Oxiperm C 164 Fully automatic chlorine dioxide processing plant C, -450C,-750C, -1300C, -2500C. Service manual

Similar documents
Oxiperm 164 C for 150 to 2500 g/h

Oxiperm 164 D for 30 to 2000 g/h

GRUNDFOS ALLDOS DISINFECTION. ALLDOS DISINFECTION SYSTEMS with Chlorine Dioxide 1 GRUNDFOS ALLDOS DISINFECTION

Oxiperm 164 and 166 GRUNDFOS PRODUCT GUIDE. Automated preparation of chlorine dioxide

Primus 221 offers optimum dosing accuracy and operating convenience. The dosing flow variation is only ± 1,5 %

GRUNDFOS DATA BOOKLET. Oxiperm OCD to 2000 g/h. Preparation of chlorine dioxide from diluted solutions

GRUNDFOS alldos product information. The digital diaphragm dosing pump for difficult liquids

GRUNDFOS ALLDOS INSTRUCTIONS. DMB dosing pump. Installation and operating instructions (basic version)

Pressure relief valve

Dosing Pump Operational Manual

CATALOG. Actuated Diaphragm Valve DN PVC-U / PVC-C / PP-H / PVDF / ABS SMART IN FLOW CONTROL.

WARCO CHEMAG SERIES GH FILTERS

UNA 13 UNA 15 UNA 15 Stainless Steel Design. Installation Instructions Steam Traps UNA 13, UNA 15

Plunger Heads Use and Maintenance Manual

ELADOS EMP IV E00 Diaphragm Pump type

COVOL. Operating Data. Areas of Application. Measuring Ranges. Method of Operation. Fields of operation. Features. Installation information

Fire Engine Dump Valve

DIAPHRAGM LIQUID PUMP NF 1.30

ProMinent Beta Solenoid Diaphragm Metering Pumps

Operating Instruction for Flowmonitor. Model: DF-WM

Instruction Manual. SMP-BCA Aseptic Mixproof Valve with PTFE Diaphragm IM70811-EN

Pressure relief valve DHV 712-R set range: 0,3-10,0 bar

PNEUMATICALLY ACTUATED 2-WAY

Air Inlet/ Discharge Port

ELADOS EMP III Diaphragm Pump type

Pneumatic Metering Pump II 3 12 l/h

GENERAL WARNING. General instructions. Technical assistance. Doseuro S.r.l. Liability

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation

Axis AGSS TERMINAL UNITS

M E T E R I N G P U M P S

ELADOS EMP-KKS Diaphragm Piston Pump Type

485 - NC NO/DA DN

Pressure chlorine changeover unit C 7520

GRUNDFOS PRODUCT GUIDE DMH. Dosing pumps

Supplementary instructions Sigmas with hygienic pump head

Supply plus delivery pressure must not exceed the admissible internal pump pressure.

RESOL SBS 1000 * * Connection Operation

Pressure Relief Valve Overflow Valve Type DHV 715 Type DHV 716 Type DHV 725

DDA AR-PVC/V/C with access.

DELTA O-RING CARTRIDGE SEAL ASSEMBLY AND INSTALLATION INSTRUCTIONS INTRODUCTION:

(3) (4) (6) (5) (10) (9) (8) (7)

dinodos DDE Diaphragm dosage pump Installation and Operating Instructions /1012/en

Assembly and operating Instructions. Bypass Flow Meter DST

Mechanical Diaphragm Metering Pump

1/2-2 INSTALLATION INSTRUCTIONS

(770) Turning Parts Changers Into TROUBLESHOOTERS!

