Supplementary Installation Instructions for RW-1019 GMC / CHEVY 4500/5500 Series Trucks

Similar documents
GM HD Heavy Duty 4 Link Tow Kit Installation Instructions

INSTRUCTION G-Comp Unser Edition Rear Suspension: Chevy Nova. Kit Contents:

Detroit Speed, Inc. Mini-Tub Kit Chevy Nova, Oldsmobile Omega, Pontiac Ventura P/N: &

DC Series Installation Manual (# )

720BAG GM 2 FRONT & 4 REAR LOWERING KIT

Jeep Wrangler Steering Stabilizer Relocation Bracket Installation Instructions

INSTALLATION INSTRUCTIONS

37-39 TCI Chevy Rear 4-Link Kit Installation Instructions

CHECK ALL PARTS INCLUDED IN THIS KIT TO THE PARTS LIST BEFORE INSTALLATION. IF ANY PIECES ARE MISSING, PLEASE CONTACT: TOTAL COST INVOLVED

Chevrolet 3100 IFS Kit

Detroit Speed, Inc. QUADRA Link Rear Suspension Camaro/Firebird P/N:

INSTALLATION INSTRUCTIONS

Super Duty Front Air Bag Installation Instructions

INSTALLATION INSTRUCTIONS

Detroit Speed, Inc. Rear QUADRAlink Conversion Kit Camaro/Firebird P/N:

159 North Maple St. Unit J, CORONA CA P F

INSTRUCTION G-Comp Rear Suspension: Chevy Camaro. Kit Contents:

IFS Installation Instructions

Detroit Speed, Inc. QUADRA Link Rear Suspension Chevy II P/N:

Detroit Speed, Inc. QUADRA Link Rear Suspension Nova P/N:

INSTALLATION OF RAILGEAR KIT R-290HD REAR

INSTALLATION OF ROAD WHEELS AND TIRES 2008 Ford F-250/F-350 4x2

SYNERGY SUSPENSION UNIVERSAL FRONT 3-LINK KIT Version 1.0

Detroit Speed, Inc. QUADRA Link Rear Suspension Camaro/Firebird P/N:

MM Panhard Bar, Mustang (MMPBA)

86-95 Suzuki Samurai Complete Contact Spring Over Axle Pads (SKU# SSP-CCSP4) Installation Instructions

Jeep JK Dana 44 and 30 Front Axle Truss Axle Truss Installation Instructions

Detroit Speed, Inc. Mustang Mini-Tub Kit Mustang P/N:

95-98 CHEVY TRUCK INSTALLATION INSTRUCTIONS KIT #112 #113

Detroit Speed, Inc. Second Generation Camaro/Firebird Mini-Tub Kit Camaro/Firebird P/N: ,

PRODUCT USE INFORMATION

3651 N Highway 89 Chino Valley, AZ (928)

Detroit Speed, Inc Mustang Mini-Tubs P/N:

FRONT & 4 REAR GM WD LOWERING KIT

A. Tools Needed:

2008 & Newer Ford F-350 Chassis Cab 4-Link Rear Installation Instructions

Installation Instructions

Part # GM F Body Complete CoilOver System

PPM-5013 JK REAR C/O KIT Version 2

Heavy Duty Miniature Quick-Change Applicator (Side-Feed Type) with Mechanical or Air Feed Systems

K20 4x4 Radius Arm Conversion Installation Instructions

6 Suspension System. Dodge wd Part#:

INSTALLATION OF ROAD WHEELS AND TIRES

FORD F-250, F-350, 4WD 2 COIL SPRING LEVELING KIT INSTALLATION INSTRUCTIONS

CHEVY / GMC BLAZER / YUKON SUBURBAN BODY LIFT INSTALLATION INSTRUCTIONS KIT # KIT #10023

Installation Instructions

Slide the billet aluminum cap over the bushing and secure with the 3/8-16 x 2 1/2 socket head allen and locknuts provided.

FORD SuperRail Mounting Kit #3111

TECHNICAL PROCEDURE NON-STEERABLE SUSPENSION SYSTEMS

Suspension. Table of Contents

Please read these instructions completely before proceeding with the installation.

