KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 Lihue, Kauai, Hawaii Original Sheet 5 RULE NO. 2 CHARACTER OF SERVICE

Similar documents
201 S. Anaheim Blvd. Page No Anaheim, CA RULE NO. 2 DESCRIPTION OF SERVICE

Electric Service Rule No. 2 Description of Service

REGULATION NO. 5 REQUIREMENTS AND RESTRICTIONS ON CUSTOMER S EQUIPMENT AND SERVICE USAGE

1. The type of service available at any particular location should be determined by inquiry at PG&E's local office.

WELLS RURAL ELECTRIC COMPANY Adopted: March 1976 Revised: March 21, 2017 Reviewed: August 21, 1998 RULE NO. 2

ELECTRIC POLICY INTRODUCTION CHAPTER I GENERAL

Northeastern Rural Electric Membership Corporation Schedule DG-2 Columbia City, Indiana Page 1 of 5

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

Northeastern Rural Electric Membership Corporation Columbia City, Indiana

Louisville Gas and Electric Company

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

Noble County Rural Electric Membership Corporation

Noble County Rural Electric Membership Corporation

NSTAR ELECTRIC COMPANY M.D.P.U. No. 28 EASTERN MASSACHUSETTS CAMBRIDGE SERVICE AREA GENERAL SERVICE

AUSTIN UTILITIES. CHARACTER OF SERVICE: AC, 60 cycles, 120/240 Volt, three wire, single-phase; or 120 Volt, two wire.

2. DEFINITIONS. 2.3 APPROVED Acceptable to the authority enforcing the National Electric Code

ECET Circuit Design Motor Loads. Branch Circuits. Article 210

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

Panola-Harrison Electric Cooperative, Inc. Louisiana Tariff Effective: March 3, 2004

Indianapolis Power & Light Company I.U.R.C. No. E-18 Original No. 17 One Monument Circle Indianapolis, Indiana

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

RESIDENTIAL SERVICE. CHARACTER OF SERVICE: This Schedule is for single phase, alternating current at standard voltage as designated by the Utility.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

BRYAN ELECTRIC DEPARTMENT General Rules and Regulations. Bryan Municipal Utilities 841 E. Edgerton St. Bryan, OH (419)

Guidelines for connection of generators:

RATE 724 RATE FOR ELECTRIC SERVICE GENERAL SERVICE LARGE

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

NP 007 Service Rules

Street Address. City-Village-Township

RATE 633 RATE FOR ELECTRIC SERVICE HIGH LOAD FACTOR INDUSTRIAL POWER SERVICE

Electric Rates & Tariffs

UNS Electric, Inc. Rules and Regulations

Rate Schedules. Effective 1/1/2019

RATE 732 RATE FOR ELECTRIC SERVICE INDUSTRIAL POWER SERVICE

Interconnection Process for Generation Systems

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5

SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL. Estimation and Costing & Utilization of Electrical Energy

Page Number Schedule Rate Class Description 1 R

EXHIBIT A-2 Amending Chapter TMC (all additions and amendments effective April 1, 2018) Chapter ELECTRIC ENERGY REGULATIONS AND RATES 1

RATE 725 RATE FOR ELECTRIC SERVICE METAL MELTING SERVICE

GENERAL INFORMATION 1.01 PURPOSE

CITY OF BOWLING GREEN, OHIO MUNICIPAL UTILITIES ELECTRIC RATE SCHEDULES

TERMS AND CONDITIONS

TELL CITY ELECTRIC DEPARTMENT RATES AND CHARGES

TACOMA POWER ELECTRIC RATE SCHEDULES

CITY OF BOWLING GREEN, OHIO MUNICIPAL UTILITIES ELECTRIC RATE SCHEDULES

Cancels Nineteenth Revised Sheet No. D6

RATE 624 RATE FOR ELECTRIC SERVICE GENERAL SERVICE LARGE

March 13, 2000 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Modification to Power Factor Adjustment Special Condition

Schedule GS-2 INTERMEDIATE GENERAL SERVICE

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

7. SERVICES OVER 600 VOLTS

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.

