NGR NGR NEUTRAL GROUNDING RESISTOR

Similar documents
35-kV Safefront SuperWell Mini-Switch Source Isolated Pad-Mounted Switchgear 50 Amp (Max) Clip-Mounted Current Limiting Fuses

35-kV Safefront 200 Amp SuperWell Primary Capacitor Station Pad-Mounted Outdoor

35-kV Safefront 200 Amp SuperWell Primary Metering Station Pad-Mounted Outdoor

GE 8000-Line Motor Control Centers

15-kV Safefront 200 Amp Primary Capacitor Station Pad-Mounted Outdoor

A. Submit manufacturer's literature and technical data before starting work.

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING

ibusway for Data Center

Specification Pad-Mounted Capacitor Bank with Dual Fusing Integral Load-Interrupter on Line-Side Fuse Mountings

TRINETICS CSD SERIES OIL SWITCH INSTALLATION INSTRUCTIONS

MATERIAL SPECIFICATION ELECTRIC OPERATIONS ORGANIZATION. M3902 ****Supercedes BECo Standard E and ComElectric Spec ****

Installation and Operation

SIEMENS. XJ-L Busway Systems. Storage, Installation and Maintenance Instructions for... Piece No. 32-J Rev 3

INSTRUCTIONS FOR THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 03/05/09 TSEWG TP-11: UFC N BEST PRACTICES

Service Instructions. SYNTRON Rotary Vibrator Screen

15-kV Wall-Mount Switchgear Three-Phase Indoor/Outdoor 600 Amp S&C Mini-Rupter Switch

GUIDELINES ON ELECTRICAL SAFETY AT WORKPLACES

Technical Installation Manual

A. Three-phase, oil filled self-cooled, padmounted transformers are installed outdoors on pads in the EWEB distribution system.

COOPER POWER SERIES. Metal-enclosed capacitor banks installation instructions. Power Capacitors MN230010EN

REFERENCE MANUAL FORM: MX-TRM-E REL REV MTE

MATERIAL STANDARD ELECTRIC OPERATIONS ORGANIZATION. ****Supercedes BECo Standard E and ComElectric Spec ****

FIXED POWER FACTOR CORRECTION EQUIPMENT 5KV CLASS MEDIUM VOLTAGE SECTION Z

Cleaning Flooded Gear

COOPER POWER SERIES. Metal-enclosed, pad-mounted capacitor banks installation instructions. Power Capacitors MN230009EN

CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS THREE-PHASE PADMOUNTED TRANSFORMERS

Solid Dielectric Load Break Switch SPECIFICATION. 25kV, 630A, 4 WAYS, 4 WAYS SWITCHED PADMOUNTED VACUUM LOAD INTERRUPTER

Installation, Operation, and Maintenance of Single-Phase Pad-Mounted Compartmental-Type Distribution Transformers

Indoor or Outdoor 2400 to 14,400 Volts 600 to 14,400 Kvac, 3 Phase, 60 Hz

35-kV Safefront Mini-Switch Source Isolated Pad-Mounted Switchgear 50 Amp (Max) Clip-Mounted Current-Limiting Fuses

15-kV Live Terminal 600 Amp Group Operated Pad-Mounted Metal-Enclosed Outdoor Switchgear 140 Amp (Max) Clip Mount Current-Limiting Fuses

15-kV Safefront Mini-Switch Source Isolated Pad-Mounted Switchgear 140 Amp (Max) Clip-Mounted Current-Limiting Fuses

POWER FACTOR CORRECTION MOTOR LOAD (ML) FIXED CAPACITOR

ME Switchgear with Vacuum Circuit Breaker and Auto-jet II Switch with Ground Position

GP/GPA GROUND FAULT PROTECTION

ELECTRIC SERVICE RULES UTILITY/CATV SERVICES Issued Jan 2016

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5

S&C Source-Transfer Vista Underground Distribution Switchgear

15-kV Safefront 200 Amp Source Isolated Cable Switching Station Pad-Mounted Non-Fusible

15-kV Live Terminal Primary Metering Station Pad-Mounted Outdoor

9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc.

