Results Report. Downtown to NAIT LRT Station Visioning Workshops Saturday, November 22, 2008 Robbins Health Learning Centre Grant MacEwan College

Similar documents
THE WAY WE MOVE LRT FOR EVERYONE

1 Downtown LRT Connector: Draft Concept

What We Heard. Edmontonians in communities Northwest of City Centre share their vision of the Metro Line NW LRT Expansion

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

What We Heard Report - Metro Line NW LRT

East Link Extension. September 16, Bel-Red Conclusion to Final Design Open House Public Involvement Summary

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Welcome. Green Line in Your Community

Parking Management Element

Welcome. Metro Line Northwest LRT Expansion Project

CORE AREA SPECIFIC PLAN

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Attachment 5 Eglinton West LRT Planning and Technical Update

Green Line LRT: Beltline Segment Update April 19, 2017

Transportation Demand Management Element

TORONTO TRANSIT COMMISSION REPORT NO.

Bus Stop Optimization Study

5. OPPORTUNITIES AND NEXT STEPS

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

West LRT Lewis Estates to Downtown Concept Plan

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

TRAIN, BUS & TRANSIT

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

Appendix C. Parking Strategies

2015 LRT STATION ACTIVITY & PASSENGER FLOW SUMMARY REPORT

Business Advisory Committee. November 3, 2015

Background. Request for Decision. Pedestrian Lighting Standards for Road Right-of-ways. Recommendation. Presented: Monday, Mar 17, 2014

MOTION NO. M Preferred Alternative for the Puyallup Station Access Improvement Project

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup

Mississauga Bus Rapid Transit Preliminary Design Project

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Ottawa LRT Stage 2. McKellar Park Information Session

West LRT. Alignment Update and Costing Report May Calgary Transit Transportation Planning Clifton ND Lea Consultants

Mercer Island Center for the Arts Parking Management Plan

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

Winnipeg Transit Bus Maintenance Garage Expansion Project

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014

West Broadway Reconstruction/LRT Design. March 19, 2015

SIDEWALK CAFE GUIDELINES

CEDAR AVENUE TRANSITWAY Implementation Plan Update

Harlem Avenue between 63 rd and 65 th

Dallas CBD Second Light Rail Alignment (D2)

On June 11, 2012, the Park Board approved the installation of three electric vehicle charging stations along Beach Avenue.

2015 LRT PASSENGER COUNT. CAPITAL and METRO LINES

AGENDA INTERCITY TRANSIT AUTHORITY WORK SESSION January 20, :30 P.M. 1) APPROVAL OF AGENDA 1 min.

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

SIDEWALK CAFE AND PARKING PATIO GUIDELINES

FREQUENTLY ASKED QUESTIONS

Downtown Parking/Wayfinding Study. Review of Recommendations to City Council: January 16, 2018

Committee Report. Transportation Committee. Business Item No

Click to edit Master title style

Waco Rapid Transit Corridor (RTC) Feasibility Study

San Rafael Transit Center. Update. Golden Gate Bridge, Highway & Transportation District Transportation Committee of the Board of Directors

and Members of Municipal Council City of Niagara Falls, Ontario Mewburn Road Speed Control Review

Business Advisory Committee. July 7, 2015

10/4/2016. October 6, Item #1 CITIZENS PARTICIPATION

Low-Speed Autonomous Shuttle Project Summary

METRO Orange Line BRT American Boulevard Station Options

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: August 30, SUBJECT: Scarborough Rt Strategic Plan

Converting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada

POLICIES FOR THE INSTALLATION OF SPEED HUMPS (Amended May 23, 2011)

2.4 TRANSIT VISION 2040 FROM VISION TO ACTION. Support the revitalization of urban cores STRATEGIC DIRECTION

McNICOLL BUS GARAGE. Public Open House June 12, 2017 Mary Ward Catholic School

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Chapter 740, Street Vending One Year Review

Newmarket GO Station Mobility Hub Study. Open House #1 MAY 18, 2017

E) That the General Manager be authorized to execute and deliver such documentation on behalf of the Park Board.

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

Chapter 4 : THEME 2. Transportation

PROJECT BACKGROUND 3

Rapid Transit and Land-Use Integration a Reality

4 Circulation & Transportation

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury

Scarborough Transit Planning

OATAC On March 14, 2018 the E-Bike Working Group met at the Northview Community Centre.

Office of Transportation Bureau of Traffic Management Downtown Parking Meter District Rate Report

Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration

Background Information about the Metrobus 29 Lines Study

CITY OF ANN ARBOR, MICHIGAN 301 E. Huron St., P.O. Box 8647 Ann Arbor, Michigan

Iliff and Florida Stations Meeting Q&A What is the elevation of the Iliff Station? How was it decided which direction of lanes Abilene loses?

