BUILDING AND CONSTRUCTION GENERAL ON-SITE AWARD 2010

Similar documents
MASTER BUILDERS ASSOCIATION OF THE ACT

JULY 2018 WAGE BULLETIN

VEHICLE MANUFACTURING, REPAIR, SERVICES AND RETAIL AWARD 2010 MANUFACTURING EMPLOYEES

VEHICLE MANUFACTURING, REPAIR, SERVICES AND RETAIL AWARD 2010 MANUFACTURING EMPLOYEES

T.A.T Minimum Wage Scale

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

On-the-Job Training Program. Overview of Training Programs

Fair Wage Office 18 th Floor, West Tower, City Hall FAIR WAGE SCHEDULE * I.C.I. WORK

St. Cloud State University St. Cloud, MN

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

Backhoe & Hoe Ram (under 3/4 Yd.) $26.11 $34.81 $ Backhoes & Hoe Ram (3 Yds & Over) $26.44 $35.25 $44.06

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

*Due to the shift of $1.00 from H&W to Pension below is the corrected rates for 6/1/17 APPENDIX 1

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

Highway and Heavy Master Job Classifications OLD versus NEW

FEMA's Schedule of Equipment Rates

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

FEMA's Schedule of Equipment Rates

BATJIC Information Sheet

EQUIPMENT HIRE Stawell Road PO Box 241 Horsham Victoria 3400 Phone: (03) Facsimile: (03)

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

General Decision Number: MN /15/2012 MN10. Superseded General Decision Number: MN State: Minnesota. Construction Type: Highway

FAIR WAGE SCHEDULE Road Building

General Decision Number: MN /04/2011 MN15. State: Minnesota. Construction Type: Highway

County Trade Job Classification Wage Holiday Overtime Notes

Why? Faster To reduce the duration of the process

All Users of the City of Denver Prevailing Wage Schedules

FAIR WAGE SCHEDULE Sewer and Watermain

SEWER AND WATERMAIN CONSTRUCTION

SEWER AND WATERMAIN CONSTRUCTION

State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone PO Box 44540, Olympia, WA

GREASE TIME RATE SINGULARLY OPERATED MACHINES

Schedule of Equipment Rates

NSRBA 2017 EQUIPMENT DESCRIPTION. Purchase Price 2017 Monthly Rental % Monthly Rate Hourly Rate Daily Rate

ATTACHMENT A. Construction Project Safety Checklist

Alquiler y venta de maquinaria para la construcción. products catalogue

SCHEDULE B Building Construction WAGE SCHEDULE: LOCAL 138 INTERNATIONAL UNION OF OPERATING ENGINEERS. EFFECTIVE DATE JUNE 1, 2017 to MAY31, 2018

Appendix H: Construction Impacts H-3 Air Quality

Kansas Department of Transportation

Pearson Edexcel Level 2 NVQ Certificate in Plant Operations (Construction) (QCF) 601/6018/4

ACCESS EQUIPMENT 1ST DAY 2ND DAY 5 DAYS

THE VEHICLE MANUFACTURING, REPAIR, SERVICES AND RETAIL AWARD 2010

THE VEHICLE MANUFACTURING, REPAIR, SERVICES AND RETAIL AWARD 2010

Contact Us: T: +27 (0) E: FTTA Building C5, Denel North, Atlas Rd, Kempton Park

CONSTRUCTION and OFF ROAD EQUIPMENT

Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2017 through DECEMBER 31, 2017

Occupations (Construction)

CONSTRUCTION EQUIPMENT

Auction Ring 1 -Ramp - North Auction Theatre

FAIR WAGE SCHEDULE HEAVY CONSTRUCTION

Hennepin County Transportation Department ADDENDUM

Roadway Erosion Control 2017 CONTRACT NO ADDENDUM NUMBER ONE

(Construction) Level 2 NVQ Certificate in Plant Operations (Road/Rail)

Eligibility Criteria to Undertake an Advanced Technical Test

ROAD TRANSPORT AND DISTRIBUTION AWARD 2010

Equipment Rental Costs

Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2014 through DECEMBER 31, 2014

