Sugarbeet Harvester. Checklist. mouse over for additional notes in this presentation

Similar documents
OPERATING MANUAL 2010 WIC HARVESTER 12 ROW TH Avenue North Fargo, ND Phone: (701) Fax: (701)

Parma Sugarbeet Harvester

OPERATING MANUAL HARVESTER 12 ROW TH Avenue North Fargo, ND Phone: (701) Fax: (701)

CPHD POST HOLE DIGGER Operator s/parts Manual. Table of Contents

MODEL M400 POST HOLE DIGGER

S-Series Combine and Front End Equipment Optimization

2. PREPARATION 1. SAFETY 3. FRAME 4. TRANSMISSION 5. DRIVE 6. ROW UNIT 7. OPTIONAL EQUIPMENT Monosem Inc.

Post Hole Diggers Compact Standard Heavy Duty

2. PREPARATION 1. SAFETY 3. FRAME 4. TRANSMISSION 5. DRIVE 6. ROW UNIT 7. OPTIONAL EQUIPMENT

TRUCKINGTRUTH.COM T T. Daniel B s Pre-Trip Inspection Checklist

Post Hole Digger. Operation Manual MODEL

Service & Operation Manual. H619 Pulled Scraper

Recommended Maintenance Procedures for the Cutters Edge MULTI-CUT 2100 Series Fire Rescue Saw

Daily Maintenance Checklist for Series 1 Industrial Paper Shredder

Choose WORKSAVER For All Your Land Management. Power Landscape Rakes

2/22/2018 Camshaft Timing Drive Components Cleaning and Inspection 2007 Saturn Aura MotoLogic

Rietveld Equipment is the U.S. Distributor of ERME onion and garlic equipment.

D6 Crawler S/n 37A1 & 44A1 & up

TR 300 ECONOMY TRAILER SPRAYER HAMILTON # 20, BOOMJET #10, BOOM XT & 8 ROW BOOM HYPRO 8 ROLLER PUMP

HORSTMAN GREASED LIGHTNING CLUTCH

Sample Daily Checklists for Powered Industrial Trucks

POWER BOX RAKE MODEL T-5 OPERATOR S MANUAL

TABLE OF CONTENTS. Warranty Disclaimers Delivery Checklist After Sale Checklist Safety Set Up... 8

2. PREPARATION 1. SAFETY 3. FRAME 4. TRANSMISSION 5. DRIVE 6. ROW UNIT 7. OPTIONAL EQUIPMENT

END WHEEL NO- TILL 706NT & 1006NT

610 BUSHEL MANURE SPREADER

Permatex products can also be used for other applications on Dirt Bikes, Cruisers, ATVs, Side-by-Sides / UTVs, Scooters and more!

Hytrol's ABC Conveyor Book

Operator's Manual. VC-60 & VC-60 Plus Harper Industries, Inc. 7/03 Part No

AllCropHarvester.com. New/New Old Stock List as of 03/04/2016

uptime INSPECTION PACKAGES

LORENZ SNOW BLOWER 310 SERIES

PARTS MANUAL 10800A TRACTOR MOUNTED SNOWBLOWER

POWER RAKE MODEL PRO-6 OPERATOR S MANUAL

03-SERIES 4 & 6-ROW RIGID & FOLDING PEANUT VINE CONDITIONER OPERATOR S MANUAL THIS MANUAL TO ACCOMPANY MACHINE

EAVERLINE. Operator s Manual. Series 5 Feed Cart Models 521, 525, 531 & 537. Weaverline, LLC - Churchtown, PA 17555

Blackfoot. ID Blackfoot. ID MDL 1110 CONVEYOR OPEN DIRT Page 1 of 19

DARMAN. ENDURA II Cloth Towel Cabinet Product Guide. Manufacturing Company, Inc Lincoln Ave., Utica, NY 13502

Auger Belt Tension Adjustment DB7659

POWER BOX RAKE MODEL T-6 OPERATOR S MANUAL

CVT Continuously Variable Transmission

When to Turn Pins and Bushings

Owners Manual. Tri- fecta & Trio and forward. PlanetAir is a registered trademark of PlanetAir Turf Products, LLC

With a Cherrington Mobile Screener Nothing Stands Between You and the

POST HOLE DIGGER. Operation, Service & Parts Manual For Models D20 & D40. FORM: D20_40DigRev.QXD

ROTARY TILLER. Operation, Service & Parts Manual For P-P/C Series. November 1996 (Rev. 4-05) FORM: PTillerBook.QXD

ALUMINUM CARGO CARRIER WITH FOLDING RAMP

FIREWOOD PROCESSORS. WP200 Series Tractor PRODUCT FEATURES

Pull-Type Digger-Inverters

Fertilizer Feed Shaft Speed. Fertilizer Drive Settings. Cleaning Fertilizer Box

A A B B B C C CC. Bulletin Number 608 Price $10.00 HYTROL CONVEYOR CO., INC. JONESBORO, ARKANSAS COPYRIGHT 2008 HYTROL CONVEYOR CO., INC.