Chapter 5. Imagine That Engineering Inc. Assured Equipment Grounding Conductor Program (AEGCP) Ground Fault Circuit Interrupter (GFCI)

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

Street Address. City-Village-Township

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

City of Westerville Electric Division

CSDA Best Practice. Hi-Cycle Concrete Cutting Equipment. Effective Date: Oct 1, 2010 Revised Date:

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

Schedule GS-3 LARGE GENERAL SERVICE SECONDARY VOLTAGE I. APPLICABILITY AND AVAILABILITY

TECHNICAL TERMS AND ABBREVIATIONS

Wegmans Fairfax Joseph B. Lookup Electrical System Existing Conditions Report & Building Load Summary Report. Appendix Tech Assignment # 2

SILICON VALLEY POWER RULES AND REGULATIONS CITY OF SANTA CLARA

BOONE REMC RATE SCHEDULE. Schedule GS-7.1. Schedule GS-7 (TOU)...3. Schedule GP-7.5. Schedule NM Schedule SP Schedule SGP-7.

City of Storm Lake Fire Department Heavy Rescue Specifications

Rider 11 Partial Requirements Service (PRS)

Characteristics of LV circuit breakers Releases, tripping curves, and limitation

NOVA SCOTIA UTILITY AND REVIEW BOARD

FRENCH BROAD ELECTRIC MEMBERSHIP CORPORATION RATE SCHEDULES

UPPCO SERVICE MANUAL

Appendix 6.7 January 23, 2015 SURPLUS ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS

Pioneer Electric Rates and Tariffs

All territory within the incorporated limits of the City and land owned or leased by the City.

d/b/a EVERSOURCE ENERGY Cancels M.D.P.U. No. 44 STREET AND SECURITY LIGHTING RATE S-1

M.P.S.C. No. 2 Electric Ninth Revised Sheet No. 27 (Rate Case) Cancels Eighth Revised Sheet No. 27

THE PUBLIC SERVICE COMMISSION OF WYOMING

Types of Motor Starters There are several types of motor starters. However, the two most basic types of these electrical devices are:

1. General Requirements

DIVISION 311 MISCELLANEOUS ELECTRICAL RULES

Scale of Inspection Fees of Electrical Inspectorate Schedule. I. Fees for Initial Inspections:

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

Case/Order Reference(s): Approved at the February 26, 2014 Admin. Mtg.

SERVICE CLASSIFICATION NO. 7. Also optional for: This option is not available to Service Classification No. 2 customers, effective December 3, 2002.

Transmission & Distribution Glossary of Electrical Terms

SUMMARY OF TOTAL CURRENT PRICES - ELECTRIC

MICHIGAN ELECTRIC UTILITY

MICHIGAN ELECTRIC UTILITY

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM

RATE DS-2 SMALL GENERAL DELIVERY SERVICE

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST

Schedule GS-1 SMALL GENERAL SERVICE

Adopted: September 24, 2015 Version: Version 1.0

TERMS AND CONDITIONS XXV. NET METERING CUSTOMERS AND SMALL AGRICULTURAL GENERATORS

BLUEBONNET ELECTRIC COOPERATIVE, INC. Section Sheet No. II 3

A. Basic Customer Charge: $ B. Energy Charge: $.09316/kWh

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

CITY OF GRAND ISLAND UTILITIES DEPARTMENT ELECTRIC RATE SCHEDULE Effective October 1, Ordinance No. 9133

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

Transcription:

