FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED MISSION SYSTEMS CCC and EWCC BOH FPU Field Pack-up Units

Similar documents
FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH Modular Workshop Container (MWC) BOH FPU Field Pack-up Units CHAPTER 5

FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units

FPU SYSTEMS OPERATION MANUAL BOH PORTABLE DRAWER MODULE (PDM) (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH FPU Field Pack-up Units CHAPTER 5

FPU SYSTEMS OPERATION MANUAL BOH PORTABLE DRAWER MODULE (PDM) (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH FPU Field Pack-up Units CHAPTER 4

CIRRUS AIRPLANE MAINTENANCE MANUAL

US208S Scooter / Power Chair Carrier Lift N Go 117 Mini Electric Lift Electric Tote & 130 Swing Away Installation Guide & Owners Manual

US208S Scooter Carrier - US208P Power Chair Carrier 210 Lift N Go 130 Swing Away Installation Guide & Owners Manual

ELECTRIC BEDROOM SLIDEOUT SYSTEM OPERATION AND SERVICE MANUAL

Model 3050 Installation Instructions. Model 3050 Electric Wall Installation Procedure

Chapter 52 DOORS -Title

OPERATOR S MANUAL RSS-3000 MSB MOBILE SURFACE BARRIER

DOORS Table of Contents REV 3, May 03/05 CHAPTER DOORS. INTRODUCTION Introduction System Circuit Breakers

Portable Lighting Equipment Operating Instructions Table of Contents

Tooling Assistance Center

CAUTION: When aligning timing marks, always rotate engine by turning the crankshaft. Failure to do so will result in valve and/or piston damage.

TECHNICAL MANUAL. Operator's, Organizational and Direct Support Maintenance Manual (Including Repair Parts and Special Tools List) for

Lift N Go [Model 210] Electric Carrier For use with power chairs & scooters Installation Guide & Owners Manual

Hunter Automatics HA-8. Installation Manual

S-SERIES AND K-SERIES SERVICE MANUAL

Electric Through Frame Slide-Out

SD Bendix DD-3 & SD-3 Safety Actuators PUSH PLATE & SHAFT ASSY. LOCKPORT SERVICE DIAPHRAGM SEPARATOR LOCKING PISTON O-RING LOCKING PISTON

Installation, Operation & Maintenance Manual for Flo-Max II Coupler Model FM126

IOM Manual. IOM Manual. Series 20/21.

Universal Crane and Personnel Lif t OPERATOR'S MANUAL

ATTENTION: PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS BEFORE ASSEMBLING, INSTALLING OR USING THIS PRODUCT. PRODUCT REGISTRATION WARNING

Summary Report for Individual Task M-1501 Perform Load/Unload Operations in Automatic Mode Status: Approved

INSTALLATION MANUAL RA-35 & RA-45 M REV. D SEPTEMBER 2017

It don t mean a thing If it ain t got the swing

CAUTION -TABLE OF CONTENTS- II. OPERATING INSTRUCTIONS

Wheel Horse. 44 Snowthrower. for 5xi Lawn and Garden Tractors. Model No & Up. Operator s Manual

expandable booster Instruction Manual US Version

Universal Super Shield & Ultimate Aluminum w/electric Drive Conversion Kits , , Installation Instructions

Convertible Top ! WARNING: OPENING THE CONVERTIBLE TOP

OPTIMIZER TM OPERATOR MANUAL. Author: Labrie. Release Date: 1/31/07. Part #: 90320

SUNROOF - SERVICE INFORMATION ADJUSTMENTS

DWHOIST. Drywall Hoist Assembly & Operating Instructions

before serial number 2214

Plasma Display Electric Ceiling Lifts

OPERATION MANUAL RA-35 & RA-45

Property of American Airlines

w w w. h d o n l i n e s h o p. d e CRUISE CONTROL KIT GENERAL INSTALLATION -J04064 REV Kit Number Models Additional Parts Required

