Design and Application of Mini- Roundabout in the U.S.

Similar documents
Restricted Crossing U-Turn (RCUT) Intersection Concept, Case Studies, and Design Guide ITE Midwest Annual Meeting June 30, 2015 Branson, MO

Field Testing, Marketing, and Crash Analyses of Mini-roundabouts

Traffic Capacity Models for Mini-roundabouts in the United States: Calibration of Driver Performance in Simulation

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

PUBLIC MEETING. Bear Creek Park Community Center. January 24, :30 pm to 7:30 pm

INTERSECTION CONTROL EVALUATION

Per Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS

TRAFFIC PARKING ANALYSIS

Harlem Avenue between 63 rd and 65 th

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation

Existing Conditions Belmont Circle Bourne, MA. Belmont Circle Improvements

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS

Plainfield, Indiana Speed Limit Study

FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK. Michelle Thomas

Welcome. Public Open House Schedule. Super 8 West Kelowna 1655 Westgate Rd, West Kelowna. West Kelowna. Wednesday, March 2, :00 p.m. 8:00 p.m.

Citizens Committee for Facilities

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

A Gap-Based Approach to the Left Turn Signal Warrant. Jeremy R. Chapman, PhD, PE, PTOE Senior Traffic Engineer American Structurepoint, Inc.

V. DEVELOPMENT OF CONCEPTS

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE

Highway 23 New London Access & Safety Assessment. Public Open House #2 October 3, :00 to 7:00 PM

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

City of Pacific Grove

ARE DIAMONDS LRT S BEST FRIEND? AT-GRADE LRT CROSSING AT A DIAMOND INTERCHANGE

APPENDIX E. Traffic Analysis Report

RTE. 1 at RTE. 637 & RTE. 639

AASHTO Policy on Geometric Design of Highways and Streets

Memorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

Safety Evaluation of Restricted Crossing U-Turn (RCUT or J-Turn) Projects in Louisiana

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

New Generation of Curve Warning Devices. Steven D. Hoernig, P.E. Traffic Operations Engineer MoDOT SE District

Appendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

HSIP FUNDING APPLICATION

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

Intersection Control Evaluation

Weaver Road Senior Housing Traffic Impact Analysis

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

2016 Congestion Report

RAILROAD PREEMPTION FORMS. Mark Johnson, P.E.

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009

YELM HWY AND MERIDIAN RD INTERSECTION IMPROVEMENTS PROJECT CONTEXT

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Purpose and Need Report

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

Clifton Corridor Transit Initiative. Briefing to Great Lakes Community February 11, 2016

Transit City Etobicoke - Finch West LRT

STH 60 Northern Reliever Route Feasibility Study Report

Downtown One Way Street Conversion Technical Feasibility Report

Landside Access Modernization Program (LAMP)

Metropolitan Freeway System 2013 Congestion Report

Driving Safely in Maryland

Alpine Highway to North County Boulevard Connector Study

RTID Travel Demand Modeling: Assumptions and Method of Analysis

VIADUCT LOCATION STUDY. October 19, 2009

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

TRAFFIC ENGINEERING STUDY Red Light Running Camera Evaluation Analysis WB US 290 Service Road at West Road Jersey Village, Texas

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3rd Street Tunnel at Massachusetts Avenue Exit

Application of Autonomous Driving Technology to Transit - Functional Capabilities for Safety and Capacity

Swift Green Line April 11, 2019

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 400 Block 14th Street SW

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

Freight Performance Measures Using Truck GPS Data and the Application of National Performance Measure Research Data Set (NPMRDS)

TRAFFIC IMPACT ANALYSIS

South Lexington Transportation Study Lexington, Massachusetts

State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report. City of Morro Bay. Prepared for: Prepared by:

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study

Turning Data into Action: Truck Tractor Crashes on Tribal Lands in Arizona,

Over-Dimensional Vehicle Restriction Study for US 129 in TN

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

One Harbor Point Residential

Florida Strategic Highway Safety Planning Florida Strategic Highway Safety Plan (SHSP) Update and Performance Overview

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

Study Area and Location District PSA Ward ANC Phase Description B Existing 600 Block New York Avenue Northeast Westbound

ANDERSON PROPERTY SITE ANALYSIS

2017 Annual Report Kansas Department of Transportation

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

Study Area and Location District PSA Ward ANC Phase Description C Proposed 2600 Block Lincoln Road Northeast Northbound

