DODGE COOL LUBE 2 for Sleevoil Pillow Blocks Part Numbers , , ,

Similar documents
Dodge Cool Lube 2 for Sleevoil Pillow Blocks Part Numbers , , ,

DODGE USAF 200/300 Direct Mount Pillow Block Bearings

DODGE USN 500 and 600 Series Adapter Mount & 200 and 300 Series Direct Mount Plummer Blocks

INSTRUCTION MANUAL for DODGE SLEEVOIL STL Pillow Blocks and SLEEVOIL SSL Pillow Blocks Sizes 315/16 thru 8 PLXC

FLEXIDYNE PH Couplings

INSTRUCTION MANUAL FOR DODGE SAF-XT & SAFS Pillow Blocks All Sizes 1 15 / 16 " through 10 1 / 2 " 2 and 4 Bolt Base

Instruction Manual For DODGE. Airport Baggage Handling Systems Speed Reducers

DODGE No. 9D FLEXIDYNE Drive

DODGE V-Belt Tension Tester Part No

INSTRUCTION MANUAL for DODGE SLEEVOIL RTL PILLOW BLOCKS Sizes 3 7 / 16 " thru 12"

11-24 CKCP: KCM: 7-34 CKCM:

DODGE USAF 500 SERIES Pillow Blocks

INSTALLATION AND OPERATION

Instruction Manual for FLEXIDYNE Couplings Sizes 9C and 11C

Instruction Manual for Sleevoil STL Pillow Blocks and Sleevoil SSL* Pillow Blocks

BALDOR MN413 Brakes Manual

Low Profile J Series Power Unit with Vane Pump

TIN KNOCKER TK H1652 Hydraulic Shear

SIZES: HXT105 HXT205

Installation Instructions. Install Hubs Set Spacing Install Element FINISHED BORE INTERFERENCE FIT. Step 1 - HUB INSTALLATION

INSTRUCTION MANUAL FOR DODGE GRID-LIGN FLEXIBLE COUPLINGS

REDUCER LUBRICATION HORIZONAL APPLICATIONS VERTICAL MOUNT REDUCER INSTALLATION CHAR-LYNN H, S, T AND 2000 SERIES 6B SPLINE MOTOR INSTALLATION

NECO Pumping Systems

Installation & Operating Manual

Parts Replacement Manual For HYDROIL TORQUE-ARM Speed Reducers Taper Bushed For Char-Lynn H, S, T and 2000 Series 6B Spline Motors

DuraMAC LIGHT COMMERCIAL & IRRIGATION WATER PRESSURE BOOSTER SYSTEM INSTALLATION INSTRUCTIONS

Instruction Manual for HSPA Take-Up Units

DODGE INSTRUCTION MANUAL for TAF Pillow Blocks & S-1 Units

The TR-Series are large volume,

Installation Instructions Light Commercial & Irrigation Water Pressure Booster System

OFX7 Operating Maintenance and Troubleshooting Manual L-4219

Operating Instructions & Parts Manual

Operators Manual. Model 3370 Air Cooled Recirculator rev.8/98

HYDROIL TORQUE-ARM Speed Reducers Taper Bushed For Char-Lynn H, S, T and 2000 Series 6B Spline Motors

SINGLE ACTION FLUID PUMP

AIR/HYDRAULIC INJECTION GUN MODEL INSTRUCTIONS

Operation & Service Manual

SERIES PC INSTRUCTION AND OPERATION MANUAL

DODGE USAF 500 SERIES Pillow Blocks

THIS SYMBOL MEANS A WARNING OR CRITICAL INFORMATION. THIS SYMBOL IS USED TO LIST ADDITIONAL INFORMATION AND TIPS.

HALLMARK INDUSTRIES INC

TECHNICAL SERVICE MANUAL INSTALLATION, START UP, TROUBLESHOOTING, SERIES SG-04, SG-05 & SG-07 spur gear PUMPS

Designed to quickly and safely test fire hose lines!!

