Smoothness Specification Update

Similar documents
Asphalt Pavement Construction Update

FIGURE 15. MANUAL RUT DEPTH

Florida Department of Transportation. Road Ranger Performance Measures Annual Report. July 1, 2015 to June 30, 2016 Fiscal Year (FY) 2015/2016

Marriages and Dissolutions of Marriage

Book Closing: October 9, 2018 DISTRICT 1

NCDOT Rideability and IRI Special Provision. Nilesh Neel Surti, PE North Carolina DOT State Pavement Construction Engineer

Florida Courts E-Filing Authority Board. August 15,2013 E-Filing Update. Jennifer Fishback, eportal Project Manager

Florida Department of Transportation. Road Ranger Performance Measures 2nd Quarter Report. October 1 to December 31, 2014 Fiscal Year (FY) 2014/2015

CATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE

Fuel Tax Rates Adjusted Beginning January 1, 2019

Research Update Construction Conference Charles Holzschuher, P.E. February 3, Florida Department of Transportation

FLORIDA MEDIATION PROGRAMS. An Abbreviated Compendium: Court Connected Caseload Data

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

MnDOT s Experience with IRI Specifications

General Educational Development (GED) - Diplomas

Florida County Detention Facilities Average Inmate Population 2008 Annual Report

Education 2 Table 1, Average Salaries Comparison

Control of Pavement Smoothness in Kansas

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

Wholesaler/Importer Fuel Tax Return. For Calendar Year: 2018 IMPORTANT. Complete and return coupon to the Department of Revenue.

Evaluation of the Rolling Wheel Deflectometer (RWD) in Louisiana. John Ashley Horne Dr. Mostafa A Elseifi

An Update on Smoothness Specifications at ODOT

SECTIO N 610 PAVEMENT SMO O THNESS

ITEM 585 RIDE QUALITY FOR PAVEMENT SURFACES Description. Measure and evaluate the ride quality of pavement surfaces.

DESCRIPTION This work consists of measuring the smoothness of the final concrete or bituminous surface.

Terminal Supplier Fuel Tax Return IMPORTANT. Complete and return coupon to the Department of Revenue. Sample Form

THE USE OF PERFORMANCE METRICS ON THE PENNSYLVANIA TURNPIKE

FDOT MODIFICATIONS TO STANDARD SPECIFICATIONS FOR STRUCTURAL SUPPORTS FOR HIGHWAY SIGNS, LUMINAIRES AND TRAFFIC SIGNALS (LTS-5)

Table Standardized Naming Convention for ERD Files

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

BACKGROUND. Dear Mr. Dietrich:

Northeast Pavement Preservation Partnership Burlington, Vermont. Rhode Island DOT

2015 INJURY DATA TOTAL INJURIES RECORDED TYPES OF INJURY. Boating Accidents Statistical Report. Registered vessels 915,713

Expansion Projects Description

If it ain t broke, don t t fix it. HMA Thin Lifts for Pavement Preservation in Tennessee 2008 SEAUPG CONFERENCE-BIRMINGHAM, ALABAMA

Pavement Management Index Values Development of a National Standard. Mr. Douglas Frith Mr. Dennis Morian

Application for Refund of Tax Paid on Undyed Diesel Used for Off-road or Other Exempt Purposes. Mail to : Florida Department of Revenue.

Invitation for Bid Y PD

DIVISION V SURFACINGS AND PAVEMENTS

Florida s Turnpike Enterprise High Tension Median Cable Barrier Pilot Project. William H. Cook, P.E. Florida s Turnpike Assistant Roadway Engineer

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA)

Re: Notification of RMS RiskLink 11.0.SP1 Submission Revision Postcode-county relationship

Appendix 3 Traffic Technical Memorandum

CHAMPLAIN PARKWAY GRADE CROSSING DIAGNOSTIC MATRIX

MEMORANDUM FPN: State Road: 91 County: Osceola (92)

Lowering Pavement Evaluation Costs Using Big Data

Non-Destructive Pavement Testing at IDOT. LaDonna R. Rowden, P.E. Pavement Technology Engineer

Do Standard Trip Generation Rates Overstate Impact of Commercial Uses?