ProMinent. ProMinent D4a Metering Pumps with built-in proportional controllers

INDUSTRIAL PUMPS. MAGNETIC DRIVE PUMPS MECHANICAL DRIVE PUMPS VERTICAL PUMPS

Type 2000, Operating Instructions. Bedienungsanleitung Manuel d utilisation

DELTA O-RING CARTRIDGE SEAL ASSEMBLY AND INSTALLATION INSTRUCTIONS INTRODUCTION:

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation

Excel AD Electromagnetic dosing pump

FPO 80 FPOC FPOS FPON, FPOS Tank truck vane pump

Cummins 6.7 Litre 2500/3500 Diesel EGR System. Always wear gloves and safety glasses when performing this service

DK AND DK/CP DN 15 65

The Vario motor-driven pump series from ProMinent Adaptable to a wide range of applications VARIO METERING PUMP

Flow Fittings. for Electrochemical Sensors. B Operating Manual /

Operating Instructions ProMinent. Backpressure and Pressure Relief Valves

Betriebsanleitung / Operating Manual / Mode d emploi / Manual de operación ProMinent Dosiertechnik GmbH Heidelberg Germany

Lifting device for standard removable versions

Norm-Centrifugal Pumps PN 10

Type 2000, 2002, 2012

Diaphragm Vacuum Pumps and Compressors

Electronic Metering Pump

ELADOS EMP III Diaphragm Pump type

ELADOS EMP III Diaphragm Pump type electronically controlled


Flow Fittings. for Electrochemical Sensors. B Operating Manual /

motor driven metering pumps

Chem-Feed Installation Instructions

Please affix device label here!

Accessories for ProMinent Beta, Gamma, Concept and Pneumados - Foot Valves. Valve body of PP, seals of EPDM.

VXE DN PVC-C. Easyfit 2-way ball valve

PNEUMATIC PUMP Series

Centrifugal pumps. made of Polypropylene and PVDF for transferring aggressive media like acids and alkalies

Operating and Installation Instructions Diaphragm Vacuum Pumps and Compressors

Polymer Makedown Systems

Product Information Stepper Motor-driven Diaphragm Dosing Pump MEMDOS SMART LP

DK/CP DN PVC-U / PVC-C / PP-H / PVDF. Pneumatically actuated 2-way diaphragm valve

Air Operated Double Diaphragm Pump. M-Pump ½ Metallic Non Metallic Pump INSTALLATION, OPERATION & MAINTENANCE MANUAL

AIRGO MISTING SYSTEM MAINTENANCE

motor driven metering pumps

Proportional Pressure Reducing Valve PDM08130

PRECISION UK Ltd. Medical Gas Outlet BS Standard

Elevator control valve KV 1P KV 1S. Adjustment and maintenance manual

Welker Sampler. Installation, Operation, & Maintenance Manual. Model GSS-4HP

WARNING Carefully Read These Instructions Before Use

Flow Control Valve IOM 770-U

Flow Control & Pressure Reducing Valve with Hydraulic Control (Sizes 3''- 12"; DN80-DN300)

HOT WASHER MODEL NO: KING 125 OPERATION & MAINTENANCE INSTRUCTIONS PART NO: LS1009

solenoid driven diaphragm type metering pump

Identity code: Meta MTMa Diaphragm Metering Pumps Series: Meta diaphragm-type metering pump Version a

Operating Manual for sprayvalve MKDD-IS

Lock it in with IPEX DK Series Dialock. Diaphragm Valves. IPEX DK Series Dialock Diaphragm Valve VALVE AVAILABILITY

EJECTORS GENERAL OPERATION & MAINTENANCE MANUAL

ALLWEILER. Pressure-relief valves, indirectly pilot-controlled. Series DVI

A408 GB. Pneumatic oil and diesel pumps 1:1

Our vision is to be the first choice in the needs of our customers that we see as business partners and to serve without sacrificing quality.

Operating Instructions for Magnetic Filter. Model: MFR-00

Wall-mounted device ET / 1. Chlorinator C Improved changes are always reserved without notice. JESCO DOSIERTECHNIK GmbH & Co.

Transcription:

Oxiperm C 164 Fully automatic chlorine dioxide processing plant 164-150C, -450C,-750C, -1300C, -2500C Service manual 15.710136-V3.0 1

Imprint Oxiperm C 164 Fully automatic chlorine dioxide processing plant 164-150C, -450C, -750C, -1300C, -2500C Service manual Version 3.0 Issued by: ALLDOS Eichler GmbH Reetzstraße 85 76327 Pfinztal (Söllingen) Postfach 1160 76317 Pfinztal Germany Tel. ++49 (0) 72 40 61-0 / Fax. ++49 (0) 72 40 61-177 E-Mail: alldos.de@alldos.com Internet: http://www.alldos.com 2006 by ALLDOS Eichler GmbH Subject to change without notice. 2 V3.0

