TRANSPORTATION ANALYSIS. Wawa US 441 and Morningside Drive. Prepared for: Brightwork Real Estate, Inc.

Similar documents

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

886 March Road McDonald's Transportation Study

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

Sugarland Crossing Gwinnett County, Georgia

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

Weaver Road Senior Housing Traffic Impact Analysis

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

Village of Richmond Transportation Brief

Provide an overview of the development proposal including projected site traffic volumes;

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

LOST LAKE CORRIDOR REVIEW

JRL consulting. March Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3

Re: Cyrville Road Car Dealership

Date: December 20, Project #:

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

Re: Residential Development - Ogilvie/Cummings Transportation Overview

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets

Lakeside Terrace Development

Wellington Street West

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

10 th Street Residences Development Traffic Impact Analysis

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

TECHNICAL MEMORANDUM Upper Broadway Road Diet Summary of Findings

267 O Connor Street Residential Development

Traffic Impact Analysis Farmington Center Village

(A) Project Manager, Infrastructure Approvals

700 Hunt Club Road. Transportation Impact Study - Addendum #1. Submitted by:

One Harbor Point Residential

STANDARD LIMITATIONS

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA

CastleGlenn Consultants Inc.

Sweetwater Landing Traffic Impact Analysis

Traffic Impact Analysis Update

Traffic Impact Statement (TIS)

1140 Wellington Street West Transportation Brief

MMM Group Limited. Communities. Transportation. Buildings. Infrastructure

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

Appendix I: The Project Traffic Impact Study report by TJKM Transportation Consultants

Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A November 8, 2017 Revised December 20, 2017

1012 & 1024 McGarry Terrace

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality

C. iv) Analysis/Results

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID

Final Technical Report US 17 Corridor Study Update (Market Street Road Diet)

Alpine Highway to North County Boulevard Connector Study

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit Application Transportation Assessment

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use

Parking/Traffic Assessment Study

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Appendix B: Traffic Reports

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

MEMORANDUM November 19, 2012

Interstate 80 Corridor Study

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

Traffic Impact Study Speedway Gas Station Redevelopment

TRAFFIC IMPACT ANALYSIS

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Dartmouth, NS B3B 1X7 Tel: WSP. Canada Inc.

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

Intersection LOS Delay (Sec) LOS Delay (Sec.) US 3/ Hawthorne Drive N B 16.1 B 17.5

Oakbrook Village Plaza City of Laguna Hills

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

Proposed Hotel and Restaurant Development

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

APPENDIX G. Traffic Data

Proposed Pit Development

CitiGate Retail Development

LEMON FLATS SECOND ACCESS

Appendix H: Construction Impacts H-2 Transportation

Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT TIA Report.docx

Winnetka Avenue Bike Lanes Traffic Impact Analysis

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

RTE. 1 at RTE. 637 & RTE. 639

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS

Critical Movement* Delay (sec/veh) Critical Movement* LOS 8 a.m. 9 a.m. B 25.2 C. 3 p.m. 4 p.m. B 17.3 B

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS

Transcription:

TRANSPORTATION ANALYSIS Wawa US 441 and Morningside Drive Prepared for: Brightwork Real Estate, Inc.

TABLE OF CONTENTS Introduction... 1 Project Description... 1 Estimated Daily Project Traffic... 3 Estimated AM Peak Hour Project Traffic... 3 Estimated PM Peak Hour Project Traffic... 3 Analysis Period... 7 Project Trip Distribution / Assignment... 7 Adjacent Roadways... 7 Peak Season Traffic... 11 Intersection Analysis... 15 Access Recommendations... 18 LIST OF FIGURES Figure 1. Project Location... 2 Figure 2. AM Peak Hour Project Traffic... 9 Figure 3. PM Peak Hour Project Traffic... 10 Figure 4. Peak Season Traffic... 12 Figure 5. AM Peak Hour Peak Season + Project Traffic... 13 Figure 6. PM Peak Hour Peak Season + Project Traffic... 14 LIST OF TABLES Table 1. Estimated Daily Project Traffic... 4 Table 2. AM Peak Hour Project Traffic... 5 Table 3. PM Peak Hour Project Traffic... 6 Table 4. Estimated Peak Hour Project Traffic Distribution... 8 Table 5. Estimated Intersection Level of Service (Signalized)... 16 Table 6. Estimated Intersection Level of Service (Unsignalized)... 17 Table 7. Access Recommendations... 19 Transportation Analysis US 441 and Morningside Drive i

LIST OF APPENDICES Conceptual Site Plan Trip Generation - Proposed Uses Trip Generation Existing Uses Passerby Capture Rates Turning Movement Counts FDOT Seasonal Adjustment Factors Intersection Analysis Turn Lane Warrants Transportation Analysis US 441 and Morningside Drive ii

INTRODUCTION The purpose of this report is to provide the Transportation Analysis for the property located south of US 441 and west of Morningside Drive in the City of Mount Dora, as shown in Figure 1. PROJECT DESCRIPTION The project is proposed to have the following uses for the purpose of this analysis: 6,119 Square Foot of Convenience Market with Gasoline Pumps The site is currently occupied by a Shell gas station with four gasoline pumps. The accesses for the project are proposed to be as follows: One (1) right-in/right-out access to US 441 (existing driveway to be relocated away from the intersection) One (1) full access to Morningside Drive across from Old Eustis Road (same location as existing driveway) A conceptual site plan is included in the Appendix of this report. Transportation Analysis US 441 and Morningside Drive 1

Figure 1. Project Location Transportation Analysis US 441 and Morningside Drive 2

ESTIMATED DAILY PROJECT TRAFFIC The trip rates utilized in this report were obtained from the latest computerized version of OTISS which utilizes the Institute of Transportation Engineers (ITE) Trip Generation, 9 th Edition, 2012, as its database. Based on these trip rates, it is estimated that the proposed project will attract approximately 6,126 daily trip ends, as shown in Table 1. Studies contained in the ITE Trip Generation Handbook, 3 rd Edition, indicate that a percentage of the project trips already exist on the adjacent roadways passerby capture. Therefore, the new daily trip ends attracted to the proposed project would be 2,472 trip ends, as shown in Table 1. ESTIMATED AM PEAK HOUR PROJECT TRAFFIC Again, based on data contained in the ITE Trip Generation, 9th Edition, the proposed project would attract approximately 250 trip ends during the AM peak hour with 125 inbound and 125 outbound, as shown in Table 2. As previously stated, studies contained in the ITE Trip Generation Handbook, 3 rd Edition, indicate that a percentage of the project trips already exist on the adjacent roadways passerby capture. Therefore, the new AM peak hour trip ends attracted to the proposed project would be 92 trip ends with 46 inbound and 46 outbound, as shown in Table 2. ESTIMATED PM PEAK HOUR PROJECT TRAFFIC Again, based on data contained in the ITE Trip Generation, 9 th Edition, during the PM peak hour, the proposed project would attract approximately 312 trip ends during the PM peak hour with 156 inbound and 156 outbound, as shown in Table 3. As previously stated, studies contained in the ITE Trip Generation Handbook, 3 rd Edition, indicate that a percentage of the projects trips already exist on the adjacent roadways passerby capture. Therefore, the new PM peak hour trip ends attracted to the proposed project would be 106 trip ends with 53 inbound and 53 outbound, as shown in Table 3. Transportation Analysis US 441 and Morningside Drive 3

Table 1. Estimated Daily Project Traffic Daily ITE Trip Passerby New Daily Land Use LUC Size Ends (1) Capture (2) Trip Ends Proposed Convenience Market w Gas 853 6,119 SF 5,175 3,260 1,915 Existing Gas Station w Convenience 945 4 Pumps 651 365 286 (1) Source: ITE Trip Generation, 9th Edition, 2012. (2) Source: ITE Trip Generation Handbook, 3rd Edition. Difference 4,524 2,895 1,629 Transportation Analysis US 441 and Morningside Drive 4