Lihue, Kauai, Hawaii Original Sheet 5 RULE NO. 2 A. GENERAL 1. The character of service available at any particular location must be ascertained by the Company business office, and will depend upon the size and nature of the customer's load. 2. Alternating current service of approximately 60-hertz frequency will be supplied. 3. Voltages referred to in the tariff are nominal and may vary within the limits set forth in Section B.3. of this rule. 4. The rate schedules in the tariff are applicable for service supplied from overhead facilities and for service supplied from underground facilities when underground facilities are provided in accordance with Rule Nos. 13 and 14. 5. The cogeneration qualifying facility shall maintain a character of service as herein defined in Rule No. 2. 6. The rate schedules in the tariff are applicable only for service where the customer, with a demand of 30 KW or more, purchases the entire electric energy requirements from the Company, except when such schedules provide otherwise. B. PHASE AND VOLTAGE SPECIFICATIONS The Company shall specify the available phase and service voltage for all customers. Customers who wish to install new load, either for a new service or additional load on an existing service, shall notify the Company before installing the new load and the Company will specify the available phase and service voltage for the new load. The Company may, for engineering and operating reasons, change the phase or service voltage, or both, for the existing equipment of a customer provided that no undue hardship will result. 1. Voltages less than 2 KV a. Single-Phase Service Single-phase service will be 3-wire 120/240 volts or in certain locations approved by the Company will be 3-wire, 120/208 volts.

Lihue, Kauai, Hawaii Original Sheet 6 b. Three-Phase Service at 240 Volts or Less Three-phase service will be 3-wire 240 volts, or 4-wire 208Y/120 volts. Where three-phase service is supplied, the load shall be balanced on the three phases in accordance with good engineering practice. c. Three-Phase Service at 480 Volts or 2400 Volts. Customers with an aggregate connected load of 100 KVA or more or a motor rated 50 HP or more may be served at 3-wire 480 volts or 4-wire 480Y/277 volts. Customers with an aggregate connected load of 500 KVA or more or motor rated 250 HP or more may be served at 4-wire l2,470 volts. d. Limitation on Number of Voltages Electric service at only one nominal voltage level will be supplied for each class of service at any one location. In certain locations, only singlephase 3-wire l20/208 volts and three-phase, 4-wire 208Y/120 volts or 480Y/277 volts service will be available and if such service is supplied to a building, services at other voltage will not be supplied to the same building. In all other locations, only one nominal voltage level will be supplied for each class of service. For this purpose the nominal voltage levels are: 3-wire, 1-phase, 120/240 volts 3-wire, 1-phase, 120/208 volts 3-wire, 3-phase, 240 volts 3-wire, 3-phase, 480 volts 4-wire, 3-phase, 208Y/120 volts 4-wire, 3-phase, 480Y/277 volts e. In special circumstances, service may be rendered under conditions other than those specified in this subparagraph 1, provided requests for service under such conditions are made in writing to the Company and are approved by the Company.

Lihue, Kauai, Hawaii Original Sheet 7 2. Distribution and Transmission Voltages The nominal distribution line-to-line voltage is 12.47 KV. If service is rendered at any of these voltages by transformation from another distribution voltage, such service will be considered secondary for determining the charges in the rate schedules. Nominal transmission voltages are 57.1 and 69 KV. Service will be supplied at distribution or transmission voltage only under conditions specifically provided in the rate schedules. Where three-phase service is supplied, the load shall be balanced on the three phases in accordance with good engineering practice. 3. Voltage Limits Voltage variations will normally be within the range specified in paragraphs a, b and c below. a. Secondary Voltages For all service, except power service, the variations of voltage will normally be no more than 5% above or below the nominal voltage. For power service, the variation of voltage will normally be no more than 7-1/2% above or below the nominal voltage. Where 3-phase service is provided, the Company shall exercise reasonable care to assure that the phase voltages are in balance. b. Primary Voltages For service rendered principally for industrial or power purposes, the voltage variation will normally be no more than 5% above or below the nominal voltage. c. Transmission Voltages For service rendered at a transmission voltage, the variation of voltage will normally be no more than 10% above or 10% below the nominal voltage.

