SunLink PV System Disconnect with Arc Fault Detection Installation and Operations Manual

Similar documents
100A 225A 400A PATENT PENDING

Safety and Installation Instructions

General Installation Manual 2007 Sanyo Electric Co., Ltd. All Rights Reserved 6/15/07

Copyright 2012 DelSolar Co. Ltd MQWRD installation manual-iec Ver. 1.4

CP-250E-60/72-208/240-MC4 Microinverter with Modular Trunk Cable

INSTALLATION MANUAL.

Disconnect Combiner Box Installation Manual

Contactor Combiner Box Installation Manual

Installation and Operations Manual

General Installation Manual July 1, SANYO Energy (USA) Corp. All Rights Reserved.

INSTALLATION MANUAL CRYSTALLINE SOLAR MODULES

General Installation Manual Mar 2009, Sanyo Electric Co., Ltd. All Rights Reserved 3/23/09

General Installation Manual for POWERCOM Photovoltaic Modules

Safety and Installation Instructions For Fluitecnik PV Modules

Combiner Manual #OMBINER #OMBINER < 2* )NSTALLATION 7(&+12/ i 62/$5

Installation Manual. Opal Solar QSA Series

Solar module user manual Conergy PM 225P-250P

SunWize SWPB Series Solar Modules GENERAL INSTALLATION & USER GUIDE

RSDCOM. Installation and Operation Guide. Commercial Rapid Shutdown Combiner. DOCR Published March 2017 Revision C English

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

Installation Manual AXITEC SOLAR MODULES

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

Model LA 4100 Time Delay OFF Controller

Application Note Three Phase String Inverters NEC 2014 Compliance

INSTALLATION MANUAL THE / MODULE. IEC & UL version

Product manual Rapid Shutdown (RSD) system for residential and small commercial

Installation Guide. Trace Combiner Box 6

PM300P00 Installation Guide for Users

MASTERsine Inverter PXA Series Installation Guide

Combiner Box Installation Manual

Grape Solar Photovoltaic Modules. User Manual

Acme Conduit Entry. String Combiner/Pass-Through. FOR PHOTOVOLTAIC INSTALLATION Installation Manual

Model LA 4400 Time Delay OFF Controller

SunWize SW and OEM Series Solar Modules GENERAL INSTALLATION & USER GUIDE

INSTALLATION MANUAL. IEC version. TSM_IEC_IM_2012_RevB

Grape Solar Photovoltaic Modules. Safety and Installation Manual

SBCB-6, SCCB-12, 28, 52 6 to 52 Circuit Combiner Boxes

Solar Combiner Solutions

Residential Transition Box. Model RU-1. Specifications. Electrical

Solar PV General Introduction Guide for Electricians

2016 Photovoltaic Solar System Plan Review List

HOYMILES MICRO-IVERTER MI-250

dv Sentry TM 208V 600V INSTALLATION GUIDE Quick Reference ❶ How to Install Pages 6 14 ❷ Startup/Troubleshooting Pages WARNING

Model LA 4300 Time Delay OFF Controller

PM220P00 / PM240P00 Installation Guide for Users

High Frequency SineWave Guardian TM

CP /240-MC4 User Manual

SineWave Guardian TM 380V 600V INSTALLATION GUIDE. Quick Reference. ❶ How to Install Pages 6 17 ❷ Startup/Troubleshooting Pages WARNING

Sunny Boy Accessories SUNNY BOY COMBINER BOX TLUS SBCBTL6

Grape Solar Photovoltaic Modules. User Manual

Installation And User Manual SCHOTT PERFORM POLY SCHOTT PERFORM MONO

Photovoltaic Solar Plan Review

Installation, Maintenance, and Operation Manual

Matrix AP 400V 690V INSTALLATION GUIDE. Quick Reference. ❶ How to Install Pages 6 20 ❷ Startup/Troubleshooting Pages WARNING

Installation Manual. Installation Manual. AXITEC, LLC 160 Greentree Drive, Suite 101 Dover, Delaware

Installation Instructions: ACCENT SYSTEM

INSTALLATION MANUAL MODULE TSM-PDG5/PDG5(C) TSM-PEG5/PEG5(C) TSM-PEG40 THE. UL version IEC version. TSM_UL/IEC_IM_Dec_2014_RevB - 1 -