Table 2. AM Peak Hour Project Traffic AM Peak Hour Passerby New AM Peak Hour ITE Trip Ends (1) Capture (2) Trip Ends Land Use LUC Size In Out Total In Out Total In Out Total Proposed Convenience Market w Gas 853 6,119 SF 125 125 250 79 79 158 46 46 92 Existing Gas Station w Convenience 945 4 Pumps 21 20 41 13 12 25 8 8 16 (1) Source: ITE Trip Generation, 9th Edition, 2012. (2) Source: ITE Trip Generation Handbook, 3rd Edition. Difference 104 105 209 66 67 133 38 38 76 Transportation Analysis US 441 and Morningside Drive 5

Table 3. PM Peak Hour Project Traffic PM Peak Hour Passerby New PM Peak Hour ITE Trip Ends (1) Capture (2) Trip Ends Land Use LUC Size In Out Total In Out Total In Out Total Proposed Convenience Market w Gas 853 6,119 SF 156 156 312 103 103 206 53 53 106 Existing Gas Station w Convenience 945 4 Pumps 27 27 54 15 15 30 12 12 24 (1) Source: ITE Trip Generation, 9th Edition, 2012. (2) Source: ITE Trip Generation Handbook, 3rd Edition. Difference 129 129 258 88 88 176 41 41 82 Transportation Analysis US 441 and Morningside Drive 6

ANALYSIS PERIOD The study period for this project includes both the AM and PM peak hours. PROJECT TRIP DISTRIBUTION / ASSIGNMENT The following distribution of the AM and PM peak hour trip ends was based on the existing traffic and development patterns with hand assignment to the local network: 40% to and from the east (via US 441) 40% to and from the west (via US 441) 10% to and from the north (via Old Mount Dora Road) 10% to and from the south (via Morningside Drive) Table 4 shows the distribution of the new AM and PM peak hour project trip ends. Figure 2 and Figure 3 illustrate the project trip ends on the adjacent roadway network for the AM and PM peak hours, respectively. ADJACENT ROADWAYS As stated previously, the site is located south of US 441 and west of Morningside Drive. Morningside Drive is a two (2) lane undivided roadway and US 441 is a six (6) lane divided roadway in the vicinity of the project. According to the City of Mount Dora, Marion County, and Florida Department of Transportation (FDOT) Capital Improvement Programs, there are no capacity adding improvements budgeted in the vicinity of the project. Transportation Analysis US 441 and Morningside Drive 7

Table 4. Estimated Peak Hour Project Traffic Distribution Time East (40%) West (40%) North (10%) South (10%) Total Period In Out In Out In Out In Out In Out AM 18 18 18 18 5 5 5 5 46 46 PM 21 21 22 22 5 5 5 5 53 53 Transportation Analysis US 441 and Morningside Drive 8

Figure 2. AM Peak Hour Project Traffic Transportation Analysis US 441 and Morningside Drive 9

Figure 3. PM Peak Hour Project Traffic Transportation Analysis US 441 and Morningside Drive 10

PEAK SEASON TRAFFIC The following methodology was utilized to estimate the existing volumes within the study area: 1. WHITEHOUSE GROUP INC. obtained AM and PM turning movement counts at intersections of US 441 and Morningside Drive. 2. The turning movement counts were collected during a period when the FDOT 2015 Peak Season Adjustment Factors for Marion County was 1.0. Therefore, the counts are peak season and need no adjustment. Figure 4 illustrates the peak season traffic, Figure 5 illustrates the AM peak season plus project traffic, and Figure 6 illustrates the PM peak season plus project traffic. Transportation Analysis US 441 and Morningside Drive 11

Figure 4. Peak Season Traffic Transportation Analysis US 441 and Morningside Drive 12

Figure 5. AM Peak Hour Peak Season + Project Traffic Transportation Analysis US 441 and Morningside Drive 13

Figure 6. PM Peak Hour Peak Season + Project Traffic Transportation Analysis US 441 and Morningside Drive 14

INTERSECTION ANALYSIS Intersection analysis was conducted for the AM and PM peak hours at the following intersections within the study network: US 441 and Morningside Drive US 441 and Project Driveway A Morningside Drive and Project Driveway B The analysis was based on SYNCHRO for both with and without the proposed project traffic. Table 5 and Table 6 summarize the analysis for the signalized and unsignalized intersections, respectively, and are described in detail in the following paragraphs. US 441 and Morningside Drive This intersection is signalized. Signalized intersection analysis indicates that this intersection should operate at a Level of Service C during the AM and PM peak hours with the peak season plus project traffic, as shown in Table 5. US 441 and Project Driveway A This project driveway is purposed to be unsignalized. Unsignalized intersection analysis indicates that all the movements at this intersection should operate at an acceptable level of service during the AM and PM peak hours with the peak season plus project traffic, as shown in Table 6. Morningside Drive and Project Driveway B This project driveway is purposed to be unsignalized. Unsignalized intersection analysis indicates that all the movements at this intersection should operate at an acceptable level of service during the AM and PM peak hours with the peak season plus project traffic, as shown in Table 6. Transportation Analysis US 441 and Morningside Drive 15

Table 5. Estimated Intersection Level of Service (Signalized) Peak Season Plus Time Peak Season Traffic Project Traffic Intersection Period Delay LOS Delay LOS US 441 and AM 15.3 B 21.9 C Morningside Drive PM 18.7 B 24.2 C Transportation Analysis US 441 and Morningside Drive 16

Table 6. Estimated Intersection Level of Service (Unsignalized) Peak Season Plus Peak Season Plus Project Traffic Project Traffic AM Peak Hour PM Peak Hour Intersection Movement Left Through Right Left Through Right US 441 and Project Driveway A NB - - C - - C Morningside Drive and EB B B B B B B Project Driveway B WB A A A A A A NB A A A A A A SB A A A A A A Transportation Analysis US 441 and Morningside Drive 17

ACCESS RECOMMENDATIONS The recommendations included in this report are based on a field review of the site, the proposed site plan and the Transportation Analysis. The FDOT Driveway Guide was utilized to determine the need for right turn lanes on US 441 and Morningside Drive. The Highway Research Record 211 Volume Warrants for Left-turn Storage Lanes at Unsignalized Grade Intersections (Harmelink Curves) was utilized to determine the need for a left turn lane on Morningside Drive. The access recommendations are summarized in Table 7 and described in the following paragraph: US 441 and Project Driveway The project driveway is proposed to have right-in/right-out access to US 441. Based on the estimated project traffic, an eastbound right turn lane is not warranted. Morningside Drive and Project Driveway B The project driveway is proposed to have full access to Morningside Drive across from Old Eustis Road. Based on the estimated project traffic, neither a northbound left turn lane or a southbound right turn lane is warranted. Transportation Analysis US 441 and Morningside Drive 18

Table 7. Access Recommendations Peak Hour Turn Lane Intersection Movement Volume (1) Warrented? US 441 and Project Driveway A EBR 46/75 N Morningside Drive and Project Driveway B NBL 8/8 N SBR 62/63 N (1) See Figures 5 and 6, Peak Hour Peak Season Plus Project Traffic, from the report. Transportation Analysis US 441 and Morningside Drive 19

