JR East Efforts to Prevent Global Warming

Similar documents
Measures to Prevent Global Warming

Annual Environmental Report 2001

Prevention of Global Warming

Annual Environmental Report 2000

The outline of our management for environment. Takahito Sunohara East Japan Railway Company, Tokyo, Japan

Energy map. City gas, kerosene, class C heavy oil. Fossil fuels, etc. Light oil, kerosene, class A heavy oil. Energy consumption volume

eature Easy-to-Access Rail JR East s Initiatives Yoshihiko Ito Railway Universal Designs and Architectural Features Introduction

An Overwhelmingly Solid and Advantageo

Low Carbon Green Growth Roadmap for Asia and the Pacific FACT SHEET

Establishment of Japan Transport Engineering Company (J-TREC)

JR EAST, a passenger railway company, is the largest railway company in JAPAN

11.9% Challenge 1 New Vehicle Zero CO 2 Emissions Challenge. Developing Technologies to Achieve the Leading Fuel Efficiency Performance

Environmental approaches of Logistic companies in Japan. CO2 emission control

HEV, EV, Diesel Technology ; Indian trends and Role of Government for supporting

Basic Concept / Targets and Results

Technology from the New Product SANUPS K for a Smart Grid Society

History of Subway in Kyoto

Eco-Driving by Utilizing a Digital Tachograph System

Featured Articles Utilization of AI in the Railway Sector Case Study of Energy Efficiency in Railway Operations

Introduction of Overseas Technologies to JR East Track Maintenance

To Our Business Partners

Toward the Realization of Sustainable Mobility

Special feature article

Ex-Ante Evaluation (for Japanese ODA Loan)

Avon Products, Inc. Particulars. RSPO Annual Communications of Progress Particulars Form. About Your Organisation. 1.1 Name of your organization

Utility Operator Model

CO2 Reduction in Transportation (Automobile)

[Overview of the Consolidated Financial Results]

The Malaysia Automotive Institute (MAI) is an agency under the Ministry of International Trade and Industry (MITI)

Increasing community demonstration smart-grid projects involving consumers

Investigation of CO 2 emissions in production and usage phases for a hybrid vehicle system component

Inventing a new type of platform gate

Renovation 2018 FY2018 Medium-Term Management Plan April 28, 2016 Fuji Electric Co., Ltd.

ADB Knowledge Partnership Week. Hirokazu Yamaguchi May, 2015

Chapter 3 Promising Solutions for Reduced CO 2 Emissions from Automobiles

Director, Global Warming Prevention Division, Aichi Prefectural Government. Nobuhiro Ito

Household Renewable Energy

Special edition paper Development of an NE train

Smart Park in Okinawa Prefectural Peace Memorial Park

PLANNING TO START OR EXPAND A BUSINESS?

The evaluation of endurance running tests of the fuel cells and battery hybrid test railway train

City of Montréal s strategies to move smarter

Policy & Regulatory Issues : Solar & Wind. Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014

Battery-powered Drive Systems: Latest Technologies and Outlook

PV in Japan and Utility s activities

Strategy and Roadmap for PV Systems in Japan

Reducing CO2 Emissions in Road Transport Sector

Renewable Energy Choices

SoftBank's Renewable Energy Business and Asia Super Grid (ASG)

Specifications and schedule of a fuel cell test railway vehicle. T. Yoneyama, K. Ogawa, T. Furuya, K. Kondo, T. Yamamoto

Tesla Powerpacks enable cost effective Microgrids to accelerate the world s transition to sustainable energy

BYD Disrupts Global PV Industry with Streamlined Fully Sustainable Power Solutions Proposition

Development of Pumped Storage Power Station in China

NEWS RELEASE. Government charges up incentives for zero-emission vehicles

Energy Technical Memorandum

Current State of the Renewable Energy in Kyushu Electric Power and Our Future Plan. Kyushu Electric Power Co. Inc. June 8, 2017

Strategic Plan

Development of Motor-Assisted Hybrid Traction System

TEPCO s Emission Control Measures (in Thermal Power Plants) September 7, 2013 Toyoto Matsuoka Tokyo Electric Power Company (TEPCO) 东京电力公司

Transfer of Rolling Stock to Indonesia and Technical Support for Maintenance

New Vehicle Zero CO₂ Emissions Challenge

Development of Dual Mode Vehicle and its Effects

Smart mobility for sustainable development - ITS measures in Japan - Kinji Hasegawa

Financial Summary for 2Q-FY2017 And Projections for FY2017

Electric Vehicle Charging Workshop Pride Park Stadium 7 March 2018

BASF SE. Particulars. RSPO Annual Communications of Progress About Your Organisation. Membership. Particulars Form Page 1/1.

