Intents Separate Rolling Straightedge from Laser Profiler Create Ride Quality (Smoothness) Incentive/Disincentive Specification Based on 6 years of project data Use International Roughness Index (IRI)
International Roughness Index (IRI) Vertical movement per length traveled Measured in inches per mile Lower is Smoother IRI data obtained by Laser Profiler Pilot projects use SMO laser profiler vans Incentive/Disincentive $ based on IRI data Pay for Smoothness / Penalize Roughness
Incentive/Disincentive IRI Ranges IRI Pay Result 30-42 +$20 per IRI point per 0.1 mile LOT 43-55 Full Pay 56-95 -$ 20 per IRI point per 0.1 mile LOT >95 Remove & Replace*
Incentive / Disincentive Table 330-5
Lot Count IRI Data and Pay Range Graph 1100 1000 900 800 700 600 500 400 300 By LOT - FL Interstate FC-5 RA data - LOTs w/ AADT 150,000 Full Pay Zone IRI = 43-55, Net Pay Result = +$33,528 Incentive zone: IRI 42 10,242 LOTs 36% of all LOTs $1,218,057 Full pay zone: 43 IRI 55 11,264 LOTs 40% of all LOTs Disincentive zone: 56 IRI 95 6,634 LOTs 23% of all LOTs -$1,184,529 Represents all RA data collected with AADT 150,000 (28,302 LOTs) between 1 Jan 2005-31 Dec 2010. Top 10% IRI 35 Top 20% IRI 38 Top 30% IRI 41 Top 40% IRI 44 Top 50% IRI 47 Bottom 50% IRI 47 Bottom 40% IRI 50 Bottom 30% IRI 53 Bottom 20% IRI 57 Bottom 10% IRI 64 200 100 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 IRI R&R zone: IRI > 95 162 LOTs 0.6% of all LOTs
Project Pay Incentive/Disincentive Maximum & Minimum I/D limits established to protect Contractors & Department Max: 105% pay Min: 80% pay Project Consistency Bonus If all LOT s 55 (per FC-5 bid price) (per FC-5 bid price) Project will receive an additional 3% incentive Based on FC-5 bid price & tonnage placed
Areas Unsuitable for Laser Profiler Testing Use RSE or Manual (Rigid) Straightedge per 330 Specs R&R or Pay Reductions per current Specs
Last Structural Lift SMO will collect IRI data on Last Structural Lift Contractor Request Let s contractor know where they stand prior to paving friction course Contractor make more informed decisions on questionable pavement
Pilot Project Details Pilot projects 18 Projects completed 11 Projects received consistency bonus 3 Total incentive paid $464,819 Total Pilot project miles tested 356 Incentive paid per lane mile $1,304 No LOT s >95 No Removal and Replacement
Pilot Project List # DISTRICT FIN DESCRIPTION Lane Miles Avg IRI Min IRI Max IRI Dollars INC/DIS per lane mile $ $ 51 $ $ 299 $ $ 817 1 TP 424792-1-52-01 Suncoast Parkway, Pasco Co (Hillsborough Co Line SR 52 (MP17-27) 44.3 48 30 88 2,272 2 TP 424792-4-52-01 Suncoast Parkway, Pasco Co (SR 52 Hernando Co Line) (MP27-37) 34.8 44 32 76 10,414 3 TP 427324-1-52-01 Suncoast Parkway, Hernando Co CR 578 to SR 50 (MP 37-46) 28.7 40 28 71 23,453 4 TP 427324-4-52-01 Suncoast Parkway, Hernando Co Sr 50 to US98 (MP 46-55) 5 TP 429025-1-52-01 Suncoast Pkwy from VanDyke Rd. to Pasco Co (MP 14.0-17.2) 6 1 413041-2-52-01 I-75 from SR 78 to Charlotte Co Line (Lee County) 35.9 38 28 61 35,480 $ $ 988 7 2 426987-1-52-01 I-10 in Madison County from E of SR 53 to Suwannee County line 36.7 39 30 70 $ 35,491 $ 967 8 2 426986-1-52-01 I-10 from East of US 221 to