Union Pacific Pay Rates July 1, 2018

Union Pacific Pay Rates January 1, 2015

2011 SUGGESTED RENTAL RATES FOR CONSTRUCTION EQUIPMENT

General Decision Number: AZ /22/2013 AZ8. Superseded General Decision Number: AZ State: Arizona. Construction Type: Highway

Meredith Creme, Associate Human Resource Professional

ADDENDUM #1 MARCH 20, 2017 COUNTY PROJECT S.A.P

Qualification structure for the Edexcel Level 2 NVQ Certificate in Plant Operations (Construction) (QCF)

WORKERS' COMPENSATION AND EMPLOYERS LIABILITY TENNESSEE NCCI CONTRACTING INDUSTRY GROUP As of March 1, 2013.

Province of Prince Edward Island 2017

KENDALL COUNTY PREVAILING WAGE RATES EFFECTIVE JUNE 5, Base Wage

At Complete hire Equipment we strive for excellence, we are very aware of not being just another Hire Company.

Hennepin County Transportation Department ADDENDUM

6 Hour Backhoe Loader (CAT 415F2/ 415F2 IL, 416F/ 416F2, 420F/420F IT, 420F2/ 420F2 IT, 430F/430F IT, 430F2/ 430F2 IT, 450F or Equiva $32.

ATTACHMENT 13 DAVIS-BACON WAGE DETERMINATION (HIGHWAY) NUEX Bldg Luke AFB Temporary Lodgin Facility. 20 June 2014

UNIT OF MEASURE MATERIAL DESCRIPTION MATERIAL DESCRIPTION - LONG TEXT HOUR BACKHOE,Z54 OTHER CONTROLLED EQUIPMENT, BACKHOE, RENTAL

Index. 1 Mmakgoge Group Structure. 2 Industrial Cleaning Industrial Cleaning and Waste Removal Dry Ice Cleaning Storage Plant Cleaning and Rehab

Prevailing Wage Rates for Will County effective August 15, 2018

Training Tax Credits: Table of Eligible Programs and Completion Requirements for Employers. Income Tax Act

QUIPMENT IRE RATES ATES EFFECTIVE

MERCER COUNTY PREVAILING WAGE ORDINANCE FOR

Transcription:

BUILDING AND CONSTRUCTION GENERAL ON-SITE 2010 NATIONAL WAGE SHEET DAILY HIRE EMPLOYEES 38 S S 1 RATES CW8 Carpenter diver $34.20 $1,299.60 $13.68 $118.64 $524.40 $0.74 $1.64 $2.07 $2.79 Foresperson $27.11 $1,030.18 $10.84 $94.28 $415.69 $0.61 $1.34 $1.69 $2.27 CW7 Sub-Foresperson $26.52 $1,007.76 $10.61 $92.26 $406.64 $0.59 $1.31 $1.65 $2.22 Dogger/Crane Hand (fixed cranes) $25.67 $975.46 $10.27 $89.34 $393.61 $0.59 $1.31 $1.65 $2.22 CW6 $0.58 $1.27 $1.61 $2.16 CW5 CW4 CW3 Refractory Bricklayer (incl refractory allowance) Special Class Tradesperson, Carver Trainee Dogger/crane Hand (fixed cranes) Joiner-Setter Out, Letter Cutter, Marker-Setter out. Prefab Setter, Specialist Landscaper Tradesperson $27.09 $1,029.42 $10.84 $94.22 $415.38 $0.56 $1.24 $1.56 $2.10 $25.21 $957.98 $10.08 $87.76 $386.55 $0.56 $1.24 $1.56 $2.10 $24.37 $926.06 $9.75 $84.88 $373.67 $24.52 $931.76 $9.81 $85.39 $375.97 $0.54 $1.20 $1.52 $2.04 Signwriter $23.88 $907.44 $9.55 $83.19 $366.16 $0.54 $1.20 $1.52 $2.04 Articificial Stoneworker, Bridge & Wharf Carpenter, Carpenter, Floorsander, Form Setter, Joiner, Marble and Slateworker, Marker off, Paviour, Prefab Tradesperson, Stonemason, Tilelayer, Tradesperson (precast concrete manufacture) Caster, Fixer, Floor layer Specialist, Plasterer $23.83 $905.54 $9.53 $83.02 $365.39 $0.53 $1.16 $1.47 $1.98 $23.68 $899.84 $9.47 $82.51 $363.09 $0.53 $1.16 $1.47 $1.98 Bricklayer $23.58 $896.04 $9.43 $82.17 $361.56 $0.53 $1.16 $1.47 $1.98 Roof Tiler, Slateridger, Roof Fixer $23.43 $890.34 $9.37 $81.65 $359.26 $0.53 $1.16 $1.47 $1.98 Glazier, Painter $23.19 $881.22 $9.28 $80.83 $355.58 $0.53 $1.16 $1.47 $1.98 Machinist, Quarryworker, Rigger, Dogger, Shophand $22.98 $873.24 $9.19 $80.10 $352.36 $0.53 $1.16 $1.47 $1.98

