ELECTRICAL METERING RESIDENTIAL

Similar documents
10 Commercial, Industrial, Agricultural Services

Metering and Service Installation:

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5

Section 6 Electric Metering: Residential

9. Non-Residential Services (Commercial, Industrial, and Agricultural)

PUBLIC UTILITY DISTRICT NO. 1 OF LEWIS COUNTY METERING SPECIFICATIONS

Customer Requirements Meter Socket Configurations

Table of Contents. Electrical Service Requirements. 1. General Requirements

AMENDMENT ELECTRIC SERVICE MANUAL 2014

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS

ENGINEERING SPECIFICATION

Customer Requirements Downtown Secondary Network Service

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

7 Single Family Service

Associated equipment As related to metering equipment: such as the current transformers, CT wiring and test switches.

Approved Contractor Construction e-guide Residential Commercial

METERING REQUIREMENTS

Temporarily Approved Solar Photovoltaic System Electrical Schematics

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

COMMERCIAL QUICK REFERENCE

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

OVERHEAD SERVICE. Items to consider


DISCONNECT SWITCH REQUIREMENTS FOR DISTRIBUTED GENERATION CUSTOMERS

Meter Standards COMMERCIAL. Metering Guidelines for Electric Service. March 28, 2014

Electric Service Requirements

Clark Public Utilities Commercial Electric Service Handbook. This page left blank intentionally.

UNDERGROUND SERVICES - SECONDARY

SECTION VII METERING INSTALLATIONS

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE

CABINET - INSTRUMENT TRANSFORMER Indoor - Outdoor, 480 Volt Maximum 1200, 1600, 2000 Ampere

RESIDENTIAL. Metering Guidelines for Electric Service. Meter Standards. October 25, 2017

Meter Installation. -and- Padmount Transformer Guide

WPS SERVICE MANUAL. Section Amp and Smaller - Common

PEU reserves the right to determine all meter locations. Only authorized PEU personnel will determine this location.

10. METERING General Requirements

NEW SERVICE HANDBOOK COMMERCIAL & IRRIGATION SUPPLEMENT

CONTENTS BY CHAPTER. Chapter 2: COMPANY EQUIPMENT ON CUSTOMER PREMISES

STOUGHTON UTILITIES ELECTRIC SERVICE RULES AND INFORMATION

GENERAL INFORMATION 1.01 PURPOSE

Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

Pentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION

Electric & Gas Service Requirements (Greenbook) Overview

ELECTRIC SERVICE MANUAL

SECTION 300 OVERHEAD SERVICE

2. DEFINITIONS. 2.3 APPROVED Acceptable to the authority enforcing the National Electric Code

RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS

34.00 METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE

7. Residential Single-Family and Duplex Buildings (Dwellings)

UNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service.

90.2 Scope. The installation of electrical conductors, equipment and raceways for:

Electric Service Requirements

Service Entrance Methods

SINGLE PHASE WIRING SPECIFICATIONS

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS

7. SERVICES OVER 600 VOLTS

THREE PHASE WIRING SPECIFICATIONS

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

CABINET - CURRENT TRANSFORMER Indoor - Outdoor 240 Volts Amperes Maximum

TABLE OF CONTENTS. Important Notices Underground Plant Protection Information. Commercial/Industrial Information Sheet

Pretest Module 24 Three-phase Service Entrance

Electric Service Guide. Commercial & Industrial

Introduction. Upon completion of Basics of Meter Mounting Equipment

Approved Meter Sockets and Cabinets

Electric Service Requirements & Guidelines

March Commercial Distributed Generation with Optional Energy Storage Systems

ELECTRIC POLICY INTRODUCTION CHAPTER I GENERAL

ELECTRIC DIVISION RULES AND PROCEDURES FOR ELECTRIC SERVICE

Permit for Charging Equipment Installation Electric Vehicle Supply Equipment (EVSE)

Three-Phase Pole Mounted Recloser

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Brantford Power Inc. METERING SPECIFICATION Page 1

SAFETY SOCKET BOX. Note 8 3" MIN. 3" Max. (200 A)

KIUC Service Installation Manual

Model ESV Uninterruptible Power System 1.5 KVA/KW KVA/KW Single Phase

MP Meter-Pak Meter Centers Product Description PRODUCT DESCRIPTION. MP Meter-Pak Meter Centers

OREGON TRAIL ELECTRIC CO-OP ELECTRIC SERVICE REQUIREMENTS & GUIDELINES

ELECTRIC SERVICE REQUIREMENTS

Indianapolis Power & Light Company

1. General Requirements

MP Meter-Pak Meter Centers Product Description PRODUCT DESCRIPTION. MP Meter-Pak Meter Centers

Customer Guide to Electric Service Requirements

Brantford Power Inc. METERING SPECIFICATION Page 1

SECTION PANELBOARDS

Document Requirements for Engineering Review PV Systems v1.0 6/9/2017

Requirements for Secondary Voltage Revenue Metering (750 V and less)

UPPCO SERVICE MANUAL

SECTION 500 METERING AND ASSOCIATED EQUIPMENT

3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements.