SR 14 26.9 35 23 58 $ 43,863 $ 1,631 9 2 426985-1-52-01 I-10 from East Of US 221 to SR 14 22.4 37 29 50 $ 50,460 $ 2,253 10 2 426983-1-52-01 I-295 (9A) Duval County 24.6 41 27 66 $ 19,688 $ 800 11 2 424631-1-52-01 I-75 (SR93) from SR 6 to GEORGIA S/L 57.5 32 23 59 $ 118,880 $ 2,067 12 3 428938-1-52-01 I-10 from West of SR 79 to Washington Co Line, LENGTH = 5.632 18.4 34 27 55 $ 51,903 $ 2,821 13 3 428939-1-52-01 I-10 from E of SR 10 (US90) to Jefferson Co Line, LENGTH = 6.557 mi 26.2 31 24 50 $ 72,914 $ 2,783 14 3 430908-1-52-01 I-10 from Okaloosa Co Line to E of SR 83 (US 331), LENGTH = 20.150 15 4 421707-4-52-01 I-75 from S of Mirimar Pkwy Intg to S of Sheridan St. (MP 1.08-4.645) 16 5 429079-1-52-01 I-4 from Osceola Co Line to East Of Sr 536 17 5 429080-1-52-01 I-4 from West of EE Williamson Overpass to West Of Lake Mary Blvd 18 5 430643-1-52-01 I-75 from N of Sr 500/US27 Intchg to Alachua Co Line 356.4 Total $ 464,819
Lot Count IRI Data and Pay Range Graph 1100 1000 900 800 700 600 500 400 300 By LOT - FL Interstate FC-5 RA data - LOTs w/ AADT 150,000 Full Pay Zone IRI = 43-55, Net Pay Result = +$33,528 Incentive zone: IRI 42 10,242 LOTs 36% of all LOTs $1,218,057 Full pay zone: 43 IRI 55 11,264 LOTs 40% of all LOTs Disincentive zone: 56 IRI 95 6,634 LOTs 23% of all LOTs -$1,184,529 Represents all RA data collected with AADT 150,000 (28,302 LOTs) between 1 Jan 2005-31 Dec 2010. Top 10% IRI 35 Top 20% IRI 38 Top 30% IRI 41 Top 40% IRI 44 Top 50% IRI 47 Bottom 50% IRI 47 Bottom 40% IRI 50 Bottom 30% IRI 53 Bottom 20% IRI 57 Bottom 10% IRI 64 200 100 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 IRI R&R zone: IRI > 95 162 LOTs 0.6% of all LOTs
% LOT Count Summary Pilot Project Performance (IRI) 8% 7% Incentive Zone IRI 42 Full Pay 43 IRI 55 Ride Acceptance (Lot) IRIs Disincentive 56 IRI 95 R&R Zone IRI>95 6% 5% 4% Median 46 RA Data Interstate FC-5 LOTs (28,301) with AADT < 150,000 and accepted between Jan 2005 to Dec 2010 Interstates: 28,301 Lots 3% 2% 1% 0% 10 20 30 40 50 60 70 80 90 100 110 120 130 140 IRI (inch/mile)
% LOT Count Summary Pilot Project Performance (IRI) 8% 7% Incentive Zone IRI 42 Full Pay 43 IRI 55 Ride Acceptance (Lot) IRIs Disincentive 56 IRI 95 R&R Zone IRI>95 6% Median 37 5% 4% 3% Median 46 RA Data Interstate FC-5 LOTs (28,301) with AADT < 150,000 and accepted between Jan 2005 to Dec 2010 Interstates: 28,301 Lots 11 Dev330SM Pilot Projects: 3,560 Lots 2% 1% -9 0% 10 20 30 40 50 60 70 80 90 100 110 120 130 140 IRI (inch/mile)
Pilot Projects
Pilot Projects Locations 7 8 10 9 4 6 5 LOCATION PROJECT FIN MILEPOST ROADWAY COUNTY 1 424792-1-52-01 0 to 11.066 Suncoast Pkwy. (SR589) Pasco 2 424792-4-52-01 11.099 to 19.866 Suncoast Pkwy. (SR589) Pasco 3 427324-1-52-01 0.036 to 7.212 Suncoast Pkwy. (SR589) Hernando 4 426987-1-52-01 23.686 to 32.860 I-10 (SR8) Madison 5 426983-1-52-01 22.500 to 28.654 I-295 (SR9A) Duval 6 424631-1-52-01 19.048 to 28.633 I-75 (SR93) Hamilton 7 428938-1-52-01 16.682 to 21.276 I-10 (SR8) Holmes 8 428939-1-52-01 15.643 to 22.200 I-10 (SR8) Leon 9 426986-1-52-01 16.969 to 23.669 I-10 (SR8) Madison 10 426985-1-52-01 11.378 to 16.969 I-10 (SR8) Madison 11 413041-2-5201 28.147 to 34.138 I-75 (SR93) Lee 3 2 1 11
