2016 Photovoltaic Solar System Plan Review List

SECTION 1: Field Inspection Guide for Rooftop Photovoltaic (PV) Systems

INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL

Solar PV Standard Electrical Plan

Residential Photovoltaic (PV) Packet

Photovoltaic Solar Plan Review

Solar PV Standard Electric Plan

STREAMLINED SOLAR CHECKLIST Owner Name:

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

Non-Residential Solar Energy Photovoltaic (PV) Packet

SOLAR PV INSTALLATIONS

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

33'-10"± ROOF #1 (2) SUNPOWER SPR E C-AC MICROINVERTER MODULES ROOF #2 (13) SUNPOWER SPR E C-AC MICROINVERTER MODULES 78'-9"± 25'-5"

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

CITY OF LANCASTER SPV TOOLKIT DOCUMENT #1

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

COVER VICINITY MAP SCOPE OF WORK ELECTRICAL NOTES GOVERNING CODES SHEET INDEX

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

Solar PV Standard Plan Simplified Microinverter and ACM Systems for Oneand Two-Family Dwellings

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

CITY OF SONOMA - TOOLKIT DOCUMENT #1

SOLAR PV STANDARD PLAN - COMPREHENSIVE Central/String Inverter Systems for One and Two Family Dwellings

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Solar Rooftop Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

RESIDENTIAL PHOTOVOLTAIC (PV) PACKET

Applicant and Site Information Job Address: Permit #:

Expedited Permitting Process for Electric Vehicle Charging Stations

Solar Power Installation Application

PHOTOVOLTAIC SYSTEMS

RESIDENTIAL PHOTOVOLTAIC (PV) PACKET

Roof Top Solar Permit Document 1 Submittal Requirements Bulletin. Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

Submittal Requirements Bulletin Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

Georgia Tech Bunger Henry Solar Roof Array ENGINEERING PACKAGE

Green Building Technology

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

2. Fire Department Inspections are required and available by appointment on Tuesdays and Wednesdays. See item number four for fees.

CHAPTER 10 ELECTRICAL. Notes:

Fire and Safety Considerations for Solar PV

Electric Vehicle Charging System Guidelines for Residential Buildings

XXX RESIDENCE : XXX kw DC GROUND MOUNTED PHOTOVOLTAIC SYSTEM

Solar Photovoltaic Power. Overarching Objectives. How many questions? 9/16/2012. From plan review to Final Inspection

RGS PV-000. Sheet List

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

EV Charging Station Submittal Requirements

SECTION 300 OVERHEAD SERVICE

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

Temporarily Approved Solar Photovoltaic System Electrical Schematics

Residential microinverter system

Inspector Training Workshops Module One Photovoltaic Labeling based on 2008 NEC

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

Mike Holt s Illustrated Guide to SOLAR PV SYSTEMS

City of Daly City Department of Economic and Community Development Building Division th Street, Daly City. CA

PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST

Microinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV.

ENGINEERING SPECIFICATION

Service Requirements

EXPANSION JOINT DETAILS DURA-BLOK CONDUIT SUPPORT CONDUIT ATTACHMENT DETAIL SCALE: NOT TO SCALE GROUNDING WIRE DETAIL SCALE: NOT TO SCALE

Spring Test 10 due 05/11/2013

10 Commercial, Industrial, Agricultural Services

Application Note Three Phase String Inverters NEC 2014 Compliance

The following permits are required to install a solar PV system with a maximum power output of 10 kw or less:

First Responder System Identification Quiz. Presented by the NY-SUN PV Trainers Network

Service Requirements

SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST

Arial Regular 25pt. Learn Solar Installation From the Pros!

9/7/2010. Objectives. Article 90. Introduction NEC Significant Changes. Review significant revisions in the 2011 NEC

STOUGHTON UTILITIES ELECTRIC SERVICE RULES AND INFORMATION

Document Requirements for Engineering Review PV Systems v1.0 6/9/2017

Washoe County PLAN SUBMITTAL

PV Vault Yielding safety quickly

Know the Code: PV and NEC

THIS PANEL FED FROM INV1. PER NEC 408.4(B) Part No NEC (C) Entrances to rooms or other guarded locations that contain exposed live

Job Address: Permit #:

COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT

Permitting, Installation and Inspection Residential EV Chargers Be aware that there are different types of Electric Vehicle (EV) Chargers.

