Georgia Territorial Act

Similar documents
UNITED STATES DISTRICT COURT WESTERN DISTRICT OF WASHINGTON

2lr1344 CF 2lr1396. Drafted by: Heide Typed by: Rita Stored 02/02/12 Proofread by Checked by By: Senator Pinsky A BILL ENTITLED

SCHEDULE 6 RESIDENTIAL SERVICE ON-SITE GENERATION

"Buyer" or "you" means the person, firm or corporation to whom the order is addressed.

GRASS LAKE CHARTER TOWNSHIP PAGE 1 POLICE POWER ORDINANCE

IN THE SUPERIOR COURT OF FULTON COUNTY STATE OF GEORGIA

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

SCHEDULE 84 CUSTOMER ENERGY PRODUCTION NET METERING SERVICE

COVINGTON POLICE DEPARTMENT STANDARD OPERATING PROCEDURE

Definitions.

Case 3:10-cv JGH Document 1 Filed 02/04/10 Page 1 of 11 PageID #: 1

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

ORDINANCE AMENDING TITLE VII: TRAFFIC CODE OF THE CODE OF ORDINANCES TO PERMIT AND REGULATE THE OPERATION OF GOLF CARTS ON PUBLIC STREETS

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

Illinois Official Reports

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.

September 2, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

STATE OF NEW JERSEY. SENATE, No th LEGISLATURE. Sponsored by: Senator BOB SMITH District 17 (Middlesex and Somerset)

Noble County Rural Electric Membership Corporation

Northeastern Rural Electric Membership Corporation Columbia City, Indiana

CHAPTER 14 TRAFFIC CODE THE MINNESOTA HIGHWAY TRAFFIC REGULATION ACT.

ROANOKE ELECTRIC COOPERATIVE RATE SCHEDULES

GUIDELINES FOR PROPER ELECTRIC POWER TRADE. December 20, Fair Trade Commission. and. Ministry of Economy, Trade and Industry

CHAPTER 403. HAZARDOUS MATERIAL TRANSPORTATION

Consumer Guidelines for Electric Power Generator Installation and Interconnection

RATE APPLICATION MANUAL. Kansas City Board of Public Utilities

TITLE 15 MOTOR VEHICLES, TRAFFIC AND PARKING 1 CHAPTER 1 MISCELLANEOUS

Septage Disposal Ordinance for Kent County

Electricity Safety (Electrical Installations) Regulation 2005

Service Delivery Strategy

Starting a franchise business ESTABLISHMENT GUIDE

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) APPLICATION

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

HB 2471: Municipal Electric Utility Formation in Oregon

HB 2471: Municipal Electric Utility Formation in Oregon

RULES OF THE DEPARTMENT OF PUBLIC SAFETY. Chapter Non-Consensual Towing

P.S.C. No. 9 - Electricity Consolidated Edison Company First Revised Leaf No. 310 of New York, Inc. Superseding Original Leaf No.

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California

H 7366 S T A T E O F R H O D E I S L A N D

County Council Of Howard County, Maryland

The Commonwealth of Massachusetts

Revised Cal. P.U.C. Sheet No E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

traffic markings. (Ord , )

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

USAACE & Fort Rucker Preventative Law Program. Alabama Lemon Law

HOUSE BILL No Koch

The following definitions shall apply in the interpretation of this article:

Street Address. City-Village-Township

COMPUTING COUNTY OFFICIAL SALARIES FOR

SENATE BILL lr1706 A BILL ENTITLED. Vehicle Laws Manufacturers, Distributors, and Factory Branches Prohibited Acts

COMMERCIAL VEHICLE LICENCING

216B.164 COGENERATION AND SMALL POWER PRODUCTION.

CHAPTER 14B. DRIVE-IN, TAKE-OUT AND SELF-SERVICE BUSINESS ESTABLISHMENTS. 1

Northeastern Rural Electric Membership Corporation Schedule DG-2 Columbia City, Indiana Page 1 of 5

Welcome to the CAAFI Biennial General Meeting & ASCENT Symposium December 4-6, 2018 Washington Marriott at Metro Center, Washington, DC

GENERAL ASSEMBLY OF NORTH CAROLINA 1991 SESSION CHAPTER 530 HOUSE BILL 516

Buy All Sell All Rider for Interconnection of Renewable Generation

IN THE SUPERIOR COURT OF FULTON COUNTY STATE OF GEORGIA. Plaintiffs, CIVIL ACTION v. NO. COMPLAINT FOR DECLARATORY JUDGMENT

Filed with the Iowa Utilities Board on September 17, 2018, RMU STATE OF IOWA DEPARTMENT OF COMMERCE IOWA UTILITIES BOARD

Panola-Harrison Electric Cooperative, Inc. Louisiana Tariff Effective: March 3, 2004

ORDINANCE NO. O-6-10

Article 7: Motorized Carts

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM

Chapter 17 TRAFFIC AND VEHICLES. Adoption of Uniform Rules of the Road. Temporary Traffic Regulations.

