InvestSmart Business Energy Upgrades Custom Equipment Catalog 01/01/2017

Similar documents
InvestSmart Business Energy Upgrades Cool Roof and Window Film Equipment Catalog 01/01/2018

InvestSmart Business Energy Upgrades HVAC Equipment Catalog 01/01/2017

Premium Efficiency Motor Rebate Program (Retrofit Applications) Efficiency Requirements Page

The Rebate Program can change without notice. CPS Energy reserved the right to discontinue the program at any time.

PART 2 GUIDELINES. To be eligible to receive a financial incentive, the following conditions must be met:

Motors & Drives Rebate Application

Appendix G - Danvers Electric

JEA Distributed Generation Policy Effective April 1, 2018

OREGON SCHEDULE 115 COMMERCIAL AND INDUSTRIAL ENERGY EFFICIENCY RETROFIT INCENTIVES 20,000 SQUARE FEET OR LESS NO NEW SERVICE Page 1

Retro-commissioning for Peak Electric Demand Reduction in New York City. Kim Lenihan , ext.

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

Energy Savings and Incentives with PG&E. Chad Stout Account Manager

H 8270 SUBSTITUTE A ======== LC006082/SUB A ======== S T A T E O F R H O D E I S L A N D

Pepco & Delmarva Power. Commercial & Industrial Energy Savings Program Grocery and Convenience Stores October 11, 2012

Lighting Technologies

HVAC Rebates Rebate Application

Municipality Generator Interconnection Application Single Meter Application Part I

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California

Heber Light & Power Electric Service Rule No. 14 NET METERING SERVICE

M.P.S.C. No. 2 Electric Third Revised Sheet No. 65 (Rate Case) Cancels Second Revised Sheet No. 65

HydroGenerations PROGRAM HANDBOOK

2017 Commercial & Industrial Program K-12 Schools Program Rebate Application

HVAC Rebates Rebate Application

Energy Efficiency Program Overview

Electrical District No. 3 SOLAR Q & A

Lighting Technologies

Motor and Drive Efficiency

Contents. 04 Overview. 05 Residential Energy Efficiency Program. 07 Heating Ventilation and Air Conditioning (HVAC) Systems

Electric Vehicle Charging Station Incentives PROGRAM HANDBOOK

NET ENERGY METERING RIDER Rider NEM. Certain words, when used in this Rider NEM shall be understood to have the following meanings:

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-21 PRICE PLAN FOR RESIDENTIAL SUPER PEAK TIME-OF-USE SERVICE

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

Prescriptive Program Rebate Application

RIDER NM NET METERING

Incentive Catalog Lighting Effective: July 11, 2016

Incentive Catalog Lighting

MISSOURI SERVICE AREA

COMMERCIAL HVAC REBATES

Kicking off Commercial and Industrial Program

Prescriptive Program Rebate Application

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No.

2018 Program Manual CoolSaver

Prescriptive Rebate Program

Motor and Drive Efficiency Constant Speed Motor Controller Rebate Application

Lighting Retrofit Incentive Application for Business Customers

ELECTRIC SCHEDULE E-9 EXPERIMENTAL RESIDENTIAL TIME-OF-USE SERVICE FOR LOW EMISSION VEHICLE CUSTOMERS

TERRITORY: This rate schedule applies everywhere PG&E provides electric service. I

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

06/05/2018. COMMUNITY SOLAR OVERVIEW For Generation Owners and Subscribers

ELECTRIC SCHEDULE E-1 Sheet 1 RESIDENTIAL SERVICES

Lighting and Lighting Controls Energy Savings Opportunities Technical Training Series

SCHEDULE 62 COGENERATION AND SMALL POWER PRODUCTION SCHEDULE - IDAHO

Cooling Efficiency 2017 Cooling Equipment Rebate Application

Xcel Energy s Energy Efficiency Programs. Derek Shockley Trade Relations Manager Commercial and Industrial

Pepco & Delmarva Power. Commercial & Industrial Energy Savings Program Small Business Program October 3, 2012