MOUNTING RAILS ***DO NOT EXCEED VEHICLE MANUFACTURER'S RECOMMENDED TOWING CAPACITY.***

INSTALLATION INSTRUCTION 88148

INSTALLATION INSTRUCTIONS

»Product» Safety Warning

INSTALLATION INSTRUCTIONS

Installation Instructions

(877) MON-FRI 7AM-5PM PST OR WEBSITE: ReadyLIFT.COM **Please retain this document in your vehicle at all times**

4, 6 Suspension System. Ford F250/350 4WD Part#: ,

Rating when used as a weight distributing hitch with spring bars:

DO NOT GRIND ANY WELDS

Step 5 Install the frame rail insert into the frame.

INSTALLATION INSTRUCTIONS

(877) MON-FRI 7AM-5PM PST OR WEBSITE: ReadyLIFT.COM **Please retain this document in your vehicle at all times**

Installation Instructions READ THOROUGHLY BEFORE BEGINNING Signature Series Rail Kit Dodge Ram Trucks-all, including Mega-cabs

INSTALLATION INSTRUCTIONS

Notice: Refer to Adding Fluid to the Brake System Notice in the Preface section.

IFS Eliminator Kit,

Part # Chevy Level 2 CoilOver Suspension Package Two Piece Frame

Rating when used as a weight distributing hitch with spring bars:

Part # GM F Body Rear R-Joint Bolt-in 4 Link GM F Body Rear Bolt-in 4Link. Table of contents. Installation Instructions

PRE-INSTALLATION. INSTALLATION INSTRUCTIONS STEP 1: Park vehicle on level surface and chock rear wheels.

FORD SuperRail Mounting Kit #3113. #3100 SuperGlide (12K) Gross Trailer Weight (Maximum) Vertical Load Weight (Max. Pin Weight) SPECIFICATIONS

INSTALLATION INSTRUCTIONS For 65800, 65801, 66355, 69250, Rear Bumper And Tire Carrier For Jeep XJ Cherokee

WRANGLER TJ INSTALLATION INSTRUCTIONS Kit #: TJ251K/KN/KST/KSTN TJ401K/KN/KST/KSTN

INSTALLATION INSTRUCTIONS FOR: RE7500 SERIES TJ EXTREME DUTY LONG ARM TRI-LINK SYSTEM INCLUDING TJ UNLIMITED

»Product» Safety Warning

Installation Instructions

INSTALLATION SAFETY PRECAUTIONS OF ROAD WHEELS AND TIRES

Detroit Speed, Inc. Mini Tubs Camaro/Firebird P/N:

PRODUCT USE INFORMATION

07-13 TOYOTA TUNDRA 2WD 6" LIFT SPINDLES

KJ Jeep TJ/LJ Rock Krusher 3 Coil Spring Spacer Lift Kit with shocks DO NOT COMBINE WITH ANY OTHER SUSPENSION KIT

MAINTENANCE WEIGHT RATINGS WARNINGS. warning: never exceed your vehicle manufacturer's recommended towing capacity

Installation Instructions

1 of 12 8/25/2017, 4:29 PM

Chrysler A-Body Tubular A-Arms Installation Instructions A-ARM INSTALLATION

6 Suspension System. Dodge wd Part#: &

Master Your Terrain (307)

1988 Chevrolet Pickup V SUSPENSION - FRONT (4WD)' 'Front Suspension - "V" Series 1988 SUSPENSION - FRONT (4WD) Front Suspension - "V" Series

INSTALLATION GUIDE. 3 Dualsport suspension. ram truck 2500/3500. AEV30243AA Last Updated: 04/10/15

Ford F150 2 Suspension Kit

INSTALLATION INSTRUCTIONS

»Product» Safety Warning

PRODUCT USE INFORMATION

JEEP WRANGLER (TJ), UNLIMITED (TJL), RUBICON MODELS BODY LIFT KIT INSTALLATION INSTRUCTIONS KIT# KIT# 973

Special Note: On 4 Wheel Drive models you must remove the Drive Axle Bolts. Be sure to use the correct tool on these 12mm 12 Point Bolts.