WELCOME Open House on Parking

Capital Needs Assessment Riders Advisory Council July2, 2008

August 2, 2010 Public Meeting

REGIONAL DISTRICT OF NORTH OKANAGAN. COMMITTEE OF THE WHOLE MEETING Wednesday, October 2, :30 p.m. REGULAR AGENDA

Branch Edmonton Transit

TORONTO TRANSIT COMMISSION REPORT NO.

Tempe Streetcar. March 2, 2016

CTA Blue Line Study Area

Key Project Elements Status Report

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1

FREQUENTLY ASKED QUESTIONS

COMMISSION WORKSHOP Tuesday, May 12, :00 a.m. 12:00 p.m.

CREATING CONNECTIONS IN THE TOWN OF NEWMARKET

Halifax Commuter Rail: A Fresh Concept

residents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by

Scope of Services January 26, Project Development and Conceptual Engineering for City of Lake Forest Amtrak Station

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

ANDERSON PROPERTY SITE ANALYSIS

Pace Bus Depot Location Analysis

Transcription:

Results Report January 2009 Downtown to NAIT LRT Station Visioning Workshops Saturday, November 22, 2008 Robbins Health Learning Centre Grant MacEwan College The Downtown to NAIT LRT Project Team would like to thank everyone who came to the MacEwan and Kingsway LRT Station workshops on Saturday, November 22, 2008. We greatly appreciate the time and energy you put into the discussion. All suggestions from the workshops will be considered as the design process progresses. While, it is still too early to report on how each of the specific suggestions will be considered, it is important to report on the progress of the overall themes from the discussion. As the design progresses, updates will be shared with the surrounding community and study stakeholders through regular newsletters, website updates, and through Community Advisory Committee meetings and updates to the Stakeholder Advisory Group. Responses to comments from both station workshops have been combined in this report. Copies of this report and the data from each of the workshops can be downloaded by following links to the Downtown to NAIT LRT study at www.edmonton. ca/lrtprojects, or by calling the LRT Projects information line at 780.496.4874. www.edmonton.ca/lrtprojects

Station security and personal safety considerations Station design to be a community landmark symbol and fit/ compliment existing community (Kingsway Workshop) Use lighting/clear sight lines/other design elements to ensure transit facilities and surrounding areas do not become a staging area for criminal activity. The use of Crime Prevention Through Environmental Design (CPTED) principles is highly important to the design of the station and to ensure it is a positive development for the surrounding community. The project team will place a high importance on CPTED design principles. We will also seek out expertise to review the designs and ensure appropriate measures are taken. ETS has launched a Transit Watch program a public awareness and crime prevention program modeled after the Neighbourhood Watch program. As well, ETS participates with other community safety initiatives such as DARE (Drug Abuse and Resistance Education), Neighbourhood Watch, Safe Stranger, and Crime Stoppers. Provide security infrastructure such as emergency call stations, security cameras 2 Results Report Deal pro-actively with homeless issues, crime, and vandalism. Stations will be designed to discourage graffiti and other vandalism (through use of open sight lines, building materials, security features). Safety features including help phones, emergency call buttons, security cameras, and direct dial to security on payphones will be integrated into all transit facilities. The project will work towards 100% security camera coverage at all LRT stations, the LRT platform, and the bus terminal. We will work with ETS security to ensure this infrastructure is located in the right place. For more information on ETS security initiatives, see www.takeets.com (click on Facilities and Accessibility, click on Safety and Security ).

Weather protection All stations will have an indoor heated waiting area to provide weather protection for LRT and bus patrons. Extended community use around the station The design will explore opportunities for commercial kiosks/café. Community amenity space is important and will be incorporated where it is feasible and reasonable. 24 hour physical presence patrols by police and security with an office on-site ETS security provides roaming patrols to all LRT properties Provide adequate number of crossing locations for pedestrians, bikes, vehicles, etc. (Kingsway Workshop) Pedestrian access to Kingsway Garden Mall via a pedestrian overpass Providing safe/convenient pedestrian access from transit facilities to major activity centres such as Kingsway Garden Mall is a high priority. Pedestrian routes were examined between the transit facilities and Kingsway Garden Mall. Because of the location of other pedestrian destinations, sidewalks, and intersections, a pedestrian overpass would not address pedestrian safety concerns from the transit facilities to Kingsway Garden Mall. Pedestrians will always choose the most convenient and direct route. Pedestrian overpasses require a longer travelling time, and other jurisdictions have found the overpasses are not used where there are more convenient options. A greater safety hazard will exist if safety measures are not in place for the more direct street-level route. On-site security offices will be explored. For the MacEwan Station, this will include reviewing coverage from the main ETS security office, which is located at the nearby Churchill LRT Station. Intersection design will review pedestrian crossing data to ensure it allows for safe/convenient circulation. A safety audit will be completed on all intersections by the American Public Transportation Association (APTA). 3 Results Report