Schedule No. NMR-405 NET METERING RIDER-405 APPLICABLE

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members

ELMORE COUNTY HIGHWAY DEPARTMENT

MAINE LEMON LAW SUMMARY

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

18 HB 673/AP A BILL TO BE ENTITLED AN ACT

UNOFFICIAL COPY OF SENATE BILL 53 CHAPTER

ELECTRIC SCHEDULE AG-ICE Sheet 1 AGRICULTURAL INTERNAL COMBUSTION ENGINE CONVERSION INCENTIVE RATE - EXPIRATION TRANSITION RATE

o Payment Arrangements o Discontinuing Service o Filing a complaint Electric Service Rates Public Records Policy Annual Report Annual Fuel Mix

Case 1:99-mc Document 458 Filed 06/05/12 Page 1 of 12 PageID #: IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF DELAWARE

Federal And New York Tax Incentives For Alternative Fuels

MMP Investigation of Arthur Kill 2 and 3

Street Address. City-Village-Township

THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY

Ordinance /11/2017

Noble County Rural Electric Membership Corporation

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT

Village of West Dundee Electric Aggregation Program

University of Alberta

Revised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

Village of Mount Prospect Electric Aggregation Program

Pennsylvania s Ignition Interlock Limited License Expanded and Remodeled

ELECTRICAL ORDINANCE NO

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.

6-8-1: NONHIGHWAY VEHICLES ALLOWED: 6-8-2: DEFINITIONS: 6-8-3: RULES AND REGULATIONS:

COUNCIL OF THE EUROPEAN UNION. Brussels, 11 December /3/06 REV 3 ADD 1. Interinstitutional File: 2003/ 0153(COD) ENT 84 CODEC 561

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Policies and Procedures Handbook Procedure No.: T.2 Illinois Institute of Technology Date of Issue: 7/11

ORDINANCE NO. WHEREAS, The City of Georgetown established its current electric rates in 2007;

Santa Rosa City Code. TITLE 11 VEHICLES AND TRAFFIC Chapter RESIDENTIAL PARKING PERMITS Legislative purpose.

Transcription:

A Basic Guide to the Georgia Territorial Act Atlanta Austin New York Tallahassee Washington Prepared by: James A. Orr Sutherland Asbill & Brennan LLP 999 Peachtree Street, N.E. Atlanta, GA 30309-3996 404.853.8000

Table of Contents Introduction...... 1 I. Assignment of Territory...... 2 II. III. IV. Unassigned Areas...... 3 Corridor Rights...... 4 Large Load Exception... 8 V. Grandfather Rights... 11 VI. VII. VIII. IX. Right to Serve Own Facilities Devoted to Public Service... 12 Rights Where Premises Straddle Boundary Lines... 13 When Lines Do Not Acquire Service Rights... 14 Prohibition Against Discriminatory Rates and Certain Tying Arrangements... 17 X. Transfers of Service... 19 XI. Franchise Fees... 21 Glossary... 22 About the Author... 24 A Basic Guide to the Georgia Territorial Act

Purpose of the Guide Introduction The purpose of this Guide is to summarize and explain those provisions of the Georgia Territorial Electric Service Act that are most commonly implicated in competitive disputes. For ease of reading, provisions of the Territorial Act have been paraphrased throughout the Guide. However, because the specific terms of the Act are often critical, this Guide should not be used as a substitute for a close reading of the Act. For this reason, citations to the relevant provisions of the Territorial Act are provided. The complete Act is set forth at O.C.G.A. 46-3-1 through 46-3-15. Judicial Interpretation of the Territorial Act; Definitions Since the Territorial Act was adopted in 1973, the Act has been the subject of numerous interpretations by the Public Service Commission and the Courts, and new interpretations are issued every year. In determining legal rights, these interpretations can be as important as the specific language of the Act itself. Accordingly, advice of counsel is recommended in order to obtain the most recent interpretations of the Territorial Act. Certain terms have specific definitions under the Territorial Act. These definitions can be found at O.C.G.A. 46-3-3. Some of the more important definitions are set forth in a glossary at the end of this Guide. These include the terms "assigned area," "line," "premises," "primary supplier" and "secondary supplier." A Basic Guide to the Georgia Territorial Act 1