Installation data Please fill in this form following commissioning. It will help you and your ALLDOS servicing partner to adjust the unit during subsequent corrections. Owner: ALLDOS customer No.: Contract No.: Order No. of unit: Serial No. of unit: Put into service on: Location of unit: Used for: Installation diagram 15.710136-V3.0 3

Inhaltsverzeichnis Imprint... 2 Installation data... 3 Installation diagram... 3 1 General... 5 1.1 Spare parts set... 5 2 Preparing the installation for maintenance... 5 2.1 Systems with M208 dosing pumps and a calibration system...6 2.2 Systems with M221 dosing pumps... 7 3 Tests every 6 months... 8 3.1 Dosing tubes for HCl and NaClO2...8 3.2 Checking the solenoid valves...8 3.3 Checking the foot valves and float switch of the suction lines... 9 3.4 Check information signs... 10 3.5 Checking the dosing flow of the pumps for HCl, NaClO2 and H2O... 10 3.6 Relay connection for control system...11 3.7 Temperature sensor... 11 4 Maintenance and tests every 12 months... 12 4.1 Tests...12 4.1.1 Float switches and foot valves...12 4.1.2 Solenoid valve or circulating pump...13 4.1.3 Dosing tubes and pipe lines... 14 4.1.4 Relay connection for control system... 14 4.2 Maintenance...15 4.2.1 Reactor valves...15 4.2.2 Ball check in the bypass line...17 4.2.3 Dosing pump for HCl and NaClO2...18 4.2.4 Suction injection (optional) for enclosure exhausting... 22 4.2.5 Dosing controller... 23 5 Tests every 24 months... 24 5.1 Oxiperm (Standard version)... 24 5.2 Oxiperm with internal bypass pump...24 5.3 Oxiperm with external bypass pump... 24 5.4 Oxiperm for batch operation...25 5.5 Suction lines...25 5.6 Option enclosure exhausting... 25 6 Tests every 5 years... 26 7 Start-up after maintenance... 27 7.1 Systems with M208 dosing pumps and a calibration system...27 7.2 Systems with M221 dosing pumps...28 4 V3.0

1 General In accordance with the regulations for the prevention of accidents GUV 8.15 and VGB 65 19 (2), the safety of the chlorine dioxide systems must be checked by an expert on a regular basis, at least once a year and before each start-up. These checks can be carried out by the service centre within the framework of a 6 month or annual maintenance check. WARNING! Before any maintenance work is carried out, i.e. if parts and gaskets are replaced, the whole installation must be flushed with water. When maintenance work is carried out, all remains of chemicals must be removed. When working with acids or lyes, ensure that the necessary protective clothing is worn. Maintenance and repair work may only be carried out by authorised qualified personnel. 1.1 Spare parts set Each spare parts set includes the following parts: Spare parts sets for the dosing pumps (diaphragm, valves, O-rings) Flat gaskets for connection of solenoid valve or flow limiter O-rings for: Bypass line DN20, impeller counter, circulating pump Float bodies and O-rings for dosing controller Valve unit for the reactor (3 valves for each) Ball check DN20 for the bypass line 2 Preparing the installation for maintenance For maintenance work which involves replacing components, the dosing pumps for HCl and NaClO2 and the reactor must be flushed with demineralised water and the bypass line with process water, in order to avoid direct contact with chemical residues. For dosing pumps with a calibration system (M208), ensure that the chemicals in the pre-lifting chamber are dosed first. 15.710136-V3.0 5

