Backhoe & Hoe Ram (under 3/4 Yd.) $26.11 $34.81 $ Backhoes & Hoe Ram (3 Yds & Over) $26.44 $35.25 $44.06

Similar documents
MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

St. Cloud State University St. Cloud, MN

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone PO Box 44540, Olympia, WA

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

Highway and Heavy Master Job Classifications OLD versus NEW

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

General Decision Number: AZ /22/2013 AZ8. Superseded General Decision Number: AZ State: Arizona. Construction Type: Highway

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

All Users of the City of Denver Prevailing Wage Schedules

County Trade Job Classification Wage Holiday Overtime Notes

ATTACHMENT A. Construction Project Safety Checklist

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

ATTACHMENT 13 DAVIS-BACON WAGE DETERMINATION (HIGHWAY) NUEX Bldg Luke AFB Temporary Lodgin Facility. 20 June 2014

Roadway Erosion Control 2017 CONTRACT NO ADDENDUM NUMBER ONE

Hennepin County Transportation Department ADDENDUM

T.A.T Minimum Wage Scale

General Decision Number: MN /04/2011 MN15. State: Minnesota. Construction Type: Highway

Fair Wage Office 18 th Floor, West Tower, City Hall FAIR WAGE SCHEDULE * I.C.I. WORK

FAIR WAGE SCHEDULE Road Building

General Decision Number: OR /06/2013 OR17. Superseded General Decision Number: OR State: Oregon. Construction Type: Residential

On-the-Job Training Program. Overview of Training Programs

Meredith Creme, Associate Human Resource Professional

FEMA's Schedule of Equipment Rates

Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2014 through DECEMBER 31, 2014

Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2017 through DECEMBER 31, 2017

*Due to the shift of $1.00 from H&W to Pension below is the corrected rates for 6/1/17 APPENDIX 1

Schedule of Equipment Rates

ADDENDUM #1 MARCH 20, 2017 COUNTY PROJECT S.A.P

FEMA's Schedule of Equipment Rates

General Decision Number: MN /15/2012 MN10. Superseded General Decision Number: MN State: Minnesota. Construction Type: Highway

Kansas Department of Transportation

Why? Faster To reduce the duration of the process

Manhole Rehabilitation - Landside CONTRACT NO ADDENDUM NUMBER TWO

NSRBA 2017 EQUIPMENT DESCRIPTION. Purchase Price 2017 Monthly Rental % Monthly Rate Hourly Rate Daily Rate

MERCER COUNTY PREVAILING WAGE ORDINANCE FOR

ADDENDUM NUMBER ONE PART ONE, VOL. 1 CONTRACT DOCUMENTS

SEWER AND WATERMAIN CONSTRUCTION

Hennepin County Transportation Department ADDENDUM

LCB File No. R PROPOSED REGULATION OF THE LABOR COMMISSIONER

BUILDING CONSTRUCTION(does not include single family homes and apartments up to and including 4 stories)

ESSEX COUNTY OFFICE OF THE MANAGER

CONSTRUCTION and OFF ROAD EQUIPMENT

B JACK KOCSIS, JR., CHIEF EXECUTIVE OFFICER

LABOR COMMISSIONER'S EXHIBITS

FAIR WAGE SCHEDULE Sewer and Watermain

FAIR WAGE SCHEDULE HEAVY CONSTRUCTION

NOTICE TO BIDDERS ADDENDUM NO. 2. Dated: November 16, 2018 SAP & CP

GREASE TIME RATE SINGULARLY OPERATED MACHINES

U.S. Department of Labor Wage Determinations

9:04:49 AM]

SEWER AND WATERMAIN CONSTRUCTION

SCHEDULE B Building Construction WAGE SCHEDULE: LOCAL 138 INTERNATIONAL UNION OF OPERATING ENGINEERS. EFFECTIVE DATE JUNE 1, 2017 to MAY31, 2018

A. Clarification on DS-19B Madison Street Lift Station Mandatory Alternate Bids. MS-2 is Mandatory Alternate MA-2 on the Bid Form.

Modification Number Publication Date 0 04/01/ /23/2016 * SUMN /01/2014

NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF EAST PEORIA, TAZEWELL COUNTY, ILLINOIS, THAT:

KENDALL COUNTY PREVAILING WAGE RATES EFFECTIVE JUNE 5, Base Wage

Union Pacific Pay Rates July 1, 2018

Union Pacific Pay Rates January 1, 2015

UNIT OF MEASURE MATERIAL DESCRIPTION MATERIAL DESCRIPTION - LONG TEXT HOUR BACKHOE,Z54 OTHER CONTROLLED EQUIPMENT, BACKHOE, RENTAL

6 Hour Backhoe Loader (CAT 415F2/ 415F2 IL, 416F/ 416F2, 420F/420F IT, 420F2/ 420F2 IT, 430F/430F IT, 430F2/ 430F2 IT, 450F or Equiva $32.