ReadyLift (Part# ) Lift Kit, Installation Instructions Toyota Tundra New Body Style 2WD & 4WD

HP10033 KIT. * See application guide for proper fitment.

INSTALLATION INSTRUCTION 88051

Transcription:

Supplementary Installation Instructions for RW-1019 GMC / CHEVY 4500/5500 Series Trucks OVERVIEW: GMC / Chevrolet no longer offers the 3500HD pickup truck. There is still a dual rear wheeled 3500, but its maximum GVWR is only 11,400lbs. The Class 4 & 5 GVWR ranges (14,001 to 19,500lbs) that used to be covered by the 3500HD are now part of the GMC / Chevrolet TopKick / Kodiak (4500/5500 family) line of trucks. The TopKick / Kodiak line of trucks is much more similar in overall construction to its heavier GVWR cousins than it is to the old 3500HD pickup trucks. Therefore, the DMF RW-1019 railgear has been modified to better suit this line of trucks. The redesigned RW-1019 for TopKick /Kodiak trucks is very similar to the larger DMF RW-1212 and RW-1420 railgear. The only difference between this RW-1019 for the Chevy /GMC 4500 / 5500 series trucks and the RW-1212 and RW-1420 line is the size of the rail wheels, bearings, axle and the pivot arms. FAMILIARIZATION: Please take some time to familiarize yourself with the terms in this diagram prior to proceeding with installation. The following instructions will be much clearer if you re familiar with the terminology. Furthermore, if you need to contact DMF for assistance, we will be better able to understand your questions if you use the same terms we do.

ATTACHING GEAR TO TRUCK: 1) Remove front bumper and store for re-installation later. 2) Bolt on front frame extensions provided with railgear. 3) Slide Railgear under truck. 4) Raise the rear of one pair (passenger or driver s side) of long arms so that the two sections of threaded rod straddle the leaf spring. Continue to raise the spring hanger until it comes in contact with the lower most leaf. This can be made easier by inserting an appropriately sized bolt through hole marked A in BOTH inner and outer long arms. Then slide a long lever (e.g: 1-1/2 tube steel) OVER the bolt and UNDER the rear pin / spring hanger (see picture below) 5) Measure the height of the rear pin as the spring hanger is in contact with the spring. Add or remove spacers as necessary so that the centerline of the pin will be at approximately 9-3/4 when secured in place. 6) Install rubber pad over the top of the leaf springs and then the top 1 spacer. Thread 2 nuts on EACH of the threaded rods of the spring hanger. Tighten until the rubber just starts to deform. Do not overtighten. 7) Repeat steps 4&5 for the opposite side of the railgear. Both spring hangers should now be clamped around the leaf springs. 8) Raise the railgear until the spring hanger just touches the frame or frame extensions. The easiest way to do this is to actually connect the truck hydraulics, remove the safety pin offs, and lower the railgear. This will force the long arms up toward the frame / frame extensions. When the cross tube just contacts the frame stop and measure the height of the front pin. The height should be about 22-1/2 to 23-1/2 inches. If it is higher, you will need to space the cross tube down with flatbar. If it is too low you will have decreased road clearances in the highway position. Please see following diagram for proper highway position pin heights.

****CLEARANCE NOTE**** Proper clearances will allow the railgear to move up and down with the truck front suspension. As the truck tire hits bumps in the road, the truck spring allows the front axle to move upward (see following figure). Since the railgear is attached to the spring just in front of the axle, sufficient clearance must be allowed to prevent interference with other parts on the truck (i.e. frame, steering boxes, shocks, oil filters, spring hangers, hydraulic lines, etc.). The Front Mounting Pin does not move in relation to the vehicle frame because it is fastened through the Frame Extension (or directly to the truck frame). As the Front Mounting Pin does not move and the Rear Mounting Pin (at the axle) does, the rail gear effectively rotates about the Front Mounting Pin. Therefore, the part of the rail gear near the Rear Mounting Pin moves more than the part near the Front Mounting Pin, and attention needs to be paid to the possible clearance problems that can be caused by this movement. Front Railgear Clearance:

Align Front Rail Gear Longarms: The front Railgear now is ready to be squared up and aligned. Three measurements need to be taken to insure that everything is aligned properly. The passenger and driver side long arms must have the same fore and aft position relative to the truck axle. The long arms must be parallel to the frame. The long arms must be parallel to each other. 1) Relative fore and aft position: The first step is to make sure that the front to rear position of the railgear is the same for both passenger and driver s side long arms. The best way to determine this is to measure from the passenger s side front pin of the railgear to a point on the truck. For factory installs DMF technicians usually use the point where the front leaf springs are attached to the front spring shackles. (NOTE: Do not use a point on the frame extensions.) Then compare this measurement to the same dimension on the driver s side. If one pair of long arms is further fore or aft than the other, the nuts on one of the spring hangers must be loosened and that side moved forward or backwards until the measurements on both passenger s and driver s sides are equal. Retighten the spring hanger and remeasure. Once the front pin-to-suspension measurements are equal, you should verify that the measurement between the rear pins and the truck s front axle are also equal. If they are not, it is possible that the truck axle is not square with the frame. 2) Align long arms to frame: Place a straight edge, such as a framing square, against the outboard surface of the outer driver s side long arm. Orient the straight edge such that a measurement can be made between the truck frame and the edge that is against the long arm. Repeat this measurement with the straight edge at another location on the same long arm that is at least 12 away from the first location. The measurements taken at the two separate locations should be equal. If they are not use a hammer to slide the front of the driver s side long arms in towards or out from the center line of the truck as required. Repeat this process until the two measurements are equal. Then perform the same measurements on the passenger s side long arms. 3) Aligning long arms to each other: If the rails of the truck frame are straight and parallel, then the long arms should be parallel after performing the previous step. However, you must make sure that they are or the gear will bind when moving up and down. Take a measurement from the outboard passenger s side long arm near the rear pin to the same location on the outboard driver s side long arm. Repeat this measurement near the front pin. Adjustments should be made by tapping the long arms towards or away from the centerline of the truck. If adjustments are made during this step then step 2 (Aligning long arms to frame) MUST be repeated to verify that the whole assembly is still in line with the truck frame. After all the alignment measurements have been checked you may TACK weld the front cross tubes to the frame / frame extensions. (Do NOT fully weld off yet!) Axle Alignment and Weld Off: 1) Raise the front railgear to the highway position and pin off. 2) Center the Front Axle relative to the truck frame. To do this, put the gear in the highway position and place a straight edge along the outboard edge of the passenger s side rail wheel. Take a measurement from the straight edge to a point on the truck frame or suspension. Move the straight edge to the driver s side wheel and take the same measurement to the corresponding point on the

driver s side. Slide the rail axle to the passenger s or driver s side, as required, in order to get the measurements equal. 3) If equipped with brakes: rotate the outer axle tubes to align brake cylinders so that they will be vertical in the fully deployed (rail) position. If you measure between the forward brake arm and the pivot arm stop block a good starting point is about 6-1/4. (see diagram below). In this same position the railsweep rubber (if supplied) should be vertical when in rail position. Tack weld axle tube to the inboard surface of the outer pivot arm ONLY. CAUTION: in the following step be careful to ensure that the rail brakes do not hit the floor: 4) Fully lower the gear to the rail position and verify proper orientation of brake cylinders and rail sweeps. 5) Fully raise and lower the front rail gear several times and watch for any binding that occurs. If you note any problems, you must re-check the alignment and resolve any biding issues before continuing. If there are no binding issues you may fully weld the cross tube to the frame extension (or frame). 6) Fully raise the gear and re-verify that the axle is centered. You may then fully weld the axle tubes to the inboard surface of the outboard pivot arms ONLY! Do not weld the axle tube to the inner pivot arm at all. You will need to be able to slide the inner pivot arms toward the center of the truck if a hydraulic cylinder ever needs to be replaced. These instructions are intended to enhance and clarify the differences between this application and previous RW-1019 installations. Any information not covered here is covered in the Parts & Service Manual and or Installation Manual. This information will be incorporated into the next revision of the RW-1019 manual. Please check our website periodically for updates. Please contact DMF if you have any questions at: Diversified Metal Fabricators 665 Pylant St. NE Atlanta, GA 30306 404-875-1512 404-975-4835 fax www.dmfatlanta.com