CW2 CW1(d) Concrete Finisher, Foundation Shaftsworker, Hoist or Winch driver, Powder Monkey, Scaffolder, Steelfixer, Tack Welder Refractory Bricklayers Assistant (incl. refractory allowance) Trades Labourer; Jack Hammerman; Mixer Driver (concrete); Gantry Hand or Crane Hand,Crane Chaser; Cement Gun Operator; Concrete Cutting or Drilling Machine operator; concrete Gang including concrete Floater; Roof Layer (malthoid or similar material); Dump Cart Operator; concrete Formwork Stripper; Mobile Concrete Pump Hoseman or Line Hand; Plasterer, Terrazzo or Stonemasons Assistant;Builders labourer Group 4 DAILY HIRE EMPLOYEES 38 S S RATES 1 $22.36 $849.68 $8.94 $77.97 $342.85 $0.51 $1.13 $1.43 $1.92 $23.73 $901.74 $9.49 $82.67 $363.86 $21.92 $832.96 $8.77 $76.46 $336.11 CW1(c) After 12 months $21.54 $818.52 $8.62 $75.15 $330.28 CW1(b) After 3 months $21.25 $807.50 $8.50 $74.16 $325.83 CW1(a) New Entrant $20.84 $791.92 $8.34 $72.75 $319.55

HIRE TRADES AND LABOURERS 38 S S 1 RATES CW8 Carpenter diver $33.18 $1,260.84 $13.27 $115.14 $0.72 $1.59 $2.01 $2.70 Foresperson $26.29 $999.02 $10.52 $91.47 $403.11 $0.59 $1.30 $1.64 $2.20 CW7 Sub-Foresperson $25.71 $976.98 $10.28 $89.47 $394.22 $0.57 $1.27 $1.60 $2.15 CW6 Dogger/Crane Hand (fixed cranes) $24.89 $945.82 $9.96 $86.67 $381.65 $0.57 $1.27 $1.60 $2.15 CW5 CW4 CW3 CW2 Refractory Bricklayer (incl refractory allowance) Special Class Tradesperson, Carver Trainee Dogger/crane Hand (fixed cranes) Joiner-Setter Out, Letter Cutter, Marker-Setter out. Prefab Setter, Specialist Landscaper Tradesperson $26.33 $1,000.54 $10.53 $91.60 $403.73 $0.54 $1.20 $1.52 $2.04 $24.44 $928.72 $9.78 $85.12 $374.75 $0.54 $1.20 $1.52 $2.04 $23.62 $897.56 $9.45 $82.30 $362.17 $23.77 $903.26 $9.51 $82.81 $364.47 $0.53 $1.16 $1.47 $1.98 Signwriter $23.15 $879.70 $9.26 $80.69 $354.97 $0.53 $1.16 $1.47 $1.98 Articificial Stoneworker, Bridge & Wharf Carpenter, Carpenter, Floorsander, Form Setter, Joiner, Marble and Slateworker, Marker off, Paviour, Prefab Tradesperson, Stonemason, Tilelayer, Tradesperson (precast concrete manufacture) Caster, Fixer, Floor layer Specialist, Plasterer $23.10 $877.80 $9.24 $80.51 $354.20 $1.13 $1.43 $1.92 $22.96 $872.48 $9.18 $80.03 $352.05 $0.51 $1.13 $1.43 $1.92 Bricklayer $22.86 $868.68 $9.14 $79.69 $350.52 $0.51 $1.13 $1.43 $1.92 Roof Tiler, Slateridger, Roof Fixer $22.71 $862.98 $9.08 $79.17 $348.22 $0.51 $1.13 $1.43 $1.92 Glazier, Painter $22.48 $854.24 $8.99 $78.38 $344.69 $0.51 $1.13 $1.43 $1.92 Machinist, Quarryworker, Rigger, Dogger, Shophand Concrete Finisher, Foundation Shaftsworker, Hoist or Winch driver, Powder Monkey, Scaffolder, Steelfixer, Tack Welder $22.28 $846.64 $8.91 $77.70 $341.63 $0.51 $1.13 $1.43 $1.92 $21.68 $823.84 $8.67 $75.63 $332.43 $0.50 $1.10 $1.39 $1.86