Phantom. Thin-Profile Commercial Wheelchair Lift. Innovation in Mobility OPERATOR MANUAL

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

BOLT-ON AND WELD-ON FLUSH FLOOR SLIDEOUT SYSTEMS OPERATION AND SERVICE MANUAL

MODEL RF. Drain Cleaning Machine. Operator s Manual

M REV. C MARCH 2011 OPERATION MANUAL GPSLR-33 & GPSLR-44

CORPORATION OPERATOR S MANUAL HWH HYDRAULIC SPACEMAKER ROOM EXTENSION SYSTEMS. FEATURING: Single / Multiple Room Extensions / Generator Slide

K-SERIES PUBLIC USE LIFT OPERATING INSTRUCTIONS

Convertible top OPENING THE CONVERTIBLE TOP CAUTIONS

OPERATOR S MANUAL HWH COMPUTER-CONTROLLED LEVELING SYSTEM 610 SERIES

Maintenance and Lubrication

GPS AutoSteer System Installation Manual

Installation Instructions. Universal Accessories, Bike Holder Development. All Vehicle Production ASSEMBLY OF RACK HOURS

Installation Guide Current Ford F-250 & Ford F-350 Super Duty. Product Code: 109 & 119

Owner s Manual. (Keep in glove compartment for quick reference) Rollx Vans Power Door Vans v1.3

OPERATOR S MANUAL 2200 SERIES LIFT - LIL HOISTER. July 2017

LIPPERTCOMPONENTS, INC.

EAGLETRON II REMOTE CONTROL OPERATOR and MAINTENANCE. Remote Control Procedure

BX4330 Acclaim Tow Bar Operator Manual & Installation Instructions

expandable booster Instruction Manual US Version

Flow Line Controls. Installation & Operations Manual SERIES 20/21 Pneumatic Actuators

WARNING! THIS PRODUCT MUST BE INSTALLED BY A TRAINED, AUTHORIZED RICON SERVICE TECHNICIAN.

BX7460P Allure Tow Bar Operator Manual & Installation Instructions. ALLURE Tow Bar (10,000 lb) Pintle Coupler

INSTALLATION INSTRUCTIONS

S-SERIES PUBLIC USE OPERATING INSTRUCTIONS

I-317. AWWA Check Valves WARNING INSTALLATION AND MAINTENANCE INSTRUCTIONS SERIES 317 WARNING

OPERATING INSTRUCTIONS

SERVICE MANUAL (INTERNATIONAL)

Electro-Mechanical Swing Operator. Table of Contents

1000 Park Drive Lawrence, PA Fax

GPS AutoSteer System Installation Manual

NXLONG/HD TRAILER. Operating Manual. Trailer. Hilomast LLC 402 Chairman Court Debary FL32713

booster seat Instruction Manual US Version US-02_US_EN_Solana_Manual_ indd 1

PRODUCT DOCUMENTATION PARTS PORTAL

SwayPro. NOTE: A minimum tongue weight of 200 lbs. is required THANK YOU

INSTALLATION & OWNER S MANUAL

INSTALLATION & OWNER S MANUAL

INSTRUCTION MANUAL. with ILLUSTRATED PARTS LIST. for TRAILER AND ACCESSORIES. Part Number (10,000 Pound Capacity)

Installation, Maintenance and Service Manual QRN

This chapter contains safety precautions, daily safety check instructions, control and indicator

Quick Install Lift AL065 Installation Guide & Owners Manual

National N-55. LOAD CHARTS for Use With WRITTEN EXAMINATIONS

Instruction Manual UK

Trinity Low Profile Vehicle Restraint System

SECTION 3.00 WARNING WARNING ENGINE STARTUP AND SHUTDOWN PRESTART INSPECTION

Auger Installation, Operation and Service Manual

Operating and Assembly Manual

An Investment in Plant Floor Safety. 802C Safety Cable Pull Switches 802E Hinge Safety Interlock Switches 802F Safety Interlock Switches