In Bulgaria by. Continental Wind Bulgaria EOOD

Amman Green Policies Projects and Challenges. Prepared by: Eng. Sajeda Alnsour Project coordinator Sept. 20, 2017

Air. Goals: Improve statewide air quality Reduce greenhouse gas emissions 9 DRAFT DRAFT

CINCINNATI CHARGES UP WITH SOLAR ELECTRIC POWER - Two new green buildings feature large solar arrays

Enhancement and Utilization of Multipurpose Integrated Highly-Advanced Railway Applications (MIHARA) Test Center

217 IEEJ217 Almost all electric vehicles sold in China are currently domestic-made vehicles from local car manufacturers. The breakdown of electric ve

HOW NET METERING OF ELECTRICITY WORKS

14 Dec 17. <Date> E-mobility landscape in Singapore. <Title> Goh Chee Kiong Head, Strategic Development

off-grid Solutions Security of supply Basics: Off-grid energy supply

2010 Sustainability & Public Transportation Workshop:

Power and Energy (GDS Publishing Ltd.) (244).

Origin Solar Presentation

Singapore and Manila March Successful Deployment of Low Emission Vehicles Industry Viewpoint

Networks of pedestrian's paths

Building smart transport in Moscow

Colgate-Palmolive Company

Prius cuts CO2 throughout its life cycle for the good health of our planet

Challenges Facing the City of Cape Town in Meeting Renewable Energy Targets

[Author Name] [Type the abstract of the document here. The abstract is typically a short summary of the contents of the document.] Green Fleet Policy

Management Plan for FY2013

Energy Storage Options for the Electricity Network

Joe Butler owns both full electric and hybrid electric vehicles since His fully electric EV became their primary vehicle in 2016.

U.S. Photovoltaic Roadmap Perspective from a Manufacturing Industry. Subhendu Guha United Solar Ovonic

Seoul. (Area=605, 10mill. 23.5%) Capital Region (Area=11,730, 25mill. 49.4%)

(1) Current State and Issues of the Electricity Sector in Indonesia

Nice Rika Biotechnologies Sdn Bhd

ENERGY SAVING IN TRANSPORTATION. Wang Xie-qing Research Institute of Petroleum Processing SINOPEC Dec Beijing, China

Toyota Tsusho Corporation

Project X: Challenge to attain Zero Standby Power

Demonstration Project utilizing Hybrid Storage Battery System in the Oki-islands

PG&E s Energy Landscape. Gregg Lemler, vice president, electric transmission i-pcgrid Workshop March 28 30, 2018

Microgrids for industrial applications. ABB Group June 22, 2016 Slide 1

Energy Saving Potential Study on Thailand s Road Sector:

Low Emission Vehicle Policy Development in London

Transcription:

JR East Efforts to Prevent Global Warming Hirokazu Inoue JR East s Basic Stance The JR East group announced its JR East 2020 Vision Challenge in March 2008 outlining one of the group s basic management policies of meeting corporate social responsibilities, which includes global environmental issues. In summary, the policy recognizes that taking action on these issues can no longer be put off, and we must act now to find a solution for the future. Consequently, JR East has set a target of halving CO2 emissions from its railway business by fiscal 2030 compared to fiscal 1990 and is working on meeting that target. Achieving Environmental Targets Achievements In 1992, JR East established a basic philosophy and guidelines for balancing environmental protection with business activities. Based on this philosophy, the company formulated an action plan and environmental targets for environmental protection. In the field of preventing global warming, JR East set five numerical targets described below and the fiscal 2007 results met four of these targets (Table 1). Setting new environmental targets The JR East 2020 Vision Challenge sets long-term reduction of CO2 emissions from the railway business as a global warming countermeasure. It specifies numerical targets for electric power for train traction, power consumption per unit of transport volume, and energy conservation at stations, offices, and other facilities. Furthermore, it reviews the ratio of energy-efficient rolling stock (Table 2). Reducing CO2 Current emissions JR East generates electricity for traction, station and office lighting and air conditioning using its own power stations Table 1 Fiscal 2008 Environmental Targets (For Global Warming Prevention) Item FY 2008 Target FY 2006 Results FY 2007 Results CO2 emissions in business activities CO2 emissions per unit of electricity generated at company thermal power plants 22% reduction 28% reduction* 24% reduction* 40% reduction 41% reduction* 40% reduction* Ratio of energy-saving rolling stock Train operating power consumption per unit transport volume 82% 82% 85% 19% reduction 17% reduction* 14% reduction* Number of large coolers using CFCs 100% reduction 91% reduction 100% reduction Note: Reduction targets based on 1990 levels * Figures from fiscal 2006 use coefficients stipulated in the revised Energy Saving Law and Law to Promote Countermeasures to Global Warming. However, figures here are calculated using traditional coefficients to show the level of target achievement. Japan Railway & Transport Review No. 51 Feb 2009 22