Ideas and concepts to integrate the station into adjacent communities Design for winter/protect for weather. All stations will have an indoor heated waiting area to provide weather protection for LRT and bus patrons. Park and ride The potential for park and ride was reviewed during the earlier planning phase, where it was found that there wasn t sufficient land available in the area to provide park and ride. Also, as the stations are very close to downtown, few users would benefit from using use the area for park and ride. However, we recognize the concern from the adjacent communities and businesses regarding the potential for parasitic parking. We will review the area and determine what measures may be available to reduce the potential for parasitic parking in adjacent areas, including expanding or revising current Residential Parking Programs that are in place. Opportunity for daycare/adult respite program deficiencies ETS offers free transit travel training sessions for individuals and groups. These sessions are customized to meet individual/group learning needs and objectives. To learn more about the program or to organize a training session, contact the ETS Travel Training information line at (780) 496-3000. Need to have a workshop for the NAIT station (temporary and/or permanent). A workshop for the temporary NAIT station will be held. Encourage more opportunities for business/retail adjacent, near or within the station 4 Results Report A public information campaign will discourage patrons from trying to park and ride on the Downtown to NAIT LRT line. It will be advertised as a transit transfer/walkon/pick-up/drop off line only. Space for retail kiosks will be explored. Land use plans surrounding the stations encourage main street commercial development. When the LRT is in operation, it will provide more market to encourage this type of development.

Important considerations for the movement of pedestrian, bicycle and vehicular trafficinto adjacent communities Station underground and protected (MacEwan Workshop) Efforts will be made to minimize the impact on traffic within the available roadway capacity, recognizing that priority will be given to LRT and supporting a pedestrian friendly environment. Crossing safety delineates where the crossings are We will explore different crossing treatments to reflect this theme. Industry standards and operating practices will be followed to ensure consistency and clarity of crossing devices. Underground pedway to the hospital The project team has been working with the health authority, and we are committed to ensuring safe and fully accessible pedestrian connections are available between the LRT station and the hospital. However, the City can not plan facilities on hospital land. Underground station at NAIT Trains at grade: general impact on major traffic arteries City Council made a decision when reviewing the Concept Plan to remove roadway capacity in order to encourage more transit ridership. Planning for a station north of Princess Elizabeth Avenue is beyond the scope of the Downtown to NAIT LRT study. However, the City of Edmonton will work with NAIT to determine the ultimate location of the NAIT Station as part of the upcoming Northwest LRT study. 5 Results Report

Because of existing neighborhood challenges such as social services, social agencies, half way houses, what can you do to mitigate the station becoming a hang out area? (Macewan Workshop) Physical separation between private and public property This will be reviewed as design continues (including design of the multi-use trail). Options include landscaping, screen fencing, or less visually intrusive methods. Provide adequate number of crossing locations for pedestrians, bikes, vehicles, etc. A pedestrian and cyclist friendly environment is important and will be enhanced through the addition of the new multi-use trail. Pedestrian and cyclist crossings will be provided at all stations, intersections, and at key mid-block locations. 6 Results Report

LRT station features of other stations in Edmonton or elsewhere that people like and dislike Weather protection for people waiting for train (cold wind) All stations will have an indoor heated waiting area to provide weather protection for LRT and bus patrons. Station underground and protected The Downtown to NAIT LRT plan does not include underground LRT stations; however, there will be indoor heated waiting areas. Look at raised pedestrian crossing from LRT/hospital/ transit to mall. Avoid surface congestion at intersections. Better integration of bus and (MacEwan) LRT Station (MacEwan Workshop) and intersections, a pedestrian overpass would not address pedestrian safety concerns from the transit facilities to Kingsway Garden Mall.Pedestrians will always choose the most convenient and direct route. Pedestrian overpasses require a longer travelling time, and other jurisdictions have found the overpasses are not used where there are more convenient options. A greater safety hazard will exist if safety measures are not in place for the more direct street-level route. The project team has been working with the health authority, and we are committed to ensuring safe and fully accessible pedestrian connections are available between the LRT station and the hospital. However, the City can not plan facilities on hospital land. Intersection design will review pedestrian crossing data to ensure it allows for safe/convenient circulation. A safety audit will be completed on all intersections by the American Public Transportation Association (APTA). Pedestrian routes were examined between the transit facilities and Kingsway Garden Mall. Because of the location of other pedestrian destinations, sidewalks, 7 Results Report

