PowerLift Maintenance Manual

Similar documents
Fire Curtain Hoist. (Part No P) Maintenance Manual IMPORTA T SAFETY I FORMATIO... 2 PRODUCT USE REQUIREME TS... 3 MAI TE A CE SCHEDULE...

PowerLift Installation Manual

PowerAssist. Installation Manual

J.R. Clancy, Inc. Phone: , Interstate Island Road Fax: Syracuse, New York

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market

Installation Instructions Table of Contents

EXTREME R MOTOR OWNER'S MANUAL

PowerLift w/ Pushbutton Controls Motorized Rigging Specification

Titan is a high-performance hoist for applications requiring large capacity, speed and/or long

HexPro Series Low Profile Wrenches

RUFNEX Series Low Profile Wrenches Operation and Maintenance Manual

Maintenance Information

OPERATIONS MANUAL LEVER CHAIN HOIST

RUFNEK 80 DESIGN SERIES 001 SERVICE MANUAL INTRODUCTION AND THEORY OF OPERATION...2 ASSEMBLY NUMBER EXPLANATION...2 WINCH MODEL CODES...

Low Profile Wrenches Operation and Maintenance Manual

SAFE AND SECURE EXTREME R MOTOR OWNER'S MANUAL MODEL PRO-FDG FOR TECHNICAL SUPPORT PLEASE CALL 1-(855) OPERATOR SERIAL#

IMPORTANT INSTRUCTIONS FOR OPERATION & MAINTENANCE OF

OPERATIONAL INSTRUCTION OVERVIEW MAINTENANCE CHECKLIST

Tooling Assistance Center

COOKSON OWNER'S MANUAL


PowerLine is a line shaft hoist, re-imagined to reduce size, weight, and cost. PowerLine hoists

450 Series Belt Driven Live Roller Curve Conveyor Installation and Maintenance Manual

Cybex Arc Trainer Owner s & Service Manual. 7 - Service

Stowe Cargo Management System

AL625 & AL625HD INSTALLATION & OWNER S MANUAL

OPERATIONAL INSTRUCTION OVERVIEW REQUIRED MAINTENANCE CHECK LIST

CHESTER HOIST AIR LOW HEADROOM CHAIN HOISTS AL-680 SECTION A


AUTO REWIND AIR HOSE REEL

NIS NAV AM (MY15 >) - Aluminium Tonneau Cover ATC0051 (silver) ATC0052 (Black) Installation Time: Approx. 60 Minutes WARNING!

PRODUCT INFORMATION BULLETIN #3365 DIGITAL MOTOR CONTROL PLATTER SYSTEMS For Serial Number and After

INSTALLATION & OWNER S MANUAL

Service Jacks. Operating Instructions & Parts Manual. Model Number. Capacity 4 Ton 4 Ton Air/ Manual 10 Ton 10 Ton Air/ Manual HW93657/ HW93660

INSTALLATION INSTRUCTIONS FOR DSP9600/9100 WHEEL BALANCER

Installation Instructions

IBT Series Square Drive Torque Wrenches

Installation Manual TWM Performance Short Shifter Cobalt SS/SC, SS/TC, HHR SS, Ion Redline and Saab 9-3

OPERATION AND MAINTENANCE MANUAL

Legacy Installation Manual

WARNING. Filter Service. Section Refer to the following pages for timing and procedures of fi lter element replacement.

OPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP40E P-L/R ELECTRIC WINCH.

A B C D E F. b.tools Required (supplied by others) 3/16" Drill Bit 3/8" Wrench Phillips Head Screwdriver

4. MAINTENANCE MANUAL

Instruction Sheet. 1/2 HP Portable Electric Pumps SAFETY FIRST. L2062 Rev. F 02/ IMPORTANT RECEIVING INSTRUCTIONS 2.

Installation Guide. Stowe Cargo Management System. Table of Contents

KWSL2000RM ! CAUTION!! READ AND UNDERSTAND THIS MANUAL BEFORE INSTALLATION AND OPERATION OF THIS PRODUCT. DO NOT RETURN THIS PRODUCT TO SELLER.

Fisher 657 Diaphragm Actuator Sizes and 87

INSTALLATION INSTRUCTIONS AMBASSADOR DRUM OVERHEAD SERIES 100 DUMBWAITER

s_enn Exterior Stainless Steel Shading System by Draper

Helios is an economical, automated hoist ideal for smaller venues and available in fixed

Operation and Maintenance Manual for BS and BH Hydraulic Torque Wrenches

On-A-Roll Lifter Instruction Manual for Standard Models Read Before Use!

SERIES A & AA ROLLER DOORS INSTALLATION GUIDE

Contents. Section 5: Adjustments Ball Detect Adjustment Transport Band Tension Adjustment

SERVICE MANUAL GENERAL ASSEMBLY...14

Assembly Instructions

Responsible Unit: Facilities Management

750 Series Press Conveyor Installation and Maintenance Manual

Florham Park, NJ USA Call (ASCO) for sales or service

Legacy Installation Manual

OPERATING INSTRUCTIONS. ASTRO HOIST Type E89-CTO

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

Q-04: Replace Brake Shoes/Adjust Brakes

Place these instructions in vehicle s glove box after installation is complete. Clean Tonneau Cover with a mild detergent and water solution.

