A1100 GUARDIAN OVERFILL PREVENTION SYSTEM

Similar documents
A1100 GUARDIAN OVERFILL PREVENTION VALVE (with Installation Kit)

A1100 GUARDIAN OVERFILL PREVENTION SYSTEM

INSTALLATION INSTRUCTIONS. Double Wall, Drain Valve, BSPT. Torque Wrench w/ 100 to 150 ft-lbs. Setting

Vapor Tight Overfill Prevention Valves

Specification Grade Contemporary Wall Mount/Technical Installation Data

Captivate Illuminated Mirror Light

INSTRUCTION BOOK FOR. Tensioned Dual Masking Electrol

INSTRUCTION BOOK FOR. Dual Masking Electrol

Model 1100 Turbine Flow Meter Repair Kits

AEROMOTIVE Part # Street Rod Fuel Pump System INSTALLATION INSTRUCTIONS

Defender Series. Overfill Prevention Valve. Automatic Shutoff for USTs. Installation, Operation and Maintenance Series

INSTALLATION INSTRUCTIONS LED RETROFIT ASSEMBLY (LRA) Rev F

AEROMOTIVE Part # Mustang 5.0L Fuel System Kit INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # Subaru STI Fuel Rail Kit INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # A2000 Fuel Pump Kit INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # Subaru Fuel Rails for Top Feed Injectors WRX & STI INSTALLATION INSTRUCTIONS

OPW Installation and Maintenance Instructions OPW Series Primary and Secondary Bucket Replacement Instructions

Pressurized oil drain for collection of used lubricants and anti-freeze.

AEROMOTIVE Part # /2 4.6L SOHC Ford Fuel Rail Kit INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # and F-Body Fuel System Kit INSTALLATION INSTRUCTIONS

INSTALLATION AND OPERATION MANUAL

Installation and Maintenance Instructions 44TA Liquid Level Float Switch

½ DODGE CUMMINS OEM BYPASS LIFT PUMP KIT Installation Instructions Part #

INSTALLATION INSTRUCTIONS LED Canopy Retrofit Kit

M Remote Mounting Kit

AEROMOTIVE Part # Ford 5.4L GT500 Shelby Mustang Fuel Rail Kit INSTALLATION INSTRUCTIONS

Installation Instructions

Dayton Parts, LLC P. O. Box 5795 Harrisburg, PA Support rear axle with jack stands or other suitable device, remove rear tires and wheels.

Installation Instructions

MOONRING 1.5 MOONRING 3

AEROMOTIVE Part # L Ford F L Ford Expedition L Ford F-250 Super Duty INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # Generic Fuel System Kit INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS MOONRING 1 LP1/MR1

Operating and Installation Instructions

Stainless Steel Air Motor Conversion Kits

AEROMOTIVE Part # Generic Fuel System Kit INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # Fuel System Prime Kit INSTALLATION INSTRUCTIONS

Safety, Installation and Operating Instructions Instructions importantes concernant la sécurité

# and # FAST Fuel System Kits

Retractor SM Installation Guide

AEROMOTIVE Part # C5 Corvette Fuel Rail Kit INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # / L SOHC Ford Fuel Rail Kit INSTALLATION INSTRUCTIONS

Stainless Steel Air Motor Conversion Kits

INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # C5 Corvette Fuel Rail / Regulator Kit INSTALLATION INSTRUCTIONS

IMPORTANT: SAFETY INSTRUCTIONS Important: Instructions de securité

AEROMOTIVE Part # & Generic Fuel System Kit INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Model 1100 Turbine Flow Meter

Please visit for the latest version of these installation instructions.

AEROMOTIVE Part # Generic Fuel System Kit INSTALLATION INSTRUCTIONS

CSD Series Current Devices Split Core

VW/AUDI MK7 VEHICLES

READ AND FOLLOW ALL SAFETY INSTRUCTIONS 1. DANGER RISK OF SHOCK DISCONNECT POWER BEFORE INSTALLATION

AEROMOTIVE Part # L Ford F L Ford Expedition L Ford F-250 Super Duty INSTALLATION INSTRUCTIONS

OSQ Series IMPORTANT SAFEGUARDS READ AND FOLLOW ALL SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE. LED Area Light TO INSTALL:

L DODGE CUMMINS MK-2 + BLK APPS Mount

Model For petroleum products and other fluids compatible with aluminum and buna-n seals.