CW1(d) Refractory Bricklayers Assistant (incl. refractory allowance) Trades Labourer; Jack Hammerman; Mixer Driver (concrete); Gantry Hand or Crane Hand,Crane Chaser; Cement Gun Operator; Concrete Cutting or Drilling Machine operator; concrete Gang including concrete Floater; Roof Layer (malthoid or similar material); Dump Cart Operator; concrete Formwork Stripper; Mobile Concrete Pump Hoseman or Line Hand; Plasterer, Terrazzo or Stonemasons Assistant;Builders labourer Group 4 HIRE TRADES AND LABOURERS 38 S S $23.07 $876.66 $9.23 $80.41 $353.74 $21.26 $807.88 $8.50 $74.19 $325.99 CW1(c) After 12 months $20.88 $793.44 $8.35 $72.88 $320.16 CW1(b) After 3 months $20.61 $783.18 $8.24 $71.96 $316.02 CW1(a) New Entrant $20.21 $767.98 $8.08 $70.59 $309.89 1 RATES

ECW9 CW8 Advanced tradesperson level II, Engineering technician level V HIRE EMPLOYEES 38 S S 1 RATES $26.33 $1,000.54 $10.53 $91.60 $403.73 $0.60 $1.32 $1.67 $2.24 ECW8 CW7 ECW7 CW6 Advanced tradesperson level I, Engineering technician level IV Mobile crane with lifting capacity in excess of 180 ton and not exceeding 220 ton, Operator, mobile crane with lifting capacity in excess of 220 ton, Operator, tower crane driver, operator of tractor from 450 kw (600 hp) Special class tradesperson level III $25.90 $984.20 $10.36 $90.13 $397.13 $0.59 $1.30 $1.64 $2.20 $24.89 $945.82 $9.96 $86.67 $381.65 $0.57 $1.27 $1.60 $2.15 $25.32 $962.16 $10.13 $88.14 $388.24 $2.15 Dumper from 100 ton struck capacity, Loader front end and overhead, from 370 kw (500 hp) up to but not exceeding 450 kw (600 hp), Mobile crane with lifting capacity in excess of 100 ton and not exceeding 140 ton, Operator (dragline/ shovel excavator from 3 cubic metres, side boom/pipe layer from 220 kw (295 hp), Operator of mobile crane with lifting capacity in excess of 140 ton and not exceeding 180 ton, Tractor from 370 kw (500 hp) up to but not exceeding 450 kw (600 hp) ECW6 Special class tradesperson level II and Engineering technician level III, Electronics tradesperson, Instrumentation and control tradesperson $24.22 $920.36 $9.69 $84.36 $371.37 $0.56 $1.23 $1.56 $2.09 $24.65 $936.70 $9.86 $85.83 $377.97 $0.56 $1.23 $1.56 $2.09