APPENDIX

APPENDIX CONCEPTUAL SITE PLAN

EC N OU TS 8 WB 19,78 SITE EXISTING TRAFFIC SIGNAL REVISIONS REV US PROPOSED FULL ACCESS ' PROPOSED RIGHT-IN/ RIGHT-OUT ACCESS APE 4'x3' AIR MACHINE PAD W/ 2 BOLLARDS ER BUFF It's fast. It's free. It's the law. www.callsunshine.com E 30' RIV 20' 10' 5' 11' 10' 10 NOT APPROVED FOR CONSTRUCTION 28'. 183 CK 15 7.5 0 PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: 30 NB LEASE EXHIBIT BE TS UN CO PROPOSED CROSS ACCESS FER UF 6'x6' VENT STACK PAD 10' B PE CA DS 30' 68' FLT150049 JDP GRR 05/04/2016 AS NOTED CONCEPT PROJECT: TU AN 35' 1"= 30' 25 5' WIDE ROCK BED a" L 1' 34. 96' 4 E" 20' 10' TYP K AC 90' 1,4 14' 20' 10' ETB GS 55' 30 8' DIN UIL 150' 5 A SETB DING L I U B B 90' ' 243.3 30' BY KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG ED 10' SC LAND ' 203.6 SID FUEL PRICING SIGN MAX HEIGHT 10' 150 SF MAX SITE SIGNAGE AREA ING E COMMENT RN MO "AIR PUMP PARKING ONLY" SIGN 150 9 19,76 DATE 41 4 Y HW AIR SPACE, AISLE, AND ADJACENT SPACE TO BE 6" CONC. NTS COU E B B TU NORTHERN VIRGINIA CENTRAL VIRGINIA CHARLOTTE, NC RALEIGH, NC TAMPA, FL BOCA RATON, FL B TU S T OUN C E TUB LEHIGH VALLEY, PA SOUTHEASTERN, PA REHOBOTH BEACH, DE BALTIMORE, MD SOUTHERN MARYLAND SB N.T.S. UPSTATE NEW YORK NEW ENGLAND NEW YORK METRO NEW JERSEY PHILADELPHIA, PA SITE CIVIL AND CONSULTING ENGINEERING PROGRAM MANAGEMENT LANDSCAPE ARCHITECTURE LAND SURVEYING SUSTAINABLE DESIGN PERMITTING SERVICES TRANSPORTATION SERVICES TM 52 1,4 VICINITY MAP FOR 20' 30' 12' 25' 34' SE 35' 20' ' 0.6 1 10' 5' 3' 93. C DS LAN " B E " FER TYP BUF 30' ' 200 2.18 AC BUILDING AREA 6,119 SF CURRENT ZONING 10' FRONT SETBACK (ROW) - NORTH FRONT SETBACK (ROW) - EAST 21' 266.1' ICE BOX 5' 50'.6' 213 90' FROM CL OF MORNINGSIDE, 25' INTERNAL REAR SETBACK 50' FRONT AND SIDE YARD BUFFER 10' REAR YARD BUFFER 30' MAX IMP: 65% 55 (INCLUDING 3 ADA SPACES) ZONE A 24 (INCLUDING 3 ADA SPACES) ZONE B 17 SPACES ZONE C 14 SPACES CANOPY CONFIGURATION CANOPY TYPE #MPD'S Phone: Fax: (813) 812-4100 (813) 812-4101 FLORIDA BUSINESS CERT. OF AUTH. No. 30780 F85 F/B STACKED SLOPED 6 NOTES: 1. THE CONCEPT REPRESENTED HEREIN IDENTIFIES A DESIGN CONCEPT RESULTING FROM LAYOUT PREFERENCES IDENTIFIED BY OWNER COUPLED WITH A PRELIMINARY REVIEW OF ZONING AND LAND DEVELOPMENT REQUIREMENTS AND ISSUES. THE FEASIBILITY WITH RESPECT TO OBTAINING LOCAL, COUNTY, STATE, AND OTHER APPLICABLE APPROVALS IS NOT WARRANTED AND CAN ONLY BE ASSESSED AFTER FURTHER EXAMINATION AND VERIFICATION OF SAME REQUIREMENTS AND PROCUREMENT OF JURISDICTIONAL APPROVALS. 2. THE CONCEPTUAL PLAN IS PREPARED FOR CONCEPTUAL PRESENTATION PURPOSES ONLY AND IS NOT INTENDED FOR UTILIZATION AS A ZONING AND/OR CONSTRUCTION DOCUMENT. THE EXISTING CONDITIONS SHOWN HEREON ARE BASED UPON INFORMATION THAT WAS SUPPLIED TO BOHLER ENGINEERING AT THE TIME OF PLAN PREPARATION AND MAY BE SUBJECT TO CHANGE UPON AVAILABILITY OF ADDITIONAL INFORMATION. H:\2015\FLT150049-WAWA US 441 & MORNINGSIDE\DRAWINGS\EXHIBITS\US 441 & MORNINGSIDE LEASE EXHIBIT.DWG PRINTED BY: JTAMARGO 6.02.16 @ 8:42 AM LAST SAVED BY: JTAMARGO 3820 NORTHDALE BLVD., SUITE 300B TAMPA, FLORIDA 33624 61 SPACES, CONV STORE: 1 PER 100 SF + GAS: 1 PER EMPL ON LARGEST SHIFT PARKING PROVIDED (TOTAL) BUILDING TYPE US 441 & MORNINGSIDE DR CITY OF MOUNT DORA LAKE COUNTY, FL 150' FROM CL OF US 441 25' MAXIMUM BUILDING COVERAGE LOCATION OF SITE C-3 HIGHWAY COMMERCIAL SIDE SETBACK - WEST REQUIRED PARKING 3S 1 PARCEL C-3 HWY COMM, 1 PARCEL URBAN EXPANSION 25' 12' 10' DUMPSTER ENCLOSURE LOCATION 10' CITY OF MOUNT DORA SITE AREA PROPOSED ZONING E-STOP 6' 70. 30' 20 ' 28. R G DIN UIL CK B ' 50 TBA SE F85 F/B (6,119 SF) 20' PE A FE UF EB AP SC ND 10' K LA AC "a" TB PE 12' ING TY JURISDICTION BIKE RACK (IF REQ.) TRANSFORMER PAD AND CT CABINET SITE DATA TABLE 5' 7' ILD 13. BU 10' RAISED LANDSCAPE PLANTER (TYP.) 12 SHEET TITLE: SKETCH PLAN SHEET NUMBER: B

APPENDIX TRIP GENERATION PROPOSED USES

PERIOD SETTING Analysis Name : Project Name : Daily Wawa - US 441 and Morningside Dr Date: 11/22/2016 City: State/Province: Zip/Postal Code: Country: Client Name: Analyst's Name: Edition: ITE-TGM 9th Edition No : Land Use 853 - Convenience Market with Gasoline Pumps (0) indicates size out of range. Independent Variable 1000 Sq. Feet Gross Floor Area Size Time Period Method Entry Exit Total 6.12 (0) Weekday Average 845.6 2588 50% 2587 50% 5175 TRAFFIC REDUCTIONS Entry Land Use Reduction 853 - Convenience Market with Gasoline Pumps 0 % Adjusted Entry Exit Reduction Adjusted Exit 2588 2587 0 % EXTERNAL TRIPS Land Use External Trips Pass-by% Pass-by Trips 853 - Convenience Market with Gasoline Pumps 5175 63 % Non-pass-by Trips 3260 1915 ITE DEVIATION DETAILS Weekday Landuse Methods External Trips No deviations from ITE. No deviations from ITE. 853 - Convenience Market with Gasoline Pumps ITE does not recommend a particular pass-by% for this case.