2014 RENEWABLE ENERGY PHOTOVOLTAIC Fact Sheet

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

Revised Cal. P.U.C. Sheet No E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

Company name Date submitted. Billing address City State ZIP. Phone ( ) *

Net Metering Policy Framework. July 2015

Town of Cohasset Alternative Energy Committee: Current Initiatives to Reduce Energy Costs While Promoting Energy Efficiency and Sustainability

Lighting Retrofit Incentive Application for Business Customers

Revised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

Consumer Guidelines for Electric Power Generator Installation and Interconnection

RATE 765 RENEWABLE FEED-IN TARIFF

Lassen MUD PV BUYDOWN PROGRAM Photovoltaic Systems Guidelines

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

2018 Solar Home & Solar Share Home Program Manual

Merger of the generator interconnection processes of Valley Electric and the ISO;

Commercial & Industrial Retrofit 2017 Compressed Air Incentive

City Title. . Is System Owner interested in being contacted about energy efficiency opportunities at this site? Title. City. Site Contact.

COMMERCIAL FOOD SERVICE EQUIPMENT REBATE APPLICATION

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

2016 ANNUAL CONSERVATION REPORT

Florida Department of Revenue

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

Eligible Renewable Generation (ERG) Application INSTRUCTIONS

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

COMMERCIAL MOTORS & VARIABLE SPEED DRIVES REBATE APPLICATION

Prescriptive Program Rebate Application

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE

Prescriptive Lighting Rebate Application

EAU CLAIRE ENERGY COOPERATIVE FALL CREEK, WI Issue Date: 05/28/2014 Subject: New Distributed Generation Post May 28, 2014

STAFF REPORT ACTION REQUIRED

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

National Grid. Narragansett Electric Company INVESTIGATION AS TO THE PROPRIETY OF COMPLIANCE TARIFF CHANGES. 2 nd Amended Compliance Filing

Commercial and Industrial Energy Efficiency Rebate Program

Efficiency Works Business

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

ON-SITE ASSESSMENT REPORT. <Engineering Firm> Presented to: <Customer> <Presentation Date> Funding by: <Report Date>

Revised Cal. P.U.C. Sheet No E Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

TERMS AND CONDITIONS

Lighting Technologies

Prescriptive HVAC and Mechanical Equipment Application

COUNTY OF ROCKLAND Department of General Services Purchasing Division

24. SOLAR INCENTIVE PROGRAM II

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

Transcription:

2017 InvestSmart Business Energy Upgrades 01/01/2017

Table of Contents 1 Custom Measures...1-1 1.1 Custom Measures... 1-1 2 Sample Rebate Worksheet...1-4

1 Custom Measures This Equipment Catalog describes the eligibility requirements and rebate amounts for qualifying Custom measures under InvestSmart Business Energy Upgrades. It also includes instructions on how to complete the Rebate Application and information regarding any required additional documentation. InvestSmart provides rebates for many types of energy efficient technologies. Please read the following sections carefully to ensure that you purchase and install qualifying equipment. In order to be eligible for rebates through Business Energy Upgrades, all equipment must meet the following requirements: Equipment must be new and installed in a manner that meets or exceeds code regulations and adheres to industry standards. Equipment may be installed in either retrofit or new construction/major renovation applications, except where indicated in individual measures. Replaced equipment must be disposed of in accordance with local, state, or federal codes and regulations and cannot be re-installed elsewhere. Rebates will be capped at 50% net customer cost and a possible rebate buy-down to a simple payback of no less than 3.0 years. Rebates will be capped at $100,000 per customer per program year. Pre-qualification of eligible measures under Business Energy Upgrades is required for all Custom projects. Additional eligibility and submittal requirements for Custom technologies are outlined in this Equipment Catalog. Rebates for additional measures may be available. For more information about rebates, eligibility requirements, rebate levels, other JEA energy efficiency programs, or general inquiries, visit the InvestSmart website at jea.com/investsmart, email investsmart@jea.com, or contact the Customer Service Center at (888) 345-4609. 1.1 Custom Measures Measure Description: Custom measures are projects that apply to many end-uses to increase energy efficiency and reduce annual electrical use. The program does not explicitly specify eligible measures to provide program participants maximum flexibility in identifying potential projects. Participants may propose the inclusion of any measure that: Involves a capital expenditure for project(s) that have an energy savings component; Produces a verifiable reduction in annual electric energy consumption without creating an increase in summer peak demand usage Is installed in either a retrofit or new construction application Is cost-effective as determined by JEA s internal cost-benefit test(s) 1-1