Section 6. Ride Specification Special Provisions Step-by-Step Ride Guide for Inspectors and Project Engineers

Florida Dept. of State Summary Data 2016 Overvote-Undervote Report

Ride Smoothness Measurement and Specification Issues. Nicholas Vitillo, Ph. D. Manager, Bureau of Research New Jersey Department of Transportation

EXISTING PAVEMENT EVALUATION Howell Ferry Road Duluth, Gwinnett County, Georgia. WILLMER ENGINEERING INC. Willmer Project No

I.D.O.T. Update Version -

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc.

Inventory Levels - All Prices. Inventory Levels - By Price Range

Inventory Levels - All Prices. Inventory Levels - By Price Range

RUNWAY ROUGHNESS CONSIDERATIONS. SWIFT 2013 Chris Olidis, P.Eng.

Asset Class 2019 Target 2020 Target 2021 Target 2022 Target 2023 Target REVENUE VEHICLES AB - Articulated Bus N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

Inventory Levels - All Prices. Inventory Levels - By Price Range

Evaluation of Grind and Groove (Next Generation Concrete Surface) Pilot Projects in California

HMA Thin Lifts for Pavement Preservation in Tennessee

FHFC Posted 1/30/ Florida Housing Finance Corporation Housing Credit Rents According To Household Size

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Long Life Asphalt Performance Testing January 17, 2018

LLI DELIVERY - OCT SEP 20 OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP LIBRARY Sent Recd Sent Recd Sent Recd Sent Recd Sent Recd Sent Recd

Florida Housing Finance Agency 1995 Rents Adjusted To Unit Size

Site DNL Calculator. Guidelines:

TRAFFICENGINEER S. Florida sturnpikesystem FiscalYearEndedJune30,2015. FloridaDepartmentofTransportation

12/2/2010. The Florida Department of Transportation (FDOT) funded the Observational Survey of Motorcyclists through the use of highway safety funds.

DOCUMENTATION WORKBOOK FY 2017

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

Manitoba Infrastructure and Transportation

TRAFFIC AND SAFETY NOTE 907B. Incentive/Disincentive Clause

Effingham County Ash Roads Update 2018 Winter Storm Grayson Jan 16, 2018

Automated Occupancy Detection October 2015 (Phase I) Demonstration Results Presented by Kathy McCune

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

Safety Evaluation of Restricted Crossing U-Turn (RCUT or J-Turn) Projects in Louisiana

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA)

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways

Traffic Crash Facts Annual Report 2012

747 ACRES LAND FOR SALE

Work Zone Changes Since We Last Met 2016 Louisiana Transportation Conference. Barry L. Lacy, P.E. Work Zone/Claims/Audit Engineer

Transportation accomplishments

[Insert name] newsletter CALCULATING SAFETY OUTCOMES FOR ROAD PROJECTS. User Manual MONTH YEAR

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/30/2013

TRAFFIC ENGINEER S ANNUAL LETTER REPORT

Roadway Safety Audit Packet

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

CSG National Conference Nashville

Florida s Turnpike Enterprise March 2014

RESIDENTIAL WASTE HAULING ASSESSMENT SERVICES. January 10, 2011 Presentation to Arvada City Council

Center for Urban Transportation Research University of South Florida

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

Florida s Turnpike Enterprise. Incident Management Program for All Levels & Specialty Towing & Roadside Repair (STARR)

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: Interstate

Do Tax Incentive Programs Change Taxpayers' Behavior?

EFFECT OF PAVEMENT CONDITIONS ON FUEL CONSUMPTION, TIRE WEAR AND REPAIR AND MAINTENANCE COSTS

Florida Housing Finance Corporation 1998 Rents Adjusted To Unit Size

Transcription:

Florida Department of TRANSPORTATION Smoothness Specification Update 38 th Annual Asphalt Conference September 9, 2014

Intents Separate Rolling Straightedge from Laser Profiler Create Ride Quality (Smoothness) Incentive/Disincentive Specification Based on 6 years of project data Use International Roughness Index (IRI)

International Roughness Index (IRI) Vertical movement per length traveled Measured in inches per mile Lower is Smoother IRI data obtained by Laser Profiler Pilot projects use SMO laser profiler vans Incentive/Disincentive $ based on IRI data Pay for Smoothness / Penalize Roughness

Incentive/Disincentive IRI Ranges IRI Pay Result 30-42 +$20 per IRI point per 0.1 mile LOT 43-55 Full Pay 56-95 -$ 20 per IRI point per 0.1 mile LOT >95 Remove & Replace*