Installation Instructions: HYPERION R-Lite SYSTEM

Residential Photovoltaic (PV) Packet

The Power of Reliability INSTRUCTION MANUAL

Monicon Instruments Co., Ltd. CHR-1285/2485 CHR-1285/2485 BATTERY CHARGER

Bulletin Wiring methods for solar photovoltaic systems Rules 2-034, , , , , Tables 11 and 19

Dimensions 12/800N 12/1200N D. DC to AC Power Inverters. OWNERS MANUAL for Models: OWNERS MANUAL April ISO 9001:2000 Certified Company

Installation Instructions: ACCENT HIGH OUTPUT SYSTEM

Model Numbers SAVI-NOTE75, SAVI-NOTE150

User Manual. Solar Charge Controller 3KW

Installation guide for Suntech Power photovoltaic module Purpose of this guide

poollux Power plx-pw60 & plx-pw100

SAVE THESE INSTRUCTIONS

Mipco Connections for Refrigerated Containers. No One Does It Like Mipco. The Mipco. Advantage. Reliability. Safety. Easy Installation & Service

CALTRAP INSTALLATION AND OPERATIONS MANUAL

SAVE THESE INSTRUCTIONS

MIL-24/2600Q MIL-24/3200DQ

Models beginning with MO, MK, 7B, 6S, 6F or 5B. Product Description. Technical Specifications. Installation Instructions.

Installation Manual LIGHTWAY PV MODULES. Revision Date March 30, 2013 /Applicable for IEC certified products

Quick Start Guide TS 910 & TS 920

IEC INSTALLATION INSTRUCTION AND MAINTENANCE MANUAL FOR CRYSTALLINE SOLAR PV MODULE

Installation Instructions

Installation Instructions Electric Heaters 5 20 kw

Installation Instructions Electric Heaters 5 20 kw

Inspector Training Workshops Module One Photovoltaic Labeling based on 2008 NEC

Product Manual. Installation Instructions for CHSM-230M Series Solar Module

General Safety & Installation Instructions

Bulletin Wiring methods for Solar Photovoltaic Systems Rules, 2-034, , and , Tables 11 and 19

Crystalline Silicon PV Module Installation Guide (JET)

CPS 3Phs String Inverters NEC 2014 Compliance

SCC-MPPT Solar Charge Controller

User s Guide Includes Mounting, Installation, and Product Registration

GTX UNIT SUBSTATION Installation, Maintenance & Operation Manual

SOLAR LIGHTING CONTROLLER SUNLIGHT MODELS INCLUDED IN THIS MANUAL SL-10 SL-10-24V SL-20 SL-20-24V

Health & Safety Issues Associated with Solar Photovoltaic (PV)

Instruction Manual. Blink HQ Charger. Charge on. a CarCharging Company

DC to AC Power Inverters

EVoInnovate EVSE Model Numbers: EVO & EVO User Manual & Installation Guide. Revision 1.0

Installation and operating instructions. Solar charge controller MPPT 10 A / 20 A Z Z

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

DC to AC Power Inverters

Non-Residential Solar Energy Photovoltaic (PV) Packet

Powerware Vdc Extended Battery Cabinet User s Guide.

Photovoltaic Modules Installation Manual for Australia

Transcription:

Combiner Box Installation & Operations Manual SunLink PV System Disconnect with Arc Fault Detection Installation and Operations Manual TABLE OF CONTENTS Notices and Safety Precautions Pages 1-2 Combiner Box Electrical Characteristics Page 3 Combiner Box Mounting Page 4 Grounding, Fuses and Wiring Pages 5-6 Operation Page 6-7 Maintenance and Service, Schematics Page 8-10 1