SUMMARY Total Entering 2588 Total Exiting 2587 Total Entering Reduction 0 Total Exiting Reduction 0 Total Entering Internal Capture Reduction 0 Total Exiting Internal Capture Reduction 0 Total Entering Pass-by Reduction 1630 Total Exiting Pass-by Reduction 1630 Total Entering Non-Pass-by Trips 958 Total Exiting Non-Pass-by Trips 957

PERIOD SETTING Analysis Name : Project Name : AM Peak Hour Wawa - US 441 and Morningside Dr Date: 11/22/2016 City: State/Province: Zip/Postal Code: Country: Client Name: Analyst's Name: Edition: ITE-TGM 9th Edition No : Land Use 853 - Convenience Market with Gasoline Pumps Independent Variable 1000 Sq. Feet Gross Floor Area Size Time Period Method Entry Exit Total 6.12 Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Average 40.92 125 50% 125 50% 250 TRAFFIC REDUCTIONS Entry Land Use Reduction 853 - Convenience Market with Gasoline Pumps 0 % Adjusted Entry Exit Reduction Adjusted Exit 125 125 0 % EXTERNAL TRIPS Land Use External Trips Pass-by% Pass-by Trips 853 - Convenience Market with Gasoline Pumps 250 63 % Non-pass-by Trips 158 92 ITE DEVIATION DETAILS Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Landuse No deviations from ITE. Methods External Trips No deviations from ITE. No deviations from ITE.

SUMMARY Total Entering 125 Total Exiting 125 Total Entering Reduction 0 Total Exiting Reduction 0 Total Entering Internal Capture Reduction 0 Total Exiting Internal Capture Reduction 0 Total Entering Pass-by Reduction 79 Total Exiting Pass-by Reduction 79 Total Entering Non-Pass-by Trips 46 Total Exiting Non-Pass-by Trips 46

PERIOD SETTING Analysis Name : Project Name : PM Peak Hour Wawa - US 441 and Morningside Dr Date: 11/22/2016 City: State/Province: Zip/Postal Code: Country: Client Name: Analyst's Name: Edition: ITE-TGM 9th Edition No : Land Use 853 - Convenience Market with Gasoline Pumps Independent Variable 1000 Sq. Feet Gross Floor Area Size Time Period Method Entry Exit Total 6.12 Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Average 50.92 156 50% 156 50% 312 TRAFFIC REDUCTIONS Entry Land Use Reduction 853 - Convenience Market with Gasoline Pumps 0 % Adjusted Entry Exit Reduction Adjusted Exit 156 156 0 % EXTERNAL TRIPS Land Use External Trips Pass-by% Pass-by Trips 853 - Convenience Market with Gasoline Pumps 312 66 % Non-pass-by Trips 206 106 ITE DEVIATION DETAILS Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Landuse No deviations from ITE. Methods External Trips No deviations from ITE. No deviations from ITE.

SUMMARY Total Entering 156 Total Exiting 156 Total Entering Reduction 0 Total Exiting Reduction 0 Total Entering Internal Capture Reduction 0 Total Exiting Internal Capture Reduction 0 Total Entering Pass-by Reduction 103 Total Exiting Pass-by Reduction 103 Total Entering Non-Pass-by Trips 53 Total Exiting Non-Pass-by Trips 53

APPENDIX TRIP GENERATION EXISTING USES

Print Preview PERIOD SETTING Analysis Name : Project Name : Daily Wawa - US 441 and Morningside - Existing Date: 12/1/2016 City: State/Province: Zip/Postal Code: Country: Client Name: Analyst's Name: Edition: ITE-TGM 9th Edition No : Land Use 945 - Gasoline/Service Station With Convenience Market (0) indicates size out of range. Independent Variable Vehicle Fueling Positions Size Time Period Method Entry Exit Total 4 (0) Weekday Average 162.78 326 50% 325 50% 651 TRAFFIC REDUCTIONS Entry Land Use Reduction 945 - Gasoline/Service Station With Convenience Market 0 % Adjusted Entry Exit Reduction Adjusted Exit 326 325 0 % EXTERNAL TRIPS Land Use External Trips Pass-by% Pass-by Trips 945 - Gasoline/Service Station With Convenience Market 651 56 % Non-pass-by Trips 365 286 ITE DEVIATION DETAILS Weekday Landuse Methods External Trips No deviations from ITE. No deviations from ITE. 945 - Gasoline/Service Station With Convenience Market ITE does not recommend a particular pass-by% for this case. SUMMARY Total Entering 326 Total Exiting 325 Total Entering Reduction 0 Total Exiting Reduction 0 Total Entering Internal Capture Reduction 0 Total Exiting Internal Capture Reduction 0 Total Entering Pass-by Reduction 183 Total Exiting Pass-by Reduction 182 Total Entering Non-Pass-by Trips 143 Total Exiting Non-Pass-by Trips 143

Print Preview PERIOD SETTING Analysis Name : Project Name : AM Peak Hour Wawa - US 441 and Morningside - Existing Date: 12/1/2016 City: State/Province: Zip/Postal Code: Country: Client Name: Analyst's Name: Edition: ITE-TGM 9th Edition No : Land Use 945 - Gasoline/Service Station With Convenience Market (0) indicates size out of range. Independent Variable Vehicle Fueling Positions Size Time Period Method Entry Exit Total 4 (0) Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Average 10.16 21 51% 20 49% 41 TRAFFIC REDUCTIONS Entry Land Use Reduction 945 - Gasoline/Service Station With Convenience Market 0 % Adjusted Entry Exit Reduction Adjusted Exit 21 20 0 % EXTERNAL TRIPS Land Use External Trips Pass-by% Pass-by Trips 945 - Gasoline/Service Station With Convenience Market 41 62 % Non-pass-by Trips 25 16 ITE DEVIATION DETAILS Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Landuse No deviations from ITE. Methods External Trips No deviations from ITE. No deviations from ITE. SUMMARY Total Entering 21 Total Exiting 20 Total Entering Reduction 0 Total Exiting Reduction 0 Total Entering Internal Capture Reduction 0 Total Exiting Internal Capture Reduction 0 Total Entering Pass-by Reduction 13 Total Exiting Pass-by Reduction 12 Total Entering Non-Pass-by Trips 8 Total Exiting Non-Pass-by Trips 8

Print Preview PERIOD SETTING Analysis Name : Project Name : PM Peak Hour Wawa - US 441 and Morningside - Existing Date: 12/1/2016 City: State/Province: Zip/Postal Code: Country: Client Name: Analyst's Name: Edition: ITE-TGM 9th Edition No : Land Use 945 - Gasoline/Service Station With Convenience Market Independent Variable Vehicle Fueling Positions Size Time Period Method Entry Exit Total 4 Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Average 13.51 27 50% 27 50% 54 TRAFFIC REDUCTIONS Entry Land Use Reduction 945 - Gasoline/Service Station With Convenience Market 0 % Adjusted Entry Exit Reduction Adjusted Exit 27 27 0 % EXTERNAL TRIPS Land Use External Trips Pass-by% Pass-by Trips 945 - Gasoline/Service Station With Convenience Market 54 56 % Non-pass-by Trips 30 24 ITE DEVIATION DETAILS Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Landuse No deviations from ITE. Methods External Trips No deviations from ITE. No deviations from ITE. SUMMARY Total Entering 27 Total Exiting 27 Total Entering Reduction 0 Total Exiting Reduction 0 Total Entering Internal Capture Reduction 0 Total Exiting Internal Capture Reduction 0 Total Entering Pass-by Reduction 15 Total Exiting Pass-by Reduction 15 Total Entering Non-Pass-by Trips 12 Total Exiting Non-Pass-by Trips 12

