METRO Blue Line LRT Extension (BLRT) 5514 West Broadway Avenue, Suite 200, Crystal, MN

Similar documents
SUMMARY OF COMMENTS AT PUBLIC OPEN HOUSES SCOPING OF ALTERNATIVES GATEWAY CORRIDOR ALTERNATIVES ANALYSIS

West Broadway Reconstruction/LRT Design. March 19, 2015

TRAIN, BUS & TRANSIT

Committee Report. Transportation Committee. Business Item No

Traveling around Town

Kendall Drive Premium Transit PD&E Study

CITY OF ANN ARBOR, MICHIGAN 301 E. Huron St., P.O. Box 8647 Ann Arbor, Michigan

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Breakout Session. The Mobility Challenges of Our Growing & Sprawling Upstate

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

Transportation Infrastructure Investment Program moving

Golden Valley Road/Plymouth Avenue Stations Community Meeting February 26, 2015

WELCOME. North Central LRT Open Houses. June 11, Ascension of Our Lord School June 12, Winston Heights June 13, Thorncliffe Community Hall

Click to edit Master title style

Fresno County. Sustainable Communities Strategy (SCS) Public Workshop

CITY OF ANN ARBOR, MICHIGAN 301 E. Huron St., P.O. Box 8647 Ann Arbor, Michigan

US 10 Corridor Performance

Here is a map from the LBNL gate to Bldg. 55:

Business Advisory Committee. July 7, 2015

Puyallup Station Access Improvements Project

Green Line LRT: Beltline Segment Update April 19, 2017

Business Advisory Committee. November 3, 2015

Transport Group Perspective Chris Blow Chair of The Guildford Society Transport Group 21st Jan 2015

2.0 Development Driveways. Movin Out June 2017

More than $9 Million coming to Central Valley for transportation

Revised Evaluation Scores. System Preservation

residents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by

4 Circulation & Transportation

Perry City 1200 West Walking/ Biking Path Project Type Pedestrian/ Bike

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Welcome to Open House #5 Scarborough Rapid Transit

IMPROVEMENT CONCEPTS

Public Opinion of Waterloo Region Rapid Transit Proposal May 2011

- 1 - Minneapolis College of Art and Design Campus Parking & Transportation Guide

Comments_Negative_A. Neg_ScenA

Community Advisory Committee. October 5, 2015

Role of Connected and Autonomous Vehicles

Green Line LRT: Beltline Recommendation Frequently Asked Questions

M79. Between Upper East Side and Upper West Side via 79 Street. Local Crosstown Service. Bus Timetable. Effective June 29, New York City Transit

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Three ULTra Case Studies examples of the performance of the system in three different environments

Sound Transit East Link: Bus/LRT System Integration Study

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS

Extending TRACKS. Preliminary design plan review underway. Public comment and approval process in May & June. Municipal Consent Process

Transportation Audit- Data Collection

PRO/CON: Self-driving cars could take over the road in the near future

Program Overview. February 2018

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) PLEASE SIGN IN

Public Transportation. Economics 312 Martin Farnham

FREQUENTLY ASKED QUESTIONS

Welcome. Please Sign In

The Re:Queen and Sparks Traffic Brief - Addendum #2

Sales and Use Transportation Tax Implementation Plan

CITY OF VANCOUVER ADMINISTRATIVE REPORT

PROJECT SCHEDULE. Plan for Implementation. Explore and Analyze. Refine Ideas. Identify Common Ideas SPRING 2016 SUMMER 2016 FALL 2016

Garrett Hill Master Plan

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Central Loop Bus Rapid Transit

New York, We ve Got a Problem!

What We Heard Report - Metro Line NW LRT

Public Workshop Results

Troost Corridor Transit Study

Transit Hub Case Study: Owings Mills Metro Station. By: Kathleen Cary Rose, J. Luke Byrne and Catherine Buhler

Purpose of Tonight s Meeting

O-Train Light Rail Transit Stage 2 Look Ahead

Background Information about the Metrobus 29 Lines Study

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Public Meeting June 20, 2017

The Run Ozaukee 2018

Integrating transport (buses)

Electric Scooter Sharing Program Community Meeting Feedback

Organization. SDOT Date and Commute Seattle. Dave Sowers, Deputy Program Administrator

TOWN OF SAN ANSELMO Staff Report May 1, 2017

ULTRA LOW EMISSIONS ZONE CONSULTATION LONDON COUNCILS RESPONSE

M104. Between Harlem and Port Authority Bus Terminal. Local Service. Bus Timetable. Effective as of September 3, New York City Transit

WELCOME Open House on Parking

NEW SOFIA PARKING POLICY

Asking for Directions

South Dallas-Waxahachie Corridor Strategy Meeting. June 2, 2009

Jeff s House. Downtown Charlottesville. PEC Office

DRIVING Question: Is it important to know how to drive? Are you a good driver? Complete the paragraph on the right with the words on the left.