INSTRUCTIONS PARTS LIST

Installation Instructions

In this kit there should be: 1 x Engine Case Cover (ECC0085) 2 x M6x28mm long button head bolts PLEASE READ THESE INSTRUCTIONS FULLY BEFORE STARTING

MODELS. 2 & 4 Low Profile Linears

Universal Hand Pump. Instructions D EN. - For transferring grease to Grease Jockey and G3 Systems - Part No Hand Operated - 35# Pump

M x Series Valve Linkage Kits

TANK MONITOR SYSTEMS DTM04 TANK MONITOR DTM08 TANK MONITOR DTM12 TANK MONITOR INSTALLATION AND OPERATION MANUAL

IMPORTANT: SAFETY INSTRUCTIONS Important: Instructions de securité

DODGE CUMMINS 24V ISB OEM BYPASS LIFT PUMP KIT Installation Instructions Part #

390 Airless Sprayer. Parts J EN. Models: , , , , , ,262024, , , , Hi-Boy.

BMK-30. Heavy-Duty By-Pass Filtration System Installation and Servicing Instructions

M Remote Mounting Kit

Tank Monitor. Instruction manual DTM01. Tank Monitor

Installation Instructions

Installation Instructions

RV-10 Center Arm Rest Console

MODELS SafeSite LED Linear, Class I Div V, 2 & 4 Versions

Palomino BATTERY CHARGERS. Installation and Operating Instructions. One Technology Place Caledonia, New York The Power of Excellence

15H882 Slider Bearing Kit

AEROMOTIVE Part # & Mustang 5.0L Stealth Fuel System Kit INSTALLATION INSTRUCTIONS

TECHNICAL SERVICE MANUAL

Installation Instructions

Pneumatic Cylinder 14 Bore X 22 Stroke Part No. R (Formerly P )

Continental Super Flow

Cable Cubby 1202 and 1402 Installation Guide

MODELS 2 & 4 Top Conduit Linears

Installation Instructions

Quadratec Delrin Door Hinge Pin Bushings for Jeep Wrangler JK 07- Current

INSTALLATION INSTRUCTIONS SUPERPLANE 2.5. Suspended. A nd Avenue, Unit 1 Oakland, CA P E W alwusa.

Cleaning System. Instructions/Parts A

HP190SL Series Slimline Radon Fans

DODGE CUMMINS MK-2 Micro-Kleen System

INSTALLATION & OPERATION MANUAL

Pump/Manifold Kits. Instructions F ENG. To convert E-Flo 4-Ball Piston Pumps to a different size lower. For professional use only.

LAL SERIES LED LUMINAIRE

STAINLESS STEEL FORGED FITTINGS 3000lb 304/304L & 316/316L Forged Stainless Steel Fittings Product Specifications

AEROMOTIVE Part # & ½ L DOHC Return Style Fuel System Kit INSTALLATION INSTRUCTIONS

IMPORTANT: SAFETY INSTRUCTIONS

Installation Instructions and Warranty Information

Pump Package Conversion Kits

Pneumatic Cylinder 14 Bore X 21 Stroke Part No. P Replaces Part No. P

Transcription:

A1100 GUARDIAN OVERFILL PREVENTION SYSTEM (with 493734S collar kit) Assembly and Installation Instructions (includes 566710S paper template) IMPORTANT: Read these instructions completely and carefully before attempting to install and operate this valve. Failure to do so may result in improper valve operation allowing for a potential storage tank overfill. An overfilled tank can create extremely hazardous fuel spills which may result in personal injury and property damage. For further information, please call our Customer Service Department at (252) 243-0150. IMPORTANT: Veuillez lire ces instructions attentivement avant d'installer et d'exploiter cette vanne. Ne pas le faire peut entraîner un fonctionnement incorrect de la vanne permettant un potentiel débordement de la citerne de stockage. Un réservoir trop plein peut créer des déversements de carburant extrêmement dangereuses qui peuvent entraîner des blessures et des dommages matériels. Pour plus d'informations, s'il vous plaît communiquer avec notre service à la clientèle au (252) 243-0150. TABLE OF CONTENTS Assembly 2-7 Tools 2 Packing List 2 Procedure 2 Installation 7 General Maintenance 8 Warranty 8 Note: All information, illustrations and specifications in this manual are based on the latest product information available. We reserve the right to make changes at any time without notice. CAUTION: Never disconnect the drop elbow from the tight-fill adapter when the A1100 has reached the positive shut-off level. At this point, the tank truck hose is still full and must not be disconnected until enough fuel has been removed from the underground storage tank to drain the hose. Premature disconnection will result in a hazardous spill and a potential for personal injury and property damage. ATTENTION: Ne jamais déconnecter le coude de baisse de l'adaptateur permet le remplissage étanche lorsque le A1100 a atteint le niveau d'arrêt positive. A ce point, le tuyau de camion-citerne est encore pleine et ne doit pas être débranché jusqu'à ce que suffisamment de carburant a été éliminée du réservoir de stockage souterrain pour vidanger le tuyau. Déconnexion prématurée entraîne un déversement dangereux et un risque de blessures et de dommages matériels.