APPENDIX PASSERBY CAPTURE RATES

APPENDIX TURNING MOVEMENT COUNTS

LOCATION: Old Mt. Dora Rd_Morningside Dr & US 441 CITY/STATE: Mt. Dora PROJECT ID: 16 3427 002 DATE: Tue, Nov 29, 2016 114 94 Peak Hour: 07:30 AM 08:30 AM Peak 15 Minute: 07:45 AM 08:00 AM 0.0 0.0 14 18 82 0.0 0.0 0.0 1806 18 Peak Hour Factor 56 1832 1.4 0.0 0.0 1.4 1096 0.90 1736 2.5 1.4 1145 31 40 1233 2.4 0.0 0.0 2.2 56 20 55 0.0 0.0 0.0 89 131 0.0 0.0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NA NA NA NA NA NA NA NA 15-Min Count Period Beginning At 07:00 AM 07:15 AM 07:30 AM 07:45 AM 08:00 AM 08:15 AM 08:30 AM 08:45 AM Old Mt. Dora Rd_Morningside Dr Old Mt. Dora Rd_Morningside Dr US 441 US 441 Northbound Southbound Eastbound Westbound Left Thru Rgt U R* Left Thru Rgt U R* Left Thru Rgt U R* Left Thru Rgt U 8 1 16 0 15 2 1 0 2 249 4 0 5 345 9 1 5 2 13 0 12 0 0 0 3 237 4 0 13 397 11 0 11 1 12 0 24 4 4 0 3 253 8 1 8 441 13 0 19 8 12 0 25 6 3 0 7 290 11 1 13 482 17 2 14 5 17 0 13 5 3 0 1 286 3 0 8 429 13 0 12 6 14 0 20 3 4 0 7 267 9 2 11 384 13 2 12 4 12 0 20 2 3 0 4 267 4 3 7 382 16 0 18 2 14 0 16 1 3 0 9 283 9 1 17 410 14 2 R* Hourly Total Total 657 3029 697 3169 782 3222 893 3173 797 3076 750 2279 733 1529 796 796 Peak 15-Min Flowrates All Vehicles Heavy Trucks Pedestrians Bicycles Railroad Stopped Buses Northbound Southbound Eastbound Westbound Left Thru Rgt U R* Left Thru Rgt U R* Left Thru Rgt U R* Left Thru Rgt U 76 32 68 0 100 24 16 0 28 1160 44 8 52 1928 68 8 0 0 0 0 0 0 0 40 0 0 40 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 R* Total 3596 80 0 4

LOCATION: Old Mt. Dora Rd_Morningside Dr & US 441 CITY/STATE: Mt. Dora PROJECT ID: 16 3427 002 DATE: Tue, Nov 29, 2016 141 137 Peak Hour: 04:30 PM 05:30 PM 0.0 0.0 Peak 15 Minute: 05:00 PM 05:15 PM 28 12 101 0.0 0.0 0.0 1704 33 94 1781 1.6 0.0 0.0 1.6 Peak Hour Factor 2072 0.94 1623 0.7 1.7 2192 87 64 2238 0.6 0.0 1.6 0.6 53 10 65 0.0 0.0 0.0 163 128 0.6 0.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NA NA NA NA NA NA NA NA 15-Min Count Old Mt. Dora Rd_Morningside Dr Old Mt. Dora Rd_Morningside Dr US 441 US 441 Period Northbound Southbound Eastbound Westbound Hourly Beginning At Left Thru Rgt U R* Left Thru Rgt U R* Left Thru Rgt U R* Left Thru Rgt U R* Total Total 04:00 PM 11 2 16 0 40 3 8 0 10 459 14 4 12 387 24 2 986 4060 04:15 PM 10 4 17 0 26 4 6 0 3 454 10 1 17 428 25 6 1004 4201 04:30 PM 15 5 11 0 23 2 6 0 10 512 25 2 16 398 28 3 1051 4242 04:45 PM 13 3 11 0 24 2 5 0 10 467 22 1 17 418 27 4 1019 4212 05:00 PM 7 0 16 0 26 3 12 0 9 577 20 6 9 426 22 3 1127 4186 05:15 PM 18 2 27 0 28 5 5 0 4 516 20 1 22 381 17 5 1045 3059 05:30 PM 16 3 17 0 27 3 5 0 3 506 19 1 12 393 17 5 1021 2014 05:45 PM 11 2 15 0 27 2 1 0 3 476 15 2 16 407 18 4 993 993 Peak 15-Min Northbound Southbound Eastbound Westbound Flowrates Left Thru Rgt U R* Left Thru Rgt U R* Left Thru Rgt U R* Left Thru Rgt U R* Total All Vehicles 72 20 108 0 112 20 48 0 40 2308 100 24 88 1704 112 20 4732 Heavy Trucks 0 0 0 0 0 0 0 20 0 4 36 0 60 Pedestrians 0 4 0 0 4 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Railroad Stopped Buses

LOCATION: Morningside Dr & Old Eustis Rd CITY/STATE: Mt. Dora PROJECT ID: 16 3427 003 DATE: Tue, Nov 29, 2016 86 135 Peak Hour: 07:30 AM 08:30 AM Peak 15 Minute: 07:45 AM 08:00 AM 0.0 0.0 8 58 20 0.0 0.0 0.0 16 14 Peak Hour Factor 48 74 0.0 0.0 0.0 0.0 1 0.84 4 0.0 0.0 21 6 22 43 0.0 0.0 0.0 0.0 4 73 22 0.0 0.0 0.0 86 99 0.0 0.0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 1 2 0 0 0 1 NA NA NA NA NA NA NA NA 15-Min Count Period Beginning At 07:00 AM 07:15 AM 07:30 AM 07:45 AM 08:00 AM 08:15 AM 08:30 AM 08:45 AM Morningside Dr Northbound Left Thru Rgt U R* 1 20 3 0 1 10 2 0 0 15 4 0 1 17 8 0 2 23 4 0 1 18 6 0 0 16 5 0 0 25 3 0 Morningside Dr Old Eustis Rd Southbound Eastbound Left Thru Rgt U R* Left Thru Rgt U R* 4 4 1 0 2 1 0 0 4 11 2 0 3 0 1 0 7 10 3 0 3 0 3 0 7 18 1 0 0 1 2 0 2 14 3 0 6 0 0 0 4 16 1 0 5 0 1 0 3 6 1 1 1 1 0 0 6 19 3 0 1 1 0 0 Old Eustis Rd Westbound Left Thru Rgt U 0 0 5 0 2 1 4 0 2 1 9 0 7 1 20 0 9 1 11 0 4 1 8 0 5 0 8 0 5 0 8 0 R* Hourly Total Total 41 222 41 256 57 280 83 269 75 257 65 182 46 117 71 71 Peak 15-Min Flowrates All Vehicles Heavy Trucks Pedestrians Bicycles Railroad Stopped Buses Northbound Southbound Eastbound Westbound Left Thru Rgt U R* Left Thru Rgt U R* Left Thru Rgt U R* Left Thru Rgt U 8 92 32 0 28 72 12 0 24 4 12 0 36 4 80 0 0 0 0 0 0 0 0 0 0 0 0 0 8 0 0 0 0 0 4 0 4 0 0 0 0 4 4 0 R* Total 404 0 8 16

LOCATION: Morningside Dr & Old Eustis Rd CITY/STATE: Mt. Dora PROJECT ID: 16 3427 003 DATE: Tue, Nov 29, 2016 138 137 Peak Hour: 04:45 PM 05:45 PM 0.0 0.0 Peak 15 Minute: 05:15 PM 05:30 PM 12 62 64 0.0 0.0 0.0 22 13 48 90 0.0 0.0 0.0 0.0 Peak Hour Factor 11 0.78 6 0.0 0.0 36 12 36 99 0.0 0.0 0.0 0.0 4 76 24 0.0 0.0 0.0 110 104 0.0 0.0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 0 0 0 0 NA NA NA NA NA NA NA NA 15-Min Count Morningside Dr Morningside Dr Old Eustis Rd Old Eustis Rd Period Northbound Southbound Eastbound Westbound Hourly Beginning At Left Thru Rgt U R* Left Thru Rgt U R* Left Thru Rgt U R* Left Thru Rgt U R* Total Total 04:00 PM 1 15 6 0 11 14 2 0 5 1 1 0 4 0 6 0 66 315 04:15 PM 5 16 8 0 9 12 4 0 9 2 3 0 4 0 9 0 81 324 04:30 PM 0 13 5 0 12 25 1 1 6 2 0 0 10 0 10 0 84 361 04:45 PM 2 12 5 0 18 19 0 0 3 2 2 0 9 1 11 0 84 368 05:00 PM 0 14 5 0 17 12 2 0 2 1 3 0 9 2 8 0 75 347 05:15 PM 1 31 9 0 15 18 8 0 4 6 1 0 9 2 14 0 118 272 05:30 PM 1 19 5 0 14 13 2 0 4 2 6 0 9 1 15 0 91 154 05:45 PM 1 18 3 0 8 18 2 0 3 0 0 0 5 0 5 0 63 63 Peak 15-Min Northbound Southbound Eastbound Westbound Flowrates Left Thru Rgt U R* Left Thru Rgt U R* Left Thru Rgt U R* Left Thru Rgt U R* Total All Vehicles 8 124 36 0 72 76 32 0 16 24 24 0 36 8 60 0 516 Heavy Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 Pedestrians 4 0 0 0 4 Bicycles 0 0 0 0 0 0 0 4 0 0 0 0 4 Railroad Stopped Buses

