BD SUPER B SPECIAL Dodge 5.9L Cummins 24v ISB

Similar documents
Dodge 24v ISBe

2004½-2007 Dodge 5.9L Cummins 24v ISBe (600 motors only)

Installation Instructions. Application List Dodge 24V PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLATION

Installation Instructions

Dodge 24v ISB

Part# Accessory Power Distribution Module

For electronically controlled E4OD and 4R100 automatic transmissions ** READ ALL INSTRUCTIONS BEFORE INSTALLATION **

Chevrolet/GMC LB7 Duramax Turbo Kit

DODGE CUMMINS 24V ISB OEM BYPASS LIFT PUMP KIT Installation Instructions Part #

6 November Ford Powerstroke 6.0/7.3L X-Monitor 1 BD X-MONITOR Ford 6.0/7.3L Powerstroke

½ DODGE CUMMINS OEM BYPASS LIFT PUMP KIT Installation Instructions Part #

17 August Cool Down Timer Page 1. Part# Application Chart --

DODGE CUMMINS Arctic-Heat Grid Relocation Kit

CRANKCASE VENTILATION KIT

THIS IS A HIGH PERFORMANCE PRODUCT - USE AT YOUR OWN RISK!!!

BD Ford 1999½ L Power Stroke CRANKCASE VENTILATION KIT

DODGE CUMMINS 24V ISB

31 January / Universal Dash-Top X-Monitor 1 BD X-MONITOR. Universal Top Button Dash-Mount Gauge System

9/8/ ½-2004 Dodge 5.9L Cummins Flow-MAX Lift Pump Retro Kit # ½ L DODGE CUMMINS. Installation Instructions

Air-Boss VP Intake Plenum

DODGE CUMMINS Air-Boss CR Intake Plenum

Dodge Cummins 5.9L 24 Valve Edge Products EZ Module Installation Instructions & Manual

BD POWER SHORT SHIFTER Dodge Speed Dodge Speed Dodge Speed.

Dodge 5.9L Cummins 24v ISBe

GDP STREET-GATE 38mm Wastegate System

Dodge Ram 5.9L Cummins LOW FUEL PRESSURE ALARM LIGHT - Installation Manual -

L DODGE CUMMINS Maximizer System

DODGE CUMMINS GDP Big Line Kit

DODGE CUMMINS GDP Twin CP-3 Big Line Kit

DODGE CUMMINS MK-2 Micro-Kleen System

Mega-Rail System Installation

Mercedes MBE 906/ L & 7.2L Engine Module. Part # Installation Instructions

RACE PPE Manifolds and Up-Pipes

20250 Module Installation Guide

PMD DRIVER RELOCATION KIT For Chevy 6.5L Diesel Trucks

30100 Module Installation Guide L

BD SUPER B SINGLE TURBO KIT Dodge 5.9L Cummins v ISBe (Non 600 motors)

15100 Module Installation Guide Mercedes EPA07 w/dpf

GM 6.6L Duramax. Up to 90HP Gain. AgDieselSolutions.com

BD Remote Mount Air Exhaust Brake

CU6703 Module Installation Guide

Dual Fueler Kit Dodge Cummins 6.7L kit w/no pump ( ) package w/pump ( ) Installation Guide

3 October 2016 PN# V Dodge Twin Turbo Kit (I-00274) ½ D o d g e 2 4 v I S B

Twin Turbo Installation Instructions

Cummins N14 Celect & Celect Plus Engine Module. For Agricultural Applications Only. Part # 31200

JDCR2000 Module Installation Guide

INSTALL MANUAL D o d g e 1 2 v 6 B T A PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLATION.

