Oil-hydraulic operator for swinging gates

Similar documents
TECHNICAL DATA HYDRAULIC UNIT

INSPECTIONS AND MAINTENANCE

CHECKING AND MAINTENANCE:

BAYT 980. Oil-hydraulic OIL-HYDRAULIC BARRIER FOR TRAFFIC CONTROL INSTALLATION MANUAL. code 4425 Post with fixing base. POLO 44 - optional -

INSTALLATION MANUAL GB

DRIVE 700 OVERALL DIMENSIONS

Instructions manual. Below ground oil-hydraulic operator for swinging gates. pages 17-32

GB INSTALLATION MANUAL

NYOTA 115. Electro-mechanical sliding gate operator. Instruction manual

GB Instructions Manual

EC MACHINE DIRECTIVE COMPLIANCE DECLARATION

1-24. Oil-hydraulic. Oil-hydraulic road barrier for traffic control from 3 to 8 metres

EC MACHINE DIRECTIVE COMPLIANCE DECLARATION

BAYT 980. Oil-hydraulic Road Traffic Barrier. BAYT 980 painted version BAYT 980 stainless steel version inox

D Vers. 03 ELECTROMECHANICAL AUTOMATION FOR SWING GATES

I - Libretto di istruzioni GB - Instructions manual F - Notices de montage

FROG KIT. Installation Instructions for a Pair of gates... TECHNICAL HELPLINE THE FROG-P KIT CONSISTS OF:

FITTING AND CONNECTION INSTRUCTIONS

E R A I GATE AUTOMATION DIVISION

a p prove d ELECTROMECHANICAL SLIDING GATE OPENER

Type of installation. external motor. underground motor. Leaf max length (m) Leaf max length (m) Max leaf weight (kg) V V V

UNDERGROUND OPERATOR FOR SWINGING GATES. WARNING!! Before installing, thoroughly read this manual that is an integral part of the pack

SARGON S - M - L. All rights reserved INSTALLATION MANUAL

Typical Installation Schematic

PW320/PW330 USER MANUAL SWING GATE OPENERS 24V DC GEAR MOTOR FOR RESIDENTIAL. Flashing Light. Push Button. Control box. Gate 2.

EC DECLARATION OF CONFORMITY FOR MACHINES (DIRECTIVE 98/37/EC) WARNINGS FOR THE INSTALLER

Instruction Manual for the. E-SL 450 Series

IRREVERSIBLE OPERATOR FOR SWING GATES AND DOORS

AUTOMATION SYSTEM FOR SWING GATES FROG SERIES INSTALLATION MANUAL SUPERFROG

contents Installation Maintenance DOOR OPERATOR SLIDING-1300/2100 Installation and Operating Manual DoorHan, 2012

MEKO OPENER FOR RACK-DRIVEN SLIDING MOTOR

SLIDE & OL USER'S AND INSTALLER'S MANUAL V1.0 REV. 06/2017

HÖRMANN DSA 100 DSA 100 L DSA 200 DSA 200L. page 1

PW150/PW200 USER MANUAL SWING GATE OPENERS 24V DC GEAR MOTOR

MOUNTING AND CONNECTING INSTRUCTIONS 1. GATE ARRANGEMENT ENGLISH

Automatic concealed bollards 275 H600 and 275 H800 with pit

SCUTI INSTALLATION INSTRUCTIONS FOR AUTOMATING COUNTER BALANCED DOORS USING THE SCUTI OPERATOR

BISON 20 OM BISON 25 OTI

Installation manual. English. mystrike OPENER FOR RACK-DRIVEN SLIDING MOTOR

Contents. EC DECLARATION OF CONFORMITY FOR MACHINES... p. 10. WARNINGS FOR THE INSTALLER... p. 10

SUBWING 700 USER S AND INSTALLER S MANUAL V1.0 REV. 04/2017

FEATURES AND SPECIFICATIONS

F ERNI K I T THE FERNI-S KIT CONSISTS OF:

Installation Manual. Swing Gate System. Leading the way...