APPENDIX FDOT SEASONAL ADJUSTMENT FACTORS

2015 PEAK SEASON FACTOR CATEGORY REPORT - REPORT TYPE: ALL CATEGORY: 3600 MARION COUNTYWIDE MOCF: 0.97 WEEK DATES SF PSCF ================================================================================ 1 01/01/2015-01/03/2015 0.97 1.00 2 01/04/2015-01/10/2015 1.02 1.05 3 01/11/2015-01/17/2015 1.07 1.10 4 01/18/2015-01/24/2015 1.05 1.08 5 01/25/2015-01/31/2015 1.03 1.06 6 02/01/2015-02/07/2015 1.01 1.04 * 7 02/08/2015-02/14/2015 1.00 1.03 * 8 02/15/2015-02/21/2015 0.98 1.01 * 9 02/22/2015-02/28/2015 0.97 1.00 *10 03/01/2015-03/07/2015 0.95 0.98 *11 03/08/2015-03/14/2015 0.93 0.96 *12 03/15/2015-03/21/2015 0.94 0.97 *13 03/22/2015-03/28/2015 0.95 0.98 *14 03/29/2015-04/04/2015 0.96 0.99 *15 04/05/2015-04/11/2015 0.97 1.00 *16 04/12/2015-04/18/2015 0.98 1.01 *17 04/19/2015-04/25/2015 0.98 1.01 *18 04/26/2015-05/02/2015 0.99 1.02 *19 05/03/2015-05/09/2015 1.00 1.03 20 05/10/2015-05/16/2015 1.01 1.04 21 05/17/2015-05/23/2015 1.01 1.04 22 05/24/2015-05/30/2015 1.01 1.04 23 05/31/2015-06/06/2015 1.01 1.04 24 06/07/2015-06/13/2015 1.02 1.05 25 06/14/2015-06/20/2015 1.02 1.05 26 06/21/2015-06/27/2015 1.03 1.06 27 06/28/2015-07/04/2015 1.03 1.06 28 07/05/2015-07/11/2015 1.04 1.07 29 07/12/2015-07/18/2015 1.04 1.07 30 07/19/2015-07/25/2015 1.05 1.08 31 07/26/2015-08/01/2015 1.05 1.08 32 08/02/2015-08/08/2015 1.05 1.08 33 08/09/2015-08/15/2015 1.06 1.09 34 08/16/2015-08/22/2015 1.06 1.09 35 08/23/2015-08/29/2015 1.06 1.09 36 08/30/2015-09/05/2015 1.06 1.09 37 09/06/2015-09/12/2015 1.07 1.10 38 09/13/2015-09/19/2015 1.05 1.08 39 09/20/2015-09/26/2015 1.04 1.07 40 09/27/2015-10/03/2015 1.03 1.06 41 10/04/2015-10/10/2015 1.02 1.05 42 10/11/2015-10/17/2015 1.00 1.03 43 10/18/2015-10/24/2015 1.00 1.03 44 10/25/2015-10/31/2015 0.99 1.02 45 11/01/2015-11/07/2015 0.98 1.01 46 11/08/2015-11/14/2015 0.97 1.00 47 11/15/2015-11/21/2015 0.97 1.00 48 11/22/2015-11/28/2015 0.97 1.00 49 11/29/2015-12/05/2015 0.97 1.00 50 12/06/2015-12/12/2015 0.97 1.00 51 12/13/2015-12/19/2015 1.00 1.03 52 12/20/2015-12/26/2015 1.03 1.06 53 12/27/2015-12/31/2015 1.07 1.10 * PEAK SEASON 03-MAR-2016 11:19:23 830UPD 5_3600_PKSEASON.TXT

APPENDIX INTERSECTION ANALYSIS

Timings 1: Morningside Dr/Old Mount Dora Road & US 441 12/1/2016 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 18 1096 31 40 1736 56 56 20 55 82 18 14 Future Volume (vph) 18 1096 31 40 1736 56 56 20 55 82 18 14 Turn Type Prot NA Perm Prot NA Perm Perm NA Perm Perm NA Perm Protected Phases 5 2 1 6 8 4 Permitted Phases 2 6 8 8 4 4 Detector Phase 5 2 2 1 6 6 8 8 8 4 4 4 Switch Phase Minimum Initial (s) 5.0 15.0 15.0 5.0 15.0 15.0 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 12.0 22.0 22.0 12.0 22.0 22.0 17.0 17.0 17.0 17.0 17.0 17.0 Total Split (s) 16.0 100.0 100.0 21.0 105.0 105.0 39.0 39.0 39.0 39.0 39.0 39.0 Total Split (%) 10.0% 62.5% 62.5% 13.1% 65.6% 65.6% 24.4% 24.4% 24.4% 24.4% 24.4% 24.4% Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 Lead/Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None C-Max C-Max None C-Max C-Max None None None Min Min Min Act Effct Green (s) 7.3 114.4 114.4 9.2 118.9 118.9 18.0 18.0 18.0 18.0 Actuated g/c Ratio 0.05 0.72 0.72 0.06 0.74 0.74 0.11 0.11 0.11 0.11 v/c Ratio 0.24 0.32 0.03 0.42 0.48 0.05 0.59 0.24 0.71 0.06 Control Delay 80.1 9.8 0.0 84.1 10.2 1.2 84.1 8.5 92.1 0.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 80.1 9.8 0.0 84.1 10.2 1.2 84.1 8.5 92.1 0.5 LOS F A A F B A F A F A Approach Delay 10.7 11.5 52.3 80.7 Approach LOS B B D F Intersection Summary Cycle Length: 160 Actuated Cycle Length: 160 Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.71 Intersection Signal Delay: 15.3 Intersection LOS: B Intersection Capacity Utilization 67.7% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 1: Morningside Dr/Old Mount Dora Road & US 441 Synchro 9 Report 2016 Peak Season AM Peak Hour