Installation Instructions

Female Plug. connecting to Fuel Quantity

L DODGE CUMMINS MK-2 + BLK APPS Mount

JD2800 Module Installation Guide

Attitude Instructions Ford 6.0 Powerstroke

L/6.7L DODGE CUMMINS

Dual Fueler CP3 Pump Kit Installation Guide for LBZ/LMM

Rapid Flow Induction Dodge Cummins 5.9L 52101

Cummins-2004 Dodge Edge EZ Module Installation Instructions and Manual

L DODGE CUMMINS MK-2 High Flow Fuel Filter Kit

Installation Instructions

FLUID DAMPER. Vehicle Applications:

Power Edge Juice Module Ford 6.0 Powerstroke Diesel

5/11/ Cool Engine Shutdown Page 1. Part#

Dual Fueler CP3 Pump Kit Installation Guide for LB7

BD Cummins VE Fuel Pin Kit

BD Remote Mount Exhaust Brake 2003-up International VT365

2004½-0505 Dodge Cummins BD Turbo Mount Exhaust Brake

97-03 Volkswagen 1.9L TDI Injector Nozzles

Dfuser T/C Lock-Un Lock

Part# PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLATION.

BD BrakeLoc EBP Valve Controlol Ford Powerstroke (Manual Transmissions)

LB LB LLY LLY 1000

Dodge Cummins BD Remote Mount Exhaust Brake Installation Instructions

Stage4 Installation Guide STAGE 4 TRANSMISSION KIT INSTALLATION GUIDE Allison LB7/ LLY only for 5 speed trasmissions

Vehicle Application. Rapid Flow 4 Aluminized Exhaust Dodge Cummins 5.9L Rapid Flow 4 T-409 SST Exhaust Dodge Cummins 5.


Owner smanual. Banks Big Hoss Intake Manifold System Chevy/GMC Duramax Turbo-Diesel Engines. with Installation Instructions

Part# PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLATION.

Dodge Cummins 5.9L Edge Comp Module Installation Instructions & Manual OLD P/N s: ECD2000, ECD2000A & ECD2000B NEW P/N s: 30300, 30301,

Tractor Applications Rapid Power Model Number

BD PRESSURELOC INSTALLATION MANUAL

BD 6.7L Super B Special Turbo Kit For L Dodge -- I n s t a l l a t i o n I n s t r u c t i o n s -- PN#

BD 6.7L Super B Special Turbo Kit For L Dodge -- I n s t a l l a t i o n I n s t r u c t i o n s -- PN#

Dodge Cummins

UNLEASH THE POWER. See More at: bullydog.com WITH BULLY DOG PERFORMANCE PRODUCTS. Doc.# BD41001 v1.0.3

Owner s Manual Ford Powerstroke 7.3 liter CAUTION: THIS IS A HIGH PERFORMANCE PRODUCT. USE AT YOUR OWN RISK.

Dfuser T/C Lock Override with LED

Vehicle Application: Part Numbers

Installation Manual v1.0: Dodge 68RFE Automatic Transmission. Please read all instructions before the installation of the ATS Co-Pilot

Assembly Instructions

Dfuser Stage I Power Module DT-466, DT-570, and HT-570

12/05/2012 Lockup Co-Pilot Instructions INST. Installation Manual v1.6: Dodge 68RFE Automatic Transmission

PowerMax Diesel Upgrade For Cummins Engines

Vehicle Programming Instructions Ford Powerstroke 7.3 liter

Warranty Statement - Terms and Conditions

Mechanical Lift Pump System

HOW TO INSTALL YOUR BOV

PowerMax Diesel Upgrade For Cummins Engines

SOLAR DASH CHARGING SYSTEM USER GUIDE

Ford Powerstroke (Manual Transmissions)

TOOLS REQUIRED General mechanic tools

Speedometer Interface

Transcription:

1 This turbo is intended for high performance applications and is not to be used for towing applications BD SUPER B SPECIAL 1994-2002 Dodge 5.9L Cummins 24v ISB Part# 1045120 PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLATION

2 KIT CONTENTS: Please check to make sure that you have all the parts listed in this kit before you start the disassembly your truck. DODGE 1994-2002 SUPER B SPECIAL TURBO KIT (BD# 1045120) 1405121 1405926 1045927 1100740 Super B Special 4 Stainless Steel Turbo Clamp 4 Down Pipe Turbo Down Pipe Clamp Qty: 1 Qty: 1 Qty: 1 Qty: 1 1405986 1453152 1453153 1452815 1130315 Manifold bolt 1/4NPT to ORFS Viton O-Ring 3/8 Washer 3/8NC x 1 (Used on 12V Installs) Qty: 2 Qty: 1 Qty: 1 Qty: 2 Qty: 2