Installation Guide Current Ford F-250 & Ford F-350 Super Duty. Product Code: 109 & 119

Installation and Service Manual

Rescue Hoist Ground Support Equipment Electric Version

A B C D E F. Tools Required (supplied by others)

SUNROOF - SERVICE INFORMATION ADJUSTMENTS

Quick Install Lift AL065 Installation Guide & Owners Manual

INSPECTION AND MAINTENANCE CHECKLIST

Installation Manual. For. Alumavator and Platinum. Vertical Installation. Elevator Boat Lifts

TROUBLESHOOTING SPECIAL TOOL ASSEMBLY AND ADJUSTMENT

Self-Recovery Winch WARNING. General Safety Precautions

Electric motor testing

OPERATOR S MANUAL R-Series Roust-a-Bout

MM Rear Coil-Over Kit - Bilstein Shocks (MMCO-3)

OPERATION SERVICE PARTS TUGIT2. Manually Operated Short Handle Lever Hoist A3140-XXX

INSTALL MANUAL. FOR ON LINE ORDERING- E Commerce Visit Our Website

RUFNEK 100 SERVICE MANUAL

THE ERGO-MATIC DRUM TRANSPORT POWER DRIVE SERIES MODEL PWPL 750 OWNERS MANUAL

Owner s Manual Gantry Cranes

MiTek Machinery Division. Service Bulletin

MODEL JH JACKSHAFT INDUSTRIAL DOOR OPERATOR INSTALLATION MANUAL. OPERATOR SPECIALTY COMPANY, INC. P.O. Box 128 Casnovia, MI 49318

PORTABLE Q-CATCH 86 SERIES CHUTE & ALLEY PRODUCT MANUAL arrowquip.com

Hydraulic Transmission Jacks

Package Contents Part A (3) I-Beam (1) Base (2) Other parts

MM IRS Coil-Over Kit - Bilstein/MM Shocks (MMCO-4)

Transmission Overhaul Procedures-Bench Service

Lincoln Hoist. Web Hoist Operating Manual. Lincoln Hoist

USER MANUAL KLIPER BMU. All persons operating this equipment must read and completely understand this manual.

AC Electric Capstan Owner s Manual Installation and Operating Instructions

Lbs Kgs Ft M

Tooling Assistance Center

INSTALLATION & OWNER S MANUAL

WARNING. Electric Recovery Winch. General Safety Precautions

Breezair TBA 550 Installation Manual

ANSI Z50.1. Safety Standards

TM-VE436MC.KIT. VE436MC Roll Grooving Tool WARNING EXPLODED VIEW OF SLIDE UPGRADE KIT SLIDE UPGRADE KIT INSTRUCTIONS

Transcription:

PowerLift Maintenance Manual IMPORTA T SAFETY I FORMATIO... 2 PRODUCT USE REQUIREME TS... 3 REPLACEME T PARTS... 3 RECOMME DED TOOLS... 4 I SPECTIO A D MAI TE A CE PROCEDURES... 5 BEAM CLAMPS AND MACHINERY FRAME... 5 BLOCKS AND WIRE ROPE... 6 GUIDE ROLLERS... 10 CABLE DRUM... 12 MOTOR AND GEAR REDUCER... 12 SECONDARY LOAD BRAKE -... 15 MANUALLY RELEASING THE HOIST BRAKES... 17 OUTPUT SHAFT PILLOW BLOCK... 18 DRIVE SHAFT BEARING... 18 CONTROLS ENCOSURE... 18 CIRCUIT PROTECTION AND CONTROLS ELECTRONICS... 19 LIMIT SWITCH SETTINGS... 21 WARNING SIGNS AND OPERATIONAL INSTRUCTIONS... 24 DECOMMISIO I G A D DISPOSAL... 25 HOW TO CO TACT JR CLA CY... 25 POWERLIFT MAI TE A CE A D I SPECTIO LOG... 26