Solar Standard Plan Simplified Systems for - and Two-Family Dwellings

Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018

RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS

Solar PV General Introduction Guide for Electricians

7. Residential Single-Family and Duplex Buildings (Dwellings)

4/15/2015 Item #10D Page 1

PUBLIC UTILITY DISTRICT NO. 1 OF LEWIS COUNTY METERING SPECIFICATIONS

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST

The Green Meter Adapter (GMA) program will become effective on January 15, Customers may start applying for a GMA on January 15, 2018.

Bulletin Wiring methods for Solar Photovoltaic Systems Rules and , Tables 11 and 19

CPS 3Phs String Inverters NEC 2014 Compliance

PV Installations 2015 Electrical Code & more. Presented by: Ted Olechna Director Codes and Standards Support

Job Address: Permit #: Contractor/Engineer Name: License # and Class: Signature: Date: Phone Number:

9. Non-Residential Services (Commercial, Industrial, and Agricultural)

City of Perris Development Services Building & Safety

SOLAR PV standard Plan-Simplified Central/String Inverter Systems for One and Two Family Dwellings

Spring Test 7 due 05/03/2013

2014 NEC Changes (Homestudy)

SECTION SOLAR ENERGY ELECTRICAL POWER GENERATION SYSTEM

DIVISION 311 MISCELLANEOUS ELECTRICAL RULES

Moraga-Orinda Fire District

Bulletin Wiring methods for Solar Photovoltaic Systems Rule and , Tables 11 and 19

Transcription:

City of Manhattan Beach Community Development Phone: (310) 802-5500 FAX: (310) 802-5501 TDD: (310) 546-3501 Photovoltaic Solar Panel Plan Check Guidelines Updated: 10-01-15 ORDINANCE NO. 15-0022 MBMC 9.06 CALIFORNIA CIVIL CODE SECTION 714 GOVERNMENT CODE SECTION 658505 Please attach these forms to approved plans 1. All work must comply with 2013 California Building Code and Electrical Code as well as applicable Manhattan Beach Municipal Code and amendments. 2. Provide engineering calculations and details demonstrating method of attachment of panels and adequacy of supporting members. Include wind uplift effects. Per ASCE 7-05, all calculations and designs to be stamped and signed by the engineer of record. Exemption for new Single Family Dwelling or Duplexes built after 1990: engineering calculations are not required, but the following must be provided: Structural framing plans for the existing building Solar panels must be flush mounted on the roof (4 from surface) Pre-fabricated roof systems require plans Structural installation details for the photovoltaic system Structural calculations by a licensed Engineer or Architect may be required at plan check, as determined by the Plan Check Engineer. 3. Provide elevation drawings that show heights of the panels and indicate how they comply with the height limit for the property, including any limits or conditions on any discretionary applications such as Coastal Permitting, Minor Exceptions or Variances. 4. Per Planning Division requirements: Provide a site plan that shows location of panels and all related equipment, and distances to property lines. Panels and equipment cannot be located in required front or side setbacks or required parking, driveway or vehicular areas. Related equipment may be located where on-site utility meters are permitted 3 clear of P/L. Ground-mounted panels may be located where accessory structures are permitted. Solar panel height must comply with MBMC 10.60.060 A (see Page 7). 5. Visually screen all related equipment and conduit in accordance with MBMC 10.60.090. 6. Provide three (3) sets of plans, minimum 18 x 24 ; attach all manufacturer s specification sheets, installation instructions and listing. Page 1 of 15 City Hall Address: 1400 Highland Avenue, Manhattan Beach, CA 90266 Visit the City of Manhattan Beach web site at http://www.citymb.info