EQUIPMENT HIRE Stawell Road PO Box 241 Horsham Victoria 3400 Phone: (03) Facsimile: (03)


CITY OF MONTICELLO PIATT COUNTY, ILLINOIS AN ORDINANCE ENACTING THE ILLINOIS PREVAILING RATE OF WAGES FOR PUBLIC WORKS NO

BIDDING REQUIREMENTS Addendum No. 2. June 21, Southern Illinois University School of Medicine Springfield, IL PROSPECTIVE BIDDERS

Appendix D. Noise Calculations

APPENDIX H-2 CONSTRUCTION NOISE ANALYSES

CERTIFICATE. I, Marilyn L. Banks, DO HEREBY CERTIFY THAT I am the Town. of the City of Champaign Township Clerk in and for the Town of the City of

GENERAL DECISION: NY /10/2011 NY4. Date: June 10, 2011 General Decision Number: NY /10/2011

Auction Ring 1 -Ramp - North Auction Theatre

GENERAL DECISION: NY /16/2004 NY4. Date: July 16, 2004 General Decision Number: NY /16/2004

2011 SUGGESTED RENTAL RATES FOR CONSTRUCTION EQUIPMENT

WA Modification 9 Federal Wage Determinations for Highway Construction

Alquiler y venta de maquinaria para la construcción. products catalogue

STATE OF MICHIGAN Prevailing Wages PO Box Lansing, MI Informational Sheet: Prevailing Wages on State Projects

ILLINOIS DEPARTMENT OF LABOR

RESOLUTION OF THE BOARD OF EDUCATION OF. for said CONSOLIDATED SCHOOL DISTRICT 158. PREVAILING WAGE

Transcription:

2018 SPOKANE TRIBAL WAGE RATES FOR CONTRACTORS All rates are based on 100% of Washington State prevailing wage rates for Stevens County All wage rates are subject to annual adjustments by the TERO Commission Effective February 1, 2018 Power Equipment Operators Entry Level @ 60% SecondLevel @ 80% Journeyman @ 100% Backhoe & Hoe Ram (under 3/4 Yd.) $26.11 $34.81 $43.51 Backhoes & Hoe Ram (3 Yds & Over) $26.44 $35.25 $44.06 Backhoes & Hoe Ram (3/4 Yd. To 3 Yd.) $26.27 $35.03 $43.79 Blade (finish & Bluetop), Automatic, Cmi, Abc, Finish Athey & Huber & Similar When Used As Automatic $26.44 $35.25 $44.06 Blade Operator (motor Patrol & Attachments) $26.27 $35.03 $43.79 Bob Cat (skid Steer) $25.91 $34.55 $43.19 Cranes (25 Tons & Under), All Attachments Incl. Clamshell, Dragline Cranes (25 Tons To And Including 45 Tons), All Attachments Incl. Clamshell, Dragline $26.11 $34.81 $43.51 $26.27 $35.03 $43.79 Crusher Feeder $25.36 $33.81 $42.26 Crusher, Grizzle & Screening Plant Operator $26.27 $35.03 $43.79 Dozer / Tractor (up To D-6 Or Equivalent) And Traxcavator $25.91 $34.55 $43.19 Dozer / Tractors (d-6 & Equivalent & Over) $26.27 $35.03 $43.79 Dozer, 834 R/t & Similar $26.27 $35.03 $43.79 Drills (churn, Core, Calyx Or Diamond) $26.01 $34.68 $43.35 Equipment Serviceman, Greaser & Oiler $26.01 $34.68 $43.35 Fireman & Heater Tender $25.36 $33.81 $42.26 Fork Lift Or Lumber Stacker, Hydra-life & Similar $25.55 $34.06 $42.58 Grade Checker $26.11 $34.81 $43.51 H.d. Welder $26.44 $35.25 $44.06 Hoe Ram $26.11 $34.81 $43.51 Loader (360 Degrees Revolving Koehring Scooper Or Similar) $26.44 $35.25 $44.06