2.1 Systems with M208 dosing pumps and a calibration system Oxiperm 164C 150-2500 g Service en For dosing pumps M208 with a calibration system, ensure that the pre-lifting chamber is emptied first. Deactivate installation via display. Remove suction lines from the chemical containers and place separately in an empty container. Push float switches of the suction lines upwards, in order to not produce any error messages. Error messages (pre-empty signals and empty signals) for suction lines, which are caused by the float switches. Switch to manual mode on the display Set installation capacity to 100% Activate installation Set stroke setting for dosing pumps to 100% Remove cover from pre-lifting chambers The chemicals can now be dosed from the calibration system. The installation continues to run until no more liquid is left in the pre-lifting chamber. Deactivate installation Place suction lines in a container that has been filled with demineralised water, or fill the empty container with demineralised water. Push float switches of the suction lines upwards, in order to not produce any error messages and, if necessary, acknowledge any error messages Switch to Service operation/deaeration mode on the display Deaerate both dosing pumps, until the dosing controller LEDs flash evenly. Switch to Manual mode on the display Activate the installation in manual mode, dosing flow 100% Set stroke setting for dosing pumps to 100% The dosing pumps for the chemicals are now flushed with demineralised water. If an error message for the Dosing controller appears on the display, the dosing pumps must be deaerated again. The installation remains active for approximately 5-10 minutes when the dosing flow is 100%. Deactivate the installation and switch to Service operation mode Switch to start-up mode Activate start-up mode The reactor is now flushed with water via the H2O pump and the run-down tank H2O. The bypass line is also flushed with water at the same time. After the start-up operation, all dosing pumps and lines have therefore been flushed with water. 6 V3.0

2.2 Systems with M221 dosing pumps For dosing pumps M221, there is no pre-lifting chamber, which has to be emptied first. Deactivate installation via display. Remove suction lines from the chemical containers and place separately in a container that has been filled with demineralised water. Push float switches of the suction lines upwards, in order to not produce any error messages. Error messages (pre-empty signals and empty signals) for suction lines, which are caused by the float switches. Push float switches of the suction lines upwards, in order to not produce any error messages and, if necessary, acknowledge any error messages Switch to Service operation/deaeration mode on the display Deaerate both dosing pumps, until the dosing controller LEDs flash evenly. Switch to Manual mode on the display Activate the installation in manual mode, dosing flow 100% Set stroke setting for dosing pumps to 100% The dosing pumps for the chemicals are now flushed with demineralised water. If an error message for the Dosing controller appears on the display, the dosing pumps must be deaerated again. The installation remains active for approximately 5-10 minutes when the dosing flow is 100%. Deactivate the installation and switch to Service operation mode Switch to start-up mode Activate start-up mode The reactor is now flushed with water via the H2O pump and the run-down tank H2O. The bypass line is also flushed with water at the same time. After the start-up operation, all dosing pumps and lines have therefore been flushed with water. 15.710136-V3.0 7

3 Tests every 6 months Oxiperm 164C 150-2500 g Service en 3.1 Dosing tubes for HCl and NaClO2 During these tests, the following functions or components are checked, and if necessary cleaned or replaced. Here, the dosing tubes between the dosing pump and reactor inlet are checked for wear, brittleness or discolouration which can be caused by possible leaking reactor valves. These are replaced if necessary. Wear/Brittleness Replace dosing tubes Discolouration Replace dosing tubes Replace reactor valves If the hose connections should show signs of discolouration, caused by possible leaking reactor valves, then they must be replaced. 3.2 Checking the solenoid valves Spare hoses (includes: 2x connection screws DN4 or DN8; 1.5m hose DN4 or DN8) Order No. 553-1555 Dosing tube DN4 (Colour: red) for HCl Order No. 553-1556 Dosing tube DN4 (Colour: blue) for NaClO2 Order No. 553-1557 Dosing tube DN8 (Colour: transparent) for HCl or NaClO2 Here, the function of existing solenoid valves is checked. (depending on option) Solenoid valves of the bypass line Solenoid valves for suction of housing Solenoid valves for suction of batch container If a solenoid valve is faulty, it must be replaced. Spare valves 45.10245-1/2 Solenoid valve 230V, 50Hz 45.10249-1/2 Solenoid valve 115V, 60Hz 8 V3.0

3.3 Checking the foot valves and float switch of the suction lines Here, the foot valves are checked for contamination and the function of the float switches is checked. 5 4 3 2 1 Check the connection to the suction line Check mesh bottom plate (pos.1), seat (pos.2) and balls (pos.3) for contamination, replace if necessary Check the operation of the float switch Spare parts for suction line Pos. Part No. Designation Installation 1 10.4559-401 Union nut, grey PVC 164-030D to 164-2000D 2 10.7299-400 Valve seat, grey PVC 164-030D to 164-2000D 3 10.6564 Ball, ceramics 164-030D to 164-2000D 4 10.7372-436 Float switch, PP 164-030D to 164-2000D 5 10.2254-400 Weighting stone, KER 1101 164-030D to 164-2000D 15.710136-V3.0 9

