ConocoPhillips Alaska: NPR-A Update April 21, 2016 Nick Olds, VP North Slope Opera;ons & Development
Cau8onary Statement & Safe Harbor The following presenta8on includes forward-looking statements. These statements relate to future events, such as an8cipated revenues, earnings, business strategies, compe88ve posi8on or other aspects of our opera8ons, opera8ng results or the industries or markets in which we operate or par8cipate in general. Actual outcomes and results may differ materially from what is expressed or forecast in such forwardlooking statements. These statements are not guarantees of future performance and involve certain risks, uncertain8es and assump8ons that may prove to be incorrect and are difficult to predict such as oil and gas prices; opera8onal hazards and drilling risks; poten8al failure to achieve, and poten8al delays in achieving expected reserves or produc8on levels from exis8ng and future oil and gas development projects; unsuccessful exploratory ac8vi8es; unexpected cost increases or technical difficul8es in construc8ng, maintaining or modifying company facili8es; interna8onal monetary condi8ons and exchange controls; poten8al liability for remedial ac8ons under exis8ng or future environmental regula8ons or from pending or future li8ga8on; limited access to capital or significantly higher cost of capital related to illiquidity or uncertainty in the domes8c or interna8onal financial markets; general domes8c and interna8onal economic and poli8cal condi8ons, as well as changes in tax, environmental and other laws applicable to ConocoPhillips business and other economic, business, compe88ve and/or regulatory factors affec8ng ConocoPhillips business generally as set forth in ConocoPhillips filings with the Securi8es and Exchange Commission (SEC). We cau8on you not to place undue reliance on our forward-looking statements, which are only as of the date of this presenta8on or as otherwise indicated, and we expressly disclaim any responsibility for upda8ng such informa8on. Use of non-gaap financial informa8on This presenta8on may include non-gaap financial measures, which help facilitate comparison of company opera8ng performance across periods and with peer companies. Any non-gaap measures included herein will be accompanied by a reconcilia8on to the nearest corresponding GAAP measure on our website at www.conocophillips.com/nongaap. Cau8onary Note to U.S. Investors The SEC permits oil and gas companies, in their filings with the SEC, to disclose only proved, probable and possible reserves. We use the term "resource" in this presenta8on that the SEC s guidelines prohibit us from including in filings with the SEC. U.S. investors are urged to consider closely the oil and gas disclosures in our Form 10-K and other reports and filings with the SEC. Copies are available from the SEC and from the ConocoPhillips website. 2
North Slope of Alaska 3
History of the NPR-A In 1923, the NPR-A was set aside by President Harding as a petroleum reserve. The Navy drilled 36 test wells in the 1940s & 50s In the 70s & 80s the United States Geological Survey drilled 28 test wells Recent round of lease sales began in 1999 in Northeast NPR-A NE NPR-A lease sales followed in 2002, 2010, and in the Northwest NPR-A in 2004, 2006. Both areas: 2008 and 2011. COPA has drilled 30 explora8on wells since 1999 and operated 28 of these wells. COPA formed first BLM unit in 2008 (Greater Mooses Tooth Unit) COPA formed second unit in 2009 (Bear Tooth Unit) 4
COPA Historical Explora8on Ac8vity in NPR-A Wells Drilled by ConocoPhillips: 2000 3 wells: Spark 1, Rendezvous A, Clover 2001 5 wells: Lookout 1, Rendezvous 2, Moose's Tooth C. Par8cipated with BP in Trailblazer A & H. 2002 3 wells: Hunter A, Lookout 2, Mitre 1 2003 1 well: Puviaq 1 2004 3 wells: Scout 1, Carbon 1, Spark 4 2005 2 wells: Kokoda 1 and 5 2007 2 wells: Intrepid, Noatak 2008 2 wells: Char, Spark DD 2009 2 wells: Grandview, Pioneer 2013 2 wells: Cassin 1 and 6 2014 2 wells: Rendezvous 3 and Flat Top 2016 3 wells: Tiqmiaq 2 and 6, Hyperion Lookout #1 @ Explora8on Rendezvous #2 @ Explora8on Lookout #1 in Summer Rendezvous #2 in Summer 5
Outreach and Engagement Honest and respecnul rela8onships with North Slope communi8es Support community projects and economic opportuni8es while minimizing impacts from opera8ons: Subsistence support Educa8on/workforce development programs Frequent communica8on to balance needs of subsistence users with development: Obtain feedback on our opera8ons Gather local and tradi8onal knowledge to help protect subsistence resources 6
7 NPR-A Development Planning
CD5 New Drill Site New drillsite to access the western extension of the Alpine reservoir in the NPR-A Facili8es include: 6-mile gravel road, 11.8 acre gravel well pad, Nigliq Channel bridge and 3 addi8onal bridges, pipeline, power and communica8on. First oil on October 27, 2015 Peak Slope employment during construc8on: 700 posi8ons over two winters $1.1 billion to develop Forecasted peak produc8on of 16,000 BOPD gross annual average 8
CD5 Approved for Addi8onal Wells Announcing Today Addi8onal Wells at CD5 $190 million investment Funding approved for wells and on-pad infrastructure 18 addi8onal wells Full design capacity of 33 wells Within exis8ng CD5 footprint No new gravel required First oil expected 3Q 2017 Work beginning this year 9
Greater Mooses Tooth 1 (GMT1) and GMT2 Developments on Na8ve and Federal Leases GMT1 8-mile gravel road with 2 bridges 11.8 acre gravel well pad, poten8al for 33 wells Peak Est. NS Employment: ~700 posi8ons Project sanc8oned for funding Nov 2015 Targe8ng first oil late 2018 Total cost approximately $900 MM gross Peak produc8on 30,000 BOPD gross Long lead materials ordered, detailed engineering underway Existing Infrastructure (Post CD5 Install) CD1/ACF New Infrastructure GMT1 8 Mile Road 1 Mile CD5 6 Mile Road Alpine GMT2 8-mile gravel road and 14-acre pad 33-well development FEL2 Engineering in progress Peak est. NS Employment: ~700 posi8ons Permirng process underway Planning first oil 4Q 2020 $1B+ to develop 111 0
Summary Alpine has set the standard for small footprint, environmentally sound development Alpine provides the infrastructure to develop accumula8ons in the NPR-A. GMT1 first oil planned for late 2018 GMT2 to build off of GMT1 to expedite funding decision and construc8on Keys to NPR-A development: more certainty in the permirng process, and reasonable, non-duplica8ve regula8ons 11