Loaders (bucket Elevators And Conveyors) $25.55 $34.06 $42.58 Loaders (overhead & Front-end, Over 8 Yds. To 10 Yds.) $26.44 $35.25 $44.06 Loaders (overhead & Front-end, Under 4 Yds.. R/t) $26.01 $34.68 $43.35 Loaders (overhead And Front-end, 10 Yds. & Over) $27.10 $36.13 $45.16 Multiple Dozer Units With Single Blade $26.27 $35.03 $43.79 Pavement Breaker, Hydra-hammer & Similar $25.55 $34.06 $42.58 Paving (dual Drum) $26.11 $34.81 $43.51 Paving Machine (asphalt And Concrete) $26.27 $35.03 $43.79 Posthole Auger Or Punch $25.91 $34.55 $43.19 Power Broom $25.55 $34.06 $42.58 Pump (grout Or Jet) $25.91 $34.55 $43.19 Rollerman (finishing Asphalt Pavement) $26.27 $35.03 $43.79 Rollers, All Types On Subgrade, Including Seal And Chip Coating (farm Type, Case, John Deere And Similar,or Compacting Vibrator), Except When Pulled B $25.36 $33.81 $42.26 Scrapers, All, Rubber-tired $26.27 $35.03 $43.79 Shovels (3 Yds. & Over) $26.44 $35.25 $44.06 Shovels (under 3 Yds.) $26.27 $35.03 $43.79 Tractor (farm Type R/t With Attachments, Except Backhoe) $25.55 $34.06 $42.58 FLAGGERS Flaggers $21.64 $28.85 $36.06 CARPENTERS Carpenters $26.34 $35.12 $43.90 Millwright $37.12 $49.49 $61.86 Pile Driver $26.99 $35.99 $44.99 Roofers $23.38 $31.18 $38.97 Roofers $24.58 $32.78 $40.97

ELECTRICIANS Electrician $30.53 $40.70 $50.88 Electrician - Inside $30.53 $40.70 $50.88 FENCE ERECTORS/ FULL SCALE Fence Erector $8.28 $11.04 $13.80 Fence Laborer $6.96 $9.28 $11.60 Drywall Applicator $26.34 $35.12 $43.90 Drywall Tapers $23.27 $31.02 $38.78 Painters $12.76 $17.01 $21.26 SOFT FLOOR LAYERS $12.85 $17.14 $21.42 CEMENT MASONS $25.20 $33.60 $42.00 TILE SETTERS $24.54 $32.72 $40.90 SPRINKLER FITTERS (FIRE PROTECTION) $31.80 $42.40 $53.00 LABORERS Air And Hydraulic Track Drill $23.22 $30.96 $38.70 Asphalt Raker $23.22 $30.96 $38.70 Asphalt Roller, Walking $23.06 $30.74 $38.43 Brick Pavers $22.90 $30.53 $38.16 Brush Hog Feeder $22.90 $30.53 $38.16 Brush Machine $23.22 $30.96 $38.70 Caisson Worker, Free Air $23.22 $30.96 $38.70 Carpenter Tender $22.90 $30.53 $38.16 Cement Finisher Tender $23.06 $30.74 $38.43 Cement Handler $22.90 $30.53 $38.16 Chain Saw Operator & Faller $23.22 $30.96 $38.70

Clean-up Laborer $22.90 $30.53 $38.16 Compaction Equipment $23.06 $30.74 $38.43 Concrete Crewman $22.90 $30.53 $38.16 Concrete Saw, Walking $23.06 $30.74 $38.43 Concrete Signalman $22.90 $30.53 $38.16 Concrete Stack $23.22 $30.96 $38.70 Confined Space Attendant $22.90 $30.53 $38.16 Crusher Feeder $22.90 $30.53 $38.16 Demolition $22.90 $30.53 $38.16 Demolition Torch $23.06 $30.74 $38.43 Dope Pot Fireman, Non-mechanical $23.06 $30.74 $38.43 Driller Helper (when Required To Move & Position Machine) $23.06 $30.74 $38.43 Drills With Dual Masts $23.39 $31.18 $38.98 Dry Stack Walls $22.90 $30.53 $38.16 Dumpman $22.90 $30.53 $38.16 Erosion Control Laborer $22.90 $30.53 $38.16 Final Detail Cleanup (i.e., Dusting, Vacuuming, Window Cleaning; Not Construction Debris Cleanup) $21.64 $28.85 $36.06 Firewatch $22.90 $30.53 $38.16 Form Cleaning Machine Feeder, Stacker $22.90 $30.53 $38.16 Form Setter, Paving $23.06 $30.74 $38.43 General Laborer $22.90 $30.53 $38.16 Grade Checker $24.41 $32.55 $40.69 Grout Machine Header Tender $22.90 $30.53 $38.16 Guard Rail $22.90 $30.53 $38.16 Gunite $23.22 $30.96 $38.70 Hazardous Waste Worker (level A) $23.39 $31.18 $38.98 Hazardous Waste Worker (level B) $23.22 $30.96 $38.70 Hazardous Waste Worker (level C) $23.06 $30.74 $38.43