Combiner Box Installation & Operations Manual SunLink s Arc Fault Combiner Boxes are the professional solar installer s choice for combining PV Arrays and complying with the new Arc Fault Protection requirements in the National Electrical Code. These boxes include: Compliance with the stringent UL1741 and UL1699B safety listing for continuous rated current operation at 50 C. Installation friendly TYPE 4 watertight enclosure for vertical or horizontal mounting. Simple, clean and solid construction for years of service. SAVE THESE INSTRUCTIONS - This manual provides important instructions for the Arc Fault Series Combiner Boxes that shall be followed during installation and maintenance. The Arc Fault Series Combiner Boxes are designed and tested to stringent international safety requirements. However, as with all electrical equipment, specific safety practices must be followed. To reduce the risk of injury, carefully read this instruction booklet in its entirety before installing, wiring, or using this product in any way. 1.1. Disclaimer of Liability The installation techniques, handling and use of this product are beyond company control. Therefore, SunLink Corporation does not assume responsibility for loss, damage or expense resulting from improper installation, handling or use of this product. 1.2. Listing Information This product meets or exceeds the requirements set forth by Underwriters Laboratories for components used with PV Modules. This UL Standard is UL1741 for accessories used with inverters. This product is also certified for Arc Fault Detection and Interruption per UL Standard 1699B. 1.3. Limited Warranty Combiner box limited warranties are for 1 year for materials and workmanship unless otherwise indicated. Important Safety Instructions There are NO user-serviceable parts in this enclosure. Modifying this product in any way will void the manufactures warranty. WARNING: PV modules pass direct current (DC) when the module is under load. Direct current will arc across gaps and may cause injury or death if improper connection or disconnection is made. Do not connect or disconnect wires to the combiner box when current from the modules or an external source is present. WARNING: Voltage is present in open circuit conditions. Photovoltaic modules create voltage anytime light is present. CAUTION: For continued protection against risk of fire, replace fuses with only 600VDC / 1000V rated, max. 20A fuses. Make connections in combiner box prior to connecting modules. To work on the combiner box after the modules are connected, cover all modules in the PV array with an opaque cloth or material. All US installations must be performed in compliance with the National Electrical Code (NEC), ANSI/NFPA 70 and any applicable local codes. All Canadian installations must be done in compliance Canadian Electrical Code, Part I No GFDI included in the combiner boxes Installation, maintenance & servicing should be performed only by authorized personnel. Remove all metallic jewelry prior to installing this product to reduce the chance of accidental exposure to live circuits. Use insulated tools to reduce your risk of electric shock. Do not install or handle the combiner box if it is wet. Maximum 95% humidity during use. Contact SunLink Corporation if the combiner box enclosure is damaged or its contents are compromised. Storage temperature: - 50º C - + 85 º C 2

Combiner Box Installation & Operations Manual Positive Ground Configuration The Homerun TM Series Combiner Boxes may be installed for use with positive grounded solar arrays, as required for example with certain SunPower TM solar modules. If used in a positive ground configuration substitute the word negative for every instance of the word positive below and substitute the word positive for every instance of the word negative below. Loss of Power In the event that the combiner box loses power, for example if there is a power outage from the grid that is supplying power to the combiner box, the arc fault detector will reset itself. It is therefore necessary to investigate any arc faults that are detected promptly and certainly before the next grid outage. Disconnecting Means During installation a disconnecting means must be provided to unplug or disconnect all AC power to this device. Rev 1 Page 3

Combiner Box Installation & Operations Manual ARC FAULT COMBINER BOX ELECTRICAL CHARACTERISTICS, AC CONTACTOR VERSION Family ID 12-0518 12-0520 Maximum Input Fuse Rating (A) 20 20 DC Maximum Voltage (VDC) 600 600 DC Voltage Range (VDC) 0-600 0-600 DC Maximum Continuous DC Current (A) 40 40 AC Maximum Voltage (VAC) 600 600 AC Maximum Current (A) 24 24 SCCR AT 600VDC (KAIC) 10 10 DC Positive Input Wire Size (AWG) 14-6 14-6 DC Positive Input Terminal Torque (in-lbs) 14.75 14.75 DC Negative Input Wire Size (AWG) 14-6 14-8 DC Negative Input Terminal Torque (in-lbs) 14.75 14.75 Ground Input Wire Size (AWG) 14-4 14-4 Ground Input Terminal Torque (in-lbs) 40 40 DC Output Wire Size (AWG) 14-6 14-6 AC Input Wire Size 16-10 16-10 AC Output Wire Size 16-10 16-10 Terminal Temperature Rating 75 C 75 C Operating Temperature -35 C to 50 C -35 C to 50 C NEMA Rating NEMA 4 NEMA 4 Maximum # of Fused Inputs for this Family 8 3 Switch Position 0 = OFF 1 = ON 0 = OFF 1 = ON Enclosure Exterior Dimensions 12 x12 x6 12 x12 x6 Weight 15 lbs. 14 lbs. Rev 1 Page 4