3.4 Check information signs Here, the legibility of all system signs or labels is checked. Oxiperm 164C 150-2500 g Service en Warning label HCl label on dosing pump NaClO2 label on dosing pump If the labels are illegible or damaged, they must be replaced. Label Part No. Designation Installation 12.6029-300 Warning label all 12.6028-410 HCI label all 12.6028-400 NaClO2 label all 3.5 Checking the dosing flow of the pumps for HCl, NaClO2 and H2O Here, the dosing pumps are calibrated, in order to check the set dosing volume. If these deviate from the specified settings, the dosing pumps must be reset and redosed. Settings, see table System ClO2 generation performance * At 6 bar back-pressure Max. system pressure Consumption of components * Dilution water requirement for bypass system Solenoid valve 2) Bypass pump 3) (standard) Internal/external In batch mode 50 Hz 60 Hz 1) HCl NaClO2 H2O Standard MIN Standard MIN min. 4) max. 5) (g/h) (l/h) (bar) (bar) (l/h) (l/h) (l/h) (l/h) (l/h) (l/h) (l/h) (l/h) (l/h) 164-150C 150 428 9 6 1,0 1,0 5,5 420 63 420 63 30 70 164-450C 450 442 9 6 2,8 2,8 16 420 126 420 126 90 200 164-750C 750 937 9 6 4,8 4,8 27 900 315 900 315 150 340 164-1300C 1300 962 9 6 8,2 8,2 46 900 405 900 405 260 590 164-2500C 2500 1022 7 6 16 16 90 900 630 900 630 510 1150 10 V3.0

3.6 Relay connection for control system Here, all relay connections are checked. To check on the display, switch to service mode/test mode/relay. The following relays can be checked: Dosing pump NaClO2 Dosing pump HCl Bypass line (solenoid valve, circulating pump) Suction of housing (solenoid valve) Electrically isolated output - Auto/Manual Electrically isolated output - error messages Electrically isolated output - pre-empty signals Electrically isolated output - dry-run batch container Suction of batch container (solenoid valve) 3.7 Temperature sensor For maintenance work, the temperature sensor should be checked for damage or corrosion on the end of the sensor. The temperature sensor is screwed into an orifice and therefore does not come into direct contact with the chlorine dioxide solution in the reactor. Unscrew the sensor from the orifice, check it and then screw it back into the orifice.! WARNING! If the orifice, pos. 3 is removed, there is the danger that the contents of the reactor is released into the open! Spare parts Pos. Part No. Designation 1 48.978-164 Temperature sensor 2 52.105-2 O-ring 3 12.5954-400 Orifice for sensor, PTFE/carbon If the orifice has to be replaced, the reactor must first of all be emptied. 15.710136-V3.0 11

4 Maintenance and tests every 12 months Oxiperm 164C 150-2500 g Service en During these maintenance tests, the following components are checked, and if necessary cleaned or replaced. 4.1 Tests Float switches and foot valves Solenoid valve or circulating pump of the bypass line Hose connections and pipe lines Relay connection for control system 4.1.1 Float switches and foot valves 5 4 3 2 1 Check the connection to the suction line Check mesh bottom plate (pos.1), seat (pos.2) and balls (pos.3) for contamination, replace if necessary Check the operation of the float switch 12 V3.0

4.1.2 Solenoid valve or circulating pump Here, the operation and tightness of the solenoid valve or circulating pump and flow limiter are checked. Switch to service mode/start-up mode on the display Bypass water Switch bypass on, in order to check the operation of the solenoid valve or circulating pump. The specified amount of water on the display must be within the set tolerances. Check the tightness of the solenoid valve or circulating pump, replace if necessary. Check connection screws and O-rings (pos. 2) of the circulating pump, replace O-rings if necessary Check tightness of the flow limiter, replace flat gaskets if necessary (pos. 1) Observe mounting position (flow direction)! Switch bypass off 15.710136-V3.0 13