M REV. J APRIL 2012 OPERATION MANUAL GPTLR-25, GPTLR-33, GPTLR-44 & GPTLR-55

OFFICE PARTITIONS. Data Port Openings. Use cable tie bracket to dress data cables under panels. STEP 1

T his chapter contains instructions for installing the RICON S-Series (ADA) Transit Use Wheelchair and Standee Lift

EAVERLINE. Operator s Manual. Series 5 Feed Cart Models 521, 525, 531 & 537. Weaverline, LLC - Churchtown, PA 17555

2300 OPERATING/APPLICATION/INSTALLATION INSTRUCTIONS

HYDRAULIC SLIDEOUT SYSTEM OPERATION AND SERVICE MANUAL

ABSOLUTE EQUIPMENT PTY LTD

Instruction Manual ENGLISH

The RICON Eclipse F8000 (A) Series Export Use Wheelchair and Standee Lift is installed in a

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

Smart-Till. Models ST101, ST151, ST203, and ST303. HCC, inc st Avenue Mendota, IL

Installation Instructions Capacity 10,000 lbs. (100 Series Lift)

Transcription:

FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED MISSION SYSTEMS CCC and EWCC BOH FPU Field Pack-up Units CHAPTER 2 OPERATOR INSTRUCTIONS 2016 BOH Environmental LLC

This page was intentionally left blank

0007 00 OPERATOR INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED MISSION SYSTEMS CCC and EWCC BOH FPU Field Pack-up Units MOVEMENT AND TRANSPORT Fork Pockets The CCC (1) and EWCC (2) are both provided with fork pockets (3) in the front and rear of the containers to facilitate lifting, positioning and loading of the containers on transport vehicles and site locations. 1 CCC Front 2 3 EWCC Front 3 3 0007 00-1

0007 00 Positioning CCC and EWCC from the transport to the site The following tasks should be conducted prior to moving the CCC or EWCC: 1. The expando units for the EWCC and all other equipment, ie HVAC, for both the EWCC and CCC, should be fully retracted and properly secured. 2. All loose material inside the container should be removed and general cleaning and inspection of the interior should be performed. 3. All locking devices, shelves, drawer latches and door edges should be swept or wiped clean of debris and inspected to ensure they function prior to securing the CCC and EWCC. See Cleaning Table page 0018 00-1 4. Lubrication of all moving parts, devices, locks, latches and hinges should be performed, especially prior to long-term storage or shipment. See Cleaning and Lubrication Tables pages 0018 00-1 through 00-3. 5. All shelves, chairs, equipment (ie, monitors, printers, and HVAC units) should be locked in place and secured with locking devices provided, prior to closing the container. CCC Tare Weight is 8,770 lb. GROUND GUIDE EWCC Tare Weight is 11,880 lb. GROUND GUIDE DIRECT LINE OF SIGHT DIRECT LINE OF SIGHT WARNING Ground guides and the MHE operators must maintain direct line of sight and insure that personnel are clear of the containers during this operation. Overhead power lines and obstructions can cause serious injury or damage to property. Forklift operators, truck drivers and ground guides should always clear overhead when loading, unloading the BOH CCC and EWCC. 0007 00-2

0007 00 WARNING The EWCC and CCC containers are not ISO-certified or CSC Safety-Approved. When transporting or storing, never stack the containers. The container structure is not designed to support additional containers. Failure to comply could cause damage to the container and equipment or death or injury. 0007 00-3

0007 00 Setup and Preparation CCC and EWCC CAUTION The CCC and EWCC must be placed on a level site to stabilize the container and permit a level working environment. 1. Inspect the site and remove rocks roots and debris that would prevent the container from being placed on a firm level site. 2. Locate the CCC or EWCC within proximity of electrical and communications service connections at the rear of the container. CCC EWCC CAUTION Flood plain conditions should be considered for containerized mission systems. If in doubt, consult the operations supervisor or commander. 0007 00-4