Table of Contents. General Information Page 2. Installation Procedure Page 3. Flanged Connections Page 3. Return Rail Connections Page 4

Installation Manual. Automated Fuel. Maintenance. System FUEL TECHNOLOGIES INTERNATIONAL LLC

UNPACKING SAFETY GUIDELINES GENERAL SAFETY INFORMATION. Operating Instructions & Maintenance Manual

END SUCTION CENTRIFUGAL PUMPS

456 Series Hydra-Lift Drum Rollers Operator s Manual for Morse Hydra-Lift Drum Rollers 456 Series

UNPACKING SAFETY GUIDELINES GENERAL SAFETY INFORMATION. Operating Instructions & Maintenance Manual

Operating Instructions & Parts Manual

PARTS MANUAL FOR TWO STAGE AIR COMPRESSOR

Operating instructions Form no safety definitions

BALDOR IN-LINE HELICAL REDUCER

ROOTS Meters Series B3 Meter Models 8C175-56M175

Air / Hydraulic Pump

DODGE QUANTIS IN-LINE HELICAL REDUCER

The EL-FHT is a. The FH-series line of fire hose testers, offers testing. Pressure Wands Fire Hose Testers Hose Restraints Hand Pumps MINI HOSE TESTER

DSTP20: Fuel Transfer Pump

Marine Fuel Filtration. Marine Turbine Series. Stage One: Separation. Stage Two: Coalescing. Stage Three: Filtration. And more

Catalog Little Champ Hydraulic Power Units

Track Drive Circuit - General System. Simplified Travel Circuit Diagrams: Neutral Controls Forward Travel Reverse Travel

The EL-FHT is a. The FH-series line of fire hose testers, offers testing. Pressure Wands Fire Hose Testers Hose Restraints Hand Pumps MINI HOSE TESTER

The EL-FHT is a. The FH-series line of fire hose testers, offers testing. Pressure Wands Fire Hose Testers Hose Restraints Hand Pumps MINI HOSE TESTER

SERVICE INSTRUCTIONS. Transfer Pump

MODEL NUMBER: MEDIUM DUTY ONBOARD AIR SYSTEM

PE 20 SERIES ELECTRIC POWER PUMPS

Installation and Parts Replacement Manual for DODGE Double Reduction Screw Conveyor and Hydroil Screw Conveyor Drive

M-3025CB-AV Fuel Pump

OWNER/OPERATOR MANUAL. Airmotor effective dia. in. 2.5

KJ4000LW Operating Instructions & Parts Manual NSN

Refinery Supply Company, Inc.

The EL-FHT is a. The FH-series line of fire hose testers, offers testing. Pressure Wands Fire Hose Testers Hose Restraints Hand Pumps MINI HOSE TESTER

APCO ASR-400/450 SEWAGE AIR RELEASE VALVES

Section 6.1. Implement Circuit - General System. General: Implement Control Valve: Implement Circuit

Catalog Little Champ Hydraulic Power Unit Kits

Installation and Operation Manual for VMAC Accessory A / A Air Receiver Tanks

Maintenance Manual. Automated. Fuel Maintenance System FTI-5A. FUEL TECHNOLOGIES INTERNATIONAL LLC

User s Manual D-Series Blowers and Exhausters

Hydraulic Immediate Need Power Pack

Ph: (07) Fax: (07) Pump Manual

Installation and Operating Manual

Maintenance Manual. Automated Fuel Maintenance System FTI-5A SINGLE TANK FUEL TECHNOLOGIES INTERNATIONAL

Model AM2 M40 Panel Installation, Operation, and Maintenance Manual

Operating Instructions - Electric Pow'r-Riser Models

Wash Prep Systems featuring CAT PUMPS DUPM623 DUPM820 / DUPM820-TS DUPM820D / DUPM820D-TS DUPM1010. Owner s Manual #

WCI-20 Power-Pak Coldwork Hydraulic Power Supply Rev B

PARTS LIST FOR WLP-40-0M10 WATER RECYCLING TREATMENT SYSTEM

VARNA Products 15 GPM (57 LPM) Prelube Kit for MTU 4000 Series Marine Engines

MicroCoat System Operating Manual MC4000 Series MC785M, MC785M-WF Spray Valves

810201,810202,810203,810204

Packaged Pump Sets FOR DIESEL FUEL OIL APPLICATION. Packaged Pump Sets for Diesel/Fuel Oil Application Page 1