% LOT Count Summary Pilot Project Performance (IRI) 8% 7% Incentive Zone IRI 42 Full Pay 43 IRI 55 Ride Acceptance (Lot) IRIs Disincentive 56 IRI 95 R&R Zone IRI>95 6% 5% 4% Median 46 RA Data Interstate FC-5 LOTs (28,301) with AADT < 150,000 and accepted between Jan 2005 to Dec 2010 Interstates: 28,301 Lots 3% 2% 1% 0% 10 20 30 40 50 60 70 80 90 100 110 120 130 140 IRI (inch/mile)
% LOT Count Summary Pilot Project Performance (IRI) 8% 7% Incentive Zone IRI 42 Full Pay 43 IRI 55 Ride Acceptance (Lot) IRIs Disincentive 56 IRI 95 R&R Zone IRI>95 6% Median 37 5% 4% 3% Median 46 RA Data Interstate FC-5 LOTs (28,301) with AADT < 150,000 and accepted between Jan 2005 to Dec 2010 Interstates: 28,301 Lots 11 Dev330SM Pilot Projects: 3,560 Lots 2% 1% -9 0% 10 20 30 40 50 60 70 80 90 100 110 120 130 140 IRI (inch/mile)
% LOT Count Summary Pilot Project Comparison (IRI) 8% Lot IRIs Obtained from 11 Pilot Projects 7% Incentive Zone IRI 42 Full Pay 43 IRI 55 Disincentive 56 IRI 95 R&R Zone IRI>95 6% 5% FC-5 IRI Average: 38 Median: 37 Std.:7.71 3,560 FC-5 Lots IRI Incentive Paid: $395,116 Consistency Incentive Paid: $69,704 Total Incentive Paid: $464,819 4% 3% 2% Structural IRI Average: 50 Median: 48 Std.: 12.27 Preconstruction IRI Average: 62 Median: 57 Std.: 17.93 1% 0% 10 20 30 40 50 60 70 80 90 100 110 120 130 140 IRI (inch/mile)
Individual Project Comparisons of IRI Consistency Bonus Highest Incentive Limestone Structural Assessment Friction Course
Consistency Bonus 3 projects met consistency (< 55 IRI) 4 projects missed consistency by 2 LOTs or less
Average IRI (inch/mile) I-10 Leon County (MP 15.643-22.200) Average IRIs 100 IRI Preconstruction IRI Structural IRI FC-5 80 60 40 50 53 55 55 53 44 40 40 41 41 34 30 32 31 32 20 0 R1 R2 L1 L2 All Lanes 264 FC-5 Lots IRI Incentive Paid: $ 45,572 Consistency Incentive Paid: $27,343 Total: $72,914 Friction Mean IRI = 31, Range (24-55) Structural to Friction (+9) Lowest Mean IRI of all the pilots
IRI (inch/mile) I-10 Leon County (MP 15.643-22.200) 100 I-10 (SR-8) R1 (MP: 15.643 to 22.200) 90 80 70 60 50 40 Average: 50 Average: 40 Average: 34 30 20 10 IRI Preconstruction IRI Structural IRI FC-5 Remove/Replace Trahshold 15 16 17 18 19 20 21 22 Mile Post
Average IRI (inch/mile) I-10 Holmes County (MP 16.682-21.276) Average IRIs 100 IRI Preconstruction IRI Structural IRI FC-5 80 72 76 64 60 53 55 55 51 52 53 53 40 34 34 36 32 34 20 0 R1 R2 L1 L2 All Lanes 180 FC-5 Lots IRI Incentive Paid: $31,881 Consistency Incentive Paid: $20,021 Total: $51,902 Friction Mean IRI = 34, Range (27-55) Structural to Friction (+19)
IRI (inch/mile) I-10 Holmes County (MP 16.682-21.276) 100 I-10 (SR-8) R1 (Milepost: 16.682 to 21.276) 90 80 70 60 50 40 Average: 53 Average: 55 Average: 34 30 20 10 0 IRI Preconstruction IRI Structural IRI FC-5 Remove/Replace Trahshold 16 17 18 19 20 21 Mile Post
Average IRI (inch/mile) Frequency (%) I-10 Madison County (MP 11.378-16.969) 13% 12% 11% 10% 9% 8% 7% 6% 5% 4% 3% 2% 1% 0% Incentive Zone IRI 42 I-10 (Financial Project Number: 426985-1-52-01) Full Pay 43 IRI 55 FC-5 IRI Average: 37 Median: 37 Disincentive 56 IRI 95 R&R Zone IRI>95 225 FC-5 Lots IRI Incentive Paid: $28,120 Consistency Incentive Paid: $22,340 Total: $50,460 Friction Mean IRI = 37, Range (29-50) Structural to Friction (N/A) 20 30 40 50 60 70 80 90 100 110 IRI (inch/mile) 100 80 60 40 20 0 Individual Lane IRI FC-5 38 37 39 34 37 R1 R2 L1 L2 All Lanes