0007 00 HVAC Operating Position The CCC and EWCC are provided with an HVAC unit located on the side of the container. The HVAC is mounted on drawer slides for easy deployment to the operating position. The HVAC has a weather cover and exterior door (1) with latches (2) to cover the unit during shipment or storage. This door must first be unlatched to allow the HVAC to be unlocked and pushed out into the operating position (3). 2 1 Stowed Position CAUTION Do not attempt to operate the HVAC without opening the shutter door and pushing out the unit to the operating position. Overheating will result if the unit is operated in the stowed position. 0007 00-5

0007 00 The HVAC can be retracted within the CCC and EWCC with latch devices (1) and lock bars (2) for securing during storage and shipment and unlocked to be pushed out for HVAC operation. The latch devices for the HVAC are on the right and left side of the unit. The latches in the locked position must be pulled out and rotated downward to the unlocked position. At this point, the HVAC can be pushed out to the operating position. Locked Unlocked 2 1 Operating Position 0007 00-6

0007 00 Window Shutters Prior to shipment, the window shutter doors must be closed and locked by first lifting the locking pins on both sides of the doors and then locking the doors together by rotating the two latches closed. Operating Position Stowed Position END OF WORK PACKAGE 0007 00-7

This page was intentionally left blank

0008 00 OPERATOR INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED MISSION SYSTEMS CCC and EWCC BOH FPU Field Pack-up Units DOOR OPERATION CCC and EWCC Doors The CCC and EWCC entrance doors have a key and piston handle lock (older version) that when engaged provides a closed handle position positive lock. CAUTION If the door is required to remain in the open position, utilize the tie-down shackle and strap assembly (1) at the lower right corner of the CCC and EWCC. 1 The Older Door Handle Lock System 1. To disengage the door handle lock piston (2), insert the key, rotate the key clockwise, and pull the key and lock set (3) outward until the lock piston (2) is disengaged from the plate socket (6). 4 5 6 2 3 2. To open the door, swing the handle (4) in a 90 degree upward motion to the open position; this disengages the interior door lock blade (5). 3. Return the handle (4) to the center position and pull open the door. NOTE Follow the instruction plate (7) to the right of the door handle. 7 5 0008 00-1

0008 00 Locking the Door 1. To engage the interior lock blade (1) with the door closed, rotate the handle (3) downward 90 degrees to the engage position. 2. Return the handle (3) to the center position. 3. To engage the door handle lock piston, rotate the key counter-clockwise, and push the key and lock set inward until engaged in the plate socket. 4 3 1 4 Door Interior NOTE The new door handle version (3) no longer has a key lock device. The new deadbolt (4) replaces the handle key lock device, has been applied to CCC models Serial # ACCCC208-03134 and EWCC models Serial # ACEWCC208-03197. Interior Door Handle 1. To engage the door lock blade (1), rotate the handle (2) downward. 2. To open the door and retract the door lock blade (1), rotate the door handle (2) upward. 1 2 2 END OF WORK PACKAGE 0008 00-2

0009 00 OPERATOR INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED MISSION SYSTEMS CCC and EWCC BOH FPU Field Pack-up Units CCC ELECTRICAL SYSTEM CCC Electrical and Communications Connections The CCC is provided with dual communication connection boxes (1), a shore power connection box (2) with protective weather covers and external ground lug (3) for the ground rod stored in the interior next to the load center. 1. Before any electrical connections are made, enter the CCC and ensure the main circuit breaker and all the circuit breakers are turned off. 2. Retrieve the ground rod and establish the electrical ground. 2 3 1 NOTE New communication pass-through connections provided beginning with CCC serial # ACCCC208-03177. See page 0005 00-6 for details. CAUTION Ensure proper electrical source connections (110/220, single phase, 60 Hz) are made. Low power conditions may result in dimming of lights, improper HVAC operation, and/or tripped circuit breakers. 0009 00-1