Model &

Air-Operated 5:1 Oil Pump

D-Series Blowers and Exhausters

PRO PRO20-115RD 115-Volt AC. PRO Volt AC OWNER'S MANUAL SAVE THESE INSTRUCTIONS

Pneumatic High-Viscosity Filtration System Instruction Manual

HEAVY DUTY ONBOARD AIR SYSTEM PART NO

Premium Supply. Direct Push. Models PCK-3530-DP PCK DP PCK-530-DP. Operator s Manual and Installation Instructions

Section 7.1. Wheel Drive Circuit - General System

Transcription:

DODGE COOL LUBE for Sleevoil Pillow Blocks Part s 063487, 063488, 07889, 07890 These instructions must be read thoroughly before installing or operating this product. WARNING: To ensure the drive is not unexpectedly started, turn off and lock-out or tag power source before proceeding. Failure to observe these precautions could result in bodily injury. WARNING: Only qualified personnel familiar with hydraulic and electrical installations, the construction and operation of this equipment, and the hazards involved should install, adjust, operate, and/or service it. Read and understand this manual in its entirety before proceeding. Failure to observe this precaution could result in severe bodily injury or loss of life. Receiving & Inspection: 1. Carefully unpack the Oil (CO) system. Inspect the system for any damage during shipping.. Report any damage to the carrier for claims. 3. Make sure that available voltage supply is within 10% of the system voltage. 4. Check all hydraulics to ensure that nothing came loose during shipping. Tighten as needed. 5. No alterations are allowed without authorization from Dodge. Unauthorized changes void the warranty. System Specifications: System Part Motors Information 063488 Single Phase 115/30 VAC 063487 Three Phase 30/460 VAC 07889 Three Phase 08-30/460 VAC (Explosion Proof Motors) 07890 Three Phase 575 VAC (Canada) Air to oil heat exchanger: Thermal Transfer BOL-8- * Pump Relief valve setting: 150 psi * Bearing Relief valve setting: 65 psi Pump flow rate: GPM Flow meter range: 0.5 4.0 GPM Oil supply line connection: Two 1/" NPT connections at the flow meter outlets (female) Oil return line connection: Two 1 NPT connections (female) * Relief valves are preset at the factory, but are field adjustable. If other settings are required, consult Dodge Engineering FLOW METERS Figure 1 - Cool Lube Figure - Controls BEARING PRESSURE GAUGE NEEDLE VALVES PUMP PRESSURE GAUGE WARNING: Because of the possible danger to person(s) or property from accidents which may result from the improper use of products, it is important that correct procedures be followed. Products must be used in accordance with the engineering information specified in the catalog. Proper installation, maintenance and operation procedures must be observed. The instructions in the instruction manuals must be followed. Inspections should be made as necessary to assure safe operation under prevailing conditions. Proper guards and other suitable safety devices or procedures, as may be desirable, or as may be specified in safety codes should be provided, and are neither provided by Baldor Electric Company, nor are the responsibility of Baldor Electric Company. This unit and its associated equipment must be installed, adjusted and maintained by qualified personnel who are familiar with the construction and operation of all equipment in the system and the potential hazards involved. When risks to persons or property may be involved, a holding device must be an integral part of the driven equipment beyond the speed reducer output shaft. 1 Installation Instructions: 1. Place the unit in the designated area and anchor it down using the 4 mounting holes in the base plate. The unit should be positioned below the circulating oil drain holes in the bearings so that at least a 15 drain line slope is achieved to allow for adequate oil return.. Make sure that there is enough space around the unit to allow for servicing. 3. Connect oil supply lines (not included) from the two 1/ NPT (female) outputs of the flow meters to the circulating oil inlets on the housings. Connection details for each type of SLEEVOIL bearing are provided in sections following. NOTE: All plumbing should be cleaned and flushed before being connected to the bearings.