Incentive / Disincentive Table 330-5

Lot Count IRI Data and Pay Range Graph 1100 1000 900 800 700 600 500 400 300 By LOT - FL Interstate FC-5 RA data - LOTs w/ AADT 150,000 Full Pay Zone IRI = 43-55, Net Pay Result = +$33,528 Incentive zone: IRI 42 10,242 LOTs 36% of all LOTs $1,218,057 Full pay zone: 43 IRI 55 11,264 LOTs 40% of all LOTs Disincentive zone: 56 IRI 95 6,634 LOTs 23% of all LOTs -$1,184,529 Represents all RA data collected with AADT 150,000 (28,302 LOTs) between 1 Jan 2005-31 Dec 2010. Top 10% IRI 35 Top 20% IRI 38 Top 30% IRI 41 Top 40% IRI 44 Top 50% IRI 47 Bottom 50% IRI 47 Bottom 40% IRI 50 Bottom 30% IRI 53 Bottom 20% IRI 57 Bottom 10% IRI 64 200 100 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 IRI R&R zone: IRI > 95 162 LOTs 0.6% of all LOTs

Project Pay Incentive/Disincentive Maximum & Minimum I/D limits established to protect Contractors & Department Max: 105% pay Min: 80% pay Project Consistency Bonus If all LOT s 55 (per FC-5 bid price) (per FC-5 bid price) Project will receive an additional 3% incentive Based on FC-5 bid price & tonnage placed

Areas Unsuitable for Laser Profiler Testing Use RSE or Manual (Rigid) Straightedge per 330 Specs R&R or Pay Reductions per current Specs

Last Structural Lift SMO will collect IRI data on Last Structural Lift Contractor Request Let s contractor know where they stand prior to paving friction course Contractor make more informed decisions on questionable pavement

Pilot Project Details Pilot projects 18 Projects completed 11 Projects received consistency bonus 3 Total incentive paid $464,819 Total Pilot project miles tested 356 Incentive paid per lane mile $1,304 No LOT s >95 No Removal and Replacement

Pilot Project List # DISTRICT FIN DESCRIPTION Lane Miles Avg IRI Min IRI Max IRI Dollars INC/DIS per lane mile $ $ 51 $ $ 299 $ $ 817 1 TP 424792-1-52-01 Suncoast Parkway, Pasco Co (Hillsborough Co Line SR 52 (MP17-27) 44.3 48 30 88 2,272 2 TP 424792-4-52-01 Suncoast Parkway, Pasco Co (SR 52 Hernando Co Line) (MP27-37) 34.8 44 32 76 10,414 3 TP 427324-1-52-01 Suncoast Parkway, Hernando Co CR 578 to SR 50 (MP 37-46) 28.7 40 28 71 23,453 4 TP 427324-4-52-01 Suncoast Parkway, Hernando Co Sr 50 to US98 (MP 46-55) 5 TP 429025-1-52-01 Suncoast Pkwy from VanDyke Rd. to Pasco Co (MP 14.0-17.2) 6 1 413041-2-52-01 I-75 from SR 78 to Charlotte Co Line (Lee County) 35.9 38 28 61 35,480 $ $ 988 7 2 426987-1-52-01 I-10 in Madison County from E of SR 53 to Suwannee County line 36.7 39 30 70 $ 35,491 $ 967 8 2 426986-1-52-01 I-10 from East of US 221 to SR 14 26.9 35 23 58 $ 43,863 $ 1,631 9 2 426985-1-52-01 I-10 from East Of US 221 to SR 14 22.4 37 29 50 $ 50,460 $ 2,253 10 2 426983-1-52-01 I-295 (9A) Duval County 24.6 41 27 66 $ 19,688 $ 800 11 2 424631-1-52-01 I-75 (SR93) from SR 6 to GEORGIA S/L 57.5 32 23 59 $ 118,880 $ 2,067 12 3 428938-1-52-01 I-10 from West of SR 79 to Washington Co Line, LENGTH = 5.632 18.4 34 27 55 $ 51,903 $ 2,821 13 3 428939-1-52-01 I-10 from E of SR 10 (US90) to Jefferson Co Line, LENGTH = 6.557 mi 26.2 31 24 50 $ 72,914 $ 2,783 14 3 430908-1-52-01 I-10 from Okaloosa Co Line to E of SR 83 (US 331), LENGTH = 20.150 15 4 421707-4-52-01 I-75 from S of Mirimar Pkwy Intg to S of Sheridan St. (MP 1.08-4.645) 16 5 429079-1-52-01 I-4 from Osceola Co Line to East Of Sr 536 17 5 429080-1-52-01 I-4 from West of EE Williamson Overpass to West Of Lake Mary Blvd 18 5 430643-1-52-01 I-75 from N of Sr 500/US27 Intchg to Alachua Co Line 356.4 Total $ 464,819

