Includes: 1. High Flow Turbo Up-Pipe 1. J-Hook Block Off / Coolant Reroute 1. Coolant Hose 1. EGR Valve Block Off Plate 2. Hose Clamps 4.

Similar documents
Includes: 1. J-hook Block Off / Coolant Reroute 1. Coolant Hose 1. Turbocharger Up Pipe Block Off Disc 2. Hose clamps

XDP Complete EGR Race Track Kit w/up-pipe. Item Number: XD144

* PLEASE READ INSTRUCTIONS PRIOR TO INSTALLATION

Included: 2. Intake Block Off Plates 1. Exhaust Block Off Plate 1. Coolant Hose - Reroutes the EGR Cooler Coolant 12. Pieces of mounting hardware -

Includes: 1. Silicone Hose 2. EGR Block Off Plates 1. Exhaust Block Off Plate 2. Hose Clamps 1. Spacer/Washer 8. Bolts 2. Nuts

This kit may void factory warranty please check with manufacturer.

Please call us at Mon-Fri 8am-5pm if you need any additional assistance.

Includes: 1. Upgraded Tube Type EGR Cooler 2. Silicone Hoses

CUSTOM-DIESEL.COM ATTENTION VERY IMPORTANT - PLEASE READ

DURAMAX LMM EGR DELETE

L DURAMAX LBZ EGR DELETE GDP TUNING

DURAMAX LBZ EGR DELETE

Duramax LMM EGR Delete With Intake Tube

DISCLAIMER 1) By installing this product onto your vehicle, you assume all risk and liability associated with its use.

2017+ L5P Duramax 3 ½ Down Pipe & EGR Fix Kit

DURAMAX LML EGR DELETE

Ford 6.0L Regulated Return Kit

6.4L EGR Delete With Intake Elbow

Forbidden Diesel Performance Ford 6.7L Powerstroke EGR Delete Instructions 6.7L EGR DELETE BY FORBIDDEN DIESEL PERFORMANCE. Page 1

Ford 6.0L. Part #: Part #: BD GASKET PART# will be needed for this installation.

Included parts: 1 - BorgWarner SX-E Turbocharger 1 - SX-E 90-Degree Compressor Outlet Elbow 1 - HSM Cast Exhaust Manifold 1 - HSM Downpipe

Powerstroke EGR Delete A B C

6.7L Cummins EGR Delete

EGR Delete Kit Dodge 6.7L Cummins

INSTALLATION GUIDE: EGR Delete Kit Ford 6.7L Powerstroke`

L powerstroke ford egr cooler

GM 6.6L DURAMAX LLY EGR DELETE

* PLEASE READ INSTRUCTIONS PRIOR TO INSTALLATION *

Long Tube Header Installation PNs , 17276

Included parts: 1 - BorgWarner SX-E Turbocharger 1 - SX-E 90-Degree Compressor Outlet Elbow 1 - HSM Cast Exhaust Manifold 1 - HSM Downpipe

Powerstroke 6.4L EGR Block Kit

BD 6.7L Super B Special Turbo Kit For L Dodge -- I n s t a l l a t i o n I n s t r u c t i o n s -- PN#

Ford 6.7 EGR Delete Kit

Step 6: Remove and save the MAP sensor for later use. Step 7: Remove the passenger side intercooler pipe and the EGR intake manifold.

REMOVAL AND INSTALLATION

BD 6.7L Super B Special Turbo Kit For L Dodge -- I n s t a l l a t i o n I n s t r u c t i o n s -- PN#

05-08 GT. Hellion Power Systems Mustang Kit Instructions

Mercedes E63/CLS AMG Carbon Turbo Intake System Instructions

LML 3 Y-Bridge Kit or High Flow Intake Bundle Package

Ford 6.0L Powerstoke Regulated Fuel Return

2014+ Ram 3.0 EcoDiesel EGR Delete

This kit may void factory warranty please check with manufacturer.

VW & Audi TDI CR140 ECO KIT Installation Guide

TABLE OF CONTENTS PARTS LIST

Installation Manual v1.0: : Pulse Flow Exhaust Manifolds 2006 LBZ Duramax 6.6L EGR Equipped Vehicles

Long Tube Header Installation For Charger R/T, Magnum R/T, Chrysler 300C, Challenger R/T & Charger R/T PN , 17275,17256, 17275

2001 Ford Windstar ENGINES 3.8L V6 - VIN 4 - Windstar

Long Tube Header Installation for Charger R/T, Magnum R/T, Chrysler 300C, Challenger R/T & Charger R/T PN *,17256*, 17275*