7. Add notes to plans: Exterior Remote Disconnect @ Roof Top and @ Inverter/Panel: DC and AC array conductors that are routed and installed completely on the exterior of the building shall be contained in galvanized rigid steel conduit from any PV array rooftop J box, fusible combiner box, or fusible DC/AC disconnect @ rooftop to the ground level DC/AC disconnect and/or inverter (integral or separate components). These DC/AC array conductors installed in galvanized rigid steel conduit need to be run entirely on the exterior of the building. 8. Add notes to plans: Interior Remote Disconnect: DC array conductors that are routed through the building are required to be in galvanized rigid steel conduit from any PV array rooftop J box, fusible combiner box, or fusible DC disconnect through any attic. Conduit run through the interior of the building shall be installed a minimum of 18 below the roof surface. Note: E.M.T conduit is not approved for exterior use or the interior attic space. 9. Add note to plans: Inspection required for roof connection mounting assemblies prior to installing solar module. 10. Provide DC array solar panel Voc calculated @ x 1.13 [Temp. Coor.] //Isc calculated @ x 125% [CEC-690] x 125% [UL 1703]. 11. Provide complete inverter and solar module manufacturer specification sheet. 12. Show all conduit and conductor sizes, include derating of conductors. 13. Inverter integral AC/DC disconnects are not permitted. The AD/DC disconnects must be the blade-type (not drum-type). Drum-type disconnects are not permitted. 14. AC disconnect between inverter AC output and connection to utility to be a visible blade, lockable type disconnect listed for its use. Required DC/AC disconnects at roof top and at entrance of ground mounted inverters, to be visible blade-type listed for its use. 15. Distance between inverter and next downstream AC over current protection device to be maximum 25. AC over current device is required prior to entering the building (line of sight). 16. Verify main electrical service over current device and buss rating. For a dwelling unit the sum of the ampere ratings of the over current devices shall not exceed 120% or the rating of the busbar or conductor. 17. Show existing main electric service equipment and ground electrode system, conduit and conductor size. 18. Provide ground electrode system from inverter to existing main service ground electrode per CEC Article 250.50 through 250.86. 19. Ground electrode conductor from inverter to ground electrode to be minimum protection of bare armor sheathed cable, #8 awg. minimum. SOLAR Photovoltaic COMMERCIAL Panel Plan Check Guidelines 2015-10-01.doc Page 2 of 15

20. Show all signage required per 2013 CEC Article 690. See Page 3. 21. Roof top blade type disconnects are required for all DC and AC systems per City of Manhattan Beach Fire Department requirements. See Fire Department Solar Photovoltaic System Requirements Residential 1 and 2 Family Homes and Commercial Building and Residential Housing of 3 or More Units. SOLAR Photovoltaic COMMERCIAL Panel Plan Check Guidelines 2015-10-01.doc Page 3 of 15

SOLAR PHOTOVOLTAIC SYSTEM REQUIRED BUILDING INSPECTIONS BUILDING INSPECTOR / CONTRACTOR NOTE Two site inspections are required for roof-mounted PV systems: 1. FIRST INSPECTION TO INCLUDE: a. PV mounting bases, stanchions, roof flashings, rails, roof shingle/roof tile penetrations, conductor type and sizing, and conduit runs, combiner boxes, rough electrical components. b. Provide a ladder for Building Inspector to use. Structural calculations (where applicable) to be on site and available for the Building Inspector. c. No PV modules to be mounted until all of the above components have been inspected and approved (including fasteners). 2. SECOND / FINAL INSPECTION TO INCLUDE: a. Verifying conductor size/conductor type, grounding and bonding components, transfer switches, combiner boxes, through-roof penetrations, panel boards, disconnects, and warning labels. b. Sealants, caulking products need to be listed and approved for the application. c. Contractor shall have the product cut sheets, caulking & sealant product available for the Building Inspector. SOLAR Photovoltaic COMMERCIAL Panel Plan Check Guidelines 2015-10-01.doc Page 4 of 15

