HC-11 Programmer (optional)

Similar documents
HC-11 Programmer (optional)

Rimac Spring Tester Retro-Fit Kit

27" Natural Gas Conversion Manual

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

SCION im PREMIUM AUDIO Preparation

INSTALLATION INSTRUCTIONS

Adjustable Light Kits E-Z-Go TXT All Models Installation Instructions

2-Fryer Battery Wiring Restraint Kit Fryer Battery Wiring Restraint Kit Fryer Battery Wiring Restraint Kit

PC45 Air PumP replacement kit- For replacing A denver-gardner PumP with A hiblow PumP.

INSTALLATION INSTRUCTIONS

SCION TC HANDS FREE BLU LOGIC Preparation

Desktop 5.5 Z Axis Retrofit

ASSEMBLY MANUAL VALVE AND PLUMBING KIT INSTRUCTIONS NEW HOLLAND TRACTORS WITH TANDEM GEAR PUMP HYDRAULIC SYSTEM

Inteli-Lift GEN II DUMBWAITER

Service Procedure COL-213

TOYOTA TUNDRA HANDS FREE BLU LOGIC Preparation

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market

SCION tc Navigation System Preparation. Part Number: PT

Air Conditioner for M915 A0/A1 Truck

LGT-312L E-Z-Go TXT Light Bar Bumper Kit Installation Instructions

SERVICE INSTRUCTIONS KEATING keatingofchicago.com

igen2500 and ipro2500 IGNITION COIL RETROFIT GUIDE

Service Procedure COL-211

This harness kit includes: Installing the Hybrid ReVolt Universal grid charger in an Insight

Turn Signal / Horn Kit PN 7101 by All years Polaris RZR 1000 and RZR 900, 900-4, 900 trail, 900S and 900XC STOP - THIS KIT IS DESIGNED

LGT-306L / LB Club Car Precedent LED Light Bar Bumper Kit Installation Instructions

FilterQuick OQS Gas Installation Instructions

Service Procedure COL-209

INSTALLATION INSTRUCTIONS

Instructions for 2-row monitoring only

Assembly Manual. Assembly Instructions Read Carefully 2.1. Parts included: Tools suggested: Electric Drill

VALVE AND PLUMBING KIT INSTRUCTIONS SMC 84Q & 2408 LOADERS NEW HOLLAND TRACTORS MODEL 2WD 4WD LESS CAB WITH CAB 1720 X X X 1920 X X X

Part Number: TAV-713 TOYOTA AVALON LED DRL

INSTALLATION INSTRUCTIONS

CHALLENGER TWIN TURBO SYSTEM INSTALLATION INSTRUCTIONS

PD15-UL-M KIT INSTRUCTIONS

Wolverine Turn Signal / Horn Kit 2102

Instructions for 2-row monitoring only

Soffit Application Sound Enclosure

Ford 7.3L Powerstroke Regulated Fuel Return

TOYOTA TUNDRA TVIP V4 Preparation

INSTALLATION INSTRUCTIONS

Owner smanual. Banks Monster-Ram Intake and Grid Heater Delete Kit. For Racing Only Ram 6.7L Pickup Trucks. with Installation Instructions

Conflicts: Highlander without sunroof

John Deere 4730, 4830 Installation Manual JD8

Rear Vision System Liftgate Emblem Camera for Aftermarket Display Ford Flex (Kit part number )

SPECIAL INSTALLATION INSTRUCTIONS

2016 HONDA 1000 Pioneer PN 3102 Turn signal / horn kit rev nc

If technical support is required, please contact Advent Technical Support at

TOYOTA TACOMA HANDS FREE BLU LOGIC Preparation. Item 5 Item 6 Item 7 Item 8. Item 4. General Applicability Note: Recommended Tools

Prodigy to Encore HD Manual Powder Spray System Upgrade Kit

A. VEHICLE INSPECTION PROCEDURE

Installation Manual. AutoSteer. Gleaner Combine. AutoGuide 2 Steer Ready. Supported Models A66 A76 R66 R76 S67 S77 PN: A

Rear Vision System Tailgate Emblem Camera Aftermarket Display 2009-Current Ford F-150 and 2010-Current Super Duty (Kit part number )

FOG LAMPS INSTALL KIT

SPEED CONTROL 4 AND 6 CYL. JEEP WRANGLER. Read entire instructions thoroughly before starting. INSTALLATION INSTRUCTIONS TOOLS REQUIRED:

INSTALLATION INSTRUCTIONS

TOYOTA tc HANDS FREE BLU LOGIC Preparation

USB and ipod Music interface

Instruction Sheet. Subject: Installations Instructions. Air Compressor Kits. Importan

Special Chemicals VDC approved cleaner. General Applicability All Scion iq models, including 10 Year Anniversary Edition.