Timings 1: Morningside Dr/Old Mount Dora Road & US 441 12/1/2016 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 49 1088 30 93 1693 55 86 26 74 80 25 14 Future Volume (vph) 49 1088 30 93 1693 55 86 26 74 80 25 14 Turn Type Prot NA Perm Prot NA Perm Perm NA Perm Perm NA Perm Protected Phases 5 2 1 6 8 4 Permitted Phases 2 6 8 8 4 4 Detector Phase 5 2 2 1 6 6 8 8 8 4 4 4 Switch Phase Minimum Initial (s) 5.0 15.0 15.0 5.0 15.0 15.0 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 12.0 22.0 22.0 12.0 22.0 22.0 17.0 17.0 17.0 17.0 17.0 17.0 Total Split (s) 16.0 100.0 100.0 21.0 105.0 105.0 39.0 39.0 39.0 39.0 39.0 39.0 Total Split (%) 10.0% 62.5% 62.5% 13.1% 65.6% 65.6% 24.4% 24.4% 24.4% 24.4% 24.4% 24.4% Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 Lead/Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None C-Max C-Max None C-Max C-Max None None None Min Min Min Act Effct Green (s) 9.8 104.9 104.9 13.8 111.6 111.6 20.3 20.3 20.3 20.3 Actuated g/c Ratio 0.06 0.66 0.66 0.09 0.70 0.70 0.13 0.13 0.13 0.13 v/c Ratio 0.48 0.34 0.03 0.64 0.50 0.05 0.79 0.29 0.77 0.06 Control Delay 86.8 13.5 0.1 89.4 13.4 1.4 100.6 13.8 99.3 0.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 86.8 13.5 0.1 89.4 13.4 1.4 100.6 13.8 99.3 0.4 LOS F B A F B A F B F A Approach Delay 16.2 16.9 66.0 87.4 Approach LOS B B E F Intersection Summary Cycle Length: 160 Actuated Cycle Length: 160 Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.79 Intersection Signal Delay: 21.9 Intersection LOS: C Intersection Capacity Utilization 67.2% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 1: Morningside Dr/Old Mount Dora Road & US 441 Synchro 9 Report 2016 Peak Season + Project AM Peak Hour

Timings 1: Morningside Dr/Old Mount Dora Road & US 441 12/1/2016 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 33 2072 87 64 1623 94 53 10 65 101 12 28 Future Volume (vph) 33 2072 87 64 1623 94 53 10 65 101 12 28 Turn Type Prot NA Perm Prot NA Perm Perm NA Perm Perm NA Perm Protected Phases 5 2 1 6 8 4 Permitted Phases 2 6 8 8 4 4 Detector Phase 5 2 2 1 6 6 8 8 8 4 4 4 Switch Phase Minimum Initial (s) 5.0 15.0 15.0 5.0 15.0 15.0 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 12.0 22.0 22.0 12.0 22.0 22.0 17.0 17.0 17.0 17.0 17.0 17.0 Total Split (s) 17.0 104.0 104.0 21.0 108.0 108.0 35.0 35.0 35.0 35.0 35.0 35.0 Total Split (%) 10.6% 65.0% 65.0% 13.1% 67.5% 67.5% 21.9% 21.9% 21.9% 21.9% 21.9% 21.9% Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 Lead/Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None C-Max C-Max None C-Max C-Max None None None Min Min Min Act Effct Green (s) 8.3 108.1 108.1 11.1 113.4 113.4 19.8 19.8 19.8 19.8 Actuated g/c Ratio 0.05 0.68 0.68 0.07 0.71 0.71 0.12 0.12 0.12 0.12 v/c Ratio 0.38 0.63 0.08 0.54 0.47 0.09 0.50 0.26 0.74 0.11 Control Delay 84.7 16.9 3.5 87.8 12.0 2.0 77.0 12.0 92.4 0.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 84.7 16.9 3.5 87.8 12.0 2.0 77.0 12.0 92.4 0.9 LOS F B A F B A E B F A Approach Delay 17.4 14.2 44.2 74.4 Approach LOS B B D E Intersection Summary Cycle Length: 160 Actuated Cycle Length: 160 Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 65 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 18.7 Intersection LOS: B Intersection Capacity Utilization 74.6% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 1: Morningside Dr/Old Mount Dora Road & US 441 Synchro 9 Report 2016 Peak Season PM Peak Hour

Timings 1: Morningside Dr/Old Mount Dora Road & US 441 12/1/2016 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 64 2055 85 116 1584 92 83 18 95 98 21 27 Future Volume (vph) 64 2055 85 116 1584 92 83 18 95 98 21 27 Turn Type Prot NA Perm Prot NA Perm Perm NA Perm Perm NA Perm Protected Phases 5 2 1 6 8 4 Permitted Phases 2 6 8 8 4 4 Detector Phase 5 2 2 1 6 6 8 8 8 4 4 4 Switch Phase Minimum Initial (s) 5.0 15.0 15.0 5.0 15.0 15.0 10.0 10.0 10.0 10.0 10.0 10.0 Minimum Split (s) 12.0 22.0 22.0 12.0 22.0 22.0 17.0 17.0 17.0 17.0 17.0 17.0 Total Split (s) 16.0 100.0 100.0 21.0 105.0 105.0 39.0 39.0 39.0 39.0 39.0 39.0 Total Split (%) 10.0% 62.5% 62.5% 13.1% 65.6% 65.6% 24.4% 24.4% 24.4% 24.4% 24.4% 24.4% Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 Lead/Lag Lead Lag Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None C-Max C-Max None C-Max C-Max None None None Min Min Min Act Effct Green (s) 10.8 101.9 101.9 15.8 106.9 106.9 21.3 21.3 21.3 21.3 Actuated g/c Ratio 0.07 0.64 0.64 0.10 0.67 0.67 0.13 0.13 0.13 0.13 v/c Ratio 0.56 0.67 0.09 0.70 0.49 0.09 0.75 0.34 0.79 0.10 Control Delay 90.2 20.7 4.0 90.4 14.5 2.3 95.6 12.7 98.5 0.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 90.2 20.7 4.0 90.4 14.5 2.3 95.6 12.7 98.5 0.7 LOS F C A F B A F B F A Approach Delay 22.1 18.8 55.4 80.6 Approach LOS C B E F Intersection Summary Cycle Length: 160 Actuated Cycle Length: 160 Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 65 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.79 Intersection Signal Delay: 24.2 Intersection LOS: C Intersection Capacity Utilization 76.8% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 1: Morningside Dr/Old Mount Dora Road & US 441 Synchro 9 Report 2016 Peak Season + Project PM Peak Hour

HCM Unsignalized Intersection Capacity Analysis 2: Driveway A & US 441 12/1/2016 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (veh/h) 1117 46 0 1827 0 50 Future Volume (Veh/h) 1117 46 0 1827 0 50 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Hourly flow rate (vph) 1176 48 0 1923 0 53 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) 380 px, platoon unblocked 0.83 vc, conflicting volume 1224 1841 416 vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol 1224 1300 416 tc, single (s) 4.1 6.8 6.9 tc, 2 stage (s) tf (s) 2.2 3.5 3.3 p0 queue free % 100 100 91 cm capacity (veh/h) 565 127 585 Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 Volume Total 470 470 283 641 641 641 53 Volume Left 0 0 0 0 0 0 0 Volume Right 0 0 48 0 0 0 53 csh 1700 1700 1700 1700 1700 1700 585 Volume to Capacity 0.28 0.28 0.17 0.38 0.38 0.38 0.09 Queue Length 95th (ft) 0 0 0 0 0 0 7 Control Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 11.8 Lane LOS B Approach Delay (s) 0.0 0.0 11.8 Approach LOS B Intersection Summary Average Delay 0.2 Intersection Capacity Utilization 38.6% ICU Level of Service A Analysis Period (min) 15 Synchro 9 Report 2016 Peak Season + Project AM Peak Hour

HCM Unsignalized Intersection Capacity Analysis 3: Morningside Dr & Driveway B/Old Eustis Rd 12/1/2016 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 58 9 8 22 9 48 8 70 22 20 55 62 Future Volume (Veh/h) 58 9 8 22 9 48 8 70 22 20 55 62 Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Hourly flow rate (vph) 61 9 8 23 9 51 8 74 23 21 58 65 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) 2 Median type None None Median storage veh) Upstream signal (ft) 180 px, platoon unblocked vc, conflicting volume 238 246 90 246 266 86 123 97 vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol 238 246 90 246 266 86 123 97 tc, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1 tc, 2 stage (s) tf (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 91 99 99 97 99 95 99 99 cm capacity (veh/h) 661 644 967 684 627 973 1464 1496 Direction, Lane # EB 1 WB 1 NB 1 SB 1 Volume Total 78 83 105 144 Volume Left 61 23 8 21 Volume Right 8 51 23 65 csh 681 1584 1464 1496 Volume to Capacity 0.11 0.05 0.01 0.01 Queue Length 95th (ft) 10 4 0 1 Control Delay (s) 11.0 9.6 0.6 1.2 Lane LOS B A A A Approach Delay (s) 11.0 9.6 0.6 1.2 Approach LOS B A Intersection Summary Average Delay 4.6 Intersection Capacity Utilization 30.0% ICU Level of Service A Analysis Period (min) 15 Synchro 9 Report 2016 Peak Season + Project AM Peak Hour