Highest Incentive
Average IRI (inch/mile) I-75 Hamilton County (MP 19.048-28.633) Average IRIs 100 IRI Preconstruction IRI Structural IRI FC-5 80 70 60 52 55 60 51 53 57 40 37 39 40 36 38 30 30 31 30 40 38 34 35 32 20 0 R1 R2 R3 L1 L2 L3 All Lanes 576 FC-5 Lots 57.5 miles IRI Incentive Paid: $118,880 Friction Mean IRI = 32, Range (23-59) Structural to Friction (+6) 1 LOT (59) prevented consistency bonus
IRI (inch/mile) I-75 Hamilton County (MP 19.048-28.633) 90 I-75 (SR-93) R1 (Milepost: 19.048 to 28.633) 80 70 60 50 40 30 Average: 52 Average: 37 Average: 30 20 10 IRI Preconstruction IRI Structural IRI Final Remove/Replace Trahshold 19 20 21 22 23 24 25 26 27 28 29 Mile Post
Limestone Project
Average IRI (inch/mile) I-75 Lee County (MP 28.147-34.138) Average IRIs 100 IRI Preconstruction IRI Structural IRI FC-5 80 68 81 65 60 40 55 35 56 48 48 43 37 52 38 37 49 39 38 20 0 R1 R2 R3 L1 L2 L3 All Lanes 333 FC-5 Lots IRI Incentive Paid: $ 35,480 Friction Mean IRI = 38 Range (21-68) Structural to Friction (+11)
IRI (inch/mile) I-75 Lee County (MP 28.147-34.138) 120 I-75 (SR-93) R2 (MP: 28.147 to 34.138) 110 100 90 80 70 60 50 40 30 Average: 68 Average: 48 Average: 37 20 10 IRI Preconstruction IRI Structural IRI Final Remove/Replace Trahshold 28 29 30 31 32 33 34 Mile Post
Pre-Construction to Friction Effects of smoothness Preconstruction Structural Friction
IRI (inch/mile) I-295 (MP 22.500-28.654), Duval 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 248 FC-5 Lots IRI Incentive Paid: $19,688 I-295 (SR-9A) R1 (Milepost: 22.500 to 28.654) IRI Preconstruction IRI Structural IRI Final Remove/Replace Trahshold 23 24 25 26 27 28 29 Mile Post Average: 89 Average: 57 Average: 42
IRI (inch/mile) Suncoast Pkwy. (MP 0.036-7.212), Hernando 120 110 100 90 80 Suncoast Pkwy. (SR-589) R1 (Milepost: 0.036 to 7.212) 288 FC-5 Lots IRI Incentive Paid: $23,453 Average: 73 70 60 50 40 30 20 10 IRI Preconstruction IRI Structural IRI Final Remove/Replace Trahshold 0 1 2 3 4 5 6 7 Mile Post Average: 55 Average: 39
IRI (inch/mile) I-10 Madison County (MP 23.686-32.860) 110 100 90 I-10 (SR-8) R1 (Milepost: 23.686 to 32.860) 368 FC-5 Lots IRI Incentive Paid: $35,491 1 LOT exceeded 55 IRI 80 70 60 50 Average: 52 Average: 47 Average: 39 40 30 20 IRI Preconstruction IRI Structural IRI FC-5 Remove/Replace Trahshold 23 24 25 26 27 28 29 30 31 32 33 Mile Post
Average IRI Effect of MTD Usage 80 IRI Comparison between Pilot Projects Average Acceptance IRI (2005 to 2010) Structural IRI Acceptance (FC-5) IRI 60 40 49 20 0 1 2 3 4 5 6 7 8 9 10 11 Project ID Project ID Total Incentive Paid Number of Lots MTD Usage Avg. FC-5 IRI Avg. Structural IRI IRI Improvement 1 $2,272 434 N/A 48 62 14 2 $10,414 350 No 44 56 12 3 $23,453 288 No 40 59 19 4 $35,491 368 Partial 39 48 9 5 $19,688 248 Yes 41 59 18 6 $118,880 576 Yes 32 38 6 7 $51,903 180 Yes 34 53 19 8 $72,914 264 Yes 32 41 10 9 $43,863 242 Yes 35 N/A N/A 10 $50,460 225 Yes 37 N/A N/A 11 $35,480 333 Yes 38 49 11