MOUNT BRACKET PARTS and HARDWARE: Installation parts with * come loose in hardware kit bag. Other parts are preassembled

TECHNICAL INSTRUCTIONS

SITRANS F. Ultrasonic Flowmeters. Hi-Precision Mounts. Operating Instructions. Answers for industry.

TOYOTA im NAVIGATION UPGRADE Preparation

SCION XB HANDS FREE BLU LOGIC Preparation

Table 1 - Available MIG-41 Push-Pull Gun Assemblies

REF QTY PART DESCRIPTION PART NUMBER

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Validator and Control Board Update Instructions for BC1

SE-B2, B3 & BXL Sound Enclosures

GENUINE PARTS INSTALLATION INSTRUCTIONS

Assembly Instructions

Control Panel Interface Upgrade Installation Guide For Model 200i and 250i Motorcycle Dynamometers Serial Number 202xxxx.

TOYOTA im INTERIOR LIGHT KIT Preparation

18SP675Rev. MBE 900 Grid Heater Relay Installation Instructions (P/N: A )

Service Bulletin DIS185SSI4F Air Compressor Multiple Component Update

Signal Mirror Installation Instructions Toyota Sequoia Limited, 2004 Toyota Tundra D-Cab

Owner smanual. Banks Monster-Ram Intake and Grid Heater Delete Kit. For Racing Only Ram 6.7L Pickup Trucks. with Installation Instructions

Manifold QF. Contents. Description. Installation & Setup Guide. Safety 3. Introduction 3. Installation Standards 4. Specifications 5.

Installing a PTV Inlet

Performance Inlet Manifold

SKID MARK GARAGE. Axillary Fuel Supply

Mirror Solutions Bevel & Pivot Models Installation Instructions INSTALLATION INSTRUCTIONS. Figure 1

INSTALLATION INSTRUCTIONS

SCION XB HANDS FREE BLU LOGIC Preparation. Item 4 Item 5 Item 6 Item 7. General Applicability. Note: Recommended Tools

TECHNICAL INSTRUCTIONS

Authorized Field Change

Installing a PTV Inlet

TOYOTA RAV4/HV INTERIOR LIGHT KIT Preparation

INSTALLATION INSTRUCTIONS

PRELIMINARY INSTALLATION INSTRUCTIONS. PARTS LIST Security System Kit (sold separately) P/N 08E51-EP4-101

SCION iq AUDIO Preparation

INSTALLATION INSTRUCTIONS

FAX

INSTALLATION INSTRUCTIONS

TOYOTA SOLARA CONVERTIBLE XM SATELLITE RADIO Preparation. Part Number: Mounting Kit PT

INSTALLATION AND OPERATION MANUAL

Transcription:

To avoid electrical shock, disconnect power. Do not drop the sensor. If dropped, malfunctioning of the sensor may occur. LVE-10X OQM Installation Instructions Kit Numbers 140335 Est. Time 1 hour Tools Required HC-11 Programmer (optional) p/n 140509 Phillips head screwdriver Drill gun Adjustable wrench Thread Sealant Kit Contents (140335) FM08-488-D Sept. 5, 2016 Page 1 of 11

Procedure Removing Existing Plumbing 1 Use a Phillips head screwdriver or drill to remove the screws in the power cord strain relief. 2 Lift the power cords up and out of the way of the working area. 3 Use a Phillips head bit to remove the screws that secure the strain relief to the frame. 4 Locate the hard line tube that is leading from the filter pump to the oil manifold. FM08-488-D Page 2 of 11

5 Use an adjustable wrench to loosen the fittings on the oil manifold and on the filter pump. Remove hard line and discard. 6 Use an adjustable wrench to remove the elbow fitting from the check valve on the filter pump. Installing the OQM system 7 Locate the new hard line tube included in the kit. Thread the 90 bend end onto the male fitting connector and tighten with an adjustable wrench. 8 Thread the flare fitting into the end (outlet) of the OQM sensor assembly and tighten. 9 Thread a male fitting into the bottom (inlet) of the OQM sensor assembly. 10 Locate the OQM plumbing assembly and the white oil hose. FM08-488-D Page 3 of 11

11 Thread the OQM plumbing assembly into the oil manifold where the hard line connector was previously removed and tighten. 12 Thread the elbow flare fitting into an end of the white oil hose and tighten. 13 Place the OQM sensor assembly onto the new hard line tube. Thread the male connector fitting into the hard line and tighten with an adjustable wrench. 14 Bend the white oil hose so the end meets the OQM sensor assembly flare fitting. Thread the white oil hose to the flare fitting and tighten. 15 Locate the access cover, strain relief and the communication cable. 16 Use a Phillips head screwdriver and lower the extreme right (end) control board. FM08-488-D Page 4 of 11