and also purchases electricity from electric utilities. Other than electricity, it also uses diesel and kerosene to run diesel locomotives and railcars and to heat stations, offices, and other facilities. The company s total energy consumption is showing a downward trend due to efforts to increase generation efficiency. CO2 emissions in 2007 were 2.12 million tonnes and about the same as in fiscal 2006. Efforts were made to improve the efficiency of company power plants and to switch to energy-saving carriages, but low river levels cut hydroelectric power generation in fiscal 2007 compared to fiscal 2006. The resultant increased usage of substitute thermal power plants increased total emissions to the level of the previous year. In light of these results, the company is making reduction of energy consumption for train operations (73% now) a priority, and is working on various measures to reduce CO2 emissions (Figure 1). Reducing CO2 emissions from rolling stock and stations To reduce the 70% of energy used by JR East for operating trains, by the end of fiscal 2007 the company has introduced 10,428 energy-saving carriages, which now make up 85% of all rolling stock. Energy-saving carriages use regenerative braking to convert kinetic energy at deceleration into electrical energy as well as variable voltage variable frequency (VVVF) inverters for more efficient motor control. The company is also working on reducing energy consumed (and CO2 emissions) by air conditioning, which forms the largest part of energy consumption at large stations. During rebuilding of Ueno Station and the Keiyo underground part at Tokyo Station, air-conditioning equipment using CFCs was removed and the capacity of coolers was reviewed and inverter control introduced. Efforts are also underway to optimize energy conservation by monitoring operations using IP networks and managing building energy use. As a result, energy consumption by coolers at Ueno Station has been cut by 40% (Figure 2). Reducing CO2 emissions from electric power plants To reduce CO2 emissions from its power plants, JR East is replacing inefficient equipment and increasing the ratio of renewables in its energy mix. In addition to generating its own power from thermal and hydroelectric power stations, the company also purchases electricity from commercial utilities, adjusting the proportion of each in the total to match demand. This load balancing is controlled by a central load dispatch command function that monitors and controls overall power supply in real time to maximize efficiency. JR East s thermal power plant in Kawasaki City outputs up to 655 MW using four generators, three of which have been switched to the more efficient combined cycle. As a result, CO2 emissions per generated kwh have been cut by 37% compared to 1990. In June 2006, the company switched the No. 3 generator from light fuel oil to natural gas to further cut CO2 emissions. Renewable energy is produced at the company s hydroelectric plant in Ojiya and Tokamachi in Niigata Prefecture on the Shinano River. The 449 MW output of the Table 2 Revision of Environmental Targets (For Global Warming Prevention) Item Previous Target FY 2010 Target Train operating power per unit transport volume 19% reduction* Train operating power (New) 2% reduction Train operating power per unit transport volume (New) 2% reduction Energy conservation for stations, offices, etc. (New) 4.5% reduction Ratio of energy-saving rolling stock (Revised) 82% 86% Note: 2010 targets based on 2006 levels * Previous targets based on 1990 levels 23 Japan Railway & Transport Review No. 51 Feb 2009

Figure 1 Change in CO2 Emissions 10,000 tonnes-co 2 300 250 200 276 232 220 239 258 213 212 215 150 100 50 0 1990 2002 2003 2004 2005 2006 2007 2008 Fiscal year (Target value) Figure 2 Change in Energy-saving Rolling Stock Carriages 12,000 3379 2983 2351 2079 1872 1722 9000 6000 8813 9410 9944 10,377 10,421 10,578 3000 0 2003 2004 2005 2006 2007 2010 (Target value) Conventional carriages Energy-saving carriages Fiscal year Figure 3 Change in CO2 Emissions at JR East s Thermal Power Plant per Generated Electricity Unit (g-co2/kwh) 800 700 600 500 726 504 510 534 431 433 436 400 300 (Target value) 200 100 0 1990 2003 2004 2005 2006 2007 2008 Fiscal year Japan Railway & Transport Review No. 51 Feb 2009 24