Florham Park, NJ USA Call (ASCO) for sales or service

Marshfield Utilities Rules for Electric Service Installations. Table of Contents

Definitions. Scope. Customer Generation Interconnection Requirements

CT Metering. CT Metering. Meter Mounting Equipment

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

ELECTRIC SERVICE RULES UTILITY/CATV SERVICES Issued Jan 2016

2016 Photovoltaic Solar System Plan Review List

CHAPTER 1 INTRODUCTION

Service Requirements

Transcription:

ELECTRICAL METERING RESIDENTIAL 1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 UNDERGROUND FED METER SOCKET (226-320 AMPS) 5.0 METER SOCKET (0-320 AMPS, 120/208V) 6.0 UNDERGROUND SERVICE W/CURRENT TRANSFORMER METERING (400-800 AMPS) 7.0 CONNECTION OF AUXILIARY AND STANDBY POWER SOURCES 2.0 SCOPE This standard provides specific information for construction of metering facilities for residential customers. 3.0 GENERAL REQUIREMENTS 3.1 The type of service available will normally be three wire single phase 120/240 volt. Three wire single phase 120/208 volt is available in certain areas. Custom built homes requiring three phase service will be considered under NVE standard CM0001M, Electric Metering Commercial & Industrial. 3.2 NVE should be contacted prior to purchase of equipment and wiring. 3.3 All meters and sockets shall be Underwriter's Laboratory listed. All installations and equipment shall comply with the latest requirements of Electrical Utility Service Equipment Requirements Committee, (EUSERC), as adopted by NVE. 3.4 Customer is responsible for installation and maintenance of all equipment beyond the attachment point with the exception of the meter and metering equipment. 3.5 No customer owned equipment is allowed in the metering section, pull section or behind the meter. JL MB DA 03/18 Page 1 of 5

4.0 UNDERGROUND FED METER SOCKET (226-320 AMPS) For a single phase underground service the customer shall furnish, install, and maintain a service termination and meter mounting device designed for that purpose. 1. Ring sockets are required. Bolt-in socket meters are not approved. 2. Sockets may include manual bypass facilities which maintain service continuity when the meter is removed for testing and inspection. 3. Underground Only - The meter socket may be located above, left, or right of the pull section. 4. Underground Only - Pull section cover panels shall be removable, sealable, equipped with two lifting handles (rated for lifting 75#), and not exceed nine square feet in size. Sealing provisions are to be provided on both sides of the panel. JL MB DA 03/18 Page 2 of 5

5.0 METER SOCKET (0-320 AMPERES 120/208 VOLTS) When this service is available from NVE to a separately metered residence or other domestic unit, the customer shall furnish and completely wire a five-terminal socket for 120/208 volt service, similar to that shown below. If the service is overhead, the customer shall provide, install and maintain the required overhead entrance conductors, conduit, and service head to the point of attachment of NVE's overhead service conductors. NOTE: The 120/240 Volt socket has a 4-jaw meter clip. 1. Sockets for 120/208 volt service shall be supplied with a fifth terminal which must be located in the nine o'clock position. 2. Overhead service only. 3. Overhead or underground service. JL MB DA 03/18 Page 3 of 5

6.0 UNDERGROUND SERVICE W/CURRENT TRANSFORMER METERING (400-1000 AMPS) For a service which is to be metered using current transformers, the customer shall furnish, install and maintain a separate termination cabinet, current transformer cabinet and safety socket meter box. MINIMUM CABINET SIZE MOUNTING BASE 24" x 48" x 11 2 C.T. BASE 1. Fault duty rating will match or exceed panel rating. 2. The neutral conductor shall be continuous without a splice through the current transformer cabinet. 3. Cover shall be sealable and include the caution sign "No Fuses Inside" 4. A 24" x 48" min. CT cabinet with a two-ct mounting base shall be furnished and installed by the customer. A hinged cover must be used. At least three feet of clearance in front of the cabinet is required to open the cover. 5. A 16-1/2" x 26" x 11" min. service termination cabinet will be furnished and installed. 6. A 12" x 20" x 4-1/2" safety socket meter box will be furnished and installed. JL MB DA 03/18 Page 4 of 5

7.0 CONNECTION OF AUXILIARY AND STANDBY POWER SOURCES NOTE: REFER TO NEC, ARTICLE 700, and NVE STANDARDS VOLUME 5, ENG 04U, for details. All auxiliary/standby power sources must be installed in compliance with all National Electric Codes (NEC) and local/state/federal ordinances. Any portable electric generator which is capable of being temporarily connected to a customer's electrical system, which is normally supplied by NVE, shall be connected only after opening the customer's main service switch so as to isolate the customer's electrical system from NVE's system. Also, the generator must be disconnected before reclosing the main service switch to restore normal electric service. Any electrical generator, other than one authorized by NVE to run in parallel with NVE, or standby power source capable of being permanently or temporarily connected to a customer's electrical system shall be connected only by means of a visibly open double throw-switch, to isolate the customer's electrical system from NVE's system. Failure to isolate the customer's electrical system from NVE's system can cause electrical feedback and endanger both life and property. Any person who possesses and intends to use any such auxiliary generator or standby power source on an electrical system normally supplied by NVE must notify the appropriate NVE District Engineer (at the numbers listed below) of the units' installation location and how it is intended to be used and operated. Reno/Sparks/Washoe Valley/North Lake Tahoe: 775-834-7082 Carson City/Tonopah/Hawthorne/South Lake Tahoe: 775-834-2990 Elko/Lovelock/Winnemucca/Fallon/Fernley/Battle Mountain: 775-834-2811 JL MB DA 03/18 Page 5 of 5