WARNING: If the underground storage tank is equipped with a ball float vent valve, make sure it is not extended below the positive shut-off point of the A1100, or remove the ball float vent valve. ATTENTION: Si le réservoir de stockage souterrain est équipé d'un flotteur évent de balle vanne, assurez-vous qu'il n'est pas prolongée en dessous du point d'arrêt positive de le A1100, ou enlever le flotteur vanne de purge. ASSEMBLY Tools Needed 1. 3/32" drill bit 7. hammer 2. 13/64" drill bit 8. fine half round file 3. hand drill 9. heavy duty pop rivet gun 4. tape measure 10. masking tape 5. fine tooth hacksaw 11. marker 6. screwdriver Optional: Drilling fixture #566675, recommended WARNING: Do not use electrical devices near gasoline vapors, as it could result in fire or explosion. AVERTISSEMENT: Ne pas utiliser d'appareils électriques à proximité des vapeurs d'essence, car il pourrait provoquer un incendie ou une explosion. Packing List (included with A1100) (1) collar #566679 with O-ring #480049 and O-ring #569461 installed (4) pop rivets #564412 (1) counter sink indenter #564416 (1) hose clamp #564421 (1) Seal-All sealant #566726 (1) warning plate #564420 (1) bottom aluminum tube assembly with bushing #568189 attached (1) A1100 Overfill Prevention Valve with top tube and screw base attached TOP TUBE INSTALLATION PROCEDURE The A1100 Guardian can only be installed after the containment manhole has been installed. Step 1: If already in place, remove the existing 4 cap, adapter and drop tube assembly. Step 2: Find measurement A which is the distance from the top of the tank to the top of the 4 riser pipe as shown in Figure 1. If the tank has a manway, make sure to include the height of the manway when finding measurement A as shown in Figure 2, A = J + H. Consult your tank diagram to determine the proper H dimension. If this dimension cannot be found, use 6 as the H dimension (typical manway height is 5-7 ). 2

Figure 1 Riser Pipe With Spill Containment Manhole Figure 2 Riser Pipe Installed Inside Manway 3

Step 3: Find measurement B from the chart below. It is the distance from the maximum fluid height allowed to the inside top of the tank. Calculations are based on cylindrical tanks with flat ends. For exact dimensions, consult the tank gauge chart provided with your tank. Use the actual capacity of the tank for calculations. NFPA30 Guidelines limit tank fill to 95%. 95% Shut-off Tank Diameter B Dimension Feet Meters Inches MM 6.5 1.98 7.5" 190 7.0 2.13 8.0" 203 7.6 2.29 9.0" 229 8.0 2.44 9.5" 241 8.2 2.50 9.5" 241 8.5 2.59 10.0" 254 9.0 2.74 10.5" 267 9.5 2.90 11.0" 279 10.0 3.05 11.5" 292 12.0 3.66 14.0" 336 The A1100 Overfill Prevention Valve is not recommended for tanks under 6.5 in diameter. Measurement C, cut length Place tape measure here Step 4: To determine the top tube cut length, add A and B. Step 5: Place tape measure at the 95% fill mark on the valve and measure up the tube as shown. Mark and cut the tube at the C measurement length. Step 6: Wrap the paper drilling template (p/n 566710S, supplied) over the drop tube and tape in place. Line up cut-off line on template with the cut length C. 4 NOTE: The 566675 Drill Fixture is recommended to make this step more accurate and to reduce assembly time.

Step 7: Secure with the hose clamp (p/n 564421, supplied) as indicated on the template. Step 8: Drill four pilot holes 3/32 diameter through the drop tube as indicated on the template. Redrill holes to final size of 13/64 dia. Step 9: Cut tube to proper length using a fine tooth hacksaw. The hose clamp acts as a guide for a straight cut. Step 10: Remove clamp and template. File away cutting burrs from the cut edge and from the inside surface of the holes with a fine tooth file to prevent installation damage to the O-ring seal of the collar. IMPORTANT: Do not use a power saw or tubing cutter to cut the tube. IMPORTANT: Ne pas utiliser une scie électrique ou coupe-tube pour couper le tube. OPTIONAL DRILLING METHOD A special drilling fixture (p/n 566675) is available which eliminates the paper template, is more accurate, and reduces assembly time. CONNECT THE COLLAR TO THE DROP TUBE 569461 480049 Step 11: Apply a 1/2 inch bead of Seals-All Sealant around the 480049 o-ring, the outside area of the collar. Verify the o-ring is properly secured inside the machined groove. Do not apply sealant to the 569461 drop tube o-ring. Step 12: Slide the collar inside the top end of the drop tube and align the four holes. This will be a tight fit. If necessary, use a wood block across the adapter to tap into place. 5