General rule I. Assignment of Territory See O.C.G.A. 46-3-3(1); 46-3-4; 46-3-5. Generally, an electric supplier has the exclusive right to provide electric service to all new premises locating within its assigned area. The term premises has a special definition under the Territorial Act, which is set forth in the Glossary at the end of this Guide. Assignment of territory Geographical areas located within municipalities were assigned under the Territorial Act to the primary supplier in each municipality. Geographical areas located outside municipalities were assigned to electric suppliers by the Public Service Commission in the mid-1970s, after the Territorial Act was passed.. Assigned areas are shown on territory maps on file with the Public Service Commission, often referred to as "B" maps. A Basic Guide to the Georgia Territorial Act 2

II. Unassigned Areas General rule See O.C.G.A. 46-3-3(11); 46-3-3(12); 46-3-4. Some areas have not been assigned to any electric supplier. If an area has not been assigned, it may qualify as either an unassigned area-a or an unassigned area-b. The different rights and restrictions applicable to these areas are set forth at O.C.G.A. 46-3-3(11) and (12). An unassigned area-a is a geographic area which, between March 29, 1973 and September 1, 1975, was not an assigned area and was not declared to be an unassigned area. An unassigned area-b is a geographic area which has not been assigned and which has been declared by the Commission to be an unassigned area-b or which becomes an unassigned area-b by operation of the Territorial Act. If an area qualifies as an unassigned area-b, premises locating therein generally are customer choice loads any electric supplier may serve the premises if chosen by the consumer. However, if such premises are located within 500 feet of an electric supplier s line, and more than 500 feet from the lines of every other electric supplier, the electric supplier owning the line has the exclusive right to serve such premises. See Section III below ( Corridor Rights ). A Basic Guide to the Georgia Territorial Act 3

General rule III. Corridor Rights See O.C.G.A. 46-3-3(12); 46-3-4(4); 46-3-5. Certain lines carry "corridor rights," giving the electric supplier owning such lines the right to serve new premises locating within 300 or 500 feet of such lines. Corridor rights give an electric supplier the right to serve premises located within another electric supplier's assigned area. As explained below, corridor rights may be exclusive or non-exclusive (customer choice). Different requirements and restrictions apply, depending on whether the line having corridor rights is located outside municipal limits, inside municipal limits, or within an unassigned area-b. These requirements and restrictions are set forth below. Notes The Territorial Act does not use the phrase "corridor rights." The provisions granting corridor rights are found at O.C.G.A. 46-3-4(4) (for areas outside municipalities) 46-3-5 (for areas inside municipalities), and 46-3-3(12) (for lines located in an unassigned area-b). If a line operates at a potential of 120,000 volts or more, it probably does not qualify as a "line" under the Territorial Act. See definition of "line" below. A Basic Guide to the Georgia Territorial Act 4

Corridor rights OUTSIDE municipal limits For a line located outside municipal limits to possess corridor rights, the following requirements must be met: The line must be enclosed, i.e., it must extend into or completely cross the assigned area of another electric supplier. The line must not have occasioned an assignment or unassignment of land. This has been interpreted to mean that a line which serves as a territorial boundary line does not have corridor rights. The line must have been enclosed on the date of territorial assignment. When these requirements are met, a 500 foot corridor is created. It may be exclusive or non-exclusive (customer choice): The electric supplier owning such a line has the exclusive right to extend service to all new premises locating at least partially within 500 feet of such a line, so long as no part of the premises is located within 500 feet of the lines of the electric supplier to whom the territory has been assigned (the assignee electric supplier ). The electric supplier owning such a line has the right, if chosen by the consumer, to extend service to new premises which are A Basic Guide to the Georgia Territorial Act 5

located at least partially within 500 feet of its lines and partially within 500 feet of the lines of the assignee electric supplier. The line must not be disqualified from acquiring service rights under the Territorial Act. See Section VIII below and the definition of line. Corridor rights INSIDE municipal limits Ordinarily, the primary supplier within a municipality has the exclusive right to serve new premises locating within the municipality. However, a line owned by a secondary supplier within a municipality may have corridor rights. For a line located inside municipal limits to possess corridor rights, the following requirements must be met: The line must have been located within the corporate limits of a municipality as of March 29, 1973. The line must not be disqualified from acquiring service rights under the Territorial Act. See Section VIII below and the definition of line. Among other restrictions, if a line was located within a municipality as of March 29, 1973, but was not providing retail service within the municipality on that date, the line does not acquire corridor rights as to any premises located within such municipal limits as they existed on that date. A Basic Guide to the Georgia Territorial Act 6