SWING GATE OPENERS 24V DC GEAR MOTOR

QUOTATION BLADE 7 LX. Product code GEAL6S2BAA

L /2012 rev 0 BISON 45 OTI UNIONE NAZIONALE COSTRUTTORI AUTOMATISMI PER CANCELLI, PORTE SERRANDE ED AFFINI

INSTALLATION MANUAL (cod )

DKC400Y AC Sliding Gate Installation Manual. Sliding Gate Opener. Model: DKC400Y. Installation Manual WARNING

INSTALLATION MANUAL ENGLISH ALPHA 200 ALPHA 330. L C (stroke) 960 mm 1160 mm

L /2013 rev 0 BISON 35 OTI UNIONE NAZIONALE COSTRUTTORI AUTOMATISMI PER CANCELLI, PORTE SERRANDE ED AFFINI

UNDERGROUND OPERATOR FOR SWING GATES 119AS45EN. Installation manual FROG-A / FROG-AV / FROG-AE. English

Nuova CEVA Automation. Via G.B. Signini 43. Briga Novarese (NO) ITALY Tel Fax

Corso Principi di Piemonte, 65/ RACCONIGI (CN) ITALY tel fax

EC DECLARATION OF CONFORMITY FOR MACHINES WARNINGS FOR THE INSTALLER

Installation manual ASTER AUTOMATION FOR SWING GATES 11_16

IMPORTANT NOTICE FOR THE INSTALLER

AgriWheel Single Gate Kit Low Voltage & Solar. Installation & Operating Instructions

Table of Contents. General Safety Preparation for Installation Parts List Optional Accessories Part List... 5

Automation Swing Gate Opener

FORCE SPD 800/1500/2000

Sliding Gate Operator User's Manual

TITANO 400V SLIDING GATE OPENER

ARACHNE 230V 24V- 12V

SLIDE NEW CONTROL BOARD

contents OPERATOR Maintenance SHAFT-120 Installation and Operating Manual DoorHan, 2012

L /2012 rev 0 BISON 30 OTI UNIONE NAZIONALE COSTRUTTORI AUTOMATISMI PER CANCELLI, PORTE SERRANDE ED AFFINI

OPERATOR SHAFT-120. Installation and Operating Manual CONTENTS GENERAL INFORMATION SAFETY INSTRUCTIONS OPERATOR UNIT OPERATOR INSTALLATION

Sliding Gate Operator User's Manual

IN-GROUND OPERATOR FOR SWING GATES FROG SERIES INSTALLATION MANUAL FROG-A 230V

INSTRUCTIONS FOR INSTALLATION

EC DECLARATION OF CONFORMITY FOR MACHINES (DIRECTIVE 98/37/EC)

Electromechanical gear motor for sliding gates ACHILLES

SKC400U SLIDING GATE OPENER OWNER S MANUAL

V200 USER MANUAL SWING GATE OPENER. 100kg 1.5m. 100kg 1.5m

ROCKBREAKER BOOM SYSTEM

GROUND GROUND - ( ) Interrati elettromeccanici ISTRUZIONI PER L INSTALLAZIONE. Electromechanical underground INSTRUCTIONS FOR INSTALLATIONS

Automation systems for swing gates hydraulic

ASSA ABLOY Series Power Operator Installation and Instruction ASSA Manual ABLOY ASSA ABLOY

BULL 424 ESA BULL 624 ESA

WEL. Manuale di installazione e manutenzione per automazioni per porte battenti. Installation and maintenance. for swing doors.

ASSA ABLOY Series Power Operator Installation and Instruction ASSA Manual ABLOY ASSA ABLOY

Istruzioni, instructions. Motoriduttore a braccio snodato per cancelli battenti Gear motor with articulated arm for swing gates ALPHEO