CITY OF MANHATTAN BEACH PHOTOVOLTAIC SIGNAGE REQUIREMENTS Per 2013 CEC Article 690 Electric Service Panel L1 L2 WARNING Dual Power Sources Second source is photovoltaic system Rated AC Output Current xxx Amps Nominal Operating AC Voltage xxx Volts Breaker Labeled SOLAR AC Discon. Solar Disconnect WARNING Electric Shock Hazard DO NOT TOUCH TERMINALS Terminals on both Line and Load sides may be energized in the Open Position Photovoltaic System AC Disconnect Rated AC Output Current xxx Amps Nominal Operating AC Voltage xxx Volts INVERTER WARNING Electric Shock Hazard If a ground fault is indicated, normally grounded conductors may be ungrounded and energized. DC Conduit (Every 10 ) DC Discon. Photovoltaic System DC Disconnect Rated max power-point current xxx ADC Rated max power-point voltage xxx VDC Maximum system voltage xxx VDC CAUTION SOLAR CIRCUIT DC Junction Box (typical) & Disconnect Solar Modules Roof Mounted SOLAR DC/AC DISCONNECT 300-600 VOLTS SIGNAGE Signage material shall be reflective, weather-resistant material suitable for the environment. All signage shall fall within the following format: White Lettering on a Red Background Minimum 3/8 Letter Height All Letters Shall be Capitalized SOLAR Photovoltaic Arial COMMERCIAL or Similar Font, Panel Non-Bold Plan Check Guidelines 2015-10-01.doc Page 5 of 15

REQUIRED LABELS FOR SOLAR ELECTRIC (PV) SYSTEMS <10KW Labels shall be made of RED plastic material with engraved white letters Letters shall be a minimum 3/8 in size The labels shall be permanently attached to the appropriate panel. AC & DC conduit, raceway, enclosures, cable assemblies and junction boxes shall be RED background with WHITE lettering made of durable adhesive, reflective weather resistant material suitable for the environment to alert Fire Department to avoid cutting them off. WARNING! DUAL POWER SUPPLY SOLAR ELECTRIC SYSTEM ATTACH THIS TAG TO METER PANEL WARNING! DUAL POWER SUPPLY SOLAR ELECTRIC SYSTEM DISCONNECT ATTACH THIS TAG TO PV DISCONNET DEVICE CAUTION: SOLAR ELECTRIC CIRCUIT ATTACH THIS TAG TO AC & DC CIRCUIT EQUIPMENT CITY OF MANHATTAN BEACH LABEL REQUIREMENTS : SOLAR-PV SYSTEMS DRAWING: SPV-1 Updated: 4-21-10 SOLAR Photovoltaic COMMERCIAL Panel Plan Check Guidelines 2015-10-01.doc Page 6 of 15

REQUIRED LABELS FOR SOLAR ELECTRIC (PV) SYSTEMS w/battery BACK-UP <10KW Labels shall be made of RED plastic material with engraved white letters Letters shall be a minimum 3/8 in size The labels shall be permanently attached to the appropriate panel. AC & DC conduit, raceway, enclosures, cable assemblies and junction boxes shall be RED background with WHITE lettering made of durable adhesive, reflective weather resistant material suitable for the environment to alert Fire Department to avoid cutting them off. WARNING! DUAL POWER SUPPLY SOLAR ELECTRIC SYSTEM CRITICAL LOAD MUST BE DISCONNECTED SEPARATELY ATTACH THIS TAG TO METER PANEL WARNING! DUAL POWER SUPPLY SOLAR ELECTRIC SYSTEM DISCONNECT ATTACH THIS TAG TO PV DISCONNET DEVICE CAUTION: SOLAR ELECTRIC CIRCUIT ATTACH THIS TAG TO AC & DC CIRCUIT EQUIPMENT CRITICAL LOAD DISCONNECT ATTACH THIS TAG TO AC & DC CIRCUIT EQUIPMENT CITY OF MANHATTAN BEACH SOLAR Photovoltaic COMMERCIAL Panel Plan Check Guidelines 2015-10-01.doc Page 7 of 15