0009 00 WARNING The electrical ground must be established first to prevent electrical shock to personnel. Consult ARMY TM 5-811-3 Chapter 2 and MIL-HDBK 149A Chapter 2-5. WARNING Ensure all circuit breakers and the main power source is switched off before making electrical connections. Ensure the proper electrical cable connectors (110/220, single phase, 60 Hz) are installed by a certified electrician Army MOS 21R and match the power source. CCC Circuit Load Center and Ground Rod The Circuit Breaker Box (1) and Ground Rod (2) are located on the rear wall in the center of the CCC. 1 2 0009 00-2

HVAC MAIN 0009 00 Computer Power Strip Lighting Wall Receptacles Computer Power Strip Black Wire Line 1 Black (Red Marked) Line 2 Wire Black/White Marked Wire Green Wire Neutral Ground 0009 00-3

0009 00 BLACK WIRE..LINE 1 BLACK, RED MARKED WIRE.LINE 2 BLACK, WHITE MARKED WIRE.NEUTRAL GREEN WIRE.GROUND 0009 00-4

0009 00 CCC Lighting Systems The latest generation of the CCC has been upgraded to three 4 long 120 VAC fluorescent light fixtures beginning with CCC serial number ACCCC208-03144. New 120 VAC System SN ACCCC208-03144 and beyond Older 12 VDC System prior to SN ACCCC208-03144 0009 00-5

0009 00 RED/WHITE LIGHTING CONDITIONS The CCC is provided a bank of two switches just inside the main entrance door to control red/white lighting conditions. Main Entrance Door 1 3 2 The left switch (1) sequence is as follows: 1. The left switch in the up position will select Door Switch Activated. This enables the door switches (2) to interrupt white light from escaping when the door is opened and switch to red light. 2. When the in the center position, the lighting is off. 3. When in the down position, the light selection is continuous. The right switch (3) sequence is as follows: 1. When in the up position, the white lighting is selected. 2. When in the down position, the red lighting is selected. NOTE The door switches will not permit the white lights to stay on when the doors are opened in both the red or white conditions. 0009 00-6

0009 00 CCC HVAC Systems The 24000 BTU Friedrich models prior to serial number #ACCCC208-03177 have been discontinued. Main Entrance Door Discontinued Friedrich 24000 BTU HVAC unit The HVAC thermostat applied to CCC units SN ACCCC208-03144 through ACCCC208-03158 control is located on the rear wall next to the communication outlets between the Push- Out units. CCC units SN ACCCC208-03159 through ACCCC208-03176 do not include thermostats. The new 24000 BTU LG model has been applied beginning with serial number #ACCCC208-03177. New 24000 BTU LG HVAC unit NOTE Both HVAC models retain condensation in the catch pan to assist in its efficiency. Condensation Drain CAUTION Before retracting the HVAC unit into the CCC, drain the condensation pan by depressing the condensation drain button in the bottom of the HVAC unit to remove water in the catch pan. Ensure the HVAC is properly serviced before deploying the CCC in extreme heat and cold conditions. END OF WORK PACKAGE 0009 00-7

This page was intentionally left blank

0010 00 OPERATOR INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED MISSION SYSTEMS CCC and EWCC BOH FPU Field Pack-up Units EWCC EXPANDO OPERATION Setup and Preparation EWCC The EWCC should be established on a level surface to stabilize the container and permit smooth operation and a level working environment. EXPANDO Unit #3 There are three expandable EXPANDO units secured with external (1) and internal pins (2). There are two ratchet straps inside the EWCC used to assist in deployment and retraction of the EXPANDO units. CAUTION When deploying the EXPANDO units, first release and extend EXPANDO unit #1, then #3 and then #2 in sequence to maintain counter balance on the container. 2 Older versions of the EXPANDO have interior securing pins #1 #2 1 #3 0010 00-1