4.1.3 Dosing tubes and pipe lines Here, the dosing tubes between the dosing pump and reactor inlet are checked for wear, brittleness or discolouration which can be caused by possible leaking reactor valves. These are replaced if necessary. Wear/Brittleness Replace dosing tubes Discolouration Replace dosing tubes Replace reactor valves If the hose connections should show signs of discolouration, caused by possible leaking reactor valves, then they must be replaced. Checking the return pipes of the dosing pumps Check tightness of the bypass line, activate bypass in service mode, if necessary. Spare hoses (includes: 2x connection screws DN4 or DN8; 1.5m hose DN4 or DN8) Order No. 553-1555 Dosing tube DN4 (Colour: red) for HCl Order No. 553-1556 Dosing tube DN4 (Colour: blue) for NaClO2 Order No. 553-1557 Dosing tube DN8 (Colour: transparent) for HCl or NaClO2 4.1.4 Relay connection for control system Here, all relay connections are checked. To check on the display, switch to service mode/test mode/relay. The following relays can be checked: Dosing pump NaClO2 Dosing pump HCl Bypass line (solenoid valve, circulating pump) Suction of housing (solenoid valve) Electrically isolated output - Auto/Manual Electrically isolated output - error messages Electrically isolated output - pre-empty signals Electrically isolated output - dry-run batch container Suction of batch container (solenoid valve) 14 V3.0

4.2 Maintenance Reactor valves Ball check in the bypass line Dosing pump for HCl and NaClO2 Suction injector (optional) Dosing controller 4.2.1 Reactor valves During these maintenance tests, the reactor valves must be fully replaced. Close ball valve on the injection unit or close ball valve following installation Open pipe line connections above the reactor and hose connections of the dosing pumps Replace reactor valves Open pipe line connections above the reactor and hose connections of the dosing pumps Spare parts for the reactor Part No. Designation Installation 553-650 for system backpressure, lower than 3 bar 164-150C to 164-750C 553-651 for system backpressure, higher than 3 bar 164-150C to 164-750C 553-652 for system backpressure, lower than 3 bar 164-1300C 553-653 for system backpressure, higher than 3 bar 164-1300C 553-654 for system backpressure, lower than 3 bar 164-2500C 553-655 for system backpressure, higher than 3 bar 164-2500C The reactor valves are not identical to the valves of the dosing pumps! Do not interchange valves! 15.710136-V3.0 15

16 V3.0

4.2.2 Ball check in the bypass line Here, the ball check is replaced in the bypass line. Deactivate installation Close ball valves before and after installation Loosen screws (pos. 1) of the non-return valve Replace non-return valve Observe mounting position (flow direction)! Tighten screws (pos. 1) 15.710136-V3.0 17

4.2.3 Dosing pump for HCl and NaClO2 Removing the diaphragm Insert suction lines of the pumps into a water container and allow the installation to run until the dosing heads of the pumps have been fully flushed with water. Loosen deaeration screws by 1 turn, until the deaeration lines are flushed as well. Then switch the installation off. Loosen the four dosing head screws Remove the dosing head and unscrew the diaphragm in an anticlockwise direction. Assembly Insert the intermediate ring in such a way that the relief hole faces downwards. Screw in diaphragm Switch on pump briefly, until the diaphragm reaches the back dead point. Carefully fit the dosing head and gradually tighten the screws in a diagonal sequence, so that the dosing head is not damaged. Deaerate the pump HCl NaClO2 H2O 164-150C 208-1,0 208-1,0 221-16 164-450C 208-3,0 208-3,0 221-16 164-750C 208-6,0 208-6,0 221-27 164-1300C 221-16 221-16 221-50 164-2500C 221-16 221-16 253-100/83 Dosing pump M208 Here, the dosing pumps for HCl and NaClO2 are serviced. Those parts are replaced which are on the spare parts set. Deactivate the installation or dosing pumps Spare parts set for M208-1.0 and M208-3.0 Order No. 553-1486 Spare parts set for M208-6.0 Order No. 553-1488 Pos. Part No. Designation Installation 3 10.8090-331 SD valve DN4 164-150C to 164-750C 4 10.8092-430 Deaeration cartridge 164-150C to 164-750C 17 10.8077-302 Dosing diaphragm 164-150C to 164-750C 20 52.183 O-ring, Viton 164-150C to 164-750C 37 50.272 Oval head screw 164-150C to 164-750C 73 52.337 O-ring, Viton 164-150C to 164-750C 18 V3.0