CW5 ECW5 CW4 ECW4 HIRE EMPLOYEES 38 S S 1 RATES Compactor from 48 kw (65 hp), Crawler loader (above 15,000 kg mass, up to and including 60,000 kg mass), Crawler tractor using power operated attachments class 7, 8 and 9, Dragline/shovel excavator up to but not exceeding 3.0 metre capacity, Dumper, rear and bottom (above 30 cubic metres, up to and including 120 cubic metres struck capacity), Dumper up to but not exceeding 100 ton, Excavator above 0.5 cubic metres, Excavator hydraulic telescopic boom type, Floating crane over 10 but not exceeding 100 ton, Forklift from 48 kw (65 hp) up to but not exceeding 220 kw (295 hp), Geotextile/geomembrane worker level 5, Grader, Grader from 96 kw (130 hp) up to but not exceeding 148 kw (200 hp), Loader front end and overhead, from 48 kw (65 hp) up to but not exceeding 370 kw (500 hp), Locomotive (carrying passengers), Mobile crane over 10 but not exceeding 100 ton, Operator, drilling machine, over 230 mm diameter, Operator, pneumatic tyred loader (over 105 kw, up to and including 500 kw net engine power), Operator, pneumatic tyred tractor using power operated attachments in excess of 110 kw brake power, Operator, tunnel boring machine; operator, tunnel excavating machine, Other cranes over 15 but not exceeding 100 ton, Scraper, self-powered over 10 cubic metres struck capacity, Side boom/pipe layer up to but not exceeding 220 kw (295 hp), Skid steer tractor from 48 kw (65 hp), Tractor from 48 kw (65 hp) up to but not exceeding 370 kw (500 hp), Trenching machine (greater than 2.4 metres depth and 450 mm width) and bucketwheel trencher with equivalent capacity in cubic metres per hour Special class tradesperson level I and Engineering technician level II $23.62 $897.56 $9.45 $82.30 $362.17 $0.54 $1.20 $1.52 $2.04 $24.05 $913.90 $9.62 $83.78 $368.77 $0.54 $1.20 $1.52 $2.04 Bitumen sprayer (driver), Compactor up to but not exceeding 48 kw (65 hp), Concrete paver, Crawler loader (up to and including 15,000 kg mass), Crawler tractor not using power operated attachments above class 3, Crawler tractor using power operated attachments class 3, 4, 5 and 6, Dumper, rear and bottom (above 2 cubic metres, up to and including 30 cubic metres struck capacity), Excavator up to and including 0.5 cubic metre capacity, Floating crane up to and including 10 ton, Forklift up to but not exceeding 48 kw (65 hp), Geotextile/geomembrane worker level 4, Grader, power operated below 35 kw brake power, Loader, front end or overhead, up to and including 2.25 cubic metres, Locomotive (not carrying passengers), Mobile concrete boom pump operator, Mobile crane up to and including 10 ton, Operator, tractor up to but not exceeding 48 kw (65 hp), Operator, pneumatic tyred tractor with power operated attachments (above 15 kw, up to and including 150 kw net engine power), Operator of mobile crane with lifting capacity in excess of 8 ton and not exceeding 15 ton, Operator, drilling machine over 155 mm to 230 mm diameter, Other cranes over 5 ton and not exceeding 15 ton road roller, Shaft or trench sinker, Pile driver, Roadmarker operator, Road roller (8 ton and above), Road roller, vibrating (4 ton and above), Scraper (up to and including 10 cubic metres struck capacity), Scraper, self-powered under 10 cubic metres struck capacity, Skid steer tractor up to but not exceeding 48 kw (65 hp), Track laying, fixing or levelling machine (railway ), Trench machine (depth up to 2.4 metres, and width up to 450 mm) and bucket wheel trencher with equivalent capacity in cubic metres per hour, Tunneller 2, Winding and haulage driver Engineering tradesperson level II and Engineering technician level I, Electrician special class, Inspector, Instrument tradesperson complex systems, Instrument tradesperson, Mechanical tradesperson special class $22.95 $872.10 $9.18 $79.99 $351.90 $0.53 $1.16 $1.47 $1.98 $23.38 $888.44 $9.35 $81.47 $358.49 $0.53 $1.16 $1.47 $1.98