TRANSPORTATION REVIEW

TRAFFIC IMPACT ANALYSIS FOR. STERLING FIFTH STREET APARTMENTS PROJECT Davis, CA. Prepared For:

IMPROVEMENT CONCEPTS

Strategies to keep people and goods moving in and through Seattle

Interstate 80 Corridor Study

Capital Metro Downtown Multimodal Station

Corridor Management Committee. March 7, 2012

Understanding and Identifying Crashes on Curves for Safety Improvement Potential in Illinois

Transcription:

Design and Application of Mini- Roundabout in the U.S. ITE MID-COLONIAL DISTRICT & MID-ATLANTIC SECTION 2014 ANNUAL MEETING Session 2B: Roundabouts Not Another YORK in the Road 10:45 to 12:00, May 19, 2014 Wei Zhang, Ph.D., P.E. Program Manager, Intersection Safety R&D Federal Highway Administration 6300 Georgetown Pike, McLean, VA 22101 Tel: (202)493-3317 Email: wei.zhang@dot.gov

Outline Mini-roundabout concept Operating principles and design philosophy Status of FHWA Mini-roundabout Evaluation Selected Mini-Roundabout Projects Operational/Safety problems solved by mini-roundabout Q & A

Mini-roundabout A single lane modern roundabout with ICD of 50 ft - 90 ft. Distinct feature is a traversable central island (and other raised elements) to accommodate large vehicles.

These are not mini-roundabouts

Design Philosophy Design the elements for 97% of the vehicles that are known to use the intersection daily Make raised elements traversable by the 1-3% large vehicles that occasionally use the intersection Huge savings in R/W and construction costs when compared to regular sized modern roundabouts

Advantages of Mini-roundabout Fit into existing intersection ROW More than twice the capacity of AWSC High operating efficiency and safety Lower cost

FHWA Evaluation Status 12 sites completed as of December, 2013 Takoma Park, MD (2 sites, $25,000 total) Baltimore, MD (2 sites) Lake Stevens, WA (2 sites, $20,000 total) Snohomish Co., WA (1 site, $367,000) Bel Air, MD (1 site, $172,000 + $20,000 LED lights) Elmira, NY (2 sites, $97,500 total) Jefferson, GA (1 site, $63,353) Atlanta, GA (1 site) Recruiting 5-7 sites for evaluation

Mini-Roundabout at S Tollgate Rd and W Macphail Rd Bel Air, MD

Source: Jeff Stratmeyer, Harford CO, MD

Relocating This Pole May Cost $400,000 Source: Jeff Stratmeyer, Harford CO, MD

Law Department: No Source: Jeff Stratmeyer, Harford CO, MD

Source: Jeff Stratmeyer, Harford CO, MD

Completed Project Project cost: $175,000 (including 3 LED lights) Project duration: 3 weeks

Potentially Serving Capacity = 1328 VPH 15:30 11 106 47 60 224 23.9915MPH 83.25F Dry 15:45 15 111 55 58 239 22.4391MPH 81.5F Dry 16:00 16 97 54 79 246 22.6796MPH 81.5F Dry 16:15 13 143 46 75 277 23.3999MPH 80.25F Dry 16:30 15 119 46 86 266 22.3959MPH 79.25F Dry 16:45 14 152 44 91 301 21.3944MPH 78F Dry 17:00 16 123 51 88 278 22.4454MPH 77F Dry ***17:15 19 144 46 105 314 22.6773MPH 75.5F Dry 17:30 16 138 31 102 287 21.6894MPH 75F Dry 17:45 20 120 35 104 279 22.4774MPH 74F Dry 18:00 11 124 35 90 260 24.1475MPH 74F Dry 18:15 13 121 36 81 251 23.0521MPH 73F Dry 18:30 10 118 31 69 228 22.2511MPH 72F Dry 18:45 10 121 23 63 217 21.0658MPH 72F Dry Max 15-minute Counts 20 152 55 105 332 Potential Traffic Served: 1328 VPH

Results Reduced potential for serious accidents Before, 85% vehicles >= 38 mph and right angle conflicts 2009 3 accidents: 1 PDO, 1 minor injury, 1 incapacitating injury 2010 2 accidents: 1 PDO, 1 minor injury 2011 1 PDO After, 90% vehicles at <=15 mph and side swipe conflicts 2012 2 PDOs 2013 1 PDO Improved safety for pedestrians and bicyclists.