Lihue, Kauai, Hawaii Original Sheet 8 d. Exceptions to Voltage Requirements Voltage outside the limits specified above may be furnished when: (1) The customer, by contract, agrees to accept service with unregulated voltage. (2) The variations arise from the action of the elements. (3) The variations are infrequent fluctuations not exceeding 5 minutes' duration. (4) The variations arise from service interruptions. (5) The variations arise from temporary separation of parts of the system from the main system. (6) The variations are from causes beyond the control of the Company. (7) Such fluctuations are caused solely by the load of one particular customer which does not affect the voltage of other customers in the vicinity. C. MOTOR AND EQUIPMENT PROTECTION Customer's motors and other equipment shall conform with the following requirements: 1. Motors that cannot be subjected to full rated voltage on starting with safety to the customer's and the Company's equipment, or that drive machinery of such a nature that the machinery or the product it handles will not permit the motor to resume normal speed upon the restoration of normal supply voltage, shall be equipped with devices that will disconnect them from the line upon failure of supply voltage and that will prevent the automatic reconnection of the motors upon restoration of normal supply voltage. 2. All motors, single or three-phase shall be equipped with thermal relays, fuses, or other automatic overcurrent interrupting devices to disconnect completely such motors from the line as a protection against damage due to overheating. Such protective devices shall be installed in each conductor connected to three-phase motors to protect against overheating due to open phase or low voltage conditions.

Lihue, Kauai, Hawaii Original Sheet 9 3. Reverse phase relays are required on all polyphase installations where a reversal of rotation might cause damage to the equipment. 4. Single phase protective relays are required on all polyphase installations where single phasing may result in damage to equipment. 5. Any other equipment, apparatus or device that would be subject to damage from low or high voltage or interruptions shall be equipped with appropriate protective devices. D. ALLOWABLE STARTING CURRENTS Motor starting currents shall comply with the requirements tabulated below. If the starting currents exceed those listed in the tables, a current-limiting device must be used or other means employed to limit the current to that specified. Locked-rotor current as used in the following tables is defined as the steady state current taken from the line with the motor rotor or rotors locked, with all other power consuming components, including a current limiting device, if used, connected in the starting position, and with nominal service voltage and frequency applied at the service entrance.

Lihue, Kauai, Hawaii Original Sheet 10 Table 1 - Maximum Locked Rotor Current For Single-Phase Motors 50 Amperes at 120 Volts 60 Amperes at 208 Volts 100 Amperes at 240 Volts Table 2 - Polyphase Motors Rated in Horsepower Max. Locked-Rotor Amperes at Nominal Service Voltage Motor Rating in HP 208V 240V 480V 30 and Below 403 349 175 40 416 361 180 50 520 451 225 60 625 541 271 75 778 674 337 100 1041 902 451 125 1302 1129 564 150 1557 1350 675 200 2080 1803 902 For motors rated over 200 horsepower - see Notes 1 and 2 Table 3 - Polyphase Motors Rated in Running Current without Horsepower Rating Nominal Service Voltage 208 Volts 240 Volts 480 Volts Rated Amperes Max. Locked Rotor Amps. Rated Amperes Max. Locked Rotor Amps. Rated Amperes Max. Locked Rotor Amps. 100 & Below 403 90 & Below 349 45 & Below 175 150 585 100 390 50 195 200 780 150 585 75 293 250 975 200 780 100 390 300 1170 250 975 125 488 350 1365 300 1170 150 585 400 1560 350 1365 175 683 450 1755 400 1560 200 780 500 1950 450 1755 225 878 550 2145 500 1950 250 975 For motors rated over 200 KVA - See Notes 1 and 2.

Lihue, Kauai, Hawaii Original Sheet 11 NOTES 1. Applications requiring motors rated more than 200 HP, more than 200 KVA or above 600 volts must be approved by the Company. For such applications, the Company may require that the customer furnish an increment starting device capable of limiting the current increment between successive steps to 3.3 amperes per running ampere and limiting the total current on any step to 6.0 amperes per running ampere. 2. In applications requiring motors requiring more than 450 HP, the Company will specify the service voltage. The customer will provide HP rating, full load current, speed, inertia and other pertinent data. It is the customer's responsibility to provide the appropriate equipment to ensure soft motor starting. 3. When unusual circumstances exist and if system conditions permit, locked-rotor currents larger than those stated in Tables 1, 2, and 3 and in Note 1 may be used if approved by the Company. Any requests for permission to exceed the above listed starting currents or to apply a motor with a horsepower or voltage rating not covered in Tables 1, 2, or 3 must be made to the Company in writing, giving full details of the proposed installation, including the locked-rotor current of the motor to be started and the motor nameplate data. 4. Current-limiting devices may be omitted on the smaller motors of a group installation when their omission will not result in a starting current that is in excess of the allowable starting current of the largest motor in the group. 5. Increment starting is considered to meet these rules provided the following four conditions are met: a. The current increment between successive steps does not exceed the values stated in Tables 1, 2, and 3; b. The total current on any step does not exceed l54% of the values stated in Tables 1, 2, and 3; c. The interval between steps is not less that one-half of a second; d. At no time is the circuit interrupted.