When these requirements are met, a 300-foor corridor is created. It may be either exclusive or non-exclusive (customer choice). A secondary supplier owning such a line has the exclusive right to extend service to new premises locating at least partially within 300 feet of its line, so long as no part of the premises is located within 300 feet of the lines of any other electric supplier. A secondary supplier owning such a line has the right, if chosen by the customer, to extend service to new premises locating at least partially within 300 feet of both its lines and the lines of any other electric supplier. Corridor rights in an "unassigned area-b" Ordinarily, new premises locating within an "unassigned area-b" are customer choice loads. However, if the new premises in such an area are located within 500 feet of an electric supplier's line and more than 500 feet from the lines of every other electric supplier, the electric supplier owning the line has the exclusive right to serve such premises. Lines constructed on March 29, 1973 or thereafter lawfully constructed may acquire corridor rights under this provision. The line must not be disqualified from acquiring service rights under the Territorial Act. See Section VIII below and the definition of line. A Basic Guide to the Georgia Territorial Act 7

General rule IV. Large Load Exception (Customer Choice) See O.C.G.A. 46-3-8(a). New premises that have a connected load of 900 kilowatts or greater at the time of initial full operation may qualify as "customer choice" loads. If so, the consumer may select its electric supplier from among those suppliers eligible to serve the premises. Several requirements must be met before this rule applies. These are described below. Requirements for large load exception to apply The premises must be utilized by only one consumer. The premises must have single-metered service. The connected load must be 900 kilowatts or greater at the time of "initial full operation." The rule applies to "one or more new premises," but if more than one, such premises must be located on the same tract or on contiguous tracts of land. Electric suppliers eligible to serve under the large load exception If the above requirements are met, the following electric suppliers may serve the premises if chosen by the consumer: A Basic Guide to the Georgia Territorial Act 8

If the premises are located anywhere within the limits of a municipality as they existed on March 29, 1973, then the primary supplier within that municipality may serve the premises. If the premises are located within the limits of a municipality as they existed on March 29, 1973, and within 300 feet of the lines of the secondary supplier within the municipality, then the secondary supplier may serve the premises. If the premises are located within the initial corporate limits of a wholly new municipality, any electric supplier may serve the premises. If the premises are located in a geographic area annexed to a municipality after March 29, 1973, then any electric supplier owning lines in the municipality may serve the premises. If the premises are located outside the limits of a municipality, then any electric supplier may serve the premises. Notes The large load provision of the Territorial Act has been the subject of considerable litigation. Disputed issues have included the following: Can the loads of individual buildings or facilities be combined for purposes of this exception? What qualifies for single-metered service? When is initial full operation reached? A Basic Guide to the Georgia Territorial Act 9

What is the proper method for calculating connected load? It is recommended that cooperatives seek legal advice to determine the latest rulings from the Commission on these and other issues. A Basic Guide to the Georgia Territorial Act 10

V. Grandfather Rights See O.C.G.A. 46-3-8(b). General rule Regardless of other provisions of the Territorial Act, including territorial assignments and corridor rights, an electric supplier that was lawfully serving any premises on March 29, 1973, has the exclusive right to continue serving such premises. An electric supplier that lawfully extends service to any premises after March 29, 1973, also has the exclusive right to continue serving such premises. Rights when premises are later disconnected The exclusive right to serve described above continues even if the premises have become disconnected from service. Reconstruction in substantial kind The exclusive right to serve described above continues even if the premises have been destroyed or dismantled, so long as the premises are reconstructed in substantial kind on approximately the same site. A Basic Guide to the Georgia Territorial Act 11

General Rule VI. Right to Serve Own Facilities Devoted to Public Service See O.C.G.A. 46-3-8(e)(5). An electric supplier may extend service to any of its own premises devoted to public service, even if such premises have already been served by another electric supplier. No line constructed for such purpose after March 29, 1973, shall acquire service rights. A Basic Guide to the Georgia Territorial Act 12