0010 00 Deploying the old EXPANDO Unit #1 (models prior to SN ACEWCC208-03197) This operation requires three personnel, an observer that remains outside and an operator and assistant inside. #1 Door Strap 1 1. The Observer is required to remain outside, to insure there is no interference from traffic or obstructions while the EXPANDO unit is extended. 2. The Observer will pull out the four exterior EXPANDO unit securing pins (1). 3. Open the door and retain it with the door strap stored inside the door on the right. 4. The Operator and Assistant will enter the door, to access the single EXPANDO unit #1. 5. Remove all securing pins (2) from the roller arms on both sides of the EXPANDO unit. 6. Release and remove both ratchet straps (3). 7. The Operator and Assistant evenly push the EXPANDO unit out into its fully deployed position. Fully extended, EXPANDO will make contact with heavy rubber blocks (4) at top of EXPANDO opening creating full wiper seal engagement. 8. Perform the same deployment procedure steps 1-7 to EXPANDO unit #3, then #2. CAUTION EXPANDO units must be fully engaged to help prevent rainwater from entering container. 2 2 3 3 There are no interior pins (2) in the new EXPANDO units 4 0010 00-2

0010 00 Ratchet Strap Operation To release the ratchet straps pull the release bar as shown. WARNING You must check all straps for proper threading and tension. Refer to these following instructions for each strap. Failure to do so may cause equipment damage or injury. CAUTION Do not operate the ratchet handle (1) until all the slack is taken up by hand or the strap will ball up and jam against the release lever. Do not over tighten the straps; this will cause damage to the straps, hooks or equipment. 1 JAM 1. Ensure the strap hooks are properly set. 2. Feed the blank end (2) of the strap through the slotted barrel (3). 3. Take up the excess strap slack (4) by hand until the strap is snug. 4. Tighten the strap with the ratchet handle (1) until the strap is firm and tight. 2 4 3 1 1 2 0010 00-3

0010 00 Retracting the old EXPANDO Unit #1 This procedure is to retract the EXPANDOs for movement, storage or transport. CAUTION It is recommended that the EXPANDO units be retracted in the following Sequence: #1, #3 and then unit #2 to maintain counter balance. 1. The Observer will remain outside to observe the retraction and ensure the unit retraction is stopped at the full in position and prevent damage to the exterior pin brackets (4). 2. Remove the securing pins from EXPANDO unit #1 with assistance from other personnel from the exterior of the container, push the EXPANDO unit (1) until fully retracted and the handholds (2) are together and outer seal (3) makes good contact. 3. Secure the EXPANDO unit with pins (5) and tighten ratchet straps (6) between D-ring (7) at end of ceiling track and hole (8) on roller assembly arm. NOTE See Ratchet Strap Operation, page 0010 00-3 4. Perform the same retraction procedure steps 1-3 to EXPANDO unit #3, then #2. 5. Re-attach the EXPANDO exterior retention pins (9). 5 7 4 6 8 9 0010 00-4

0010 00 Deploying the new EXPANDO Unit #1 (models SN ACEWCC208-03197 and beyond) This operation requires three personnel, an observer that remains outside and an operator and assistant inside. CAUTION It is recommended that the EXPANDO units be deployed in the following Sequence: #1, #3 and then unit #2 to maintain counter balance. #1 Door Strap 1 Follow the diagrams (2) located inside the EXPANDO units just below the D-rings. 1. The Observer is required to remain outside, to ensure there is no interference from outside traffic or obstructions or personnel while the EXPANDO unit is extended. 2. The Observer will remove the four external securing pins (1). 3. The Operator will retain the door with the door strap stored inside the door on the right. 4. Remove and extend the ratchet straps from left side and right side storage D-rings C and D. 5. Attach the ratchet straps between D-rings A and C to assist in overcoming the EXPANDO seal resistance. NOTE See Ratchet Strap Operation, page 0010 00-3 C C A 1 D New version of the EXPANDO unit #1 0010 00-5