HIRE EMPLOYEES CW3 38 S S 1 RATES Air compressor operator, All winch driver, Bitumen sprayer, Concrete spreader, powered, Crawler tractor with power operated attachments (up to and including 2000kg shipping mass), Crusher operator aggregate (dimension stone quarries), Drainer, Dumper, rear and bottom (up to and including 2 cubic metres struck capacity), Electric motor attendant, Forklift driver, Gardener, Geotextile/geomembrane worker level 3, Hand sprayer, lance type, Mobile concrete line pump operator, Mobile hydraulic platform operator, Operator, drilling machine, up to and including 155 mm diameter, Operator, pneumatic tyred tractor with power operated attachments (up to and including 15 kw net engine power), Operators of other cranes up to and including 5 ton, Paviour (including segmental paving), Pipe layer (any kind of pipes), Qualified/trade cook, Renderer in pipes, tunnels or covered drains, Roller, vibrating (under 4 ton), Second driver Navvy and dragline or dredge-type excavator, Timberperson, Tradesperson landscaper, Trenching machine (small Ditch-Witch type) $22.28 $846.64 $8.91 $77.70 $341.63 $0.51 $1.13 $1.43 $1.92 ECW3 Engineering tradesperson level 1, Air-conditioning tradesperson, Battery fitter, Boilermaker and/or structural steel tradesperson, Electrical fitter, Electrical mechanic, Fitter, Locksmith, Motor mechanic, Plant mechanic, Refrigeration mechanic, Serviceperson Sheetmetal worker 1st class Tradesperson (radio), Welder 1st class, Welder special class $22.71 $862.98 $9.08 $79.17 $348.22 $0.51 $1.13 $1.43 $1.92 ECW2 Aircon group 1,Concrete batching plant operator, Employee operating power driven portable saw, Forklift over 4500kg, Geotextile/geomembrane worker level 2, Landscaper, Manhole builder, Pitcher or beacher, Spotter, Storeman, Tack welder, Tool sharpener, Traffic controller, Wall builder $21.68 $823.84 $8.67 $75.63 $332.43 $0.50 $1.10 $1.39 $1.86 ECW1(d) Aircon group 2, Aircon group 3, Aluminium alloy structural worker, Bar bending machine operator, Bitumen worker, Cable jointer, Chainperson, Cook s offsider, work boat driver, Dresser and grinder, Dump cart operator, Employee directly assisting a tradesperson, Erector (wire mesh), Fencer, General hand, Geotextile/geomembrane worker level 1, Insulator, Ironworker on, Kerb and gutter layer, Lagger 1st assembler B, Lagger 2nd six months, Landscape labourer, Linesperson, Mess attendant, camp attendant. Painter brush hand, Pick or shovelman, Sheetmetal worker 2nd class, Steel erector, Tool/ material storeman, Welder 2nd class $21.26 $807.88 $8.50 $74.19 $325.99 ECW1(c) After 12 months $20.88 $793.44 $8.35 $72.88 $320.16 ECW1(b) After 3 months $20.61 $783.18 $8.24 $71.96 $316.02 ECW1(a) New Entrant $20.21 $767.98 $8.08 $70.59 $309.89 N.B. The above hourly rates include Industry Allowance, Tool Allowance and the Special Allowance The hourly rates do not include the following: Mobile Crane Capacity Adjustment add $19.42 per week for each additional 40T over 100T added to the CW/ECW5 rate In Charge of Plant Allowance add $38.03 per week Underground Allowance add $14.56 per week