R-Series 1-7/16 thru 3-7/16 The circulating oil inlet is a tapped hole through the plunger screw. Check Table 1 to ensure that the bearings have the correct plunger screw. If replacement is necessary, install the new plunger screw per appropriate SLEEVOIL Instruction Manual. Plunger Screw Prior to 1988 Plunger Screw 1988 to Present Figure 3 - Plunger Screw Table 1 - R-Series Oil Inlets 1-7/16 thru 3-7/16 Plunger Screw Modified For Oil (Part ) 1-7/16 439* 1-11/16 1-15/16 4393* -3/16 4394* -7/16 4395* -11/16-15/16 4397* 3-7/16 4398* * Only if pillow block was manufactured prior to 1988 is new plunger screw required. The user is required to provide connection adapters to connect the supply lines to the SLEEVOIL circulating oil inlets. (See Table ) R Series Table - R-Series 1-7/16 thru 3-7/16 of Oil Inlets Oil Inlet NPT (Female) Oil Drain Hole NPT Alternate. Oil Gauge Hole NPT 1-7/16 1 1/4 1/ 1-11/16 1 1/4 1/ 1-15/16 1 1/4 1/ -3/16 1 1/4 1/ -7/16 1 1/4 1/ -11/16 1 1/4 1/ -15/16 1 1/4 1/ 3-7/16 1 1/4 1 3/4 R-Series 3-15/16 thru 14 A Oil Inlet Kit is required for each pillow block for the CO system installation. Install the Oil Inlet Kit as shown in the appropriate SLEEVOIL Instruction Manual. Oil Inlet Kit Part R-Series 3-15/16 Oil Inlet Kit 43153 R-Series 4-7/16 thru 4-15/16 430198 Oil Inlet Kit R-Series 5-7/16 thru 1 430155 Oil Inlet Kit The user shall provide connection adapters and Tee fittings to connect the supply lines to the circulating oil inlets. A Tee fitting is required at the inlet connection because these pillow blocks have circulating oil inlets. The Tee fitting ensures both oil inlets receive an equal amount of oil. Flexible connections from the Tee fitting to the oil inlets are recommended. (See Table 3 for inlet connection size) Table 3 - R-Series 3-15/16-14 of Oil Inlets Oil Inlet NPT (Male) Oil Drain Hole NPT STL SSL Alt. Oil Gauge Hole NPT 3-15/16 PLXC 1/4 3/4 3/4 1/ 4-7/16 PLXC 1/4 3/4 1 1/ 4-15/16 PLXC 1/4 1 1-1/4 1/ 5-7/16 PLXC 1/4 1 1-1/4 3/4 6 PLXC 1/4 1 1-1/4 3/4 7 PLXC 1/4 1-1/4 1-1/4 3/4 8 PLXC 1/4 1-1/4 1-1/4 3/4 9 PL 1/4 1-1/4 1-1/4 3/4 9 XC 1/4 1-1/ 1-1/ 3/4 10 PL 1/4 1-1/4 1-1/4 3/4 10 XC 1/4 1-1/ 1-1/ 3/4 1 PL 1/4 1-1/ 1-1/ 3/4 14 PL 1/4 1-1/ 1-1/ 3/4 Figure 4 - PLXC Oil Inlet

RTL Series A Oil Inlet Kit is required for each pillow block for the CO system installation. Install the Oil Inlet Kit as shown in the SLEEVOIL Instruction Manual. Oil Inlet Kit Part RTL 3-7/16 thru 5-7/16 Oil Inlet Kit 1303 RTL 6 thru 1 Oil Inlet Kit 1305 The user shall provide connection adapters and Tee fittings to connect the supply lines to the circulating oil inlets. A Tee fitting is required at the inlet connection because these pillow blocks have circulating oil inlets. The Tee fitting ensures both oil inlets receive an equal amount of oil. Flexible connections from the Tee fitting to the oil inlets are recommended. (See Table 4 for inlet connection size) RTL Series of Circ. Oil Inlets Table 4 - RTL Series Circ. Oil Inlet NPT (Male) Circ. Oil Drain Hole NPT Alt. Oil Gauge Hole NPT 3-7/16 1/4 1-1/ 3/4 3-15/16 1/4 1-1/ 3/4 4-7/16 1/4 1-1/ 3/4 4-15/16 1/4 3/4 5-7/16 1/4 3/4 6 3/8 3/4 7 3/8 3/4 8 3/8 3/4 9 3/8 3/4 10 3/8-1/ 3/4 1 3/8-1/ 3/4 RXT Series A Oil Inlet Kit is NOT required for these pillow blocks. The circulating oil inlets are machined into the housing and are plugged with pipe plugs as shown in the SLEEVOIL Instruction Manual. The supply line should be connected to the two inlets on the downswing side of the pillow block for base loaded applications, or to the two inlets on the upswing side for cap loaded applications. The user shall provide connection adapters and Tee fittings to connect the supply lines to the SLEEVOIL circulating oil inlets. A Tee fitting is required at the inlet connection because these pillow blocks have circulating oil inlets. The Tee fitting ensures both oil inlets receive an equal amount of oil. (See Table 5 for inlet connection size) Table 5 - RXT Series RTL Series of Circ. Oil Inlets Circ. Oil Inlet NPT (Male) Circ. Oil Drain Hole NPT Alt. Oil Gauge Hole NPT -15/16 1/ 1-1/4 3/4 3-7/16 1/ 1-1/4 3/4 3-15/16 1/ 3/4 4-7/16 1/ 3/4 4-15/16 1/ 3/4 5-7/16 1/ 3/4 6 3/4-1/ 3/4 7 3/4-1/ 3/4 8 3/4-1/ 3/4 9 3/4-1/ 3/4 10 1-1/ 3/4 1 1-1/ 3/4 Figure 5 - RTL Oil Inlets Figure 6 - RXT Oil Inlets 3