PERSA 400 USER S AND INSTALLER S MANUAL V1.0 REV. 10/2016

DESIGNED FOR RESIDENTIAL APPLICATION KIT PL600/PL1000 SLIDING GATE OPENERS

Owner s Manual. For SOLAR BOOM GATE. Model: CA-5000 SOLAR

Operating Instructions Type MPT 53

Porte 150 Users Manual Swing Gate Opener 24V DC

Automatic concealed bollards 275 H600 and 275 H800 Control station

JOINT INSTALLATION MANUALS AND SAFETY INFORMATION

The House of Gate Automation

BARRY BARRIER GATE AUTOMATION

LINCE 300/400/600. User s and Intaller s manual

Ditec CUBIC Swing gates automation

Timer Relays - Fixed & Adjustable

5600 Series Power Operator Installation and Instruction Manual

BULL 5M - BULL 5M.S BULL 8M - BULL 8 M.S BULL 8 OM - BULL 8 OM.S

Compact System NRGS 11-2 NRGS Original Installation Instructions English

Installing the gate post bracket with the cardboard arm template

VELA INDUSTRIAL INSTALLATION MANUAL

Transcription:

COMBI 740 Oil-hydraulic operator for swinging gates Below ground Version with two-way locking device Version with brake in open/close cycles Version with 110 and 175 shaft rotation Instruction manual GB

COMBI 740 ELECTRIC MOTOR CUTAWAY GENERAL VIEW HYDRAULIC JACK LEFT-HAND JACK END CAP 1 st PISTON DAMPENING ADJUSTMENT LEFT-HAND DAMPENING DEVICE CYLINDER LINER VALVE COVER SAFETY PRESSURE VALVE OPEN TWO-WAY LOCKING VALVE ASSEMBLY SAFETY PRESSURE VALVE CLOSE TWO-WAY LOCKING VALVE ASSEMBLY RELEASING DEVICE OIL RESERVOIR SUCTION FILTER PUMP SHAFT STATOR MOTOR BASE FLANGE MOTOR END PART ROTOR MOTOR END PART PIC. 1 HYDRAULIC LOBE PUMP ELECTRIC MOTOR MOTOR-PUMP ASSEMBLY WITH CONTROL VALVE 2

JACK ASSEMBLY AND MOVEMENT SYSTEM RACK CENTRAL BLOCK COVER 2 nd PISTON BEARING TOOTHED MAIN SHAFT TIE ROD MOTOR PUMP JACK JOINING PART CYLINDER LINER RIGHT-HAND JACK END CAP DAMPENING ADJUSTMENT ELBOW JOINT WIRE CONNECTORS OIL RESERVOIR PLUG CABLE CONNECTOR PHASE PHASE EARTH HYDRAULIC OIL ARNICA A 15 BY AGIP OIL RESERVOIR END CAP ELECTRICAL CABLE 3

INSTRUCTIONS FOR THE INSTALLATION OF COMBI 740, ELECTRO-HYDRAULIC, BELOW GROUND, ALL-IN-ONE, WITH ANTI-CRUSH SYSTEM. It is recommended to keep to these instructions to install the equipment in the correct way to get a perfect working system. Electrohydraulic operator consisting of a jack combined to a motor pump unit for the operation of swinging gates. All-in-one in a specially designed enclosure to be sunk in the ground under the gates as shown in picture No. 2. 748 LH 748 RH 745 LH 741 LH 741 745 746 747 748 MOTOR-PUMP/JACK. HYDRAULIC 110 ROTATION, NON LOCKING ENCLOSURE GATE FIXING PLATE WITH SHAFT FITTING COLLAR GATE SPACER HINGE EMERGENCY LOCKING SHOE WITH COLLAR AND RELEASE SPANNER 745 RH 741 RH LEFT-HANDED PIC. 2 VIEW FROM INSIDE THE PROPERTY RIGHT-HANDED Pre-arrangements are possible in the case that the mechanism is installed at a later stage after mounting the gate and finishing the pavement. You will have to set the enclosure and fit the special gate spacer hinge which is designed to temporary replace the mechanism. Picture No. 3. The two enclosures must be perfectly aligned one opposite the other. The simple operation described below will ensure this: a nylon wire must pass through the centres of the holes which are factory made in the enclosures to this purpose. Picture No. 3. GATE SPACER HINGES 746 LH = LH = RH 746 RH WASHER 747 LH 747 RH HOLE LEFT-HANDED 746 747 HOLE GATE FIXING PLATE WITH SHAFT FITTING COLLAR GATE SPACER HINGE NYLON WIRE 746 747 HOLE GATE FIXING PLATE WITH SHAFT FITTING COLLAR GATE SPACER HINGE HOLE RIGHT-HANDED PIC. 3 4