Lot Count IRI Data and Pay Range Graph 1100 1000 900 800 700 600 500 400 300 By LOT - FL Interstate FC-5 RA data - LOTs w/ AADT 150,000 Full Pay Zone IRI = 43-55, Net Pay Result = +$33,528 Incentive zone: IRI 42 10,242 LOTs 36% of all LOTs $1,218,057 Full pay zone: 43 IRI 55 11,264 LOTs 40% of all LOTs Disincentive zone: 56 IRI 95 6,634 LOTs 23% of all LOTs -$1,184,529 Represents all RA data collected with AADT 150,000 (28,302 LOTs) between 1 Jan 2005-31 Dec 2010. Top 10% IRI 35 Top 20% IRI 38 Top 30% IRI 41 Top 40% IRI 44 Top 50% IRI 47 Bottom 50% IRI 47 Bottom 40% IRI 50 Bottom 30% IRI 53 Bottom 20% IRI 57 Bottom 10% IRI 64 200 100 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 IRI R&R zone: IRI > 95 162 LOTs 0.6% of all LOTs

% LOT Count Summary Pilot Project Performance (IRI) 8% 7% Incentive Zone IRI 42 Full Pay 43 IRI 55 Ride Acceptance (Lot) IRIs Disincentive 56 IRI 95 R&R Zone IRI>95 6% 5% 4% Median 46 RA Data Interstate FC-5 LOTs (28,301) with AADT < 150,000 and accepted between Jan 2005 to Dec 2010 Interstates: 28,301 Lots 3% 2% 1% 0% 10 20 30 40 50 60 70 80 90 100 110 120 130 140 IRI (inch/mile)

% LOT Count Summary Pilot Project Performance (IRI) 8% 7% Incentive Zone IRI 42 Full Pay 43 IRI 55 Ride Acceptance (Lot) IRIs Disincentive 56 IRI 95 R&R Zone IRI>95 6% Median 37 5% 4% 3% Median 46 RA Data Interstate FC-5 LOTs (28,301) with AADT < 150,000 and accepted between Jan 2005 to Dec 2010 Interstates: 28,301 Lots 11 Dev330SM Pilot Projects: 3,560 Lots 2% 1% -9 0% 10 20 30 40 50 60 70 80 90 100 110 120 130 140 IRI (inch/mile)

Pilot Projects

Pilot Projects Locations 7 8 10 9 4 6 5 LOCATION PROJECT FIN MILEPOST ROADWAY COUNTY 1 424792-1-52-01 0 to 11.066 Suncoast Pkwy. (SR589) Pasco 2 424792-4-52-01 11.099 to 19.866 Suncoast Pkwy. (SR589) Pasco 3 427324-1-52-01 0.036 to 7.212 Suncoast Pkwy. (SR589) Hernando 4 426987-1-52-01 23.686 to 32.860 I-10 (SR8) Madison 5 426983-1-52-01 22.500 to 28.654 I-295 (SR9A) Duval 6 424631-1-52-01 19.048 to 28.633 I-75 (SR93) Hamilton 7 428938-1-52-01 16.682 to 21.276 I-10 (SR8) Holmes 8 428939-1-52-01 15.643 to 22.200 I-10 (SR8) Leon 9 426986-1-52-01 16.969 to 23.669 I-10 (SR8) Madison 10 426985-1-52-01 11.378 to 16.969 I-10 (SR8) Madison 11 413041-2-5201 28.147 to 34.138 I-75 (SR93) Lee 3 2 1 11

% LOT Count Summary Pilot Project Performance (IRI) 8% 7% Incentive Zone IRI 42 Full Pay 43 IRI 55 Ride Acceptance (Lot) IRIs Disincentive 56 IRI 95 R&R Zone IRI>95 6% 5% 4% Median 46 RA Data Interstate FC-5 LOTs (28,301) with AADT < 150,000 and accepted between Jan 2005 to Dec 2010 Interstates: 28,301 Lots 3% 2% 1% 0% 10 20 30 40 50 60 70 80 90 100 110 120 130 140 IRI (inch/mile)