General Rule VII. Rights Where Premises Straddle Boundary Lines See O.C.G.A. 46-3-8(g). When new premises are located partially within one assigned area and partially within another, the consumer may choose its electric supplier from among those electric suppliers which are eligible to extend service within either area. The same rule applies when new premises straddle the boundary lines of unassigned areas. A Basic Guide to the Georgia Territorial Act 13

VIII. When Lines Do Not Acquire Service Rights See O.C.G.A. 46-3-8(e). As noted above, important service rights--corridor rights, for example--may attach to lines. In some circumstances, however, lines that would otherwise acquire service rights do not acquire such rights. These circumstances are described below. A line constructed under the large load exception If, after March 29, 1973, an electric supplier builds a line inside another electric supplier's assigned area or inside a municipality to serve premises which, but for the "large load" exception, it would not have had the right to serve, then no portion of that line shall acquire any other service rights therein. Also, such a line shall not impair or diminish any service rights of an assignee electric supplier or the service rights accruing to the lines of any electric supplier inside any assigned area or municipality. The electric supplier owning such a line may extend service from the line to any other premises which it otherwise has the right to serve. This rule also applies to such lines built in unassigned areas. See O.C.G.A. 46-3-8(e)(1) and (2). A Basic Guide to the Georgia Territorial Act 14

A line constructed for the purpose of furnishing wholesale service If a line is built after March 29, 1973, for the initial sole purpose of furnishing service at wholesale, then no portion of the line shall acquire any other service rights. Also, such a line shall not impair or diminish the service rights of any assignee electric supplier or the service rights accruing to the lines of any electric supplier. The electric supplier owning such a line may extend service from the line to any other premises which it otherwise has the right to serve. A line constructed to serve an electric supplier's own premises If a line is built after March 29, 1973, for the purpose of extending service to an electric supplier's own premises devoted to public service, then the line shall not acquire any other service rights. Also, such a line shall not impair or diminish the service rights of any assignee electric supplier or the service rights accruing to the lines of any electric supplier. The electric supplier owning such a line may extend service from the line to any other premises which it otherwise has the right to serve. A Basic Guide to the Georgia Territorial Act 15

A line of a secondary supplier which is not providing service inside a municipality on March 29, 1973 If a secondary supplier owns a line within a municipality, but the line is not providing retail service within the municipality on March 29, 1973, then the line does not acquire any service rights to provide retail service to any premises located within such municipal limits as they exist on that date. Lines not built in accordance with sound utility standards If an electric supplier constructs a line in violation of sound utility standards so as arbitrarily to preempt areas or arbitrarily to gain service rights for such a line, then the Commission has the authority to declare that the line shall not acquire service rights. The Commission also has authority to order the offending electric supplier to stop building the line or to relocate it. A Basic Guide to the Georgia Territorial Act 16

IX. Prohibition Against Discriminatory Rates and Certain Tying Arrangements Discriminatory rates See O.C.G.A. 46-3-11. Electric suppliers are prohibited from having any rate, charge, or service rule or regulation that is unreasonably discriminatory. The specific rule provides in pertinent part: Every electric supplier is prohibited from having or applying any rate, charge, or service rule or regulation which unreasonably discriminates against or in favor of (1) any member of a class of consumers as opposed to any other consumer who is or should be in the same class of consumers for such purposes, or (2) any class of its consumers as opposed to another class of consumers for such purposes. Illegal tying arrangements The Territorial Act also prohibits certain so-called "tying arrangements," that is, the practice of "tying" one product or service to another. The specific rule provides that every electric supplier is prohibited from, directly or indirectly: Requiring that a consumer receive retail electric service from such electric supplier as a condition for such consumer to receive from such electric supplier or A Basic Guide to the Georgia Territorial Act 17

any other person any goods or other services that are not reasonably related to the furnishing of retail electric service to such consumer's premises. Offering a consumer lesser charges or more favorable terms or conditions for retail electric service because of such consumer's receiving or agreeing to receive from such electric supplier any goods or other services that are not reasonably related to the furnishing of retail electric service to such consumer's premises. Imposing higher charges for any goods or other services that are not reasonably related to the furnishing of retail electric service to a consumer's premises because of such consumer's failure or refusal to receive retail electric service from that supplier. A Basic Guide to the Georgia Territorial Act 18