BRICKWORK TOP HINGE PERPENDICULAR TO THE CENTRE MARK HOLE LEVEL CENTRE MARK HOLE PAVEMENT FINISH First of all make sure that the gates are adequate to take the mechanism inspect all the critical parts and see if they need reinforcement or adjustment, specially those parts which are most subject to friction such as the upper hinge. Picture 4. Dig a hole in the ground close to the gate post (dimensions as indicated in picture No. 5) and lay the enclosure in it perfectly horizontal with the help of a level. The upper edge of the enclosure must be levelled with the pavement finish. Picture No. 7. DISTANCE 0,00 125 40 100 200 PAVEMENT UNDERNEATH LAYER CONCRETE TO SUPPORT THE ENCLOSURE SOIL CONCRETE TO PROVIDE A LEVEL BASE AT A SET DISTANCE LAYER OF GRAVEL FOR WATER TO SOAK AWAY SOAKAWAY PIPE TO BE CONNECTED TO THE STORM DRAIN Important: the centre line of the gate hinges must coincide with the centre of the hole in the bottom of the enclosure to provide a reference mark for alignment. Suitable holes are also provided in the enclosure for the electric cable and soak away tube. The distance from the top edge of the enclosure to the pavement level (after finishing all works) must be zero. Picture 6. It is important that the full weight of the gates is directly on the gate operator. Also that only a top hinge is used. PIC. 4 BRICKWORK FOUNDATIONS TOP HINGE FIXING SCREWS BRICKWORK PILLAR 220 HOLE 350 500 CABLE OUTLET 45 MINIMUM DISTANCE ALLOWED SHAFT FITTING COLLAR 702/5 COMBI 740 PIC. 5 GRAVEL SOAKAWAY PIPE DISTANCE A CONCRETE GATE HINGE THE CENTRE OF THIS HOLE TO COINCIDE WITH THE HINGE CENTRE LINE CENTRE LINE PERPENDICULAR TO THE REFERENCE MARK PAVEMENT FINISH DISTANCE A 30 mm 42 mm 70 mm ITEM No. 702/5 746 748 DESCRIPTION Ferrule with square hole Shaft fitting collar welded to the gate fixing plate Emergency locking shoe complete with collar and release spanner PIC. 6 PIC. 7 WEDGE THE ENCLOSURE FOR ALIGNMENT AND BRING THE UPPER EDGE TO THE REQUIRED LEVEL 5

Once the concrete has set, put the combined unit in the enclosure and screw it down by means of the two long bolts supplied with the equipment, see picture No. 10. Attention: follow the wiring and connecting procedure on page 9 and picture 18. Allow the operators to run full movement 3 times before hanging the gates. Weld the fixing plate to the gate, either the non-locking type or locking type, which can be released for emergency. Picture 8 or 9. LOCKING SHOE IN RELEASED POSITION WELDING PIC. 8 OR: NON LOCKING GATE FIXING PLATE WITH SHAFT FITTING COLLAR PIC. 9 BOX SPANNER Once satisfied that everything has been done as described so far, make sure that the two units are mounted on the correct side of the gate, view from inside the property: the unit marked D on the righthand side and S on the left-hand side. The COMBIs are designed as handed operators, the correct position is essential to the performance of the system. Picture 11. LONG BOLTS COMBI 740 SB RELEASE PIC. 10 L HAND RELEASE R HAND RELEASE GATE STOP PIC. 11 S JACK/PUMP LEFT-HAND SIDE SB HYDRAULIC RELEASE FOR THE FIRST OPERATIONS VIEW FROM INSIDE THE PROPERTY SB HYDRAULIC RELEASE FOR THE FIRST OPERATIONS D JACK/PUMP RIGHT-HAND SIDE 6