Lihue, Kauai, Hawaii Original Sheet 12 6. Motor starting devices using open transition must limit the maximum current drawn during the starting period to the values stated in Tables 1, 2, and 3 and are limited to applications with motors rated 200 HP (200 KVA) or less. E. COGENERATION REQUIREMENTS 1. General requirements for qualification a. Small power production facilities. A small power production facility is a qualifying facility if it: (1) Meets the maximum size criteria specified in HAR 6-74-5(a); and (2) Meets the fuel use criteria specified in HAR 6-74-5(b); and (3) Meets the ownership criteria specified in HAR 6-74-7. b. Cogeneration facilities (1) A cogeneration facility is a qualifying facility if it: (a) Meets any applicable operating and efficiency standards specified in HAR 6-74-6(a) and (b); and 2. System emergencies (b) Meets the ownership criteria specified in HAR 6-74-7. (2) For purposes of qualification of a cogeneration facility for exemption from incremental pricing, a cogeneration facility must qualify under HAR 6-74-6(c). (Eff: 10-1-85) (Auth: HRS 269-6) (Imp: HRS 269-27.2) a. Qualifying facility obligation to provide power during system emergencies. A qualifying facility shall be required to provide energy or capacity to the Company during a system emergency only to the extent provided by agreement between such qualifying facility and the Company.

Lihue, Kauai, Hawaii Original Sheet 13 b. Discontinuance of purchases and sales during system emergencies. During any system emergency, the Company may discontinue: (1) Purchases from a qualifying facility if such purchases would contribute to such emergency; and (2) Sales to a qualifying facility, provided that such discontinuance is on a nondiscriminatory basis. (Eff: 10-1-85) (Auth: HRS 269-6) (Imp: HRS 269-27.2) 3. Standards for operating reliability a. Qualifying facilities shall not be prohibited from providing automatic equipment which will isolate their generation from the system during large system disturbances. b. This will allow the qualifying facilities to remain on line and to assist in system restart rather than be dependent on the system for restart. (Eff: 10-1-85) (Auth: HRS 269-6) (Imp: HRS 269-27.2) F. USAGE OF SERVICE DETRIMENTAL TO OTHER CUSTOMERS The Company shall have the right to refuse to supply loads of a character that may impair service to other customers. In the case of motor starting welding machines, x-ray machines, arc furnaces and other installations of like character where the use of electricity is intermittent or subject to substantial fluctuation, the customer shall provide at the customer's own expense, suitable equipment to reasonably limit such fluctuation or the Company may alter its facilities to correct such fluctuations and the customer shall make a contribution in the amount of the cost of alteration.

Lihue, Kauai, Hawaii Original Sheet 14 G. POWER FACTOR CORRECTION Where neon, fluorescent or high intensity discharge lamps, welding transformers, x-ray machines and other devices including air conditioners having power factor below 85%, or non-company self-generators with induction generators that are served by the Company, the customer shall provide power factor corrective equipment at the customer's expense to increase the power factor of the load to not less than 85%. Customers served on rate schedules without power factor clauses may be required by the Company to provide, at the customer's expense, power factor corrective equipment to increase the power factor to not less than 85%. When a power factor adjustment provision is specified in a special service contract, it shall supersede or modify the application of the power factor clause in the Company's rate schedule. H. NOTICE OF CHANGE 1. The Company shall inform its customers of any change made, or proposed to be made, in the character of electric service supplied as would affect the efficiency or safety of operations of the appliances or equipment which may be in use by said customer. 2. The cogeneration qualifying facility shall inform the Company of any change made, or proposed to be made, in the character of electric service supplied as would affect the efficiency or safety or operations of the Company's equipment or personnel.