Combiner Box Installation & Operations Manual Mounting Mounting Overview A. The enclosure ships with a small bag containing sealing washers (Sagninaw p/n 102686) these must be used to preserve the NEMA 4 rating of the enclosure. B. Install the enclosure using the enclosure mounting holes only. Drilling holes in the back plate is not recommended and shall void the product warranty. Use a Zinc or Stainless steel M5 or #10 fastener through the enclosure mounting holes, place the sealing washer on the inside of the enclosure with the rubber side down. C. Place in desired location and use the appropriate hardware to mount the combiner box. D. The combiner box may be mounted vertically (door opens out) or horizontally (door opens up). E. Place the box in areas out of continuous water flow and extreme temperature. F. Do not mount the box such that the switch handle is blocked or difficult to operate. Please refer to the enclosure installation manual for additional mounting instructions. Step 1 Choose your Connectors A. The use of UL514B or equivalent conduit fittings is required to maintain the TYPE 4 (or 4X) rating of the enclosure. B. Installation of fittings must comply with UL50 for USA installations to maintain TYPE 4 (or 4x) rating of the enclosure. Equivalent connectors from other manufactures may be used as long as they satisfy citations in this section. Step 2 Install Connectors Metallic Conduit A. Place connector through hole with the o-ring on the outside of the enclosure. B. Screw on and tighten the locknut. Next screw on the Grounding Bushing, rotate to desired location and tighten set screws. Non-Metallic Conduit A. Place connector through with the o-ring on the outside of the enclosure. B. Screw on and tighten the locknut. C. Screw Insulated or plastic bushing onto connector threads to protect conductors from damage. D. Grounding Bushings are not used with non-metallic conduit. Rev 01 Page 5

Combiner Box Installation and Operations Manual Grounding Overview A. A ground bar has been provided for the convenience of combining several grounds into one larger ground wire. B. Please refer to NEC Article 690 on grounding PV arrays for specific requirements. C. Combiner box models with metallic enclosures have factory installed ground wires or straps to bond the enclosure body and door. Note: Do not connect any ground wires to enclosure body bonding location or to door bonding location. Step 1 Install Grounding Grounding With Metallic Conduit A. When installing metallic conduit grounding bushings must be used, refer to section 6.3.1 for installation. B. A continuous ground conductor must go through the lay-in lug on the grounding bushing with the insulation stripped back on either side of the lay-in lug set screw. Note: Bonding of the Grounding Bushings must comply with the NEC for USA installations. Grounding With Non-Metallic Conduit A. When installing non-metallic conduit the grounding conductor is terminated at the ground bar. Step 2 Select Fuses A. Please consult the module manufacturer and/or rating label to select the appropriate fuse size. B. Please consult NEC Article 690 for more information. C. A maximum of a 20 Amp fuse may be used with this product. Step 3 - Wiring NOTE: USE COPPER OR ALUMINUM CONDUCTORS SUITABLE FOR AT LEAST 75 C. A. Insert positive DC input conductor from the source circuit into the Touch Safe fuse holder and tighten to torque specifications as listed on pages 2 and 3. At least one source circuit must be connected to the left most fuse holder in the combiner box, otherwise the Arc Fault Detector will be bypassed and the combiner box may not function as intended. B. Insert negative DC input conductor from the source circuit into the negative fuse holder or negative terminal block and tighten to torque specifications as listed on pages 2 and 3. C. Insert DC output conductors into the output terminal block and secure to the torque requirements as listed on pages 2 and 3. D. Insert AC conductors into the terminals of the AC contactor and secure to the torque requirements as listed on pages 2 and 3. E. The power supply in the combiner box requires 120 or 240VAC input, terminate AC power directly to power supply terminals. F. Make sure all connections are tight, secure and safe for many years of operation. G. DO NOT INSTALL FUSES! Rev 01 Page 6