Anti-crush safety is ensured by the pressure valves which allow for a very fine adjustment of the required pushing power depending on the gate size and weight; after setting no further adjustment is required thanks to their precise design. Also they are adequately protected to prevent misuse. See pictures No. 12-13. THRUST ADJUSTMENT: DO THIS OPERATION WITH BOTH UNITS MORE THRUST/PUSHING POWER VALVE COVER MORE THRUST/PUSHING POWER VALVE COVER LESS THRUST/PUSHING POWER LESS THRUST/PUSHING POWER RED BLUE RED YELLOW/GREEN RELEASE LEVER SB LID 745 HYDRAULIC RELEASE - LEVER S TO RELEASE THE UNIT TURN THE LEVER S WHICH IS FITTED ON THE HYDRAULIC MOTOR PUMP RED BLUE RED YELLOW/GREEN PIC. 12 LEFT-HANDED RIGHT-HANDED PIC. 13 With single gates the electric lock is to be installed horizontally in the most suitable way to meet the application requirements. Double gates can be fitted with an electric lock at a height as indicated in the picture and with a mechanical latch for a better hold of the gates in the close position. See picture No. 14. PLEASE NOTE: it is compulsory to fit gate stops in open gate position so that both gates stop 5 before the end of the permitted piston stroke. GATE STOP LOCK KEY LH RH GATE 70 cm GATE GATE STOP. 5 MORE OPEN THAN THE OTHER GATE GATE HOLDING 95 LATCH 90 GATE STOP PIC. 14 The hydraulic jacks are designed right-handed and left-handed. Their correct application on the respective gate side will allow the gates to move out of phase by 5 degrees. See the picture: the gate with the lock keep will reach the close gate stop position earlier than the other one and will be ready to take the lock when the second gate reaches the closed position. 7

Should the model with the dampening device be required to install adjustment in the open and close cycles is by means of a screw on the top of the jack end cap: with a screwdriver give one turn clockwise. The dampening device is now in service and the gate will "brake", ie. slow down speed over the last 40 cm of its angular motion. One turn anti-clockwise will re-set to the standard operating mode. Picture No. 15. DAMPENING DEVICE JUNCTION BOX DAMPENING OUT OF SERVICE IN SERVICE OIL FILLER CAP CUT OUT BRICKWORK TO PROVIDE PROTECTION FOR THE CONTROL BOX PIC. 15 Now commence the electrical work. Connect the control panel ELPRO 13 exp as per pictures 16 and 18. Important: Should N.C. contacts eg. Photocells, Stop Button and safety contact not exist, link out individually. If the operators run in wrong direction reverse 17, 18 or 20, 21 respectively. Once the connections have been made, set the dip-switch "B" as required but with No. 3 "ON" automatic, pulse the radio transmitter or short out terminals 7-8 momentarily and make sure that the operating run and dwell times are as required, adjust through the rotary timers 7-8-9. See diagram ELPRO 13 exp. Picture 18. The electrical equipment must be properly earthed. Picture 17 shows an exemplary complete installation. N.W.: CARRY OUT A RISK ANALYSIS IN COMPLIANCE WITH EN 12445 AND EN 12453 NORMS AND FIT ANY SAFETY DEVICE WHERE REQUIRED. DIP-SWITCH B ELECTRIC P.C. BOARD PIC. 16 11 8 14 1 PIC. 17 12 13 n 3x1,5 n 4x1 2 n 2x1 n 2x1 10 5 4 3 n 4x1,5 16 NOTE WELL: EARTH CONNECT THE WHOLE SYSTEM 6 n 4x1,5 n 4x1 n 2x1 9 n 4x1 n 4x1 16 15 7 1 - MAINS SWITCH 230V - 50Hz MAGNETIC-THERMAL DIFFERENTIAL 0.03A (CABLES LONGER THAN 100 m ø 2,5 mm) 2 - JUNCTION BOX 3 - COMBINED JACK/MOTOR PUMP LEFT-HANDED 4 - CLOSED GATE STOP REQUIRED 5 - COMBINED JACK/MOTOR PUMP RIGHT-HANDED 6 - POST WITH PHOTOCELL RECEIVER POLO 44 7 - POST WITH PHOTOCELL PROJECTOR POLO 44 8 - KEYSWITCH PRIT 19 9 - PHOTOCELL RECEIVER POLO 44 10 - PHOTOCELL TRANSMITTER POLO 44 11 - FLASHING LAMP MIRI 4 12 - AERIAL BIRIO A8 13 - RADIO RECEIVER ASTRO 43/1 R 14 - CONTROL BOX ELPRO 13 exp 15 - RADIO TRANSMITTER ASTRO 43/2 TR SMALL 16 - OPEN GATE STOP REQUIRED 8