0010 00 WARNING The observer must ensure there are no personnel and/or equipment in the immediate area of the EXPANDO deployment; failure to comply may cause serious injury or even death. Observer C EXPANDO Unit #2 EXPANDO Unit #1 Assistant A Operator EXPANDO Unit #3 6. Take up the strap slack by hand. 7. The Observer outside will communicate that all is clear to the Operator. 8. The Assistant on the other side of the EXPANDO unit will synchronize the ratchet strap tightening directed by the Operator so the movement forward is smooth. CAUTION Ratchet strap operation must be synchronized to prevent binding during movement. 9. Once the resistance of the exterior seals has been overcome, the EXPANDO unit will roll with greater ease, and the handles (1) may be used to control movement. 10. The Operator and Assistant evenly push the EXPANDO unit out into its fully deployed position. Fully extended, EXPANDO will make contact with heavy rubber blocks (2) at top of EXPANDO opening creating full wiper seal engagement. CAUTION EXPANDO units must be fully engaged to help prevent rainwater from entering container. 11. Perform the same deployment procedure steps 1-10 to EXPANDO unit #3, then #2. 12. Return the ratchet straps to D-rings C and D for storage. 2 1 0010 00-6

0010 00 Retracting the new EXPANDO Units This procedure is to retract the EXPANDOs for movement, storage or transport. Follow the diagrams on the EXPANDOS just below the D rings. CAUTION It is recommended that the EXPANDO units be retracted in the following Sequence: #1, #3 and then unit #2 to maintain counter balance. 1. The Observer will remain outside to observe the retraction and ensure the unit retraction is stopped at the full in position and prevent damage to the exterior pin brackets (2). 2. The Operator and the Assistant will connect the ratchet straps between the unit D-ring A and D-ring B on the opposite wall. 3. The Operator will direct the ratchet strap synchronization for smooth retraction. CAUTION Ratchet straps operation must be synchronized to prevent binding during movement. 4. The Observer will communicate when the retraction should stop, to avoid damage and insert the four external securing pins (4). 5. Perform the same retraction procedure steps 1-4 to EXPANDO unit #3, then #2. 6. Return the ratchet straps to D-rings C and D for storage. Observer EXPANDO Unit #1 EXPANDO Unit #2 Assistant A Operator B B EXPANDO Unit #3 Observe the retraction closely from this point 3 2 4 END OF WORK PACKAGE 0010 00-7

This page was intentionally left blank

0011 00 OPERATOR INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED MISSION SYSTEMS CCC and EWCC BOH FPU Field Pack-up Units EWCC ELECTRICAL SYSTEM EWCC Electrical and Communications Connections The EWCC is provided with three communication connection boxes (1), a shore power connection box (2) with protective weather covers and external ground lug (3) for the ground rod stored in the interior next to the load center. 1. Before any electrical connections are made, enter the EWCC and ensure the main circuit breaker and all the circuit breakers are turned off. 2. Retrieve the ground rod and establish the electrical ground. NOTE New communication pass-through connections provided beginning with EWCC serial # ACEWCC208-03338. See page 0005 00-6 for details. CAUTION Ensure proper electrical source connections (110/220, single phase, 60 Hz) are made. Low power conditions may result in dimming of lights, improper HVAC operation, and/or tripped circuit breakers. 0011 00-1

0011 00 WARNING The electrical ground must be established first to prevent electrical shock to personnel. Consult ARMY TM 5-811-3 Chapter 2 and MIL-HDBK 149A Chapter 2-5. WARNING Ensure all circuit breakers and the main power source is switched off before making electrical connections. Ensure the proper electrical cable connectors (110/220, single phase, 60 Hz) are installed by a certified electrician Army MOS 21R and match the power source. EWCC Circuit Load Center and Ground Rod With the external connections made and the ground rod connected, proceed to the Load Center Box and actuate the main circuit breaker then the lighting and other circuit breakers. The Load Center Box (1) and Ground Rod (2) are located on the rear wall in the center of the EWCC. 1 2 0011 00-2