15.710136-V3.0 19

Dosing pumps M221 8 1 3 2 Spare parts set for dosing head M221-16 Order No. 553-520-3 Pos. Part No. Designation 1 10.5503-300 Dosing diaphragm, PTFE/NBR 2 54.154-400 Profiled gasket, NBR 3 54.125 Grooved ring, Perbunan 8 10.7400-321 SD valve DN8 Spare parts set for dosing head M221-27 Order No. 553-521-3 Pos. Part No. Designation 1 10.5940-300 Dosing diaphragm, PTFE/NBR 2 54.154-400 Profiled gasket, NBR 3 54.125 Grooved ring, Perbunan 8 10.7400-321 SD valve DN8 Spare parts set for dosing head M221-50 Order No. 553-523-3 Pos. Part No. Designation 1 10.5898-300 Dosing diaphragm, PTFE/NBR 2 54.154-400 Profiled gasket, NBR 3 54.125 Grooved ring, Perbunan 8 10.7400-321 SD valve DN8 20 V3.0

Spare parts set for dosing head M253-100/83 Order No. 553-292-6 Pos. Part No. Designation 4 54.001 Flat gasket, UNI blue 20 10.4796-401 Bead diaphragm, TFM 1610 53 52.141 O-ring, Viton 59 52.146 O-ring, Viton 60 10.6505-400 Valve seat, PTFE 61 10.1838 Ball, ceramics 60 61 59 46 53 20 4 15.710136-V3.0 21

4.2.4 Suction injection (optional) for enclosure exhausting Oxiperm 164C 150-2500 g Service en In the case of water which has a high deposit content, deposits can change the nozzle ratio of the injector in such a way that it causes a drop in performance during suction. In this case the nozzle must be cleaned. ATTENTION Do not use sharp objects to clean the nozzles. Diluted hydrochloride acid has proven to be the most suitable cleaning agent. Observe the regulations when using hydrochloric acid! For each service, the operation and tightness of the suction injector must be checked, replace the following parts if necessary: Pos. 12, 15, 11, 8, 7, 6, 4, 21 21 4 6 7 8 11 12 13 15 16 17 15 The following parts are not included on the spare parts set! 22 V3.0

Pos. Designation Part No. Installation 4 O-ring 52.125 6 PTFE piston 12.171-4 7 Seat 12.120-4 8 O-ring 52.139 11 Diaphragm 12.312-4 12 O-ring 52.141 Diffuser B, complete 12.591-42 Diffuser C, complete 12.591-43 164-150C - 164-2500C 15 O-ring (2x) 52.123-2 Nozzle B 12.584-42 Nozzle C 12.584-43 164-150C - 164-2500C 21 O-ring 52.164 4.2.5 Dosing controller When the dosing controller is serviced, the float bodies are replaced and if necessary also the O-rings of the connection. Deactivate installation Loosen the screws on the dosing tubes Unscrew the dosing controller (pos. 1) from the dosing pump Unscrew the upper part (pos. 12) Replace the float body (pos. 10) Observe mounting position! Check O-rings, replace if necessary Fit upper part back on Fit dosing controller back onto the pump Tighten dosing tubes again 15.710136-V3.0 23

