Clifton Corridor Transit Initiative. Briefing to Medlock Area Neighborhood Association (MANA) February 15, 2016

Similar documents
Clifton Corridor Transit Initiative. Briefing to Great Lakes Community February 11, 2016

East San Fernando Valley Transit Corridor. TAC Briefing December 4, 2013

Tempe Streetcar. March 2, 2016

Restoration of Historic Streetcar Services in Downtown Los Angeles

4.0 TIER 2 ALTERNATIVES

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

Restoration of Historic Streetcar Services in Downtown Los Angeles

Crenshaw-Prairie Transit Corridor Study Public Meetings

I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager

Public Meeting. March 21, 2013 Mimosa Elementary School

Regional Transit Extension Studies. Hampton Roads Transportation Planning Organization Passenger Rail Task Force Meeting December 17, 2013

Corridor Management Committee. March 7, 2012

Informal Business Discussion Minutes Tuesday, May 3, :00 PM 1. Transportation

KANSAS CITY STREETCAR

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives

West Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis

Streetcar and Light Rail Design Differences. February 2015

Project Scoping Report Appendix B Project Web Site. APPENDIX B Project Web Site

I-26 Fixed Guideway Alternatives Analysis

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

FREQUENTLY ASKED QUESTIONS

East San Fernando Valley Transit Corridor. Information Session, October 10, 2017

Traffic Engineering Study

Naval Station Norfolk Transit Extension Study. October 2014

Streetcar and Light Rail Design Differences. March 2015

Sepulveda Pass Corridor Systems Planning Study

Draft Results and Open House

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

3.15 SAFETY AND SECURITY

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

SAN FRANCISCO TO SAN JOSE PROJECT SECTION

Mountain View Automated Guideway Transit Feasibility Study Community Meeting September 25, 2017

Waco Rapid Transit Corridor (RTC) Feasibility Study

East San Fernando Valley Transit Corridor. Community Meetings April/May, 2012

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

Alternatives Analysis Findings Report

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Chapter 9 Recommended Locally Preferred Alternative and Alternatives for Evaluation in Draft SEIS/SEIR

What is the Connector?

Public Meeting. June 15, :30 7:30 p.m.

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

Draft Results and Recommendations

SAN FRANCISCO TO SAN JOSE PROJECT UPDATE

Federal Way Link Extension

Tier 2 Screening and Selection522. of the Short List Alternatives KISSIMMEE CORRIDOR. Downtown CRA. US 192 Alternatives Analysis

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

Midtown Corridor Alternatives Analysis. Policy Advisory Committee Meeting February 12, 2014

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA) AND FEDERAL TRANSIT ADMINISTRATION (FTA)

SWLRT Business Advisory Committee. October 10, 2012

6/11/2018. June 7, Item #1 CITIZENS PARTICIPATION

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018

FINAL TECHNICAL MEMORANDUM

Transportation Sustainability Program

Naval Station Norfolk Transit Extension Study. January 7, 2015

Business Advisory Committee. November 3, 2015

Crenshaw/LAX Transit Corridor. Transit Coalition Meeting June 26, 2012

HIGHWAY 28 FUNCTIONAL DESIGN

Troost Corridor Transit Study

Sepulveda Pass Corridor Systems Planning Study Update

Overview of Regional Commuter Rail Webinar: Phoenix, Arizona December 18, 2013

Platform, Parking and Access Planning Introduction April 5, 2007

Committee Report. Transportation Committee. Business Item No

Community Meetings. January/February 2019

Policy Advisory Committee Meeting November 13, 2013

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

I-26 Fixed Guideway Alternatives Analysis

1.0 Detailed Definition of Alternatives

Dallas CBD Second Light Rail Alignment (D2)

MARTA s blueprint for the future. COFFEE AND CONVERSATION Kyle Keahey, More MARTA Atlanta Dec. 5, 2018

METRO Orange Line BRT American Boulevard Station Options

East SanFernando Valley Transit Corridor

Bi-County Transitway/ Bethesda Station Access Demand Analysis

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009

Business Advisory Committee. July 7, 2015

Needs and Community Characteristics

Exposition Corridor Transit Project

Mobility Corridor Updates. Transit & Active Transportation Projects

3.0 TRANSPORTATION ISSUES AND ANALYSIS

Chapter Five: Transportation Impacts

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

V. DEVELOPMENT OF CONCEPTS

Staff Contact: Carlos de Melo, Community Development Director, (650)

DRAFT METROCENTER CORRIDOR STUDY

CONTENTS FIGURES. US 90A/Southwest Rail Corridor

Valley Metro: Past, Present and Future. September 11, 2014

Leadership NC. November 8, 2018

Attachment E3 Vibration Technical Memorandum

Kendall Drive Premium Transit PD&E Study

REFINEMENT PHASE PRELIMINARY REPORT BRIEFING PAPER. DRAFT November 28, 2011

SAN FRANCISCO TO SAN JOSE PROJECT SECTION. City of Brisbane Baylands Public Hearing June 7, 2017

What IS BRT, Really? Not BRT and RNY

Transcription:

Clifton Corridor Transit Initiative Briefing to Medlock Area Neighborhood Association (MANA) February 15, 2016

Neighborhood Concerns and Requests Provide a general overview and background of the project What are the different alignment alternatives in this area? How will the Medlock Park neighborhood be impacted by the project? Slide 2

Project Background & Description Slide 3

Purpose and Need Improved transit access to growing employment and population Improved connectivity to MARTA rail Improved connectivity within Clifton Corridor Emergency evacuation Slide 4

Planning Process Alternatives Analysis (AA) 2009 Identified a preferred alternative Identified Design Options Phase 1 2013 Addressed outstanding issues from the AA Environmental Impact Statement (EIS) Phase 2 2014 Starts the federal process for implementation Slide 5