17 Use a Phillips head screwdriver to remove the existing cover from the back of the control board. 18 From the back of the shroud, slide the white 3-pin and the black 8-pin connectors through the hole alongside of the existing wire bundle. 19 Pull the wires through to the front of the shroud towards the control board. 20 Remove the loop resister from the control and discard. Loop Resister FM08-488-D Page 5 of 11

21 Plug the white 3-pin connector of the new communication cable into the control board where the loop resister was previously removed. 22 Place the 8-pin connector of the communication cable through the hole of the new plate cover. 23 Connect the 8-pin connector into the control board. 24 Secure the plate in place with a Phillips head screwdriver. 25 Route the communication cable along the tops of all the plumbing and conduits towards the OQM sensor assembly. 26 Align the white dots on the connector and the receiving end on the black box. Press the connector onto the receiving end. The connector will need to be turned 90 to fully lock into the receiver. 27 Reinstall the control board to the factory position. FM08-488-D Page 6 of 11

28 Reinstall the power cord strain relief. 485 Jumper cables installation The jumper cables enable each PCU in the fryer to communicate with the OQM sensor & retrieve the %TPM measurement. These cables may or may not be present on existing fryers to be retrofit. They must be installed if not present. 29 Locate the 485 Jumper cables. The jumper cables are 3-wire harnesses with 3-pin connectors on each end. 30 Plug the 3-pin connector into the back of the control board. 31 Route the cable from one PCU to the next behind the vertical support. Loop & wire-tie the excess cable. Do this with both PCUs lowered, to leave enough slack to lower the PCUs in the future. 32 The last jumper cable terminates on the right-most PCU. The OQM connector plugs into the adjacent connector, beside the jumper cable connector. 33 Reflash the control boards. For advanced risc machine (ARM) control reflashing, proceed to the next step. For HC-11 control reflashing, go to step 46. FM08-488-D Page 7 of 11

Reflashing the ARM controls This section is the procedure for reflashing the ARM controls with the new software. 34 Rotate the control board down so that it hinges the lip of the shroud. 35 Use a Phillips head screwdriver to remove the existing cover from the back of the control board. 36 Locate the USB port on the back of the controls. If no USB port is available than proceed to step 46 for HC-11 control reflashing procedure. 37 Insert the USB Drive. 38 Press and hold the TEMP & INFO button until LEVEL 3 is displayed. 39 Enter the password 11221122. 40 Press the button once and FLASH SOFTWARE will be displayed. FM08-488-D Page 8 of 11

41 Display will show MAIN FLASH. Press the 1 button to confirm. 42 Control will display software part number on right side display. Verify part number (83829C). Press 1 to continue. 43 Control will display CONFIRM on the left side display. Press 1. 44 CHECKING FILE will be displayed indicating that the software is being reflashed. 45 When reflashing is complete, control will power down and display OFF. Reflashing the HC-11 controls This section is the procedure for reflashing the HC-11 controls with the new software. 46 Rotate the control board down so that it hinges the lip of the shroud. 47 Use a Phillips head screwdriver to remove the existing cover from the back of the control board. 48 Locate the programmer. The extender needs to be attached to the end of the ribbon cable before next step. FM08-488-D Page 9 of 11

49 Plug the programmer into the bottom, left connector (circled in the image to the right). 50 Green light on the programmer will flash to indicate it is properly connected. If the light is red, this indicates an issue. 51 Press the red button on the programmer. 52 Light will stay green while programming the control. 53 Light will flash green when it is verifying. 54 Once complete, the light will shut off. If the light is red, this indicates an issue. 55 It is now safe to disconnect the programmer. 56 Install the access cover on the control. 57 Place the control board back to factory location and secure. FM08-488-D Page 10 of 11

58 Confirm the power on the front of the controller is OFF. Initializing the controls This section is the procedure for initializing the control board. 59 Press and hold the TEMP button while pressing the heat button. ---MFG MODE--- will display. + 60 Enter 11221122 for the access code. 61 EL ASSY FRYR PNL will display. Press the right button under the word FRYR. 62 Press the or until INIT shows in the display. 63 Press and hold the button. The display shows INIT IN 3 2 1 then flashes INIT. Once completed INIT *DONE* will be displayed. 64 Turn the controller OFF then back ON. The controller may require to set time and date. 65 Repeat the Reflashing and Initializing procedure for the remaining control boards. FM08-488-D Page 11 of 11