Parking lot issues/questions Provide copy of presentation/handouts These have been posted on the web at www.edmonton. ca/lrtprojects and circulated to the people who have asked to be on our contact list. Concern noise and vibration assessments will not be extensive enough. Concerned about noise and vibration especially because there are so many curves. 8 Results Report Trains at grade: Causing gridlock and hampering emergency services (MacEwan Workshop) Integrate European-style café into the station The design will explore opportunities for commercial kiosks/café space. Open station design transparent with good sight lines This will be incorporated. The methodology for noise and vibration assessments is completed following industry standards and best practices used throughout North America. We will complete building assessments prior to construction to measure pre-construction conditions. Should issues arise, baseline information will be in place. The track curvature does provide noise challenges at specific locations. We will review engineering and operational modifications to address this (including potential for sound absorption materials, automatic lubricators, operating speeds).

Noise attenuation is only installed if predicted noise levels reach guidelines outlined in City Policy. A noise study was completed using the methodology outlined in this policy for the Downtown to NAIT study, and noise levels predicted for the future do not meet thresholds for noise attenuation. Need financial details of both the engineered solution using existing project budget and the solution after addressing all of the mitigating issues in order to calculate cost escalations. The project budget presented to City Council in September includes landscaping and architectural/ aesthetic features. At this level of design, conceptual cost estimates are prepared. Detailed costs of specific items have not been developed at this time. Project costs will be closely monitored and project costs will be reported as tender results are announced during the construction phase. Need to talk about NAIT station (temporary and/or permanent) (Kingsway Workshop) Show what features will be copied and avoided as compared to other stations like Southgate Station concepts will be developed and information on specific features will be shared. NAIT station has more importance for connections to mall than Kingsway station Pedestrian connections to the Mall from both stations are important and will be provided. Detailed financial information on specific items will not be disclosed if it has the potential to negatively impact the City s financial interests through the tendering process. 9 Results Report

Physical separation between private and public property (Kingsway Workshop) What is the plan for the Kingsway Mews? Options? What happens to tenants of Kingsway Mews (who are not owners)? Compensation by City? Property owners will not compensate. Tenants should be involved in negotiations, not just owners Engineers are working on options to reduce the property required on the Kingsway Mews site. This includes adjustments to the LRT station locations, and roadway design to avoid impacts to the existing buildings. Ensuring continued access and adequate parking is also important. At this point we don t know for certain which owners/ tenants will be affected. Owners/tenants should proceed on the basis of business as usual. The City strives to assist affected business if they are required to relocate because of City infrastructure projects. Affected businesses may include property owners and tenants of various kinds. Each party is responsible for their own interests and we deal with each individually. Any discussion with a tenant is independent of discussions with a property owner, as tenants issues and needs are different. In addition, we keep information confidential as business issues are not public information. Need details of underground costing vs. at grade (streetlevel) The discussion of underground vs. street-level LRT was extensive throughout City Council s review of the Downtown to NAIT concept plan in July and September 2008. Estimates to build the LRT underground for the entire alignment were included as part of these reports. The July 2008 Council report indicated an additional $400 million would be needed to place the entire LRT alignment underground. This report is available online at www.edmonton.ca/ LRTprojects (Downtown to NAIT LRT study>publications and News) This information was presented to City Council, who considered a motion to put the LRT underground. The motion was defeated. 10 Results Report

Look at raised pedestrian crossing from LRT/hospital/transit to mall. Avoid surface congestion at intersections (Kingsway Workshop) We will review this concern as part of the design process and provide an update in future reports. SISEM and Holy Rosary Church concerns: Maintaining the service road will be an issue at temporary NAIT station We will review this concern as part of the design process and provide an update in future reports. Safety for children and parishioners Limited access to daycare Limited access for emergency vehicles Vandalism Suggest the station be moved to the airport These concerns will be addressed in the design of the temporary station. Specific measures to address these concerns will be discussed at a future workshop. The service road will become a kiss n ride area, so instead a good location needs to be designed and built for passenger drop-offs. The permanent location of the NAIT station will be determined as part of the Northwest LRT study. 11 Results Report

Stay informed. If you would like to receive regular information on the Downtown to NAIT LRT study, please join our email list by typing subscribe to NLRT email in the subject box. You may also receive printed updates by calling the LRT Projects Information Line at 780.496.4874 and leaving your name and address. Updates will also be posted on the Downtown to NAIT LRT portion of the website at www.edmonton.ca/lrtprojects, under LRT Studies.