EGR Kit w/ Intake Chevy 6.6L Duramax

Long Tube Header Installation For Dodge Challenger SRT-8 & R/T, Charger SRT-8 & R/T, Magnum SRT-8 & R/T & Chrysler 300 SRT-8 & 300C

IAG Competition Series Air / Oil Separator (AOS) For WRX

Figure 1 - Kit Contents

IAG Street Series Air / Oil Separator (AOS) For WRX

2007 Shelby GT500 Long Tube Headers Installation

INSTALLATION GUIDE: EGR Delete Kit Chevy 6.6L Duramax

3 October 2016 PN# V Dodge Twin Turbo Kit (I-00274) ½ D o d g e 2 4 v I S B

Long Tube Header Installation For Ford Mustang GT

Page 6 of 6 OUTLAW DIESEL EGR COOLER DELETE KIT W/INTAKE ELBOW L FORD POWERSTROKE

4 December 2017 PN# , , Dodge 6.7L Rumble B SXE (I-00400) 1. BD Rumble B SXE. D o d g e 6. 7 L H P C R Installation Instructions

Chevrolet Camaro (Gen6) Installation Guide Long Tube Header PN 17293*

Installation Manual v1.0: Twin CP3 Fuel Injection Kit Dodge 5.9L

2Charge Air Elbow, 1Install hose & Parts list. hardware kit. Clamp & O-ring. Downpipe clamp. Downpipe w/ Wrap 3 & Wrap Clamp.

L CUMMINS COOLANT FILTER KIT

Ford Mustang GT Long Tube Header Installation

Turbo Upgrade Kit Installation for Ford F-150 PN s , ,

Dodge 5.9L Cummins 24v ISBe

IAG Street Series Air / Oil Separator (AOS) For 2017 WRX

Thank you for purchasing a Borla Performance Stainless Steel Header.

INSTALL MANUAL D o d g e 1 2 v 6 B T A PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLATION.

EGR Cooler Delete Kit

ASSEMBLY/INSTALLATION INSTRUCTIONS

COLD AIR INTAKE INSTALLATION INSTRUCTIONS. # D Fits: i (4.8L)

BLACKBIRD INSTALLATION SUPPLEMENT

INFINITI Q50/Q60 Red Alpha Heat Exchanger

Crawford Performance Top Mount Air/Oil Separator For 08 STi + Version 2 (S0713-1)

INSTALLATION INSTRUCTIONS Dual Catch Can Kit Subaru Turbo and STi Document# Support:

Exhaust Component Installation for Ford Focus RS PN-60631, 60646

INSTALLATION MANUAL. BULLET PROOF VK Oil Cooler Kit F-SERIES

EXTERNAL OIL FILTER SYSTEM WITH COOLANT FILTER KIT

BD TrackMaster S D o d g e H P C R Installation Instructions

INSTALLATION MANUAL. BULLET PROOF VK Oil Cooler Kit F-SERIES

BD SUPER B SINGLE TURBO KIT Dodge 5.9L Cummins v ISBe (Non 600 motors)

Subaru WRX Performance Charge-Pipe System, 2015+

Water Pump Replacement L61

Installation Manual v2.2: Twin CP3 Fuel Injection Kit Dodge 5.9L

99-04 GT. Hellion Power Systems Mustang GT Kit Instructions

Installation Instructions for Challenger R/T: , , , Charger R/T: , , ,

Please take time to read and understand the following

ENGINE COOLING Click on the applicable bookmark to selected the required model year

Part # 6695S. Read all instructions carefully before attempting installation.

All cores due 30 days after invoice date - no credit after 60 days.

Ford 6.0L Powerstroke Coolant Degas

3 Turbo Downpipe Installation Audi A3 / Volkswagen GTI / Volkswagen Jetta 2.0L FSI/TSI Turbo CD100013

03-04 Mach 1. Hellion Power Systems Mach 1 Kit Instructions

Installation Manual v1.1: Piece Pulse Flow Exhaust Manifold, Stock Replacement L Cummins

91/2 Bulb End Fuel. Low Pressure. Fitting. Low Pressure 12Molded Hose. High Pressure 11Feed Line. Injection Line

Exhaust System Installation PN , , , , &

Installation for Ford F-150 Raptor (V6 Ecoboost) PN s , 60638, 60650*

Thank you for purchasing a Borla Performance Cat-Back Exhaust System.