PowerLift Maintenance Manual PAGE 2 IMPORTANT SAFETY INFORMATION The procedures in this manual are for use by qualified personnel only. If you are not qualified, contact the company that installed your system or the JR Clancy factory to find the nearest service provider. The PowerLift Inspection Checklist must be completely filled out and a copy returned to JR Clancy as proof of initial and subsequent annual inspections. Proof of inspection may be required to activate and maintain the warranty period for this product. An Identification Label is attached to the controls enclosure on each unit and it contains important model number, speed, and capacity information that is necessary for proper maintenance and use. All users must be aware of maintenance requirements and warned of the associated hazards. Keep a copy of this manual available along with all other product documentation for future reference. WARNING! Improper installation or maintenance can cause the machine to fail. Hoisting machines impose significant loads on the structure to which they are attached. You are responsible for verifying that an engineer or other qualified person has determined that this structure can withstand the loads. Equipment must be installed and maintained by qualified personnel. Annual inspection and maintenance of this product is required. Some applications may require more frequent inspection and service. Do not substitute or modify components provided with this equipment. Do not exceed the recommended working load of the hoist. It varies by model and is marked on the Identification Label on the hoist. Do not exceed 500 lbs [228 kg] on any one wire rope. Do not lift or support people or animals. Powerlifts can weigh up to 800 lbs [363 kg] each, plus the weight of any packaging. You must use proper lifting and handling equipment and safe work practices if they are to be moved. DANGER! Electrocution Hazard Remove power before opening electrical panels. Electrical equipment must be installed by qualified electricians. WARNING! Moving parts can cut or crush Keep body parts away from machinery in motion. Remove power source before working on machinery. Machines with moving parts within 106 inches (2.7m) vertically from the floor and less than 60 inches (1.5m) horizontally from a safety barrier must be fitted with machine covers. Guards must be in place during use.

PowerLift Maintenance Manual PAGE 3 PRODUCT USE REQUIREMENTS Installation of this equipment must comply with local building codes. Equipment must be installed according to manufacturer s drawings. PowerLift hoists must be inspected by qualified personnel every year, or more frequently depending on use and local, state, and federal laws. They also feature circuit breakers located within the controls enclosure or on the wiring raceways. Do not install these machines in locations that prohibit access to the machinery or controls. PowerLifts are designed for indoor use only in buildings with temperatures between 50º and 100º F (10º- 38ºC). Do not expose machines to rain or condensing moisture. The recommended working load and duty cycle of each machine is marked on the Identification Label on the machine. Do not exceed. The hoist machinery must be protected from oil, excessive dust and other contaminants. PowerLift machines are approximately 168 inches (430 cm) long, 11 inches (28 cm) wide, and 30 inches (79 cm) tall. Units weigh up to 800 lbs. (363 kg) each depending on the horsepower. MAINTENANCE SCHEDULE NOTICE: This machinery must be inspected and maintained annually by qualified personnel. Proof of inspection is required to maintain warranty status. Annual inspection and operator training is required to maintain the warranty period specified in your information binder, and proof of annual inspection and training may be required to obtain warranty service. Certain applications may demand more frequent inspections and maintenance. It is the responsibility of the user to monitor the machinery and adjust the maintenance schedule accordingly. Be aware of government regulations concerning the inspection of hoisting equipment. REPLACEMENT PARTS Lubricants and other components that can be procured locally are fully specified in the appropriate section of this manual. Use only the specified type and grade of materials. Contact your local JR Clancy dealer to obtain any parts not listed in this document.

PowerLift Maintenance Manual PAGE 4 RECOMMENDED TOOLS The following tools and materials may be used in this manual and during annual inspections and regular maintenance. This list is not exhaustive, but can be used as a starting point for selecting the proper tools. Appropriate Personal Protective Equipment 5/16 Hex Nutdriver 9/16, 3/4 Open-Ended Box Wrenches 3/4, 17mm Socket Wrenches Torque Wrench Wire Rope Termination Tools, as necessary Castrol Inc Pyroplex Red NLGI #2 High Temperature Grease Portable Grease Pump Feeler Gauge Set 5/32 Hex (Allen) Key (2) ea M10-1.5 x 70 mm hex cap screws

PowerLift Maintenance Manual PAGE 5 INSPECTION AND MAINTENANCE PROCEDURES MACHINE COVERS 1. Machines that have moving parts within reach of people must be fitted with covers. See the requirements in the Safety Information section of this manual. Covers may also be necessary to prevent contamination of the machinery from the operating environment. Install or replace covers if required. Contact JR Clancy if covers cannot be located on site. 2. Make sure that all fasteners are in place on the covers. See Figure 1. 1/2 standoff (Do not remove) 4. Slide this cover over the screws and overlapping the first cover segment. 5. Install this screw last and then tighten all of the other screws 1. Loosely install these 10 screws into the aluminum frame 2. Slide this cover over the screws until it is approx. 1/8 from the face of the brake 3. Tighten the 6 fasteners on the first cover segment Figure 1: Machine covers and proper sequence for installation BEAM CLAMPS AND MACHINERY FRAME 1. Make sure that two roll pins are in place on each end of the main beam. See Figure 2. 2. Standard clamps are for beam flanges up to 11 (279 mm) wide and 1 (25 mm) thick. Flanges must be at least 4 (10 cm) wide and 1/4 (6 mm) thick. Confirm that the clamps are appropriate for the structure supporting the hoist. 3. Make sure the clamp rods are tightened. Note that some bending of the threaded rod will be observed. This is normal. 4. Make sure the thrust plate is in place at each end of the beam with two nuts and/or jam nuts on each end, as seen if Figure 2.