Mini-roundabout at SR 11 and SR 124 Jackson County, GA Problem: About 50 cars recurring queue on SR 11 SB

Time Range Volume Counts EB SB WB NB Total 0:00-1:00 16 11 18 0 45 1:00-2:00 14 4 13 0 31 2:00-3:00 5 3 8 3 19 3:00-4:00 5 5 14 0 24 4:00-5:00 27 11 34 4 76 5:00-6:00 59 30 83 12 183 6:00-7:00 190 103 202 27 521 7:00-8:00 375 381 407 48 1211 8:00-9:00 172 105 261 26 564 9:00-10:00 128 102 229 22 481 10:00-11:00 145 115 225 28 513 11:00-12:00 138 96 243 18 495 12:00-13:00 172 117 226 23 536 13:00-14:00 179 111 253 20 561 14:00-15:00 196 129 305 24 654 15:00-16:00 186 185 490 34 894 16:00-17:00 240 199 414 30 882 17:00-18:00 288 207 526 34 1054 18:00-19:00 223 160 391 40 813 19:00-20:00 117 81 199 23 418 20:00-21:00 95 91 182 32 399 21:00-22:00 62 41 112 8 222 22:00-23:00 31 16 81 3 130 23:00-0:00 23 17 47 1 88 Total 3082 2315 4959 454 10809 Potential Traffic Served 1. 358 x 4 = 1432 VPH 2. 384 x 4 = 1536 VPH 6:45 76 46 50 11 182 26 MPH 7:00 105 53 74 16 248 25 MPH 7:15 93 76 81 12 261 25 MPH 7:30 85 130 120 10 345 23 MPH 7:45 93 123 133 10 358 23 MPH 8:00 53 28 79 7 167 26 MPH 105 +130 +133 +16 =384

Frequency (%) AM Peak Traffic Bus left turn Truck movement Winder Hwy & Galilee Church Rd, Jefferson, GA (After_10/23/2013) Speed Frequency Distribution 40 EB 35 30 25 SB WB NB Total 20 15 10 5 0 0 10 20 30 40 50 60 70 80 Speed (mph)

Project Information Engineering: 4 days Construction: 9 days Work Completion: 7.5 weeks after identification of problem Cost: Curbing $03,510 Labor $19,490 Equipment $09,897 Material $40,474 Total $63,353 Results: recurring 50 cars queue no longer exist

After Before Safety Results Year Total Crashes # of Injury Crashes 2009 7 (6 rear end, 1 single vehicle) 2 2010 7 (6 rear end, 1 angle) 4 2011 3 (3 rear end) 2 2012 8 (6 rear end, 2 angle) 0 2013 7 (4 rear end, 3 angle) 0

2 mini-roundabouts at Frontier Village Shopping Center in Lake Stevens, WA

Lake Stevens Mini-Roundabout Sites Problems need to be addressed Recurring queues at T-intersection (PM peak) Queuing on Shopping Center NB made it hard for drivers to get in and out of shopping center Drivers observed running stop signs Businesses at the shopping center feared leaving

AWSC Intersections Year 2010 Mini-Roundabouts Year 2010 Year 2016 Year 2016

Before Results After Each mini took 2 days to construct, at about $10,000 each. Recurring congestion gone after minis opened to traffic. Traffic became smooth in and out of the shopping center U-Turn possibility at T-Intersection reduced traffic load at NB Shopping Ctr Rd. Parking lot full more often 10-15% sales increase at the SAFEWAY store Positive feedback from Fire Department. Only problem was with local Transit Company that has a policy of not allowing drivers to mount raised curb/surface.

Before and After Crashes Lake Stevens Mini-Roundabouts Period No. of months No. of crashes Crash per year Before 03/2007-03/2012 60 22 4.40 After 07/2012-12/2013 18 5 3.33 Period K Fatal A Incapacitating Injury Crash Severity B Nonincapacitating Injury C Possible Injury O No Injury U Unknown Before 0 0 0 5 16 1 22 After 0 0 0 2 3 0 5 Total

Before Period 39 th St and Canterbury Rd Baltimore, MD

After Period 39 th St and Canterbury Rd Baltimore, MD

Problems Solved by Mini-roundabouts Remove bottleneck at AWSC intersections Reduce major road approaching speed and provide more gaps to minor road traffic Deliver a solution that wouldn t be possible with regular sized roundabout. Improve intersection safety Improve access for pedestrians and bicyclists Revitalize shopping center

Questions? Wei Zhang, Ph.D., P.E. Program Manager FHWA Intersection Safety R&D 202-493-3317 wei.zhang@dot.gov