% LOT Count Summary Pilot Project Performance (IRI) 8% 7% Incentive Zone IRI 42 Full Pay 43 IRI 55 Ride Acceptance (Lot) IRIs Disincentive 56 IRI 95 R&R Zone IRI>95 6% Median 37 5% 4% 3% Median 46 RA Data Interstate FC-5 LOTs (28,301) with AADT < 150,000 and accepted between Jan 2005 to Dec 2010 Interstates: 28,301 Lots 11 Dev330SM Pilot Projects: 3,560 Lots 2% 1% -9 0% 10 20 30 40 50 60 70 80 90 100 110 120 130 140 IRI (inch/mile)

% LOT Count Summary Pilot Project Comparison (IRI) 8% Lot IRIs Obtained from 11 Pilot Projects 7% Incentive Zone IRI 42 Full Pay 43 IRI 55 Disincentive 56 IRI 95 R&R Zone IRI>95 6% 5% FC-5 IRI Average: 38 Median: 37 Std.:7.71 3,560 FC-5 Lots IRI Incentive Paid: $395,116 Consistency Incentive Paid: $69,704 Total Incentive Paid: $464,819 4% 3% 2% Structural IRI Average: 50 Median: 48 Std.: 12.27 Preconstruction IRI Average: 62 Median: 57 Std.: 17.93 1% 0% 10 20 30 40 50 60 70 80 90 100 110 120 130 140 IRI (inch/mile)

Individual Project Comparisons of IRI Consistency Bonus Highest Incentive Limestone Structural Assessment Friction Course

Consistency Bonus 3 projects met consistency (< 55 IRI) 4 projects missed consistency by 2 LOTs or less

Average IRI (inch/mile) I-10 Leon County (MP 15.643-22.200) Average IRIs 100 IRI Preconstruction IRI Structural IRI FC-5 80 60 40 50 53 55 55 53 44 40 40 41 41 34 30 32 31 32 20 0 R1 R2 L1 L2 All Lanes 264 FC-5 Lots IRI Incentive Paid: $ 45,572 Consistency Incentive Paid: $27,343 Total: $72,914 Friction Mean IRI = 31, Range (24-55) Structural to Friction (+9) Lowest Mean IRI of all the pilots

IRI (inch/mile) I-10 Leon County (MP 15.643-22.200) 100 I-10 (SR-8) R1 (MP: 15.643 to 22.200) 90 80 70 60 50 40 Average: 50 Average: 40 Average: 34 30 20 10 IRI Preconstruction IRI Structural IRI FC-5 Remove/Replace Trahshold 15 16 17 18 19 20 21 22 Mile Post

Average IRI (inch/mile) I-10 Holmes County (MP 16.682-21.276) Average IRIs 100 IRI Preconstruction IRI Structural IRI FC-5 80 72 76 64 60 53 55 55 51 52 53 53 40 34 34 36 32 34 20 0 R1 R2 L1 L2 All Lanes 180 FC-5 Lots IRI Incentive Paid: $31,881 Consistency Incentive Paid: $20,021 Total: $51,902 Friction Mean IRI = 34, Range (27-55) Structural to Friction (+19)

IRI (inch/mile) I-10 Holmes County (MP 16.682-21.276) 100 I-10 (SR-8) R1 (Milepost: 16.682 to 21.276) 90 80 70 60 50 40 Average: 53 Average: 55 Average: 34 30 20 10 0 IRI Preconstruction IRI Structural IRI FC-5 Remove/Replace Trahshold 16 17 18 19 20 21 Mile Post

Average IRI (inch/mile) Frequency (%) I-10 Madison County (MP 11.378-16.969) 13% 12% 11% 10% 9% 8% 7% 6% 5% 4% 3% 2% 1% 0% Incentive Zone IRI 42 I-10 (Financial Project Number: 426985-1-52-01) Full Pay 43 IRI 55 FC-5 IRI Average: 37 Median: 37 Disincentive 56 IRI 95 R&R Zone IRI>95 225 FC-5 Lots IRI Incentive Paid: $28,120 Consistency Incentive Paid: $22,340 Total: $50,460 Friction Mean IRI = 37, Range (29-50) Structural to Friction (N/A) 20 30 40 50 60 70 80 90 100 110 IRI (inch/mile) 100 80 60 40 20 0 Individual Lane IRI FC-5 38 37 39 34 37 R1 R2 L1 L2 All Lanes