PowerLift Maintenance Manual PAGE 6 5. Check to make sure there is no loose hardware or materials set on top of the Main Beam. Thrust Plate Nut and Jam nut Roll Pins Supporting structure Clamp Threaded rod Fixed Nut Turn to tighten the clamp Loose Nut Figure 2: PowerLift Mounting Clamp BLOCKS AND WIRE ROPE 1. Check the fleet angle on all sheaves and adjust to keep within 1.5 degrees. This is equivalent to 3 (76 mm) deviation in 10 ft (3 m). 2. Check the machine mounted loft blocks, if provided. Only one line is allowed to wrap more than 20 degrees around these sheaves. On the multi-line block that groove must be the third groove as marked on the block. See Figure 3. WARNING! Keep body parts away from the machinery in motion. 3. Remove the covers from the machine and observe the machine while running. Listen for the sound of cables that might be rubbing against the machine or other cables. Adjust blocks if necessary to eliminate any rubbing. 4. The nuts securing the machine-mounted blocks (if provided) to the hoist frame should be tightened to 18 ft-lb (24.4 Nm).

PowerLift Maintenance Manual PAGE 7 Tighten nuts to 18 ft-lbs These lines pass over but do not turn around the sheave Only this one line turns over the sheave The label indicates that only the third groove can be used to turn the line Figure 3: Detail of the multi-line beam mounted loft block 5. Observe the machine while stationary. Inspect the fleet angle of the cable with respect to the drum grooves as seen in Figure 4. Adjust the head block only if required using the following procedure. 5.1 Loosen but do not remove the locking nut on the axial head block constraint. See Figure 5. Hoist does not need to be unloaded as long as nuts remain fully engaged with the threaded fastener. WARNING! Improper adjustment of the constraint bolt can result in failure. Nut must remain fully threaded on the bolt at all times. 5.2. Adjust appropriate nut on axial head block constraint to correct the fleet angle according to Figure 4. NOTICE: Adjustment is limited by clearance at head block bracket. Stepped pin must not contact head block side plate. See Figure 6. WARNING! Do not over-tighten the constraint bolt. 5.3 Tighten the locking nut to 10 ft-lbs (13.5 Nm). 5.4 Test the operation of the machine. Cables entering the drum should not rub on the drum wraps or skip drum grooves.

PowerLift Maintenance Manual PAGE 8 Figure 4: Inspecting the fleet angle at the drum ADJUSTING NUT LOCKING NUT (TIGHTEN TO 10 FT-LBS) HEAD BLOCK AXIAL CONSTRAINT HEAD BLOCK TRANSVERSE CONSTRAINTS Figure 5: Head block constraints and adjustment nuts

PowerLift Maintenance Manual PAGE 9 Stepped Pin Head block side plate Clearance must be maintained Figure 6: Clearance at head block bracket 6. Make sure the wire rope is free of kinks, distortions and broken wires. PowerLift hoists are to be used with 3/16 diameter 7x19 Small Diameter Specialty Cord as defined by ASTM standard A1023. WARNING! Do not use wire ropes of different dimensional or structural characteristics. Replace wire ropes as necessary using the following procedure: 6.1 Move the load to a location where it can be secured using other rigging e. g. to another batten or to the building structure. 6.2 Rotate the drum so that the cable termination holes are visible. WARNING! Unplug the power before working on the machinery. 6.3 Secure the load being held by the hoist and remove the damaged cable. 6.4 Reeve the end of the new cable through the loft blocks and to the PowerLift. 6.5 Reeve the cable through the PowerLift head block being careful to stay below the sheave spacers. Swage a Nicopress stop sleeve onto the end of the cable and inspect the swage using the manufacturer s recommended gage. The cable must protrude from the stop sleeve after it is pressed, but no more than 1/16. 6.6 Wrap the cable around the drum enough times to match the number of standing wraps on the other lines of the hoist. Note that a minimum of three wraps must be maintained on the drum when the machine is at the lowest limit of travel. 6.6 Insert the swaged stop into the keyhole in the drum. Make sure the cable lays properly into the grooves on the drum. 6.7 Prior to terminating the lift lines, inspect the reeving and check the following: Cables must lie smoothly in the grooves of the drum. Double check that the cables are reeved properly through the blocks. 6.8. Cut the lines to length and terminate at the batten. Install a trim chain, turnbuckle, or other rated load leveling device on each lift line connection. Use terminating hardware that is properly rated for the load. Follow hardware manufacturers instructions carefully, e.g. use inspection gages for swaged sleeves.