GB 13 exp CONNECTION DIAGRAM FOR SWING GATES 26 27 28 RADIO CONTROL PLUG-IN CARD SUPPORT 1 st CHANNEL TERMINAL FOR CONNECTIONS TO PUSH BUTTONS PULIN 3 24 V OUTPUT ON TO 0 THE DELAY IS OUT OF SERVICE MICROPROCESSOR 7 0 8 9 + + + DWELL TIME TIMER SWITCHES LEAF DELAY TIMER CLOSE MOTOR RUN OPEN & CLOSE TIME 1 AMP. FUSE 24 V OUTPUT TERMINALS 12-13 CAPACITORS FUSE 630 ma FLASHING LAMP 630 ma FUSE FUSE 5 AMPS DIP-SWITCH ON Should more pairs of photocells be required than the recommended quantity, fit an auxiliary transformer outside the control box. 1 2 3 4 5 6 7 8 3 4 ON OFF PULSE TWICE CONSECUTIVELY TO OPEN BOTH GATE LEAFS = PHOTOCELLS 2 nd PAIR = Inside photocells N.C. contact If obstructed they prevent the gates from opening reverse gate direction during close cycle 1 2 3 4 5 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 N.C. CONTACT PHOTOCELLS PEDESTRIAN MODE ONE PULSE OPENS ONE GATE LEAF ONLY OPEN SWITCH N.O. CONTACT CLOSE SWITCH N.O. CONTACT STOP SWITCH N.C. CONTACT RADIO CONTACT N.O. VOLTAGE OUTPUT ELECTRIC LOCK SUPPLY 7 8 24 V INDICATOR - 3 W max. ALL OPERATIONS OPEN, CLOSE AND REVERSE RADIO CONTACT Max permitted load: 24 V 2 pairs photocells OUTPUT A.C. 1 radio receiver SAFETY CONTACT N.C. 12,5µF M1 12,5µF M2 ELECTRIC MOTORS SINGLE-PHASE 230 V FLASHING LAMP 25 W max. 230 V SINGLE-PHASE SUPPLY VOLTAGE NOTE WELL: For special applications, ie. to switch on lights - CCTV etc., SOLID STATE RELAYS are recommended to be used only. Standard relays would affect the micro-processor. NOTE WELL: THIS PANEL IS TESTED TO OPERATE GATES ONLY THROUGH FADINI ACCESSORIES. NO WARRANTY IS ACKNOWLEDGED BY THE MANUFACTURER IN CASE THAT OTHER ACCESSORIES ARE USED OR NON CONFORMING APPLICATIONS ARE MADE WITHOUT THE MANUFACTURER S APPROVAL. PIC. 18 26 27 28 3 CONNECTION TO THE PULIN 3 PUSH BUTTONS WITH STATUS INDICATION LEDS. LED No. 1 - It switches on when voltage is supplied 3 4 5 6 N.O. N.C. N.O. OPEN STOP CLOSE ELECTRICAL CONNECTIONS KEYSWITCH PRIT 19 ELECTRICAL WIRING DIAGRAM OF THE ELECTRONIC PROGRAMMER Once the connections have been made, do the first switching test through the control panel. Set the motor run timer so that the motor is allowed to run 4-5 seconds more than the gates. Set the other timers to meet the site requirements. Set DIP switch B No. 3 to automatic (ON): on pulsing to 4-8 the gates must be operated as pre-set, ie. opening and only after the dwell time, closing. Adjust the times through the respective timers. (See No. 07, 08 and 09 drwg. No. 1643). With DIP switch "B" No. 3 to semiautomatic (OFF) one pulse opens the gates, a second pulse to 5-9 is needed to close the gates. Any one pulse to 7-8 will open, close or reverse the gates independently from the operation being performed. It is recommended to carefully read the instructions in the control box to have all the functions performed correctly. 1 2 3 4 5 6 7 8 9 10 11 12 13 PIC. 19 RADIO CONTACT STOP N.C. CONTACT CLOSE N.O. CONTACT OPEN N.O. CONTACT TERMINAL BOARD STOP OPEN CLOSE 1 2 3 4 TERMINAL BOARD PRIT 19 I The 6 LEDs on the P.C. board indicate the following: Led No. 1 It switches on when voltage is supplied Led No. 2 Photocells - Normally on. It switches off when the photocells are obstructed Led No. 3 Open - It switches on when the respective switch is activated Led No. 4 Close - It switches on when the respective switch it activated Led No. 5 Stop - Normally on. It switches off when the respective switch is activated Led No. 6 Radio - It switches on whenever a pulse is given, either from remote control, keyswitch or push buttons. Drwg. No.1643 P.C. BOARD 9