Public Involvement Summary

Streamlining the District s Nightlife Curbside Access. Managing High-Demand Curbside Passenger Loading Zones

Rui Wang Assistant Professor, UCLA School of Public Affairs. IACP 2010, Shanghai June 20, 2010

Best Route. Best Care. The Milwaukee Regional Medical Center s Alternative Transportation Program

C LINE: LONG-TERM GLENWOOD REALIGNMENT STUDY

Future Of Transportation National Survey #10131

Riding Metrobus 16H from GHBC to Pentagon City (last update Oct )

Meeting Summary. 1 August 3, 2015 CAC Meeting Summary

Downtown Transit Connector. Making Transit Work for Rhode Island

Disruptive Technology and Mobility Change

Denver Car Share Program 2017 Program Summary

TRANSPORTATION REVIEW

Attachment D Environmental Justice and Outreach

1 Have you used Sun Trolley (which also includes Riverwalk Trolley)? Yes (Go to Question #2) No (Go to Question #10)

Executive Summary. Phase 2 Evaluation Report. Introduction

Restoration of Historic Streetcar Services in Downtown Los Angeles

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

We re Going to Miami: The First Proving Ground for Our Self-Driving Service

Transcription:

Brooklyn Park Open House August 11, 2015 *All comments are recorded verbatim from comment cards and discussion worksheets. No grammatical, word choice changes or spelling has been corrected. If handwriting is unclear, then correct spelling is used and the most contextual word choice is assumed or marked illegible. Any personal identifiable information, if provided, has been deleted from these comments* 001 Please put trail connections as far as possible with this project east to west at the following intersections: 63 rd Ave, Brooklyn Blvd, 85 th Ave, & 93 rd Ave. This will help the city and county with future trail connections instead of sidewalks. Thank you. 002 How do you sleep at night with how you are destroying our community and homes? Put this in your back yard. 003 Thanks for all the hard and efforts to bring LRT to Brooklyn Park. 004 Plans need to be made with college for parking. We will not drive out of our area to park. 005 Park & Ride @ 85 th 006 Thank you for this professional presentation. I am a big proponent of public transit. I know light rail is expensive, compared to bus transit. Yet light rail encourages economic development if done right. Protect the environment, wildlife habitat. I will continue to think of how Osseo can find opportunity for the town when the Blue Line Extension comes our way. 007a-007k NO, NO, NO, NO, NO, NO, NO, NO, NO, NO (This says no from a 2yr old!), No Stop! Page 1

008 Side walk connection on 63 rd station. Concerned about extra traffic, parking, crime, litter. 009 Bus traffic @ intersection Page 2

010 Make LRT fly over CSAH 81 011 Must have fly over bridge Page 3

012 Traffic congestion @ 81 & 73 rd - It s already backed up. 013 Put the LRT in a tunnel under this intersection Page 4

014 Put fence along tracks or along the street to keep kids from crossing the tracks to Target and shopping areas. 015 Traffic will increase here Page 5

016 What is going here? 017 Please consider full access on Candlewood during construction Page 6

018 What will bridge over creek look like? 019 Resident who lives on candlewood near W. Broadway say: She would not ride LRT unless there was a park and ride at 85 th station. As it is she can just grab a bus at Candlewood and W Broadway. Page 7

020 Concerned about lost access to West Broadway. Lives on Rhode Island Dr and now must go to College Park Dr instead of 84 th Ave. 021 All of West Broadway needs to have a fence to prevent anyone from crossing light rail tracks. Page 8

022 Put trails along 85 th as far as possible please! (East to West) 023 Must be a lite here! Must have signal Page 9

024 Arrange for parking for area people to park 025 We need an 8 to 10 ft trail along 85 th Ave N Page 10

026 I am concerned about the lack of parking at the 85 th Ave Station. If there is no parking lot/park & ride - there will be rampant hide & ride. Make huge ramp @ H.C. Library and solve 2 problems 027 Very concerned about lack of parking @ the 85 th Station. How many cars will end up in Maplebrook parked everywhere? Page 11

028 Will there be a noise wall 029 Will there be a noise wall Page 12

030 Must have signal 031 This should be a light intersection especially for emergency people Page 13

032 Bike Storage for bike & ride 033 Why a station @ 93 rd - no population & no parking!? I agree - no purpose no parking 034 City of Brooklyn Park prefers a 10 foot trail along 93 rd Ave N. Page 14

035 Why don t you use existing stop light to cross train? Extra stop light seems frivolous. And time consuming. 036 This is incredible! Gem of the night Page 15