LPA: LRT-1 Alignment Slide 6

LPA Evolution Issues Tunnel costs Cost per rider high Revised LPA Alignment refined to meet design criteria Tunnel longer tunnel required Alternative Alignments Developed To reduce costs, increase ridership, and improve cost-effectiveness To be cost competitive for FTA funding Revised LPA and At-Grade Alignment Advance to EIS At-grade alternative reduces cost by approx. 40% Not a significant difference in ridership between alternatives Slide 7

Light Rail Transit (LRT) Slide 8

What is Light Rail Transit? Power system: Power is generally provided via overhead wires (catenary system), rather than by third rail. Flexibility: Light rail can operate within exclusive guideways or within/along roadways. Smaller profile: smaller vehicles than heavy rail, may utilize street-side platforms rather than stations. Similar to Streetcar: Uses the same vehicles as streetcar, but typically uses 2 or more cars in one train set, and stops at less stations. Light Rail in a dedicated guideway (Charlotte) Light rail operating with the roadway (Houston) Slide 9

Median Alignment Light rail operates in the center of the roadway (median lanes), with vehicular traffic on either side Can operate either as dedicated lanes exclusively for light rail, or as shared lanes with vehicular traffic San Francisco, CA (median exclusive) Slide 10

Curb Alignment Light rail operates on outer (curb lanes) of the roadway Can operate either as dedicated lanes exclusively for light rail, or as shared lanes with vehicular traffic Portland, OR Slide 11

Lateral Alignment Light rail operates in both directions on one side of the road. Must be separated by a side median or safety barrier because of the opposing direction to vehicular traffic. Baltimore, MD Slide 12

Slide 14 MEDLOCK PARK

Slide 15 MEDLOCK PARK

Slide 16 MEDLOCK PARK

Medlock Park Neighborhood Alternative 1: Shallow tunnel segment at southeastern corner of Medlock Park neighborhood at Scott Boulevard and N. Decatur Station locations within ½ mile of neighborhood at N. Decatur/Clairmont and Suburban Plaza, and DeKalb Medical Center Alternative 2 and 2A: Median exclusive alignment along N. Decatur at southern boundary of Medlock Park neighborhood Station locations within ½ mile of neighborhood at N. Decatur/Clairmont, Superior, Suburban Plaza, and DeKalb Medical Center Slide 17

Traffic Considerations Slide 18

Summary of Vehicular Travel Times: Clifton/CDC Parkway Avondale Alternative Travel Time Travel Time (via Haygood) No Build (2040) Eastbound 19 Min. 19 Min. Westbound 31 Min. 27 Min. Alternative 1 (2040) Eastbound 18 Min. (-1) 13 Min. (-6) Westbound 18 Min. (-13) 15 Min. (-12) Alternative 2 (2040) Eastbound 19 Min. (0) 20 Min. (+1) Westbound 22 Min. (-9) 17 Min. (-10) Alternative 2A (2040) Eastbound 21 Min. (+2) 15 Min. (-4) Westbound 16 Min. (-15) 14 Min. (-13) Slide 19

North Decatur Road Clairmont to Scott Boulevard Approx. 1 mile No Build Alt 1 Alt 2 Alt 2A LRT Alignment -- -- Median Exclusive Lateral Alignment/ Median Shared 2040 Travel Times (AM Peak 2040 Travel Time - Eastbound 2.9 min 3.2 min 2.5 min 2.4 min 2040 Travel Time Westbound 4.0 min 2.2 min 4.6 min 2.2 min 2040 Travel Speed (AM Peak) 2040 Travel Time -Eastbound 20 mph 19 mph 24 mph 25 mph 2040 Travel Time - Westbound 15 mph 28 mph 13 mph 28 mph Slide 20

AM Peak Intersection LOS N. Decatur Rd. between Clairmont Rd. and Scott Blvd. Alternative 1 Alternative 2 Alternative 2A N. Decatur Rd. D E D Clairmont Rd. B A E D B A Superior Ave. Willivee Dr. E F F Scott Blvd. Slide 21

North Decatur Road Scott Boulevard to Church Street Approx. 0.3 miles LRT Alignment -- Shallow Tunnel 2040 Travel Times (AM Peak) No Build Alt 1 Alt 2 Alt 2A Median Exclusive Median Shared 2040 Travel Time - Eastbound 1.4 min 2.1 min 1.3 min 1.1 min 2040 Travel Time Westbound 5.3 min 2.3 min 2.5 min 2.7 min 2040 Travel Speed (AM Peak) 2040 Travel Time -Eastbound 12 mph 8 mph 13 mph 15 mph 2040 Travel Time - Westbound 3 mph 8 mph 7 mph 6 mph Slide 22

AM Peak Intersection LOS N. Decatur Rd. between Scott Blvd. and Church St. Alternative 1 Alternative 2 Alternative 2A N. Decatur Rd. E F F Scott Blvd. A B A Suburban Plaza Entrance D D D Church St. Slide 23

Right of Way Conditions Slide 24

N. Decatur Rd Right of Way (Superior - Scott) Approx. 60 foot width between parcel boundaries Slide 25

Next Steps Ridership Modeling, Finalize EIS Alternatives Through early 2016 Environmental Technical Reports Mid 2016 Public Involvement & Outreach Through mid-2016 Draft Environmental Impact Statement (DEIS) Late 2016 to early Public Hearings Late 2017 Final EIS (FEIS) December 2017 Slide 26

Questions? Give us your feedback: Email: clifton@itsmarta.com Website: www.itsmarta.com/clifton-corr.aspx Facebook: https://www.facebook.com/pages/clifton-corridor- Transit-Initiative/154114080040 Slide 27