3 Pre-Installation Notes A turbocharger is driven solely on exhaust energy. Therefore, if the vehicles current exhaust manifold is cracked or is leaking, it is recommend that new exhaust gaskets and a heavy-duty exhaust manifold be used. Installation should occur on a cold vehicle, as turbo and exhaust components become very hot with use. The BD Super B system is recommended for trucks with 400-500 RWHP with a maximum efficient boost pressure of 45psi. For optimum performance, the turbo should operate between 37 45psi. Upgrade Options Description Part # BD X Torque Converter 1070215X BD Transmission CALL BD High Flow Injectors CALL BD Lift pump kit 24V 1050226 BD High Flow Banjo Bolts 24V 10502XX Heavy Duty Exhaust Manifold 24V 1045985 Heavy Duty Exhaust Manifold 12V 1045980 BD X-Monitor CALL BD High Pressure Intercooler Boots 1405220 BD Cool Down Timer 1081150

4 BATTERY DISCONNECT Disconnect the negative terminals on both of the vehicle s batteries, and then disconnect the positive terminals. INSTALLATION Record radio settings and disconnect both battery terminals on both batteries. Lay a protective cover over the passenger side fender to eliminate any scratches. Remove the air box assembly and intake tube from the inlet of the turbocharger. Remove the two 13mm bolts connecting the exhaust down pipe to the turbo flange. Remove two exhaust bolts. Remove the v-band clamp on the turbo compressor-housing outlet that connects to the intercooler. Be sure not to lose the orange o-ring from the intercooler inlet tube elbow. Also make sure that you cover the intercooler tube so debris does not fall inside. Remove air box. Remove oil feed line. Remove the turbo oil feed line and un-bolt the turbo oil drain tube and cover the inlet to protect it from contamination. Remove the four nuts holding the turbo to the exhaust manifold. Remove the stock turbo and set it aside. Inspect the exhaust manifold for shrinkage, cracks and leaks. If none are found, remove the original turbo gasket and clean the turbo-mating surface. If any cracks are found, you will need to replace the manifold with a stock replacement or a heavy-duty aftermarket version. Remove the turbo down pipe. Note that it is assumed that the user has a full 4 exhaust system at the time of install, not a CAT-back system or stock exhaust. Remove the original gasket from the oil drain tube sealing flange and replace with the new gasket provided. Install the Super B turbo with the supplied gasket and the four factory nuts (gasket direction is unimportant) to the exhaust manifold. Torque to 24 lbs-ft. For 12V installations, two M10x1.5x45mm bolts have been provided.

5 Turbo Clocking / Aligning (If Necessary) Loosen the four bolts clamping the exhaust housing to the turbo body, and then rotate the body until the oil feed drains are straight up and down. Re-tighten the four bolts. Loosen the eight bolts clamping the turbo compressor housing to the body and rotate housing to align it with the intercooler tube. You need to align the compressor outlet to the stock cast aluminum elbow with the orange o-ring in it. Now tighten the eight bolts holding the compressor housing to the body to secure its position. Ensure the orange o-ring is in place and use the factory v-band clamp to connect to compressor housing to the intercooler elbow and tube. Exhaust clamp here Clocking bolts Wastegate line Adjustment of the first intercooler boot may be required for a proper fit. Clocking bolts Cast outlet elbow NOTE: You will need to drill out the two bolt holes of the oil drain flange using a 13/32 bit. You can then use the provided 3/8NC x 1 bolts and washers to secure the oil drain to the turbo. This will not be required on future versions of this turbocharger. Connect the oil drain tube to the bottom of the turbo using the supplied gasket and the original hardware. You will need to slide the oil drain adapter as far as possible away from the wastegate arm to prevent any contact. In some rare cases the wastegate arm may need to be bent. Be sure to squirt fresh oil down the oil feed port while rotating the compressor wheel. This will ensure a smooth start-up and reduce the chance of damaging the bearings. Remove the oil feed line adapter from stock turbo and install in the Super B turbo. Be sure to inspect the adapters o-ring for any damage to reduce the chance of an oil leak. Install the oil feed line using the 1/4 NPT to ORFS adapter. Ensure that the brass barb fitting in the compressor housing is tight, install the blue rubber wastegate hose, and then clamp the end to the wastegate. Install the new down pipe to the rear of the turbo. It is highly recommended to loosely clamp all exhaust pieces together to ensure proper fit before completely tightening