0011 00 0011 00-3

0011 00 BLACK WIRE..LINE 1 BLACK, RED MARKED WIRE.LINE 2 BLACK, WHITE MARKED WIRE.NEUTRAL GREEN WIRE.GROUND 0011 00-4

0011 00 EWCC Lighting Systems The latest generation of the EWCC has been upgraded to six 4 long 120 VAC fluorescent light fixtures beginning with EWCC serial number ACEWCC208-03234. Older 12 VDC System prior to SN ACEWCC208-03234 Newer 120 VAC System SN ACEWCC208-03234 and beyond 0011 00-5

0011 00 RED/WHITE LIGHTING CONDITIONS The EWCC is provided a bank of two switches just inside the main entrance door to control red/white lighting conditions. Main Entrance Door 1 3 2 The left switch (1) sequence is as follows: 4. The left switch in the up position will select Door Switch Activated. This enables the door switches (2) to interrupt white light from escaping when the door is opened and switch to red light. 5. When the in the center position, the lighting is off. 6. When in the down position, the light selection is continuous. The right switch (3) sequence is as follows: 3. When in the up position, the white lighting is selected. 4. When in the down position, the red lighting is selected. NOTE The door switches will not permit the white lights to stay on when the doors are opened in both the red or white conditions. 0011 00-6

0011 00 EWCC HVAC Systems The 24000 BTU Friedrich models prior to serial number #ACEWCC208-03347 have been discontinued. Main Entrance Door Discontinued Friedrich 24000 BTU HVAC unit The HVAC thermostat applied to EWCC units SN ACEWCC208-03233 through ACEWCC208-03309 control is located on the rear wall next to the communication outlets between the Push- Out units. EWCC units SN ACEWCC208-03310 through ACEWCC208-03346 do not include thermostats. The new 24000 BTU LG model has been applied beginning with serial number #ACEWCC208-03347. New 24000 BTU LG HVAC unit NOTE Both HVAC models retain condensation in the catch pan to assist in its efficiency. Condensation Drain CAUTION Before retracting the HVAC unit into the EWCC, drain the condensation pan by depressing the condensation drain button in the bottom of the HVAC unit to remove water in the catch pan. Ensure the HVAC is properly serviced before deploying the EWCC in extreme heat and cold conditions. END OF WORK PACKAGE 0011 00-7

This page was intentionally left blank

0012 00 OPERATOR INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED MISSION SYSTEMS CCC and EWCC BOH FPU Field Pack-up Units OPERATION UNDER UNUSUAL CONDITIONS INITIAL SETUP: CCC and EWCC Downloaded, Storage and Setup Maintenance Level Operator/Crew Personnel Required Two (plus one supervisor) OPERATION UNDER UNUSUAL CONDITIONS This work package provides instructions for the operation of the Containerized Mission Systems under unusual conditions. These include adverse weather, nuclear, biological and chemical attack, and emergency blackout conditions. Operation in Rain and/or Mud 1. Provide an adequate drainage ditch to prevent standing water around the CCC and EWCC. 2. Secure all accessories and container during extremely harsh rain. Operation in Hot or Cold Weather 1. Ensure the HVAC is properly serviced before deployment to extreme heat and cold conditions. Operation in Snow, Ice, or Extreme Cold WARNING Fording In extreme cold, do not touch metal parts with bare hands. Severe skin damage may result. The CCC and EWCC are not watertight. It should never be submerged in any depth of water or material damage may result. When mounted on a trailer or truck, hard-bottom water crossings should be no deeper than approximately two feet. When in doubt, refer to Unit Standard Operating Procedures. 0012 00-1

0012 00 Interim Nuclear, Biological, and Chemical (NBC) Decontamination Procedures WARNING The Containerized Mission Systems are NOT designed to be operated in contaminated NBC Environments. Do not operate in contaminated NBC environments. If possible, cease operation prior to an NBC event and close all doors. END OF WORK PACKAGE 0012 00-2