ALLOWANCES Tool Allowance Carpenter, stonemason, etc EXPENSE RELATED ALLOWANCE Caster,fixer, floorlayer specialist, plasterer Refractory Bricklayer, Bricklayer Roof tiler etc, Tradesperson in metals and Signwriter, painter or glazier Boots allowance - Refractory work $87.92 (NB All other employees must be reimbursed cost of boots (see 20.1(b)(vii) of the award) Meal allowance $14.78 $31.10 per week $25.71 per week $22.07 per week $16.29 per week $7.47 per week $4.40 per week Compensation for clothes and tools $1,804.00 Living Away From Home - Distant Work Camping allowance Meal allowance (forward & Return Journey) $14.78 Cost of transporting tools (daily hire) $20.81 Weekend Return Home $35.28 Fares & Travel Patterns Allowance Within 50km radius Travel outside radial area Transfer during working hours Apprentices 1st year 2nd year 3rd year 4th year School based apprentices 1st year 2nd year $478.44 per week $68.45 per day $197.14 per week $28.14 per day $17.43 per day $0.47 per km $0.78 per km $13.07 per day $14.82 per day $15.69 per day $16.56 per day $3.27 per day $3.71 per day SITE & GENERAL WAGE RELATED ALLOWANCES Weekly Standard Rate $809.10 Special Allowance Industry allowance Underground Allowance Multistorey Allowance Up to the 15th floor 16th to 30th floor 31st to 45th floor 46th to 60th floor 61st floor & onwards Laser Safety Officer Allowance Carpenter-diver Allowance Refractory Bricklaying allowance Bricklayer Assistant Coffer Dam Worker First Aid allowance Minimum qualification higher qualification Air-conditioning industry and refrigeration industry allowances (paid in lieu of a number of special rates see clause 21.11) Electrician's Licence Allowance $21.29 per hour $7.70 non adjustable $29.94 per week $14.56 per week $3.24 per day $0.55 per hour $0.66 per hour $1.02 per hour $1.32 per hour $1.62 per hour $2.85 per day $0.96 per hour $2.13 per hour $1.81 per hour $13.75 per week $2.91 per day $4.61 per day $63.92 per week $25.89 In Charge of Plant Allowance $38.03 SPECIAL RATES Insulation or part thereof Swing Scaffold Hot work 0-15 storeys (first 4 hours) $4.96 Between 46 degrees c & 54 degrees c each additional hour $1.02 Over 54 degrees c 16-30 storeys (first 4 hours) $6.41 Cold Work: each additional hour $1.34 Confined Spaces: 31-45 storeys (first 4 hours) $7.58 Explosive Powered Tools $1.62 cents per hour each additional hour $1.53 Wet Work 46-60 storeys (first 4 hours) $12.41 Dirty Work each additional hour $2.55 Toxic Substances Greater than 60 storeys (first 4 hours) $15.82 When working with toxic substances each additional hour $3.28 When working in close proximity Furnace Work: $1.81 per hour

SPECIAL RATES Asbestos Bitumen Work Wearing protective equipment: Height Work Eradication/Removal: $2.30 per hour Greater than 9 meters where an adequate fixed support not less than.75 meters is not provided. $0.62 per hour Acid Work: $1.81 per hour Suspended Perimeter Work Platform: $1.04 per hour Heavy Blocks: Employee Carrying Oils: $11.33 per day Over 5.5kg but under 9kg Pile Driving (in excess of 15 Tonnes) $16.18 per day Over 9kg but under 18kg $1.23 per hour Dual Lift Allowance: $3.45 per day Over 18kg $1.75 per hour Stonemasons-cutting tools $0.04 per hour Towers Allowance: Over 15 metres SPECIAL RATES BUILDING AND CONSTRUCTION SECTOR Each additional 15 meters Cleaning Down Brickwork: Bagging: Plaster or Composition Spray: Slushing: Dry Polishing of Tiles: Cutting Tiles: Second Hand Timber: Roof Repairs: Employees other than Roof Slaters & Tilers Roof Slaters & Tilers Over 15 metres If pitch of roof greater than 35 degrees If pitch is greater than 40 degrees Computing Quantities Grindstone or Wheel Not Available Certificate Allowance Spray Application (Painters) Pneumatic Tool Operation Cutting Bricks Hydraulic Hammer Waste Disposal (landfill and garbage tips) $0.62 per hour $0.62 per hour $2.68 per day $0.62 per hour or part thereof $1.23 per hour $4.96 per day or part thereof $7.28 per week $3.75 per day or part thereof $1.15 per hour $1.43 per hour SPECIAL RATES CIVIL CONSTRUCTION SECTOR Pipe Enamelling Powdered lime dust Sand blasting Live Sewer Work Timbering Special work Compressed Air work $7.28 per day $0.75 per hour $0.09 per hour $0.62 per hour $0.77 per hour $0.09 per hour 0-35 kpa $1.47 per hour Over 35 to 65 kpa Over 65 to 100 kpa Over 100 to 170 kpa Over 170 to 225 kpa Over 225 to 275 kpa Cutting Stone $1.85 per hour $3.75 per hour $7.45 per hour $12.41 per hour $23.78 per hour The new rates set out in this wage sheet are due to the increases arising from the Annual Wage Review 2016-17 Decision