Hazardous Waste Worker (level D) $22.90 $30.53 $38.16 Hdpe Or Similar Liner Installer $22.90 $30.53 $38.16 High Scaler $23.22 $30.96 $38.70 Jackhammer Operator Miner, Class b"" $23.06 $30.74 $38.43 Laser Beam Operator $23.22 $30.96 $38.70 Miner, Class a"" $22.90 $30.53 $38.16 Miner, Class c"" $23.22 $30.96 $38.70 Miner, Class d"" $23.39 $31.18 $38.98 Monitor Operator, Air Track Or Similar Mounting $23.22 $30.96 $38.70 Mortar Mixer $23.22 $30.96 $38.70 Nipper $22.90 $30.53 $38.16 Nozzleman $23.22 $30.96 $38.70 Nozzleman, Water (to Include Fire Hose), Air Or Steam $23.06 $30.74 $38.43 Pavement Breaker, 90 Lbs. & Over $23.22 $30.96 $38.70 Pavement Breaker, Under 90 Lbs. $23.06 $30.74 $38.43 Pipelayer $23.22 $30.96 $38.70 Pipelayer, Corrugated Metal Culvert And Multi-plate $23.06 $30.74 $38.43 Pipewrapper $23.22 $30.96 $38.70 Plasterer Tenders $23.22 $30.96 $38.70 Pot Tender $23.06 $30.74 $38.43 Powderman $24.21 $32.28 $40.35 Powderman Helper $23.06 $30.74 $38.43 Power Buggy Operator $23.06 $30.74 $38.43 Power Tool Operator, Gas, Electric, Pneumatic $23.06 $30.74 $38.43 Railroad Equipment, Power Driven, Except Dual Mobile $23.06 $30.74 $38.43 Railroad Power Spiker Or Puller, Dual Mobile $23.06 $30.74 $38.43 Remote Equipment Operator $23.39 $31.18 $38.98 Remote Equipment Operator (i.e. Compaction And Demolition) $23.06 $30.74 $38.43

Rigger/signal Person $23.06 $30.74 $38.43 Riprap Person $22.90 $30.53 $38.16 Rodder & Spreader $23.06 $30.74 $38.43 Sandblast Tailhoseman $22.90 $30.53 $38.16 Scaffold Erector, Wood Or Steel $22.90 $30.53 $38.16 Stake Jumper $22.90 $30.53 $38.16 Structural Mover $22.90 $30.53 $38.16 Tailhoseman (water Nozzle) $22.90 $30.53 $38.16 Timber Bucker & Faller (by Hand) $22.90 $30.53 $38.16 Track Laborer (rr) $22.90 $30.53 $38.16 Traffic Control Laborer $21.64 $28.85 $36.06 Traffic Control Supervisor $22.24 $29.65 $37.06 Trencher, Shawnee $23.06 $30.74 $38.43 Trenchless Technology Technician $23.22 $30.96 $38.70 Truck Loader $22.90 $30.53 $38.16 Tugger Operator $23.06 $30.74 $38.43 Vibrators, All $23.22 $30.96 $38.70 Wagon Drills $23.06 $30.74 $38.43 Water Pipe Liner $23.06 $30.74 $38.43 Welder, Electric, Manual Or Automatic (hdpe Or Similar Pipe And Liner) $23.39 $31.18 $38.98 Well-point Person $22.90 $30.53 $38.16 Wheelbarrow, Power Driven $23.06 $30.74 $38.43 IRONWORKERS $35.64 $47.52 $59.40 ASBESTOS ABATEMENT WORKERS $22.90 $30.53 $38.16 PLUMBERS $33.75 $45.00 $56.25

TRUCK DRIVERS Asphalt Mix Over 20 Yards (E.WA-690) $25.50 $34.00 $42.50 Asphalt Mix To 20 Yards (E. WA - 690) $25.40 $33.86 $42.33 Dump Truck & Trailer (E.WA-690) $25.50 $34.00 $42.50 Dump Truck (E.WA-690) $25.40 $33.86 $42.33 Other Trucks (E.WA-690) $25.33 $33.78 $42.22 Transit Mixer $11.32 $15.10 $18.87 HEATING & AIR CONDITION MECHANICS $11.07 $14.76 $18.45 SURVEYORS $26.34 $35.12 $43.90 HEAT & FROST INSULATORS AND ASBESTOS WORKERS $28.88 $38.51 $48.14 ROOFERS Journey Level $23.38 $31.18 $38.97 Using Irritable Bituminous Materials $24.58 $32.78 $40.97 SHEET METAL WORKERS $19.45 $25.94 $32.42