Installation Instructions (cont.) 4. Connect oil return lines (not included) from the circulating oil drain holes in the bearing housings (not the housing drains) to the 1 NPT (female) returns on the CO system reservoir. oil drain hole locations are designated in the SLEEVOIL Instruction Manuals. Drain hole sizes are provided in tables above. NOTE: The circulating oil drain holes are positioned to maintain the proper static oil level in the housing if the circulating oil is off and the circulating oil drain hole is open. This allows the oil rings to operate and supply oil to the bearing in case the CO system is shut down or stops. NOTE: Drain piping should be vented and of adequate size to drain oil from the bearings at the same rate as the incoming oil flow. The circulating oil drains must be directed straight down into a return drain sloping away at a 15 or greater angle. 5. Fill up the CO system reservoir by monitoring the oil level gauge. The CO system reservoir will hold 5 gallons of oil. NOTE: Since the satisfactory operation of the bearing depends almost entirely on the oil film being maintained between the shaft and bearing liner surface, the use of a high quality oil from a reputable manufacturer cannot be overemphasized. Use a high grade straight mineral oil with rust and oxidation (R & O) inhibitors and antifoam agents. Check construction drawings or equipment instruction manual for proper oil. Oil viscosity is determined by the equipment manufacturer and normally specified on the construction drawing or in the operating manual. 6. Fill the bearings with oil to the recommended level. (see SLEEVOIL Instruction Manual) Electrical Hook Up: Connect the two electric motors to a power supply through the proper fuses, starters and overload protection using NEC and local electrical codes. Optional Heater/Thermostat Assembly: 60W X 10V, 1 PH Part # 43475 60W X 40V, 1 PH Part # 43476 Optional Temperature/Oil Level Switch: Part # 434941. Connects to a control system (not provided by Dodge) in order to monitor oil level and temperature. Replacement Filter: Use replacement oil filter Part # 078358 Optional Filter Additions: 1. Duplex filter head with two filters. Desiccant filter with moisture absorbing capability can be added in series with the standard filter. Operating Instructions: 1. Observe the oil level gauge on the tank to ensure that oil is at the proper level.. Quickly jog both motors on and off to see if they are rotating in the correct directions (reference the rotation arrows on the motors). Correct the wiring if necessary. 3. Before starting the CO System, jog the pump motor four or more times to prime the pump. 4. Start the CO system and allow the oil to circulate. Be sure to monitor the oil level in the tank to ensure that the oil returns from the bearing housings. If air in the return lines becomes a problem, it may be necessary to bleed the air out of the lines by loosening a fitting close to where the problem is. 5. Visually check the system for leaks and correct if necessary. 6. Confirm that there is flow by using the flow meters. If there is no flow, check for leaks. 7. Adjust the oil flow rates to desired flow by adjusting the needle valves while observing the flow meters (See Figure ). To adjust the needle valves, first loosen the locknut, then use an Allen wrench to open and close the valves. Make sure that the pump pressure does not exceed 00 psi by watching the system pressure gauge. 8. Make sure there are no leaks of any kind. 9. Turn off the pump. 10. Check oil level in the tank. The oil level will go down as the oil fills the bearing lines. If the lines are lengthy, additional oil may be needed to restore the proper level. 11. Once the flows to the bearings are confirmed, the unit is ready for operation. 1. Monitor the pressure gauges and oil level closely the first few hours of operation. 13. To change the filter while the unit is running, pull and rotate the filter bypass valve 90. Maintenance: Periodically check the oil level in the bearing housings and the CO system to ensure proper operation. Most foreign material in a system flushes to the reservoir after the first few hours of operation. We recommend that you drain the tank, replace the fluid, change the filter, and clean the suction strainer after 3-5 hours of operation. After the initial cleaning, the strainer should be cleaned at a minimum of every 4000 hours of operation. More frequent cleaning is required if the system is used in a highly contaminated atmosphere such as a foundry or paper mill. After the initial replacement, the supply line filter should be replaced periodically as required by operating conditions. Check the visual clog indicator on the filter head between filter changes to ensure the filter is not being bypassed. Good preventative maintenance is the best insurance against unscheduled downtime. Unscheduled downtime is usually more expensive than preventive maintenance. 4