Highest Incentive

Average IRI (inch/mile) I-75 Hamilton County (MP 19.048-28.633) Average IRIs 100 IRI Preconstruction IRI Structural IRI FC-5 80 70 60 52 55 60 51 53 57 40 37 39 40 36 38 30 30 31 30 40 38 34 35 32 20 0 R1 R2 R3 L1 L2 L3 All Lanes 576 FC-5 Lots 57.5 miles IRI Incentive Paid: $118,880 Friction Mean IRI = 32, Range (23-59) Structural to Friction (+6) 1 LOT (59) prevented consistency bonus

IRI (inch/mile) I-75 Hamilton County (MP 19.048-28.633) 90 I-75 (SR-93) R1 (Milepost: 19.048 to 28.633) 80 70 60 50 40 30 Average: 52 Average: 37 Average: 30 20 10 IRI Preconstruction IRI Structural IRI Final Remove/Replace Trahshold 19 20 21 22 23 24 25 26 27 28 29 Mile Post

Limestone Project

Average IRI (inch/mile) I-75 Lee County (MP 28.147-34.138) Average IRIs 100 IRI Preconstruction IRI Structural IRI FC-5 80 68 81 65 60 40 55 35 56 48 48 43 37 52 38 37 49 39 38 20 0 R1 R2 R3 L1 L2 L3 All Lanes 333 FC-5 Lots IRI Incentive Paid: $ 35,480 Friction Mean IRI = 38 Range (21-68) Structural to Friction (+11)

IRI (inch/mile) I-75 Lee County (MP 28.147-34.138) 120 I-75 (SR-93) R2 (MP: 28.147 to 34.138) 110 100 90 80 70 60 50 40 30 Average: 68 Average: 48 Average: 37 20 10 IRI Preconstruction IRI Structural IRI Final Remove/Replace Trahshold 28 29 30 31 32 33 34 Mile Post

Pre-Construction to Friction Effects of smoothness Preconstruction Structural Friction

IRI (inch/mile) I-295 (MP 22.500-28.654), Duval 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 248 FC-5 Lots IRI Incentive Paid: $19,688 I-295 (SR-9A) R1 (Milepost: 22.500 to 28.654) IRI Preconstruction IRI Structural IRI Final Remove/Replace Trahshold 23 24 25 26 27 28 29 Mile Post Average: 89 Average: 57 Average: 42

IRI (inch/mile) Suncoast Pkwy. (MP 0.036-7.212), Hernando 120 110 100 90 80 Suncoast Pkwy. (SR-589) R1 (Milepost: 0.036 to 7.212) 288 FC-5 Lots IRI Incentive Paid: $23,453 Average: 73 70 60 50 40 30 20 10 IRI Preconstruction IRI Structural IRI Final Remove/Replace Trahshold 0 1 2 3 4 5 6 7 Mile Post Average: 55 Average: 39

IRI (inch/mile) I-10 Madison County (MP 23.686-32.860) 110 100 90 I-10 (SR-8) R1 (Milepost: 23.686 to 32.860) 368 FC-5 Lots IRI Incentive Paid: $35,491 1 LOT exceeded 55 IRI 80 70 60 50 Average: 52 Average: 47 Average: 39 40 30 20 IRI Preconstruction IRI Structural IRI FC-5 Remove/Replace Trahshold 23 24 25 26 27 28 29 30 31 32 33 Mile Post

Average IRI Effect of MTD Usage 80 IRI Comparison between Pilot Projects Average Acceptance IRI (2005 to 2010) Structural IRI Acceptance (FC-5) IRI 60 40 49 20 0 1 2 3 4 5 6 7 8 9 10 11 Project ID Project ID Total Incentive Paid Number of Lots MTD Usage Avg. FC-5 IRI Avg. Structural IRI IRI Improvement 1 $2,272 434 N/A 48 62 14 2 $10,414 350 No 44 56 12 3 $23,453 288 No 40 59 19 4 $35,491 368 Partial 39 48 9 5 $19,688 248 Yes 41 59 18 6 $118,880 576 Yes 32 38 6 7 $51,903 180 Yes 34 53 19 8 $72,914 264 Yes 32 41 10 9 $43,863 242 Yes 35 N/A N/A 10 $50,460 225 Yes 37 N/A N/A 11 $35,480 333 Yes 38 49 11

Florida Department of TRANSPORTATION Questions?