OMEGA. Separator Units. Standen Engineering Limited. Hereward Works, Station Road, Ely, Cambridgeshire. CB7 4BP England.

EZ Hauler 2500 Training & Procedure Manual

Fertilizer Feed Shaft Speed. Fertilizer Drive Settings. Cleaning Fertilizer Box

96A Windrow Pickup Attachment For John Deere Model 3975 Pull-Type Forage Harvester. Operator's Manual

ATTACHMENTS COMPONENT LOCATION

CROWERGLIDE AUTOMATIC CLUTCH Instruction Manual

Part Name/Description Part No

MODEL 2400 RAISED BED PLASTIC MULCH LAYER OPERATING MANUAL

John Deere. MODEL: 510 Round Baler JD-O-OME59945

Incline Drag Conveyor Manual

World plowing champions for conventional and reversible plows. Kverneland s reputation for the best plows is well earned.

Daily Maintenance Checklist for Series 4 Industrial Paper Shredder

Technical Information

GROUNDSMASTER. 52 Recycler. for 120 Traction Unit. Model No & UP. Operator s Manual

OPERATOR S & PARTS MANUAL

CDL Series Pre-Trip Inspection AT-TC3TS T1-JA01. Pre-Trip Inspection Checklist

OPERATOR'S MANUAL 304 Row Mulcher

Maintenance and Repair

MODEL 345 SERIES II FLAT BED PLASTIC MULCH LAYER OPERATING MANUAL

ROTARY TILLER. Operation, Service & Parts Manual For "AS" Series. FORM: ASTillerBook.QXD

tRIPr Chief Grain Cart. Operator s Manual. Operator s Manual

S Q UA R E T U B E T R A I L E R J A C K OWNER S MANUAL

48 in. DELUXE ALUMINUM CARGO CARRIER WITH RAMP

Wheel Horse. 44 Snowthrower. for 5xi Lawn and Garden Tractors. Model No & Up. Operator s Manual

D8 S/n 1H, 8R, 2U, & 13A

50 BUSHEL PTO DRIVE MANURE SPREADER

SECTION Accessory Drive

FIELD ADJUSTMENTS THREE POINT 2020F, 2520F, 2025F, 2525F DRILL MAINTENANCE

ILM16 ILM20 ILM30 ILM12AF ILM16AF ILM20AF ILM30AF

Instruction Kit Gleaner K2, K3, F2, F Flow Sensor K2-F

750 Series Press Conveyor Installation and Maintenance Manual

03-SERIES FOR CHAIN & BELT CONVEYOR MACHINES OPERATOR S MANUAL THIS MANUAL TO ACCOMPANY MACHINE

MODELS 1324 & 1624 & 1824

Installation and Main te nance Manual. Model RB190, SB350, RBI190, & SBI350 Effective June, 2005

KUHNS MFG LLC. Owner s Manual. Hay Accumulator. Operators Manual for the Kuhns Mfg LLC Hay Accumulators.

ADJUSTMENTS BEFORE GOING TO THE FIELD

Hanna Daily Preventive Maintenance Schedule

ProLine. 44 Mower. for 120 Traction Unit. Model No & Up. Operator s Manual

15.Main Shaft Assembly

ROLLER CHAIN SPROCKETS INDEX...E-1 E-2 MADE-TO-ORDER CAPABILITIES...E-3

Flip - Up Conveyor. for 10" BeltVeyors OWNER'S MANUAL (12/00)

DIAGNOSIS AND TESTING

7400 Series End Drive Conveyors

DEWULF P3 1-ROW 3-POINT LINKED TOP-LIFTING HARVESTER

SERVICE GUIDE AGRICULTURAL TRACK REMOVAL INSTALLATION INSPECTION ALIGNMENT CPB-316

Harrow Option Item Part No. Description Item Part No. Description

Owner s Manual. Mortar / Plaster Mixer. Models M785 M1000 M1200

EURO REEL

ADJUSTMENTS BEFORE GOING TO THE FIELD

Transcription:

Sugarbeet Harvester Checklist mouse over for additional notes in this presentation

Checklist vs. Slide Rule Pre-Field Checklist Hitch & PTO Row Finder Lifter Wheels & Struts Paddle Shaft Apron Shaft & Chain Grabrolls Scrub Chain and Tower Wheel and Carrier Boom and Mini-Tank Structural Misc. Harvester Slide Rule Speed Depth Row Finder Lifter Wheels Paddle Shaft Apron Chain Grab Bed Rear Delivery Grab Bed Side Delivery Scrub Elevator Wheel Elevator Tank & Boom Elevator

Row Finder Mounts are tight / inspect all welds X Arms straight, even and move freely X "T" shaft straight and moves freely X Arms centered over the row Hyd. & Electronics Working properly Greased

Pinch Point Settings Average Weight 2003 1.0 lbs to 1.3 lbs 5 year Average 1.14 lbs to 1.48 lbs Avg Beet Wt. Lbs. Pinch Point Setting 0.9 to 1.2 1 1/2 to 1 3/4 1.1 to 1.5 1 3/4 to 1 7/8 1.3 to 1.7 1 7/8 to 2