HCM Unsignalized Intersection Capacity Analysis 2: Driveway A & US 441 12/1/2016 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (veh/h) 2139 75 0 1726 0 65 Future Volume (Veh/h) 2139 75 0 1726 0 65 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Hourly flow rate (vph) 2252 79 0 1817 0 68 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) 380 px, platoon unblocked 0.84 vc, conflicting volume 2331 2897 790 vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol 2331 2586 790 tc, single (s) 4.1 6.8 6.9 tc, 2 stage (s) tf (s) 2.2 3.5 3.3 p0 queue free % 100 100 80 cm capacity (veh/h) 209 17 333 Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 Volume Total 901 901 529 606 606 606 68 Volume Left 0 0 0 0 0 0 0 Volume Right 0 0 79 0 0 0 68 csh 1700 1700 1700 1700 1700 1700 333 Volume to Capacity 0.53 0.53 0.31 0.36 0.36 0.36 0.20 Queue Length 95th (ft) 0 0 0 0 0 0 19 Control Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 18.6 Lane LOS C Approach Delay (s) 0.0 0.0 18.6 Approach LOS C Intersection Summary Average Delay 0.3 Intersection Capacity Utilization 53.7% ICU Level of Service A Analysis Period (min) 15 Synchro 9 Report 2016 Peak Season + Project PM Peak Hour

HCM Unsignalized Intersection Capacity Analysis 3: Morningside Dr & Driveway B/Old Eustis Rd 12/1/2016 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 71 11 9 36 10 48 8 70 22 20 55 62 Future Volume (Veh/h) 71 11 9 36 10 48 8 70 22 20 55 62 Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Hourly flow rate (vph) 75 12 9 38 11 51 8 74 23 21 58 65 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) 2 Median type None None Median storage veh) Upstream signal (ft) 180 px, platoon unblocked vc, conflicting volume 240 246 90 249 266 86 123 97 vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol 240 246 90 249 266 86 123 97 tc, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1 tc, 2 stage (s) tf (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 89 98 99 94 98 95 99 99 cm capacity (veh/h) 658 644 967 678 627 973 1464 1496 Direction, Lane # EB 1 WB 1 NB 1 SB 1 Volume Total 96 100 105 144 Volume Left 75 38 8 21 Volume Right 9 51 23 65 csh 677 1360 1464 1496 Volume to Capacity 0.14 0.07 0.01 0.01 Queue Length 95th (ft) 12 6 0 1 Control Delay (s) 11.2 9.8 0.6 1.2 Lane LOS B A A A Approach Delay (s) 11.2 9.8 0.6 1.2 Approach LOS B A Intersection Summary Average Delay 5.2 Intersection Capacity Utilization 30.9% ICU Level of Service A Analysis Period (min) 15 Synchro 9 Report 2016 Peak Season + Project PM Peak Hour

APPENDIX TURN LANE WARRANTS

7.2 WHEN SHOULD WE BUILD RIGHT TURN LANES? Exhibit 44 Recommended Guidelines for Exclusive Right Turn Lanes to Unsignalized* Driveway Roadway Posted Speed Limit Number of Right Turns Per Hour 45 mph or less 80-125 (see note 1) Over 45 mph 35-55 (see note 2) *May not be appropriate for signalized locations where signal phasing plays an important role in determining the need for right turn lanes. 1. The lower threshold of 80 right turn vehicles per hour would be most used for higher volume (greater than 600 vehicles per hour, per lane in one direction on the major roadway) or two-lane roads where lateral movement is restricted. The 125 right turn vehicles per hour upper threshold would be most appropriate on lower volume roadways, multilane highways, or driveways with a large entry radius (50 feet or greater). 2. The lower threshold of 35 right turn vehicles per hour would be most appropriately used on higher volume twolane roadways where lateral movement is restricted. The 55 right turn vehicles per hour upper threshold would be most appropriate on lower volume roadways, multilane highways, or driveways with large entry radius (50 feet or greater). Note: A posted speed limit of 45 mph may be used with these thresholds if the operating speeds are known to be over 45 mph during the time of peak right turn demand. Note on Traffic projections: Projecting turning volumes is, at best, a knowledgeable estimate. Keep this in mind especially if the projections of right turns are close to meeting the guidelines. In that case, consider requiring the turn lane. 09/26/08 56 Driveway Information Guide

Where The Right Turn Lane Guidelines Came From 7.3 IMPACT OF LARGE AND SLOW MOVING VEHICLES TURNING RIGHT These recommendations are primarily based on the research done in NCHRP Report 420, Impacts of Access Management Techniques, Chapter 4 Unsignalized Access Spacing (Technique 1B), and Use of Speed Differential as a Measure To Evaluate the Need for Right-Turn Deceleration Lane at Unsignalized Intersections, by Jan Thakkar, P.E., and Mohammed A. Hadi, Ph.D., P.E. In the NCHRP Report 420, the observed high-speed roads, 30 to 40 right turn vehicles per hour caused evasive maneuvers on 5 to 10 percent of the following through vehicles. For lower speed roadways, 80 to 110 right turn vehicles caused 15 to 20 percent of the following through vehicles to make evasive maneuvers. The choice of acceptable percentages of through vehicles impacted is a decision based on reasonable expectations of the different roadways. In the Thakkar-Hadi study, by modeling speed differentials, a better understanding of the impacts of through volume and driveway radius was discovered. Speed and the volume of right turns should not be the only criteria used to determine the requirement for an exclusive right turn lane at unsignalized intersections. In order to minimize the rear-end collision potential of some situations, a right turn lane may be required where large and slow moving vehicles need to turn right such as; Trucking facilities (or locations that have a high volume of large vehicle traffic such as water ports, train stations, etc.) Recreational facilities attracting boats, trailers and other large recreation vehicles Transit facilities Schools 09/26/08 57 Driveway Information Guide

2-lane roadway (English) INPUT Variable 85 th percentile speed, mph: Percent of left-turns in advancing volume (V A ), %: Advancing volume (V A ), veh/h: Opposing volume (V O ), veh/h: OUTPUT Variable Limiting advancing volume (V A ), veh/h: Guidance for determining the need for a major-road left-turn bay: Left-turn treatment NOT warranted. Value 25 8% 100 137 Value 638 Opposing Volume (V O ), veh/h 800 700 600 500 400 300 200 100 0 Left-turn treatment not warranted. Left-turn treatment warranted. 0 100 200 300 400 500 600 700 Advancing Volume (V A ), veh/h CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway, s: Average time for left-turn vehicle to clear the advancing lane, s: Value 3.0 5.0 1.9

2-lane roadway (English) INPUT Variable 85 th percentile speed, mph: Percent of left-turns in advancing volume (V A ), %: Advancing volume (V A ), veh/h: Opposing volume (V O ), veh/h: OUTPUT Variable Limiting advancing volume (V A ), veh/h: Guidance for determining the need for a major-road left-turn bay: Left-turn treatment NOT warranted. Value 25 8% 105 185 Value 618 Opposing Volume (V O ), veh/h 800 700 600 500 400 300 200 100 0 Left-turn treatment not warranted. Left-turn treatment warranted. 0 100 200 300 400 500 600 700 Advancing Volume (V A ), veh/h CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway, s: Average time for left-turn vehicle to clear the advancing lane, s: Value 3.0 5.0 1.9