2016+ NISSAN TITAN XD

Transcription:

Includes: 1. High Flow Turbo Up-Pipe 1. J-Hook Block Off / Coolant Reroute 1. Coolant Hose 1. EGR Valve Block Off Plate 2. Hose Clamps 4. Bolts & Nuts

WARNING: This product is not legal for sale or use on pollution controlled vehicles and is sold ONLY for off-road competition race use only. It is not for sale or use in CARRB regulated areas. This product cannot be used on highway registered vehicles. By purchasing this product, you agree to use it in conform to local, state, and federal laws. The purchaser of this product is responsible for misuse of the product. CAUTION: Never work on a hot vehicle. The hot exhaust system or hot engine can cause serious injury in the form of burns. If the vehicle has been in use or the engine was running and the exhaust system or engine is hot, allow the engine to cool for a minimum of one hour prior to starting the job. Always wear eye protection when working on or under the vehicle. Before removing any of the original parts from your vehicle, please compare the parts you have received with the picture and parts list of the kit you ordered. This assures that you have all the parts necessary for the installation. Prior to disassembly, we suggest applying penetrating fluid, such as PB-Blaster or JB-80 to all exhaust fasteners. Before working on the vehicle, be sure it is parked on a level surface and is chocked to prevent the vehicle from rolling. Please also be sure the keys are removed from the vehicle for your safety. 1: Disconnect the batteries. 2: Drain the coolant below the level of the oil cooler. (No need to drain all the coolant) 3: Remove the clips for plastic wire way located above turbo. Fold onto windshield of truck. 4: Remove the upper fan shroud by prying away from radiator through the slots. 5: Loosen hose clamps and remove the intake tube. Then remove the turbo inlet tube and PCV Valve.

6: Loosen the T bolt clamps and remove the intercooler charge pipe. Then unbolt the alternator and disconnect its wires. 7: Disconnect the downpipe by loosening the v-band clamp from back of turbo and remove the 2 bolts holding the catalytic converter to the downpipe. 8: Remove the turbo by removing the two oil feed line bolts, actuator connector, Y-pipe V-band clamp and the three mounting bolts. The turbo will roll forward toward the passenger side of the truck and off the pedestal. 9: Remove the turbo mounting pedestal and then remove the oil drain tube from the HPOP cover. 10: Remove the exhaust manifold to passenger side up-pipe bolts. The bolts can be discarded. This is easiest to do from underneath the truck. 11: Loosen the driver side Y-pipe to exhaust manifold bolts. You do not need to remove the Y-pipe however it will make install easier if you do. 12: Remove the bolts holding the factory up pipe to the Y-pipe. Loosen the v-band clamp holding the EGR cooler to the passenger side up pipe. Remove the Y-pipe, then remove the factory up pipe which has the V band EGR port. 14: Loosen the intake manifold bolts on the driver s side. Then completely remove the intake manifold bolts from the passenger side and note their location. Then remove the two bolts that go through the inner fan stator which are located under the shroud. Note: If the intake manifold gaskets are deteriorated or if you would like to be on the safe side, now is a good time to remove the intake manifold completely and replace the intake manifold gaskets.

15: Remove the bolt that is used to support the heater tube to the manifold which is located under the alternator. Bend the support tab upward. 16: Remove the three EGR cooler mounting bolts. 17: Push down on the EGR cooler and pull up on the intake manifold to remove the EGR cooler from the intake manifold. 18: Gently hold the manifold up with a pry bar or screw driver. Then move the cooler toward the back of the engine. Holding the manifold up, remove the cooler through the front of the engine. Make sure all the gaskets and O-rings are removed with the EGR cooler. 19: Install the silicone hose onto the new J-hook coolant reroute/ intake block off. Keep the hose clamp rings loose on the hose. 20: Lightly grease the J-hook block off O-ring. Then install it onto the intake manifold. Finger tighten the two long factory cooler mounting bolts. The third smaller bolt can be set aside. 21: Tighten the J-hook block off / reroute bolts to 120 in lbs. Make sure the O-ring stays in place and the alignment is correct. Do not over torque the bolts. Then slide the silicone hose over the oil cooler nipple. Replace intake manifold bolts and torque to 120 in lbs. Then tighten both hose clamps on the silicone hose. 22: Remove the EGR valve from the intake manifold and install the block off plate. Torque bolts to 120 in lbs. If the vehicle throws a code or the check engine light turns on (normally on 2005+), try leaving the factory EGR valve in place or install a programmer. 23: Install the new high flow turbo up pipe using the new hardware and the new replacement gasket.

24: Reinstall the turbo, all intake and exhaust tubes including the down pipe, alternator, shroud, wires etc. in reverse order. Be sure everything is tight and secure. 25: Using manufacturer recommended coolant, refill the coolant. 26: Start the engine and inspect for leaks. If no leaks are present, run the engine until the coolant circulates. Top off the coolant as needed. Do not open the cooling system when hot! Congratulations on your installation! Check out our other Powerstroke parts! KBDieselPerformance.com