anything. Position all exhaust clamps ¼ from joints and if possible tack weld all pipes to prevent twisting. You can now install the factory air box and intake tube. Double check all clamps to ensure they are tight. Re-connect the negative battery terminals and start the vehicle. Check for any exhaust or oil leaks. Take it easy on the turbo for the first 100 miles to allow a proper break-in period. Be very cautious of any unusually sounds or leaks during this time. Note: The exhaust housing of the turbo may smoke when new as manufacturing residue on the housing must burn off. 6

7 LIMITED WARRANTY STATEMENT THE INSTALLATION OF THIS PRODUCT INDICATES THAT THE BUYER HAS READ AND UNDERSTANDS THIS AGREEMENT AND ACCEPTS ITS TERMS AND CONDITIONS. DISCLAIMER OF LIABILITY BD Engine Brake Inc., its successors, distributors, jobbers, and dealers (hereafter BD ) shall in no way be responsible for the product's proper use and service. THE BUYER HEREBY WAIVES ALL LIABILITY CLAIMS. BD disclaims any warranty and expressly disclaims any liability for personal injury or damages. BD also disclaims any liability for incidental or consequential damages including, but not limited to, repair labor, rental vehicles, hotel costs, or any other inconvenience costs by reason of use or sale of any such equipment. The BUYER acknowledges and agrees that the disclaimer of any liability for personal injury is a material term for this agreement and the BUYER agrees to indemnify BD and to hold BD harmless from any claim related to the item of any equipment purchased. This warranty shall not apply to any unit that has been improperly stored or installed, or to misapplication, improper operation conditions, accidents, neglect, or which has been improperly repaired or altered or otherwise mistreated by the BUYER or his agent. BD also assumes no liability regarding the improper installation or misapplication of its products. It is the installer's responsibility to check for proper installation and if in doubt, contact the manufacturer. LIMITATION OF WARRANTY BD Engine Brake Inc. (hereafter "BD") warrants to the BUYER that any parts purchased shall be free from defects in material workmanship. A defect is defined as a condition within the product that would render the product inoperable. BD gives Limited Warranty as to description, quality, merchantability, fitness for any product s purpose, productiveness, or any other matter of BD's product sold herewith. BD shall be in no way responsible for the product s open use and service and the BUYER hereby waives all rights other than those expressly written herein. This Warranty shall not be extended or varied except by a written instrument signed by BD and the BUYER. The Warranty is Limited to one (1) year from the date of sale. Until BD has approved the claim, the consumer may be responsible for these costs. A Return Material Authorization (RMA) number, obtained in advance from BD, must accompany all products returned for warranty consideration. All products must be returned, shipping prepaid, to BD and must be accompanied by a dated proof of purchase receipt. All Warranty claims are subject to approval by BD and repaired or replaced product will be returned to the customer freight collect. Accepted warranty units, which have been replaced, become the sole property of BD. This warranty is in lieu of all other warranties or guaranties, either expressed or implied, and shall not extend to any consumer or to any person other than the original purchaser residing within the boundaries of the continental U.S. or Canada. IN THE EVENT THAT THE BUYER DOES NOT AGREE WITH THIS AGREEMENT, THE BUYER MAY PROMPTLY RETURN THIS PRODUCT, IN A NEW AND UNUSED CONDITION, WITH A DATED PROOF OF PURCHASE, TO THE PLACE OF PURCHASE WITHIN THIRTY (30) DAYS FROM DATE OF PURCHASE FOR A FULL REFUND. Damaged or blown head gaskets will not be covered under warranty. It is the responsibility of the user to regulate cylinder pressures to protect the head gasket and turbo.