PowerLift Maintenance Manual PAGE 10 Swaged sleeves are recommended for most installations. If wire rope clips are used, annual maintenance must include checking the clip nuts with a torque wrench. 7. Inspect any wire rope clips that may be used on the system and use a torque wrench to make sure the nuts are tightened according to the manufacturer s recommendations. 8. Visually inspect swaged (Nicopress or similar) terminations to look for signs of damage or overstress. At least 1/16 of the dead end of the cable should be protruding from the swaging sleeve. 9. Inspect all wire rope thimbles for deformation or other damage. 10. Inspect all other components used to attach the loads to the PowerLift lift lines. GUIDE ROLLERS 1. Make sure that there is a roller on every cable as shown in Figure 7. Note the position of the rollers in Figure 9. 2. Make sure roller arms are seated in the frame extrusion as seen in Figure 8. 3. Make sure the rollers are aligned with the cable as seen in Figure 9a and 9b. 4. Observe the surface of the rollers to look for abrasion or other damage. Note that the short-arm rollers are foam rubber and designed to conform to the cable and drums when stationary. If the foam roller is not round it is not necessarily damaged. 5. Observe the machine while operating and make sure that all rollers are turning. Head block on opposite side Two element rollers (Long and short arms) Up to seven places Figure 7: Position of cable keeper rollers

PowerLift Maintenance Manual PAGE 11 Short arm rollers on side opposite the head block Connecting spring Arms hook into slots in aluminum cap Long arm rollers on same side as the head block Figure 8: Position of long and short armed cable rollers Connecting spring Long arm roller on same side as head block Short arm roller on opposite side from head block Cable roller guide wheel rests in groove next to cable 3 standing wraps at all times Foam rollers rest on cable wrapped on drum A. View from head block side B. View from opposite side Figures 9a and 9b: Position of cable keeper rollers on the cable drum

PowerLift Maintenance Manual PAGE 12 CABLE DRUM Inspection Procedure 1. Examine the Drum Screw as seen in Figure 10. If the grease is contaminated with debris or excessive dust, wipe all of the contaminated grease off. Look for debris or other signs of damage to the nut inside the drum that runs on the screw. 2. Examine the exposed end of the drive shaft seen in Figure 10. If the grease is contaminated with debris or excessive dust, wipe all of the contaminated grease off. Check for scoring or wear of the aluminum shaft where the drum translates. 3. Lubricate the screw and the exposed drum with a thin even film of Castrol Inc Pyroplex Red NLGI #2 EP High Temperature Grease. Contact JR Clancy if you cannot locate a dealer with the specified grease in your area. 4. Observe the machine in operation through the entire range of motion to make sure the drum moves smoothly. 5. Check the drum tension rods to make sure that they are snug. Note that these are not fully tightened. The nuts should be tight enough to hold the drum segments securely together, but not so tight as to compress the plastic drum segments. NOTICE: Do not let end of drum hit end of screw before the limit switches are set Limit Switches Drum screw must be clean and well lubricated Exposed portion of drive shaft must be clean and well lubricated Figure 10: Drum Screw and exposed portion of Drive Shaft MOTOR AND GEAR REDUCER 1. Observe the machinery while raising the load, the brake on the electric motor should engage and stop the load before the secondary load brake engages. The load should stop quickly and without any back-winding. If the load backwinds, or if the load brake is engaged under these circumstances, the electric motor brake should be serviced. Contact the JR Clancy factory. 2. Check the gear reducer oil level. The gear reducer oil must be replaced every two years, or analyzed annually by a commercial laboratory to ensure that the oil properties and contamination levels are acceptable. Figure 13 shows the drain plug and fill levels for the machines based on mounting position. Any oil added to the reducer must match the manufacturer and type marked on the reducer label that is fastened directly onto the side of the gear case. See Figure 12. (For servomotors, the label is located on the back of the motor near the electrical junction box.) Note that

PowerLift Maintenance Manual PAGE 13 bearings inside the electric motor are lifetime lubricated and sealed and do not require periodic lubrication. 3. Inspect for any loose fasteners and retighten as necessary. 4. Use the chart in Figure 13 to locate the reducer breather valve and make sure that the protective rubber band is removed and discarded. See Figure 11. Rubber protective band Remove after installation Brass breather valve Figure 11: Reducer breather valve with protective band Motor Mounting Bracket Gear Reducer Reducer label Electric Motor with motor brake Output shaft pillow block Secondary load brake Zerk grease fitting Reducer label (on servomotors only) Figure 12: Powerlift motor and secondary load brake

PowerLift Maintenance Manual PAGE 14 Mounting Position Lubrication Ports Underhung Hoist Reducer Position M3 Upright Hoist Reducer Position M1 Wall Mounted Reducer Position M2 For units mounted at angles between horizontal and vertical, or for other positions not shown on this chart. Dimension d = 1 1/8 (28 mm) for all models CONTACT J R CLANCY FILL LEVEL BREATHER VALVE DRAIN PLUG Figure 13: Reducer Oil Levels