plant produces 1.4 to 1.8 million MWh of electricity annually. Efforts to use solar and wind power are also underway. Photovoltaic panels have been installed at Tokyo and Takasaki stations, the JR East General Education Center, and JR East Research and Development Center. Photovoltaic panels integrated into the roofing material are also scheduled for installation in fiscal 2010 at Tokyo Station over the Tokaido Line platform (Figure 3). Reducing CO2 emissions throughout transport system The rail transport mode generally has a lower environmental impact than other modes, but railways cannot meet the needs of every customer. Consequently, JR East is working to reduce transport CO2 emissions as a whole by promoting intermodal transport, combining railways with other modes. Promoting intermodal transport requires improvements in convenience and amenity to increase the number of railway passengers. Specifically, JR East is working to provide easy access to more destinations by various means, such as adding more trains on the Shonan Shinjuku Line, and building new lines such as the Tohoku Through Line connecting Tokyo and Ueno stations. Also, national and local governments are helping in efforts to make stations and carriages barrier free. Emphasis is focused on seamless passage using the 20 million+ Suica IC cards now in circulation through expanded interoperability with PASMO IC cards used by other private railways and buses (JRTR 50, pp 6 17). Some taxis in greater Tokyo now accept Suica payment and more buses are using Suica too. The company is also promoting combined rail and car travel by offering easy-to-use car rental services such as Train-ta-kun with lower rental rates. Park-and-ride schemes are being developed too and JR East now (March 2008) has 11,000 parking spaces at 123 stations. Environmental Protection Forestation is a well-known way of storing released carbon emissions and JR East has vast areas of railway forests planted to protect lines from snowdrifts, avalanches, and landslides (JRTR 51, pp 12 15). Although railway forests originated in the late 19th century as a source of timber for ties and construction and to protect lines against wind and snow, today they contribute to protecting the natural environment. The company s 6 million trees on some 4200 ha absorb 17,000 tonnes of CO2 annually or about 0.8% of JR East s CO2 emissions, helping the effort to battle global warming. In addition to railway forests, JR East branch offices and community residents have been planting trees near tracks and stations as part of the Railway Line Forestation Programme since 1992. About 38,000 people have participated in planting 260,000 trees. Furthermore, the Adatara Hometown Forestation Programme has been ongoing since 2004 using national forest land in the Adatara district of Fukushima Prefecture; 45,000 saplings of the 22 native tree species were planted Solar panels to be installed on platform roofs as part of major renovation works of Tokyo Station 25 Japan Railway & Transport Review No. 51 Feb 2009

Adatara Hometown Forestation Programme in Otama village, Adachi-gun over 3 years. After the fourth planting in 2007, the location was changed to Nihonmatsu City in Fukushima Prefecture also at the base of Mt Adatara where 50,000 trees of 17 species will be planted in the next 3 years. The plan is to plant various trees in a natural mixed stand to develop hometown forests. In 2008, 1200 people including JR East group employees, local residents, and others participated in tree planting. Railway forests owned by JR East on the Shimohama Coast in Akita City along the Uetsu Line consist mainly of Japanese Black Pine. However, over the past few years, damage from acid rain and pine weevils has caused dieback and the JR East Akita Branch Office co-organized the Akita Shimohama Coast Forestation Programme with the AEON Environmental Foundation. In a 5-year plan from 2005, the programme will work to protect the natural environment along railway lines by replanting forests. Efforts to recruit programme volunteers started in April 2008 at major stations and AEON group stores in Akita Prefecture. As a result, 2100 volunteers, planted 10,000 Daimyo Oak and Japanese Black Pine saplings. Another planting will be made next year. Greening of rooftops has also been promoted since fiscal 2004 by JR East group companies who own many station and office buildings. By March 2008, the roofs of 20 buildings with a total area of about 6900 m² had been greened, helping mitigate the heat-island effect in cities, absorbing CO2, and reducing energy use by air conditioning. R&D in Environmental Technologies JR East has established environmental protection as one of its key R&D goals. In the future, it will establish the Environmental Technology Research Center (provisional name) to heighten the environmental advantages of rail using leading environmental technologies. Current efforts include the Kiha E200 series, which entered service on the Koumi Line in 2007 as the world s first diesel hybrid railcar. It uses a battery to store power from the diesel engine and from regenerative braking and achieves 20% greater fuel efficiency than standard diesel railcars while being 30 db quieter when standing at stations, and emitting 60% less hazardous exhaust materials, such as NOX. Fuel cells also show promise as a next-generation railway technology and JR East started operational testing of the world s first fuel-cell hybrid railcar on lines in spring 2007. Current test speeds have reached about 100 km/h with ongoing progress in advancing control and safety issues for expected commercial operation within a few years. Japan Railway & Transport Review No. 51 Feb 2009 26

World s first diesel hybrid railcar running on Koumi Line Even stations cannot escape the need for environmental friendliness and the company has started designing model eco stations using various environmental technologies. There are plans to build one of these stations in each branch area over the next 10 years. Environmental Efforts in Workplace Future environmental protection depends on raising the consciousness of each and every employee in the JR East group. The company is using its JR East Eco Activities so everyone will think about environmental protection in their day-to-day work. In this way, environmental activities will spread through all group companies not just at the parent and each company will proactively spur on environmental protection. Hirokazu Inoue Mr Hirokazu Inoue is Manager of the Management Planning Department, and Leader of Environment Management Group at JR East. He joined the company in 1994, after graduating from Kobe University Graduate School of Civil Engineering. Prior to his current position, he was Acting Section Manager of the Barrier-Free Department at JR East s Tokyo Construction Office. 27 Japan Railway & Transport Review No. 51 Feb 2009