X. Transfers of Service See O.C.G.A. 46-3-8(c) and (d). In certain situations, the Commission has authority to transfer service from one electric supplier to another, or to reassign an assigned area. These situations are outlined below. Transfer of service upon joint application of utilities Upon joint application of the affected electric suppliers, the Commission has the authority to find that the public convenience and necessity require the transfer of service to a premises from one electric supplier to another. Certain procedures must be followed before the Commission may order a transfer of service under this rule. Transfer of service due to inadequate service or discriminatory rates or practices If the Commission finds that an electric supplier's service to any premises is not adequate or dependable, or that such electric supplier's rates, charges, service rules or regulations are unreasonably discriminatory, or that an electric supplier has engaged in unlawful tying arrangements (as described above), then the Commission has the authority to order the electric supplier to stop serving the premises and to order another electric supplier to provide service. The Commission may take such action only after giving the offending electric supplier the opportunity to correct its ways. A Basic Guide to the Georgia Territorial Act 19

Transfer of assigned service area due to breach of tenets of public convenience and necessity If the Commission determines that an assignee electric supplier has breached the tenets of public convenience and necessity within an assigned area, the Commission may reassign all or any portion of the assigned area to another electric supplier. A Basic Guide to the Georgia Territorial Act 20

XI. Franchise Fees See O.C.G.A. 46-3-14. The Territorial Act contains provisions regarding the imposition of franchise fees by municipalities. However, other provisions of law not contained in the Territorial Act are relevant on the matter of franchise fees. Also, the Courts of Georgia have issued decisions regarding franchise fee disputes. Therefore, it is beyond the scope of this Guide to summarize the law regarding franchise fees. It is recommended that advice of counsel be sought on such matters. A Basic Guide to the Georgia Territorial Act 21

Glossary Note: Below are selected definitions from the Territorial Act. These and other definitions are set forth at O.C.G.A. 46-3-3. "Assigned area" An enclosed geographic area assigned to only one electric supplier and inside which the assignee electric supplier has the exclusive right to extend and continue furnishing service to new premises, except as otherwise provided in the Territorial Act. "Line" Any conductor for the distribution or transmission of electricity other than a conductor operating at a potential of 120,000 volts or more. However, a conductor that initially constitutes a line shall not cease being a line if, after March 29, 1973, it is operating at a potential in excess of 120,000 volts. "Premises" The building, structure, or facility to which electricity is being or is to be furnished, provided that two or more buildings, structures, or facilities which are located on one tract or contiguous tracts of land and are utilized by one electric consumer shall together constitute one premises; provided, however, that any such building, structure, or facility shall not, together with any other building, structure, or facility, constitute one premises if the permanent service to it is separately metered and the charges for such service are calculated independently of charges for service to any other building, structure, or facility; provided, further, that an outdoor light, or an outdoor sign requiring less than A Basic Guide to the Georgia Territorial Act 22

2200 watts, shall not constitute a premises. "Primary supplier" The "primary supplier" within a municipality in existence on March 29, 1973, means, either: (a) That electric supplier which, on March 29, 1973, is furnishing service to the majority or to a plurality, whichever is the case, of the retail electric meters then inside the corporate limits of the municipality; or (b) That electric supplier to which the commission has reassigned a geographic area, previously assigned to another electric supplier, located within such municipality as its limits existed on March 29, 1973. "Secondary supplier" The "secondary supplier" within a municipality in existence on March 29, 1973, means any electric supplier which owns lines on that date within such municipality and which is not a primary supplier. A Basic Guide to the Georgia Territorial Act 23

About the Author For many years, the lawyers in the Electric and Utility Practice Group of Sutherland Asbill & Brennan have been involved in assisting the EMCs of Georgia in disputes with competitors. This work has included cases before the Public Service Commission, franchise fee litigation and competitive bidding disputes. Additionally, James Orr has extensive expertise in matters involving the Georgia Territorial Electric Service Act. This includes: Litigation Experience Lead counsel in over 30 Territorial Act cases for 19 different EMCs. Territorial Act Newsletter Conceived of and launched publication of the Georgia Territorial Act Newsletter in 1990, reporting on cases and developments under the Territorial Act. The Newsletter is distributed approximately three times a year to the EMCs and EMC attorneys, at no charge. Speaker on Territorial Act Matters Frequent speaker to EMCs and EMC lawyers on Territorial Act issues and other matters of interest to EMCs. A Basic Guide to the Georgia Territorial Act 24