding the detector assembly in place. 17

FID Remove four mounting screws. Mounting screws (one concealed) TCD Remove two mounting screws. Mounting screws 6. Lift the detector and flow manifold out of the lid as a unit. WARNING The fibrous insulation material can cause irritation to the skin, eyes, and mucous membranes. Always wear gloves when working with the insulation. If the insulation is flaky/crumbly, wear protective eyewear and respirator. 7. Remove any insulation that may be in the hole under the detector. 18

Install the Flame Ionization Detector and Flow Manifold 1. Place the flame ionization detector and flow manifold in position in the lid. Check that no wiring or tubing is trapped under either assembly. Ignitor cable Heater/sensor cable connection Screws (4 places, one not visible) 2. Secure the detector assembly to the lid with four screws. 3. Secure the manifold to the lid with three screws. 4. Plug the manifold ribbon cable into its connector. 5. Install the two connector cover plates. 6. Connect the gas supply lines as shown below. If the previous detector was a TCD, the A and H lines should be folded up in the space under the fittings. Unfold them, being careful to avoid kinks, and feed them up to the manifold area. Connect the line marked A here Connect the line marked M here Connect the line marked H here 19

Connect the Heater/Sensor Cable Connect the detector heater/sensor cable to the wiring harness near the injection part cooling fan. Connect the other Leads and the Signal Board 1. Raise the lid to the service position and lock it in place by raising the stop plate. 2. There is an oblong hole through the lid near the left rear corner of the FID assembly. If there is a grommet in the hole, remove it. Pass the ignitor cable and the ribbon cable through the hole into the signal board space. 3. Use a small screwdriver to install the grommet around the cables in the oblong hole. 4. Connect the ribbon and ignitor cables to the signal board. Ribbon cable connector A/D converter board connector Ignitor connector 5. Turn the signal board over, plug it into the A/D converter board, and secure it with the signal board clamp. 6. Install the detector electronics cover and tighten all three screws. 7. Lower the stop plate on the lid cam. Pull the lid forward until the cam follower rests on the curved surface of the cam. Raise the stop plate behind the cam follower and tighten the screw. 8. Close the lid. Be sure that the folded gas lines do not interfere with it. 20

9. Install the lid top cover. Finishing Up 1. Install the capillary adapter, if used. 2. Restore the column connection. 3. Restore carrier and other gases to the instrument. 4. Restore power. 5. Apply your normal operating pressures. Leak-check the manifold, back panel, and column fittings. 21

22

Printed on recycled paper. This product is recyclable. Agilent Technologies, Inc. Printed in USA April 2007