LABEL REQUIREMENTS : SOLAR-PV SYSTEMS W/BATTERY BACKUP DRAWING: SPV-2 Updated: 10-01-15 REQUIRED LABELS FOR MULTI-SOLAR ELECTRIC (PV) SYSTEMS <10KW Labels shall be made of RED plastic material with engraved white letters Letters shall be a minimum 3/8 in size The labels shall be permanently attached to the appropriate panel. AC & DC conduit, raceway, enclosures, cable assemblies and junction boxes shall be RED background with WHITE lettering made of durable adhesive, reflective weather resistant material suitable for the environment to alert Fire Department to avoid cutting them off. WARNING! DUAL POWER SUPPLY 2 - SOLAR ELECTRIC SYSTEMS 2- DISCONNET DEVICES ATTACH THIS TAG TO METER PANEL WARNING! DUAL POWER SUPPLY SOLAR ELECTRIC SYSTEM DISCONNECT 1 of 2 ATTACH THIS TAG TO PV DISCONNET DEVICE WARNING! DUAL POWER SUPPLY SOLAR ELECTRIC SYSTEM DISCONNECT 2 of 2 ATTACH THIS TAG TO PV DISCONNET DEVICE CAUTION: SOLAR ELECTRIC CIRCUIT ATTACH THIS TAG TO AC & DC CIRCUIT EQUIPMENT SOLAR Photovoltaic COMMERCIAL Panel Plan Check Guidelines 2015-10-01.doc Page 8 of 15

CITY OF MANHATTAN BEACH LABEL REQUIREMENTS : MULTIPLE SOLAR-PV SYSTEMS DRAWING: SPV-3 Updated: 4-21-10 SOLAR Photovoltaic COMMERCIAL Panel Plan Check Guidelines 2015-10-01.doc Page 9 of 15

SOLAR Photovoltaic COMMERCIAL Panel Plan Check Guidelines 2015-10-01.doc Page 10 of 15

SOLAR Photovoltaic COMMERCIAL Panel Plan Check Guidelines 2015-10-01.doc Page 11 of 15

City of Manhattan Beach Planning Requirements Solar Panel Height Solar panels for domestic water or swimming pool heating systems may exceed the maximum height limit if it is shown that the performance of the panel drops below 90% of the performance achieved at maximum efficiency, as defined by the State Solar Rights Act (CA Civil Code 714). All solar panels cannot exceed the maximum height limit by more than 12 per MBMC 10.60.060 A. Solar panels and equipment shall comply with all conditions of any discretionary applications. Scenario 1 Proposed Panel Height- Over Max Height Max Height Roof Cross Sections Panels lowered to point where they loose 10% efficiency. Panels still over max height. Efficiency calculations must be provided. Max Height Roof Scenario 2 Proposed Panel Height- Over Max Height Max Height Roof Cross Sections A loss of 10% in efficiency could not be shown with efficiency calculations. Panels cannot exceed max height. Max Height Roof Plans Must Show: Maximum allowable building height, obtained from the original approved building plans on file or by obtaining a property survey. Actual maximum building height (either top of ridge or top of parapet), obtained from looking at the original approved building plans on file or by obtaining a property survey. If panels exceed height limit, efficiency calculations must be provided. If a building s maximum height cannot be determined, either because it is not shown on the plans or because plans cannot be found, the panels will not be allowed to exceed the roof ridge or top of parapet. The applicant can determine the maximum height by getting a property survey. SOLAR Photovoltaic COMMERCIAL Panel Plan Check Guidelines 2015-10-01.doc Page 12 of 15

MANHATTAN BEACH FIRE DEPARTMENT FIRE PREVENTION BUREAU 400 15 TH Street Manhattan Beach, CA 90266 Telephone (310) 802-5205 FAX (310) 802-5201 SOLAR PHOTOVOLTAIC SYSTEM REQUIREMENTS Commercial Buildings and Residential Housing of 3 or More Units The following are the Manhattan Beach Fire Department s minimum requirements for Solar Photovoltaic System Installations. Manhattan Beach Fire Department may create exceptions to these requirements due to new technology, methods, or other innovations to ensure firefighter and public safety. SECTION 1 - SCOPE These requirements regulate the installation of solar photovoltaic systems and their ancillary devices. Included are requirements regulating access, fire protection, and other measures and general precautions relating to solar photovoltaic systems. SECTION 2 - PLAN REVIEW Photovoltaic (PV) installations shall be approved by the Manhattan Beach Fire Department prior to installation. At a minimum, the following information shall be presented for approval: A. Site plan of the structure on which the photovoltaic array is to be installed (see Community Development requirements for site plans) B. Note indicating rooftop-mounted panels and modules have the proper fire classification rating SECTION 3 - MARKINGS, LABELS, AND WARNING SIGNS A. Purpose: Provide emergency responders with appropriate warning and guidance with respect to isolating the solar electrical system. This can facilitate identifying energized electrical lines that connect the solar panels to the inverter, as these should not be cut when venting for smoke removal. B. Marking: Markings are required on interior and exterior AC conduit, DC conduit, enclosures, raceways, cable assemblies, junction boxes, combiner boxes and disconnects (utility/safety disconnect at main electrical panel and rooftop emergency disconnect). The markings should be readily visible from any direction of approach. SOLAR Photovoltaic COMMERCIAL Panel Plan Check Guidelines 2015-10-01.doc Page 13 of 15