PowerLift Maintenance Manual PAGE 15 SECONDARY LOAD BRAKE The PowerLift is equipped with two brakes: a primary motor brake and an electrically operated secondary load brake. WARNING! The primary and secondary brakes must be properly adjusted or the load can fall if the hoist loses power. The secondary brake is adjusted at the JR Clancy factory, but the following procedure should be used to check the brake during inspection. See Figure 14. Aluminum Block Locking nuts Manual Release Bolt (Must be removed) Manual Release Bolt (Must be removed) Output shaft pillow block Brake control cable Figure 14: Brake face and bolt locations 1. Locate the three locking nuts on the face of the brake. Confirm that all three nuts are in place. 2. Locate the manual release bolt holes in the face of the brake. Confirm that the release bolts have been removed. If the brake is to be manually released for testing or maintenance see the procedure below. 3. Slide the protective rubber boot back to expose the air gap between the brake magnet and the armature assembly. The edge of the paper disk will be visible. See Figures 15A and 15B. 4. Check the brake for rust, dust, oil and other contaminants. Also look for heat marks or abnormal wear that may indicate that brake is improperly calibrated. If any of these symptoms are present, contact JR Clancy. 5. Check the gap between the paper disk and magnet at at least three locations around the brake. This gap should be set to 0.9 mm (0.035 inches). A mechanic s feeler gauge is recommended to inspect this gap.

PowerLift Maintenance Manual PAGE 16 6. Adjust the nuts on the face of the brake as necessary to maintain the proper clearance. The nuts must remain fully threaded on the studs at all times. 7. Replace the rubber boot around the brake when adjustment is complete. Protective Rubber Boot (Slide to left to expose gap between armature and magnet) Motor Mounting Bracket Secondary Load Brake Output Shaft Pillow Block Gearbox Locking Nuts Brake Control Cable See detail below Figure 15A: Side view of brake with rubber boot

PowerLift Maintenance Manual PAGE 17 Armature Paper disk Magnet Rubber boot (slide back for access) Air gap Figure 15B: Detail view of brake air gap MANUALLY RELEASING THE HOIST BRAKES It is possible to manually release the hoist brakes for testing or maintenance. WARNING! Releasing either brake can cause the load to fall. This procedure is for use by qualified personnel only. Secure the load and/or keep the area below the hoist clear when working on the hoist brakes. DANGER! Releasing both brakes will cause the load to fall. Remove or secure the load on the hoist before releasing both brakes. To release the motor brake: 1. Locate the threaded manual brake release handle. It is clipped to the fins of the motor or screwed into the reducer adjacent to the encoder. 2. Locate the matching threaded socket in the fan shroud of the motor and screw in the release handle. 3. Pull the release handle towards the back of the motor shroud until resistance increases sharply and then slightly further to release the brake. Note that only after the resistance increases sharply will the brake be released. Take care to not bend the release handle. 4. The brake will reengage when the handle is released. Replace the brake handle in its storage position on the motor fins or gear case after work is complete. To release the secondary brake 1. Locate the manual release bolt holes in the face of the brake. See Figure 14. 2. Insert but do not tighten an M10-1.5 x 70 mm hex bolt in each of the release bolt holes. Install them with the head of the bolt finger tight against the magnet housing. 3. Use a wrench to alternately and evenly tighten the two bolts about ½ turn at a time until the brake is released. WARNING! The manual release bolts must be removed to restore function of the secondary brake. Brake can be released for testing and maintenance only and must be reengaged prior to the hoist being returned to service.

PowerLift Maintenance Manual PAGE 18 4. Use a wrench to alternately and evenly loosen the two bolts until the brake is reengaged. OUTPUT SHAFT PILLOW BLOCK 1. Observe the output shaft pillow block bearing while the machine is operating. The bearing should operate without noise or vibration. See Figure 12. 2. Pump several shots of Castrol Inc Pyroplex Red NLGI #2 EP High Temperature Grease into the Zerk grease fitting on the bearing. Wipe away any grease that appears at the seals. Contact JR Clancy if you cannot locate a dealer with the specified grease in your area. DRIVE SHAFT BEARING 1. The drive shaft bearing should operate without noise or vibration. See Figure 16. 2. Locate the access holes in the aluminum spacer at the end of the drum and remove the rubber stoppers. Rotate the drum until the Zerk fitting for the internal bearing is visible through one of the access holes. See Figure 16. 3. Pump one shot of Castrol Inc Pyroplex Red NLGI #2 EP High Temperature Grease into the Zerk fitting on the bearing. Do not overfill. Contact JR Clancy if you cannot locate a dealer with the specified grease in your area. 4. Replace the rubber plugs into their holes. Be sure they fit snugly and will not fall out. If the plugs are damaged or missing, please contact JR Clancy for replacements. CONTROLS ENCOSURE DANGER! Electrocution hazard. Make sure power is off before opening controls enclosure. 1. Check that the power and controls plugs are latched into their receptacles. 2. Check for any missing fasteners in the enclosure. 3. Check to make sure that the strain relief clamps hold the power and control cables tightly in the plugs. 4. Make sure that any unused receptacles in the controls raceway are closed and latched. Raceways for the SceneControl system will need a shunt plug in each unused receptacle.