Step 13: Use a sharp blow on the indentor tool (p/n 564416, supplied) to form the tube into each countersink on the collar. Step 14: Using only the factory supplied pop rivets, apply a good amount of the Seals-All Sealant around the base of each pop rivet before installing into each of the four holes. Using the pop rivet gun, permanently fasten the A1100 riser collar to the top of the drop tube. CONNECT THE A1100 TO THE LOWER DROP TUBE Step 15: Pipe dope or anti-seize should be be used on the male threads to prevent galling of the threads. The o-ring seals the connection. Step 16: Screw male threaded end of A1100 base into threaded end of drop tube. 6

Step 17: Tighten. The use of strap wrenches is recommended in order to prevent raising burrs on the aluminum parts. Step 18: Measure from top of riser pipe to the bottom inside of the tank, measurement D, Figure 1. Step 19: Tube length should be 6 maximum above tank bottom to determine overall length E (D - 6 = E). Mark tube to length E. Square cut the lower tube to length E. Optional: 45 degree cut - The shortest point should start at length E to maintain the 6 maximum clearance requirement at bottom of tank. E INSTALLATION OF COMPLETED ASSEMBLY INTO THE TANK Step 20: Turn the completed assembly upside down and shake vertically to remove any metal chips left from the drilling process. Position the completed assembly vertically over the riser pipe with the square cut down. Carefully lower the completed drop tube/valve assembly into the riser pipe until the collar rests on the riser pipe. Step 21: Use the hose clamp to clamp the warning plate (p/n 564420, supplied), onto the riser pipe below the threads. Make sure label is facing up. Step 22: Reinstall the tight fill adapter onto the riser and tighten. Do not use pipe dope on threads. The adapter seals on a gasket. Torque to 60-75 ft. lbs. 7

MAINTENANCE The A1100 Guardian is maintenance free. Periodic inspection of drop tube wear due to corrosion is suggested. Please leave these instructions with the owner/operator of the service station for future reference. WARRANTY Emco Wheaton Retail Corporation service station products are warranted to be free from defects in material and workmanship under normal use and service for a period of twelve (12) months from the date of manufacture. The warranty set forth herein shall be the exclusive warranty made by Emco Wheaton Retail Corporation and in lieu of all other warranties, expressed or implied, (whether written or oral), including but not limited to any implied warranty of merchantability or fitness for any particular purpose. Emco Wheaton Retail Corporation s liability under this warranty is limited to, at Emco Wheaton Retail Corporation s option, the repair or replacement of that part which proves to be defective within twelve (12) months of date of manufacture. Emco Wheaton Retail Corporation is not responsible for claims for damage due to improper installation or maintenance, corrosive fluids, or use of a product for a purpose other than that for which it was specifically designed. Emco Wheaton Retail Corporation shall have no liability or be required to fulfill any obligation under this warranty unless the original purchaser returns the claimed defective item to Emco Wheaton Retail Corporation for inspection to determine whether the claimed defect is covered by this warranty. Under no circumstances shall Emco Wheaton Retail Corporation be liable for any consequential, special or contingent damages or expenses or any other charges beyond the invoice value of the defective items. The remedies set forth herein shall be the exclusive remedies available to the user and are in lieu of all other remedies except for the remedies described below. If an Emco Wheaton Retail Corporation product fails within the warranty period, call the Customer Service Department at (800) 234-4394. Describe the problem and provide the product date stamp information to the customer service representative. The customer service representative will provide a product complaint number, if applicable. Ship the defective equipment PREPAID, to Emco Wheaton Retail Corporation for repair or replacement. Emco Wheaton Retail Corporation products should be used in compliance with applicable federal, state and local laws and regulations. Product selection should be based on physical specifications and limitations and compatibility with the environment and material to be handled. EMCO WHEATON RETAIL COR- PORATION MAKES NO WARRANTY OF FITNESS FOR A PARTICULAR USE. All illustrations and specifications in this catalog are based on the latest product information available at the time of publication. Emco Wheaton Retail Corporation reserves the right to make changes at any time in prices, materials, specifications and models and to discontinue models without notice or obligation. p/n 566709S Rev. S, 07/16