Pinch Point Angle

Pinch Point & Depth Total Lifted Area (Tons/Acre) Depth Pinch Point 1 1/2 1 5/8 1 3/4 1 7/8 2 1 1/2 9.3 9.9 10.5 11.0 11.6 2 13.4 14.1 14.9 15.7 16.5 2 1/2 17.9 18.9 19.9 20.9 21.9 3 23.0 24.2 25.4 26.5 27.7 3 1/2 28.6 29.9 31.3 32.7 34.1 4 34.6 36.2 37.8 39.3 40.9 4 1/2 41.2 42.9 44.7 46.5 48.2 Actual Lifter Wheel Cut (2" wider) 1 1/2 1 5/8 1 3/4 1 7/8 2 18.7 19.3 19.9 20.4 21.0 25.9 26.7 27.5 28.3 29.0 33.6 34.6 35.6 36.5 37.5 41.8 43.0 44.2 45.3 46.5 50.5 51.9 53.3 54.6 56.0 59.7 61.3 62.8 64.4 66.0 69.4 71.2 72.9 74.7 76.4 Difference - 15.7 ton 18.8 ton 21.9 ton Difference = Soil Compression & Digging Resistance

Pinch Points

Wheel Rotation

Close Ups / Wheel Fillers

Paddle Shaft Shaft Straight & Welds inspected Bearings good & lock collar tight Drive chain, gears & slip clutch inspected X Paddles Timed X Paddle wear & Wheel clearance correct Drive Chains oiled & Bearings greased

Apron Shaft & Chain Shaft Straight & Welds inspected Drive chain, gears & slip clutch inspected Bearings good & lock collar tight X Apron Chain Tension (worn over 30 to 50%) Apron Chain Drive sprockets worn (flip?) X Apron to wheel clearance (1.5-3") X Arpon Chain to grab scroll clearance (0.5" ) Drive Chains oiled & Bearings greased

Grabrolls Rear Delivery

Grabrolls Side Delivery

Grabrolls Inspect bearings (loose or worn) X Scrolling in good shape (over 50%) X Smooth & Grab tubes (straight & no wear areas) X Plastic - chunks missing or worn through X Check Lock collars, tappered hubs & shafts X Tighten all bolts Inspect drive belts / chains & allignment X Grab spacing - Pinch side (1-2" tube to tube) Drive Chains oiled & Bearings greased

Scrub Chain and Tower Inspect Tower for cracks, wear points & loose bolts X Idler Wheels - check bearings, wear and tightness X Idler Rollers - check bearings, wear and tightness X Scrub Chain worn (over 30 to 50% wear) Scrub Chain Drive sprockets worn (flip?/replace) X Tension arms adj. - wheel have 3/4" to 1" clearance X Scrub Chain to grabroll clearance (0.5" ) Head shaft - bearings, sprockets and drive chain X Run and inspect Scrub chains alignment Drive Chains oiled & Bearings greased

Wheel and Carrier X Inspect Wheel for wear, cracks (welds) & loose bolts Inspect Wheel carrier for cracks & loose bolts Wheel carriers - worn - check bearings Drive chain, gear & bearings inspected X Shoe - worn or bent (running centered) X Knock outs inspected Wheel Cleaner inspected Drive Chains oiled & Bearings greased

Boom and Mini-Tank X Inspect Boom for cracks, wear points & loose bolts X Tank structure sound (tight, welds & fatugue) X Chain slides - no breaks or excess wear Idler Wheels - check bearings, wear and tightness Idler Rollers - check bearings, wear and tightness Conveyor Chains worn (over 30 to 50% wear) Conveyor Chain Drive sprockets worn (flip?/replace) Shafts - bearings, sprockets and drive chains X Run and inspect Conveyor chain alignment Hydraulic motors & pumps - tighten bolts & screws Drive Chains oiled & Bearings greased

Speed Speed of Harvester Operation study 1991 - Conducted by NDSU & Uof M Extension Speed Recoverable mph Sugar % SLM % Tare % Yield (tpa) Sugar / Acre Rev / Acre* 4 18.10% 1.10% 4.5% 16.3 5,359 $655 6 18.10% 1.10% 6.0% 14.9 5,073 $599 * Revenue based on ACSC 2003 payment $56 Speed of Harvester Operation study 1992 - Conducted by NDSU & Uof M Extension Speed Recoverable mph Sugar % SLM % Tare % Yield (tpa) Sugar / Acre Rev / Acre* 3 18.25% 1.30% 4.9% 18.1 6,104 $723 5 18.30% 1.40% 6.0% 17.5 5,877 $695 * Revenue based on ACSC 2003 payment $28

Speed & Depth Keep harvester speed 4 mph or less Digging depth should be 2 to 3 Indicators for adjustment Excess tare % or large dirt return piles Broken tails or beets in/on the ground

Remember to work safely! Use cylinder stops or block equipment when your working under it Safety glasses when needed Wear gloves when needed Shut off tractor before working on equipment Have a safe and productive harvest