MANUAL TEST FOR COMBI 740 CONNECTION TWO MOVES TO POSITION THREE. THIS SHOULD REVERSE GATE OPERATION 230 V 50 Hz FIXED CONNECTION CONDENSER 12,5 µf BLUE 2 1 3 RED RED YELLOW/GREEN PIC. 20 CONNECT THE ENCLOSURE EARTH WIRE SPECIAL VERSIONS FLOW REGULATORS FOR COMBI 740 ADJUSTMENT SCREW FLOW REGULATOR PIC. 21 ADJUSTMENT SCREW FLOW REGULATOR IMPORTANT LET THE ELECTRIC CABLE BE FULL LENGTH DO NOT CUT IT 10

COMBI 740 TECHNICAL SPECIFICATIONS 40 190 C 10 A The combined motor and jack of the COMBI 740 employs the latest technology with a quiet-running steel lobe pump at its heart, creating and holding greater pressures for hydraulic locking and drive than most other underground gate operators. 190 50 B B Gate fixing device (locking version) is welded or screwed to gate foot. Lock can be released by special key. 50 35 C Gate fixing device (non locking version) is welded to gate foot. 35 30 ø 12 D Fix to the ground proper gate stops both in the open and closed gate position. See page 7 in the installation manual. Left-handed unit. View from inside property. Suitable for gate width from 2 up to 3.5 m max. with or without locking/dampening depending on gate size and site requirements. PIC. 22 140 235 470 235 45 300 140 A DOUBLE STROKE JACK AND OIL-HYDRAULIC PUMP Pump flow rate - P3...0.85 l/min. Working pressure...1 MPa (10 bars) Max. pressure...3 MPa (30 bars) Working temperature... 20 C +80 C Rotation time (110 )...23 s Oil type...a 15 FADINI by AGIP Shaft rotation angle...110 Rated torque...235 Nm Cylinder bore...75 mm Stroke...52 mm Weight with accessories...27 Kg Static gate weight...700 Kg IP Standards...IP 673 Overall dimensions...470x300x150 mm DAMPENING s.n.c. Via Mantova, 177/A - 37053 Cerea (VR) Italy - Tel. 0442 330422 r.a. - Fax 0442 331054 MOTOR W VOLTS r.p.m. Nm 2 PHASE 250 230 1 350 235 HP A Hz µf 0.25 1.2 50 12.5 Shaft ro. 110-23 sec. - P3-0.85 l/min. Shaft ro. 175-28 sec. - P3-0.85 l/min. Temperature 20 C +80 C Degree of protection IP 673 Working pressure max. 3 MPa (30 Bars) OIL FADINI A15 BY AGIP MADE IN ITALY STICKER WITH ELECTRIC MOTOR SPECIFICATIONS Pump flow rate - P3...0.85 l/min. Rotation time (175 )...28 s CLASS H, TWO-PHASE, ELECTRIC MOTOR Power output...0.18 KW (0.25 HP) Supply voltage...230 V - 50 Hz Absorbed current...1.2 A Absorbed power...250 W Capacitor...12.5 µf Motor rotation speed...1 350 r.p.m. Intermittent service...s 3 Duty cycle...23 sec. Open - 30 sec. Dwell - 23 sec. Close - 30 sec. Dwell Time of one complete cycle...106 s No. of complete cycles Open - Dwell - Close...34/hour No. cycles a year, 8 hours a day...99 000 11