HomeRun Combiner Box Installation & Operations Manual Step 4 Ensure Proper Ventilation A. Maintain a minimum clearance of 1 on all 4 sides of the enclosure. Step 5 Check Your Work BEFORE INSTALLING FUSES, complete these simple time-saving checks. Note: A multimeter is needed to verify the installation process. Check that the multimeter is capable or reading the maximum string voltage and maximum string current before proceeding. A. Measure Voltage (Voc) a. Place the multimeter in DC voltage mode. b. Check the open circuit positive voltage (Voc) from each individual solar array string to the negative string. c. Ensure each Voc is the proper polarity (this means the meter reads a positive DC voltage) and within the intended range. d. Voc does not vary much with irradiance and temperature conditions. B. Check the DC current from each individual string (fuse holder) to ground and verify that no current is flowing to ground. a. If current is present, locate and repair any ground faults. Step 6 Insert Fuses A. Insert fuses into fuse holders and secure it in the closed position. Step 7 Conduct Final Inspection A. Check the DC voltage from the negative to positive inputs. B. Ensure voltage is the proper polarity and within the desired voltage range. C. Double check that all conduit penetrations are properly sealed against water and pest intrusion. D. Close and secure the enclosure door. E. Inspect enclosure for any physical damage that may have occurred during installation, apply protective coating to any exposed metal or areas where powder coating has been damaged, remove any metal shavings from enclosure produced from conduit installation. Ongoing Operation A. The disconnect switch may be used to disconnect the combiner box from current coming from other parts of the array and/or to disconnect the voltage and current of the combiner box from an inverter or other equipment that is downstream of the combiner box. B. To operate the switch simply rotate the handle 90 degrees, the switch contacts will be open if the switch handle is pointing to the off position. C. Always place the switch of every combiner box that is connected to an inverter in the off position before servicing the inverter. D. The fuse holders are not load break rated, and may cause damage or injury if opened under load. E. There are no other operable parts in the combiner box other than the disconnect switch, fuse holders and Santon ADU reset button. Rev 1 Page 7

HomeRun Combiner Box Installation & Operations Manual Arc-Fault Detection Unit (ADU) Operation A. An arc fault occurs when loose or corroded connections make intermittent contact and cause sparking or arcing between the connections. This translates into heat, which will break down the insulation of the wire and in most cases is the trigger for an electrical fire. By detecting arc faults and resolving the cause at an early stage, fire and a lot of damage can be prevented. B. When the ADU detects an arc fault, the visual arc fault indicator will illuminate and the contactor in the combiner box will open, effectively turning off the inverter that is connected to the combiner box. C. As soon as the problem causing the arc fault has been resolved, the ADU needs to be reset. To reset the ADU use press the reset button. If the problem hasn t been resolved correctly and an arc fault still exists the arc fault indicator will immediately light up again. D. For more information please refer to the ADU manual, available here: http://www.santonswitchgear.com/products/download.html?download=1354106704_issuu.pdf Rev 1 Page 8

HomeRun Combiner Box Installation & Operations Manual WARNING: This is the end of the Installation and Operation Manual, the following section is service and maintenace instructions. Service instuctionsare for qualified service personel ONLY. Rev 1 Page 9

Combiner Box Installation and Operations Manual SunLink PV System Disconnect with Arc Fault Detection Service and Mainenance Instructions Service and Maintenance Instructions A. Read the Notices and Safety Precautions on pages 1-2 for important safety information before performing any maintenance or service. B. Please use protective safety equipment and disconnect all sources of supply before working on this product. C. The only serviceable components in the PV System Disconnect are the fuses and the arc fault detector. a. Before changing a fuse(s) check the system for problems and make repairs as needed. b. Then go through Steps 5 on page 7 before installing a new fuse(s). D. WARNING: - For Continued Protection against risk of fire, replace fuses with same type and rating of fuse (600V DC rated, MAX 20A Midget fuses). E. If the combiner box has a disconnect switch it must be switched ten times in a row, once a year, with the system off, to clean contacts. F. Mechanical aspects of the switch handle should be checked for dirt on an annual basis. G. No more than 3x the force of normal operation should be applied to the switch. If switch does not operate within this capacity, check for blockage or obstruction. H. Every 6 months inspect and re-torque the field installed wire connections. I. Inspect enclosure for any physical damage that may have occurred during installation, apply protective coating to any exposed metal or areas where powder coating has been damaged. Rev 01 Page 10

HomeRun Combiner Box Installation & Operations Manual Service and Maintenance Instructions Wiring Diagram for 12-0518 Rev 1 Page 11

HomeRun Combiner Box Installation & Operations Manual Service and Maintenance Instructions Wiring Diagram for 12-0520 Rev 1 Page 12