5 Tests every 24 months Oxiperm 164C 150-2500 g Service en For this test, we recommend replacing the following components! 5.1 Oxiperm (Standard version) Bypass line with solenoid valve + flow limiter Replacing the solenoid valve Replacing the flow limiter Replacing the impeller counter (flow meter) Part No. Designation Installation 45.10245-1/2 Solenoid valve 230V, 50Hz all 45.10249-1/2 Solenoid valve 115V, 60Hz all 53.625-70 Flow limiter 7 l/min 164-150C / 164-450C 53.625-150 Flow limiter 15 l/min 164-750C to -2500C 12.6010-1 Flow meter FHKU 100 all 5.2 Oxiperm with internal bypass pump Bypass line with internal circulating pump + flow limiter Replacing the circulating pump + flow limiter Replacing the impeller counter (flow meter) 5.3 Oxiperm with external bypass pump Part No. Designation Installation 12.6078-400 Bypass pump 230V, cpl. 164-150C to -2500C 53.650-005 Bypass pump 115V 164-150C to -2500C 12.6010-1 Flow meter FHKU 100 all 53.625-70 Flow limiter 7 l/min 164-150C / 164-450C 53.625-150 Flow limiter 15 l/min 164-750C to -2500C Bypass line with external rotary pump + flow limiter Replacing the flow limiter Replacing the impeller counter (flow meter) Part No. Designation Installation 12.6010-1 Flow meter FHKU 100 all 53.625-70 Flow limiter 7 l/min 164-150C / 164-450C 53.625-150 Flow limiter 15 l/min 164-750C to -2500C 24 V3.0

5.4 Oxiperm for batch operation Bypass line with solenoid valve + ball valve Replacing the solenoid valve Replacing the impeller counter (flow meter) Replacing the pressure retention valve Part No. Designation Installation 12.6010-1 Flow meter FHKU 100 164-1300C 164-2500C 12.6010-2 Flow meter FHKU 40 164-450C 12.6010-3 Flow meter FHKU 56 164-750C 12.6010-4 Flow meter FHKU 25 164-150C 53.919-10 PVC solenoid valve 230V 50/60Hz all 53.919-11 PVC solenoid valve 110V 50/60Hz all 525-0567 Pressure retention valve DN8 164-150C to 164-750C 525-1113 Pressure retention valve DN20 164-1300C 164-2500C 5.5 Suction lines Here, the suction lines are checked. Replace foot valve + ball Check suction lines for brittleness, replace if necessary 5.6 Option enclosure exhausting Here, the operation of the solenoid valve is checked. If a solenoid valve is faulty, it must be replaced. Spare valves 45.10245-1/2 Solenoid valve 230V, 50Hz 45.10249-1/2 Solenoid valve 115V, 60Hz 15.710136-V3.0 25

6 Tests every 5 years Oxiperm 164C 150-2500 g Service en For this test, we recommend replacing the following components! Replacing the dosing pump for HCl Replacing the dosing pump for NaClO2 Replacing the dosing pump for H2O 26 V3.0

7 Start-up after maintenance After each maintenance procedure, the following points or settings should be checked: System type and operating mode Dosing flow of the pumps for HCl and NaClO2 (dosing flow, see documentation, Settings), the dosing pumps must be calibrated, if necessary, deaerate the dosing head Operation of dosing controller, adjust if necessary Volume of bypass water Screws Tightness of installation 7.1 Systems with M208 dosing pumps and a calibration system For dosing pumps M208 with a calibration system, ensure that the water is emptied out of the pre-lifting chamber. Deactivate installation via display. Remove suction lines from the water containers Push float switches of the suction lines upwards, in order to not produce any error messages. Error messages (pre-empty signals and empty signals) for suction lines, which are caused by the float switches. Switch to manual mode on the display Set installation capacity to 100% Activate installation Set stroke setting for dosing pumps to 100% Remove cover from pre-lifting chambers The water is now dosed from the calibration system. The installation continues to run until no more liquid is left in the pre-lifting chamber. Deactivate installation Connect suction lines to the chemical containers The settings listed in Section 3 are now checked. System type and operating mode In Service operation/deaeration, deaerate all dosing pumps Check operation of dosing controller, adjust if necessary Check volume of bypass water Calibrate dosing pumps (e.g manual mode, installation capacity 100%) and set to the required dosing line Activate installation and check the tightness of all screws 15.710136-V3.0 27

7.2 Systems with M221 dosing pumps Oxiperm 164C 150-2500 g Service en For dosing pumps M221, there is no pre-lifting chamber, which has to be emptied first. Deactivate installation via display. Connect suction lines to the chemical containers The settings listed in Section 3 are now checked. System type and operating mode In Service operation/deaeration, deaerate all dosing pumps Check operation of dosing controller, adjust if necessary Check volume of bypass water Calibrate dosing pumps (e.g manual mode, installation capacity 100%) and set to the required dosing line Activate installation and check the tightness of all screws 28 V3.0