PowerLift Maintenance Manual PAGE 19 Drive Shaft Bearing Access Holes (2) Aluminum Spacer Access Hole Zerk Fitting Figure 16: Cutaway view of the aluminum drum spacer and internal bearing CIRCUIT PROTECTION AND CONTROLS ELECTRONICS DANGER! Electrocution hazard. Remove power source before opening electrical enclosures. Fixed speed machines Fixed speed machines are controlled through the use of a self-protected motor starter inside the controls enclosure. See Figure 17. This unit includes both overload sensors and a disconnect switch to shut off the motor power. The disconnect handle is turned to the twelve o clock position to turn the power on, and to nine o clock to turn the power off. This handle also functions as a fault indicator; when the sensors detect an overload, the power will automatically be disconnected and the handle will snap to the ten-thirty position. To reset a fault turn the disconnect handle to the reset position (seven o clock) and then back to the on position. The dial of the overload sensor is set at the factory to match the motor s Full Load Amperage (FLA). Do not adjust this setting unless directed by a JR Clancy factory representative. For all other adjustments to the control electronics contact the JR Clancy factory.

PowerLift Maintenance Manual PAGE 20 Figure 17: Fixed Speed Starter Module Variable speed machines Variable speed machines are controlled by an electronic drive module as well as being protected by a circuit breaker. In the event of an overload or over-current situation the sensors built into the drive module will trigger a drive fault that will shut down the drive. A fault condition will be reported to the user at the SceneControl console. The Fault Reset button on the main screen of the controller will reset the drive electronics. The circuit breaker for the drive module is located either inside the drive enclosure or mounted into the electrical raceway adjacent to the power plug, depending on your installation. The circuit breaker can be manually switched to the ON or OFF positions. In the event of a fault condition the breaker may switch to a TRIPPED position midway between ON and OFF. To reset the circuit breaker, move the switch to the OFF position and then back to the ON position. For all other adjustments to the control electronics contact the JR Clancy factory.

PowerLift Maintenance Manual PAGE 21 Identification Label Controls Enclosure Figure 18: Location of Identification Label. LIMIT SWITCH SETTINGS WARNING! Machinery and loads can collide with surroundings if limit switches are incorrectly adjusted. Operate machine at slow speed only when setting limits. Operator or observer must be in sight of all obstacles in the path of machine or load. Do not operate over the heads of people. CHECK THE SOFT LIMITS The PowerLift has upper and lower limits that are set from within the control system software ( soft limits). These limit the travel of the hoist to prevent damage to the machine and the surrounding structure, and to prevent the load from hitting an obstruction and causing an unsafe condition. 1. Position the operator or an observer so that both ends of the cable drum can be seen. See Figures 10 and 19. 2. Position the operator or an observer so that all parts of the lifted load can be seen. 3. Slowly run the hoist down until it reaches its soft lower limit, or approaches an obstruction. Confirm that the soft limit stops the hoist before the hoist reaches its hard lower limit (see below). If the soft limit requires adjustment, see the control system Operations and Maintenance Manual. 4. Slowly run the hoist up until it reaches its soft upper limit, or approaches an obstruction. Confirm that the soft limit stops the hoist before the hoist reaches its hard upper limit (see below). If the soft limit requires adjustment, see the control system Operations and Maintenance Manual.

PowerLift Maintenance Manual PAGE 22 CHECK THE HARD LIMITS The PowerLift features adjustable switches that limit normal travel of the hoist in both the up and down directions. The machine also features redundant overtravel switches, but unlike some other machines these are rigidly linked to the normal end of travel switches, so they are automatically set when the normal limits are set. The distance between the normal stopping position and the overtravel stopping position will vary with the speed of the unit, but will be no more than 6 inches (15 cm). This is not adjustable in the field. In order to leave enough room for an emergency stop of the lifted load at full speed, the switches must be set so that striking the normal, hard limit will stop the load with sufficient clearance from any obstruction. (See step 1 for clearance measurements.) NOTICE: The hoist should never strike the hard limit switches during normal operation. The limits set in the control system ( soft limits) should always activate first. To check the hard limits, a Maintenance Control Pendant should be used. The limit switch indicator lights on the Maintenance Control Pendant should be used to facilitate setting the limit switches. Please contact JR Clancy to obtain a control pendant in order to check the hard limits. See the PowerLift Installation Manual for more information. Limit switches must be set in the same way regardless of whether the hoist is controlled by a computerized control system or by push buttons. WARNING! Cable must have at least three complete wraps around the drum at all times to avoid failure of the termination. 1. Run the machine to its lower direct struck ( hard ) limit. (See Figure 19) For all PowerLift units, confirm that the machine stops the load at least 6 inches (15 cm) from any obstruction. WARNING! Load can hit surrounding structure and fall if clearance to obstruction is not maintained. 2. If adjustment of the limit switches is required use the following procedure: 2.1 Position the operator or an observer so that the limit switches and both ends of the cable drum can be seen. See Figures 10 and 19. 2.2 Position the operator or an observer so that all parts of the lifted load can be seen. 2.3 Start with the batten at the lower end of travel. NOTICE: Do not allow hoist drum to hit the machine frame. Observe during operation prior to setting limit switches. 2.4 Drive the hoist upward a few feet, and then down again until the switch stops the machine or until the hoisted load approaches an obstruction. NOTICE: For variable speed units striking the limit switch will actually cause the machine to stop and then drive backwards by approximately 4 inches. The stop position is considered to be where the load first stopped, before it drove backwards. 2.5 Observe the position of the load and the wraps remaining on the drum to decide if the limit switch stops the load in the desired position. NOTICE: Carefully observe the movement of the limit switches while adjusting. Do not drive limit switches into the machine frame or the drum limit striker plate. 2.6. If the switch requires adjustment, loosen the locking nut on the down limit adjustment bolt and use a hex (Allen) key to turn the end fitting to move the limit as indicated in Figure 20. Adjust the limit