Qualifying Measure Examples: Examples of eligible measures are listed below. Program participants are free to propose measures not included below, so long as the above requirements are met. HVAC upgrades (e.g. constant volume systems upgraded to variable air volume system) VFDs larger than 200 HP VFDs installed on chillers, pumps, air compressors, or non-hvac equipment Increased compressed air system efficiencies (e.g. installation of VFD s, added storage) Control applications (e.g. installation of a building energy management control system) Process improvements Induction lighting Heat Recovery Units JEA will review all measures for their eligibility and appropriateness to participate in Custom Business Energy Upgrades. JEA retains the right to determine, at their sole discretion, eligible measures and reject applications or request additional information as necessary. Exclusions: The following measures are excluded from consideration for Custom rebates: Any projects that are eligible under the Lighting or Standard Programs Retro-commissioning measures Projects without a capital purchase of new equipment Projects that receive a rebate through any other energy efficiency program offered by JEA Rely solely on changes in customer behavior Merely terminate existing processes, facilities, operations, or vacancies Relocate existing processes, facilities, or operations out of JEA s service territory Are required by local, state, or federal law; building or other codes, or are standard industry practice Produce an electric energy reduction through substitution of another energy source for electricity Generate electricity, including cogeneration or renewable energy generation Energy Conservation Measures that apply duty cycling technology in air conditioning or heating units Energy Conservation Measures are subject to provide 3 rd party lab results according to JEA s discretion to qualify for a rebate Projects that have a projected pay-back of less than three years. Items to submit with Custom Application: Energy savings calculations and explanations of the savings methodologies Lighting workbook not required for Induction lighting projects 1-2

Items to submit with Custom Installation Notice: Revised energy savings calculations and explanations of the changes to the original submittal (if applicable) Dated sales receipt or detailed invoice indicating the total project cost, differentiating the labor and material. (Please note: JEA reserves the right to cancel any project that has not submitted all required supporting documentation within 90 days of the receipt of the initial application.) Measure Rebate: The rebate amount for qualifying measures is listed in Table 1-1. The rebate may be capped at 50% of incremental cost, or a possible rebate buy down to no less than 3.0 year payback, whichever is less. Projects must also pass JEA s cost effectiveness tests. Measure Description Eligible Custom measures Rebate ($/unit) $0.05 / kwh Table 1-1: Rebate Amount for eligible Custom Measures 1-3

2 Sample Rebate Worksheet The following is an example for a VFD air compressor. Parameter Measure 1 Measure 2 Measure 3 Project type (Retrofit or New Construction) Retrofit Estimated installation date 2/1/13 Dealer/contractor name ACME Energy efficiency measure (type and description) Replace an existing 20HP air compressor with a new 20 HP VFD compressor. Estimated baseline usage (kwh/yr) 250,000 Estimated post-retrofit usage (kwh/yr) Estimated savings (kwh/yr) Estimated annual operating hours Estimated Project Incremental costs ($) Estimated rebate ($) 200,000 50,000 8760 $10,000 $2,500 The annual operation hours of the equipment being replaced The cost related to this project: equipment, labor, installation $0.05 x Estimated Savings Or 50% of Incremental cost whichever is lesser **Be sure to include a copy of the invoice indicating the total project cost (differentiating the labor and material)** To locate equipment catalog: -www.jea.com/investsmart -Select Custom Business Energy Upgrades -Select 1-4