SECTION 4 ACCESS, PATHWAYS, AND SMOKE VENTILATION A. Access: A minimum 6 wide clear perimeter is required around the entire circumference of the roof. B. There shall be an unobstructed clearance of 7 or more between the roof deck surface and the underside of an overhead array. C. Pathways: Shall be established in the design of the solar installation and meet the following requirements: 1. Located over structurally supported members. 2. Center line axis pathways shall be provided in both axes of the roof. Centerline axis pathways shall run on structurally supported members or over the next closest structurally supported member nearest to the centerlines of the roof. 3. A minimum of 4 clear straight line pathway shall be provided from the access path to skylights and/or ventilation hatches. 4. A minimum of 4 clear straight line pathway shall be provided from the access path to roof standpipes. 5. A minimum of 4 clearance around roof access hatches with at least one 4 clear straight line pathway to parapet or roof edge. D. Smoke Ventilation: 1. Panels/modules shall be located no higher than 3 below the ridge. 2. The panels may be located no higher than 18 below the ridge if photovoltaic panels are installed on only one side of the ridge. 3. Arrays shall be no greater than 150 by 150 in distance in either axis. 4. Smoke ventilation options between array sections shall be one of the following: i. An access pathway 8 or greater in width. ii. A 4 or greater in width access pathway and bordering roof skylights or smoke and heat ventilation hatches. iii. A 4 or greater in width access pathway and bordering 4 by 8 venting cutouts every 20 on alternating sides of the pathway. EXCEPTION: The MBFD may determine that the roof configuration is similar to that of a one-or two-family dwelling residential building, as in the case of townhouses, condominiums, or single family attached buildings in which case the residential access requirements may be used. SOLAR Photovoltaic COMMERCIAL Panel Plan Check Guidelines 2015-10-01.doc Page 14 of 15

SECTION 5 - CONDUCTOR LOCATIONS, AC and DC A. Conduit, Wiring Systems, and Raceways: To reduce trip hazards and maximize ventilation opportunities photovoltaic circuits shall be located as close as possible to the ridge, hip or valley and from the hip or valley as directly as possible to an outside wall. B. Conduit Runs between Sub Arrays and DC Combiner Boxes shall: 1. Use design guidelines that minimizes the total amount of conduit used on the roof by taking the shortest path from the array to the DC combiner box. 2. The DC combiner boxes are to be located in such a manner that conduit runs are minimized in the pathways between arrays. C. AC and DC Wiring: 1. AC and DC wiring shall be run in metallic conduit or raceways when located within enclosed spaces in a building. 2. Conduit shall run a minimum of 18 below the roof decking. SECTION 6 DISCONNECTS A. Central Inverter Systems: Central inverter systems shall have a DC disconnect switch on the roof at the combiner (emergency disconnect) and a DC disconnect at the inverter in the area of the main service panel (utility/safety disconnect) for the purpose of de-energizing or providing for rapid shutdown of PV system. B. Micro inverter Systems: Micro inverter systems shall have an AC disconnect switch on the roof at the collector circuit breaker panel (emergency disconnect) and an AC disconnect at the main service panel (utility/safety disconnect) for the purpose of de-energizing or providing for rapid shutdown of PV system. SECTION 7 - GROUND MOUNTED PHOTOVOLTAIC ARRAYS A. Shall not obstruct Fire Department access. B. Overhead arrays shall comply with the same marking, labeling, and warning signs as required of roof-mounted systems. SECTION 8 BATTERY SYSTEMS Battery systems shall comply with CFC Section 608: Stationary Storage Battery Systems. SOLAR Photovoltaic COMMERCIAL Panel Plan Check Guidelines 2015-10-01.doc Page 15 of 15