PowerLift Maintenance Manual PAGE 23 switch until the switch activates against the striker plate. There is a soft audible click when the switch is activated. When using the Maintenance Control Pendant, the Lower Limit Indicator will also light up when the switch is activated (see Figure 11). Tighten the locking nut when adjustment is complete. 2.7 Repeat steps 2.4, 2.5, and 2.6 until the lower limit switch is set in the desired position. 2.8 Raise the load slowly until it reaches its upper limit switch, or until the hoisted load approaches an obstruction. 2.9 Observe the position of the load to decide if the limit switch stops the load in the desired position. Remember that for variable speed units, striking the limit switch will actually cause the machine to stop and then drive backwards by approximately 4 inches. The stop position is considered to be where the load first stopped, before it drove backwards. 2.10 If the upper limit switch requires adjustment, loosen the locking nut and use a hex (Allen) key to turn the end fitting to move the limit as indicated in Figure 20. Adjust the limit switch until the switch activates against the striker plate. Tighten the locking nuts when adjustment is complete. Direct Struck DOWN limit switches Limit striker plate Direct Struck UP limit switches Figure 19: Limit Switches and Striker Plate

PowerLift Maintenance Manual PAGE 24 Figure 20: Limit switch adjustment fittings 2.11 Drive the hoist down a few feet, and then up again until the switch stops the machine. 2.12 Repeat steps 2.9, 2.10, and 2.11 until the upper limit switch is set in the desired position. 2.13 Retighten the locking nuts that hold the adjusting bolts on both the lower and upper limits. 2.14. Test the overtravel switches in both directions by manually triggering the switch and confirming that the motor stops. Note that when an overtravel switch is activated, the machinery cannot be moved again until the switch is no longer pressed or the overtravel bypass switch in the control cabinet is activated. WARNING SIGNS AND OPERATIONAL INSTRUCTIONS In the event that operation, service, or training questions arise, the users must have contact information for qualified service personnel readily available. 1. Make sure that the JR Clancy Motorized Rigging safety sign (Part # 002-WINSIGN) is placed in a prominent location and that the service contact information is filled in. 2. Make sure that the capacity labels are in place on each batten, and that the labels match the capacity of the machines to which they are attached. 3. Interview the user and make sure that they have access to the Operation and Maintenance Manual. Also, a service log form is provided at the end of this manual. Locate this log and examine it. The following information should be recorded for each occasion of service: Date of service The provider of the service, with contact information. The machinery, i.e channel number, on which the service was performed. The work or inspection that was performed. NOTICE: Documentation of annual inspection is required to maintain the full warranty period of the hoist and may need to be provided upon request to obtain warranty service.

PowerLift Maintenance Manual PAGE 25 SERVICE LIGHT A service indicator light has been provided on the equipment to remind the users of the annual inspection and service requirement. Contact the JR Clancy factory or an authorized dealer if the service light is on. After service is complete the light timer must be reset by an authorized JR Clancy dealer. DECOMMISIONING AND DISPOSAL Remove machines if necessary using qualified personnel and safe rigging practices. Any modifications to the structure and wiring must be performed by qualified persons and conform to local codes. Do not defeat interlock switches or any other safety features of remaining machines or control system. Dispose of all materials according to local codes. HOW TO CONTACT JR CLANCY Contact the factory at any time with questions and comments concerning this product: JR Clancy Incorporated 7041 Interstate Island Road Syracuse, NY 13209 USA Telephone (315) 451-3440 www.jrclancy.com

PowerLift Maintenance Manual PAGE 26 POWERLIFT MAINTENANCE AND INSPECTION LOG Use this log to keep track of required annual inspections and any service performed on your motorized rigging equipment. Keep this in a binder along with other service information such as inspection reports. DATE SET # SERVICE PERFORMED SERVICE PROVIDER INITIALS

PowerLift Maintenance Manual PAGE 27 Attach Additional Pages As Necessary.