BEARING PRESSURE GUAGE SYSTEM PRESSURE GAUGE P1 1/" NPT ITEM QTY. DESCRIPTION 1 1 RESERVOIR 1 SKID 3 1 PUMP/MOTOR ADAPTER 4 1 GASKET 5 1 MOTOR COUPLING 6 1 COUPLING INSERT 7 1 PUMP COUPLING 8 1 GEAR PUMP 9 1 SUCTION STRAINER 10 1 CHECK VALVE 11 1 MANIFOLD 1 CHECK VALVE 13 4-WAY MANUAL VALVE 14 1 RELIEF VALVE 15 1 RELIEF VALVE 16 NEEDLE VALVE 17 1 FILTER HEAD 18 1 FILTER ELEMENT 19 1 HEAT EXCHANGER WITH/BALDOR MOTOR 0 PRESSURE GAUGE 1 FLOW METER 1/NPT 0.5-4.0 GPM 1 TOP PLATE 3 1 FILLER/BREATHER 4 1 BALDOR PUMP MOTOR 5 1 CHECK VALVE 4.1 4.68 APPROX. 4.11 APPROX. 19 0 0 4 19 1" NPT HALF COUPLING FOR FUTURE TANK HEATER 18 1.00 3.50 18.83 APPROX. 0.70 APPROX. 3.30 APPROX. 3.00 30.00 P 1/" NPT 1 1 11 16 16 5 15 14 1.00 3.50 4XØ.56 THRU 3 1" NPT HALF COUPLING FOR FUTURE LEVEL SWITCH 1" NPT RETURN PORTS (NO DOWN PIPES) FILTER BYPASS LOCK POSITION CARTRIDGE VALVE 13 5 17 COOL LUBE, GPM PUMP, 5 GAL TANK 0.5-4.0 GPM FLOW METERS 1/" PIPE 1/ HP 3/8" HOSE 7 PSI 10 1/" PIPE 5 GALLON RESERVOIR CUSTOMER: 1/" NPT 1/" NPT 1" NPT 1/" NPT DRAIN REPLACEMENT FILTER ELEMENT PART# 078358 1" NPT (HALF COUPLING) 1" NPT (NO DOWN PIPE) 1" NPT (NO DOWN PIPE) 0 A -6 SAE 16 B 1/3 HP 19 5 PSI 5 16-6 SAE SET @ 65 PSI 4 PSI FACTORY PRESET HIDDEN ADJ. 17 18 15 5 PSI 4 PSI 1 1 4 3 4 9 GPM 8 0 5 6 7 14 FACTORY PRESET P HIDDEN ADJ. T 1 1 3 1 13-8 SAE SET @ 150 PSI 1/" NPT ORDER NO. CUSTOMER ORDER NO. APPROVED BY DIST. DATE DR. BY CK. BY APPD. BY MCD DATE 06/06/13 DRAWING NO. AHM COOL LUBE 5

Baldor Electric Company MN308 P.O. Box 400, Fort Smith, AR 790-400 U.S.A., Ph: (1) 479.646.4711, Fax (1) 479.648.579, International Fax (1) 479.648.5895 Dodge Product Support 6040 Ponders Court, Greenville, SC 9615-4617 U.S.A., Ph: (1) 864.97.4800, Fax: (1) 864.81.433 *308-0913* www.baldor.com All Rights Reserved. Printed in USA. 9/13