COMBI 740 PRODUCT FEATURES Pre-oiled and pre-set for immediate installation. Close proximity of pump and jack gives fast response. Close pivot point (45 mm) to gate pier. Manual release from inside and outside of property. Choice of 110 or 175 rotation angle. Braking or non-braking versions available. Locking or non-locking versions available. Conforming to EN 12453, EN 12445 safety standards. All-in-one pump and jack unit, contained in a single enclosure, is sunk into the ground at the foot of the left-hand and right-hand gate to achieve synchronised operation. The unit should be piped into a soak-away to allow for water drainage. Meccanica Fadini recommends the control panel ELPRO 13 CEI to achieve an installation that is in conformity to the existing safety standards as illustrated in our chart. The electronic programmer ELPRO 13 incorporates and can provide all the functions which are required by the most demanding applications with swinging gates. In addition to the standard features of ELPRO 9 (Drwg. No. 1310) the following requirements can be provided: stroke reversing pulse, pedestrian mode, stop in any gate position by holding down the remote control button. Among the added features and improvements of ELPRO 13 in conformity to the European safety standards, there is the mains rotary switch: it is fitted to the box cover and switches off the mains voltage whenever the cover is removed. 13 CEI SINGLE-PHASE WARNINGS - Before installing the equipment carry out a Risk Analysis and fit any required device in compliance with EN 12445 and EN 12453 Safety Norms. - Should the combined unit jack/hydraulic motor pump be removed for maintenance, servicing or repair, disconnect the electric motor cable from the junction box. - Never cut off the cable from the electric motor. - Make sure that the oil plug is properly tightened. - Do not throw away oil from repaired or serviced units, waste oil must be disposed of properly through a specialised company. - Do not throw away packaging such as cardboard, polystyrene and nylon, which must be disposed of properly through a specialised company. - The electrical equipment must be properly earthed. * Best performance can only be achieved by keeping to these instructions. CHECKING AND MAINTENANCE: To achieve an optimum performance and longer life of the equipment and in observance of the safety regulations, it is recommended that inspections and proper maintenance are made by qualified technicians to the whole installation ie. both the mechanical and electronic parts, as well as wiring. - Mechanical parts: maintenance every 6 months approx. - Electronic apparatus and safety equipment: maintenance inspection monthly. 11-2007 l apricancello CUT OFF MAINS SWITCH The CE mark certifies that the operator conforms to the essential requirements of the European Directive art. 10 EEC 73/23, in relation to the manufacturer s declaration for the supplied items, in compliance with the body of the regulations ISO 9000=UNI EN 29000. Automation in conformity to EN 12453, EN 12445 safety standard. DECLARATION OF CONFORMITY SAFETY NORMS EN 12453, EN 12445 STANDARDS CEI EN 60204-1 STANDARDS WARRANTY CERTIFICATE ON THE CUSTOMER S REQUEST GB 2003/108/CE Directive for waste electrical and electronic equipments EUROPEAN MARK CERTIFYING CONFORMITY TO THE ESSENTIAL REQUIREMENTS OF THE STANDARDS 98/37/EC The growth of MECCANICA FADINI has always been based on the development of guaranteed products thanks to our TOTAL QUALITY CONTROL system which ensures constant quality standards, updated knowledge of the European Standards and compliance with their requirements, in view of an ever increasing process of improvement. DISPOSE OF PROPERLY ENVIRONMENT-NOXIOUS MATERIALS s.n.c. AUTOMATIC GATE MANUFACTURERS Via Mantova, 177/A - 37053 Cerea (Verona) Italy Tel. +39 0442 330422 r.a. - Fax +39 0442 331054 e-mail: info@fadini.net - www.fadini.net Distributor s box The manufacturers reserve the right to change the products without any previous notice