RAMPAGE POWER LIFT RAMP

Val-Matic Air / Oil Hydraulic Panel Pump Control System. Operation, Maintenance and Installation Manual

Transfer Switch TS-50. Owner s Manual

Pro. User Manual. Safe-T-Pull Inc Page 1 of 19

OPERATOR S MANUAL ECB-22 ELECTRIC FORKLIFT WARNING

GTX UNIT SUBSTATION Installation, Maintenance & Operation Manual

Owner s Manual. ELECTRIC WIRE ROPE HOIST and TROLLEY RH SERIES

Installation and Operating Procedures For C&D Technologies TRUE Front Access TEL Series Batteries

CALTRAP INSTALLATION AND OPERATIONS MANUAL

ENGINE STAND MODEL NO: CES560

35-kV Safefront 200 Amp Primary Metering Station Pad-Mounted Outdoor

CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS THREE-PHASE PADMOUNTED TRANSFORMERS

440/880LB ELECTRIC HOIST STF-4488EH

TRANSPORT. Take all the necessary precautions to prevent the load from knocking against the vehicle during transport. - 1/5 -

Installation, Maintenance, and Operation Manual

100 / 110 DRYWELL FUSE SPECIFICATION

Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes

Technical Specification for Pole Mounted Capacitor Rack

Instructions (HI-102) Installation, Operation and Maintenance of Fluid-Filled Overhead Distribution Transformers

INSTRUCTION MANUAL (M A)

2018 Consultant s Handbook Division 26 Electrical 2413 Switchboards

C1000 Series Automatic Cap Bank

70 Series 8700 Coupler 2-pc Hub & Shaft Three Phase Brake Instructions IP43 & IP56 (NEMA 2 & 4) Housing

METERING REQUIREMENTS

OWNERS MANUAL JANUARY 2007 ISO

dv Sentry TM 208V 600V INSTALLATION GUIDE Quick Reference ❶ How to Install Pages 6 14 ❷ Startup/Troubleshooting Pages WARNING

U Series Installation Guide

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

Cleaning Flooded Gear

Albany RR1000. Mechanical Installation Manual. PN: 6410T0029 Version - Rev: 04/23/2014. ASSA ABLOY Entrance Systems

GE Industrial Solutions. DEH Installation and Maintenance Manual AKD-20 AR / Entellisys AR Exhaust Plenum System

SineWave Guardian TM 380V 600V INSTALLATION GUIDE. Quick Reference. ❶ How to Install Pages 6 17 ❷ Startup/Troubleshooting Pages WARNING

Owner s Manual Gantry Cranes

MGV (Marshall TM Guv'nor TM Replica) Instructions

OPERATOR S MANUAL 7(5 & ( 8&. $5.00 P/N REV.B

TRANSMISSION SYSTEMS

Installation Instructions LINK---C

Issued Revised Approved Reviewed October 31, 1984 October 22, 2002 J. Ross J. Fuller

70 Series 8700 End Mount Three Phase Brake Instructions IP56 (NEMA 4) Housing

9. Non-Residential Services (Commercial, Industrial, and Agricultural)

LV Capacitor CLMD03 Power Module Instruction manual

GPA 13.8 kv Semi-Annual Slip Ring PM, Sav 10-41

Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers

OVERHEAD SERVICE. Items to consider

MSW020/025-E [A895]; MPB040-E [B827]; MPW045-E [B802]; MPW050-E [C802] PART NO YRM

Operation and Maintenance Manual. MNS-SG Low Voltage, Metal-Enclosed, Drawout Switchgear

GVX BATTERY CABINET. Installation documents. for. Electrical integration. Battery installation. Shipping and onsite installation

INSTALLATION AND SERVICE INSTRUCTIONS FOR 2000 SERIES FLAMEPROOF XENON AND FLUORESCENT BEACONS

U-18. Company furnishes and installs: 10. Service lateral and connectors. 11. Conduit package, Amperes.

MASTERCLAD Metal-Clad Indoor Switchgear

University of Houston Master Construction Specifications Insert Project Name

Lincoln Hoist. Web Hoist Operating Manual. Lincoln Hoist

D.A.T. Single-phase Voltage Regulator. --o-- Complying with EDF specifications HM-76/99/047/B, of 10/10/ o-- Doc. : DAT\GUI-J13-UK\S230

Swing-Flex Check Valve

Transfer Switch GPTS 30

CIVACON GROUND VERIFICATION RACK MONITOR SYSTEM and ASSOCIATED EQUIPMENT

COOPER POWER SERIES. Instructions for oil-filled, single-phase overhead distribution transformers. Distribution Transformers MN201003EN

Swing-Flex Check Valve

Transcription:

NGR NGR NEUTRAL GROUNDING RESISTOR Installation and Maintenance Instruction Manual C-100EM, September 2014

NEUTRAL GROUNDING RESISTORS WARNING Neutral Grounding (Earthing) resistors, like all high voltage electrical apparatus, can pose a danger to life or health if operated without adequate safety precautions. They should only be installed or maintained by personnel who are trained in high voltage electrical installations. All electrical equipment, including neutral grounding resistors, should be disconnected from the electrical supply, the disconnecting switch should be locked out and the equipment should be grounded during any service or maintenance operation. TABLE OF CONTENTS 1. Shipping...3 2. Receiving...4 3. Installation...5 4. Inspection...6 5. Neutral Connection...7 6. Ground Connection...7 7. Maintenance...7 8. FIgures...8 PHOTOS FIGURES Photo #1: I-Gard NGR (upright position)...3 Photo #2: I-Gard NGR being handles with a hand truck...3 Photo #3: Ceramic bushing packaged separately and secured inside the enclosure..3 Photo #4: Bushing Assembly step 1...3 Photo #5: Bushing Assembly step 2...4 Photo #6: Bushing Assembly step 3...4 Photo #7: Bushing Assembly step 4...4 Photo #8: Bushing Assembly step 5...4 Photo #9: Bushing Assembly step 6...4 Photo #10: 11/16 holes provided at each enclosure frame leg Figure A Neutral Connection Options...8 Figure B Neutral Connection Options...9 Figure C Neutral Connection Options...9 Figure D Ground Connection Options...10 Figure E Ground Connection Options...10 Figure F Ground Connection Options...11 Figure G Ground Connection Options...11 2

1. SHIPPING I-Gard Neutral Grounding Resistors are shipped in their normal,upright position. The units are securely fastened to wooden skids. In cases where additional support to the resistor banks is required during shipment, wooden or haysite bracing material is used inside the resistor enclosure. In such cases, a sign indicating the removal of these supports before energizing is placed outside the enclosure. Photo #1: I-Gard NGR (upright position) All crated resistors are clearly marked with shipping information including customer s purchase number, tags and/or special instructions. The finished crates are easily handled with a forklift or hand trucks and normally loaded into covered truckvans by hand truck. Photo #2: I-Gard NGR being handled with a hand truck The Neutral Grounding (Earthing) Resistors have been properly tested prior to shipping. The test report is attached to the documentation accompanying the enclosure. The neutral bushing could have been shipped in a separate package to avoid possible damage during shipping. In that case the ceramic bushing is, placed and secured inside the enclosure. Photo #3: Ceramic bushing packaged separately and secured inside the enclosure Photo #4: Bushing Assembly Step 1 To install the Neutral Bushing, proceed to un-pack the bushing ensuring it is in good condition, should the ceramic be cracked the bushing will need to be replaced. The bushing assembly has four (4) main components, the Bushing itself, the top rubber gasket, the back bracket and the holding spring. 3

Photo #5: Bushing Assembly Step 2 Photo #6: Bushing Assembly Step 3 Photo #7: Bushing Assembly Step 4 Place the gasket on the top side of the enclosure prior to inserting the bushing. Insert the bushing from the top. From inside the enclosure, insert the back bracket from the lower end of the bushing. Photo #8: Bushing Assembly Step 5 Followed by the holding spring. Ensure to set the holding spring in the grove prior to tightening the bolts on the back bracket. Photo #9: Bushing Assembly Step 6 Prior to tightening the back bracket, ensure that the gasket is well positioned and that the bushing sits exactly on top of it, then tighten the bracket. 2. RECEIVING Once delivered, the crated resistor should be unloaded and moved by forklift. Heavier and bulkier units may also be unloaded with a crane. Four lifting eyebolts are provided in each top corner of the equipment. At this point, a visual inspection of the crate should be made to ensure proper handling has been practiced during shipment. It is recommended that the unit remains crated until it reaches the job site. I-Gard crated Neutral Grounding (Earthing) Resistors are suitable for prolonged storage. They should however be stored upright as shipped. 4

3. INSTALLATION Upon receipt of the equipment at the job site, proceed to uncrate the resistor and remove the skid fasteners. Extra care should be taken while uncrating in order not to damage the ceramic insulation bushings or the enclosure. Once all the crating and covering material have been removed, the resistor is ready for installation. It is recommended that a hoisting device is used to lift the unit with the aid of the eyebolts provided on top of the enclosure. If a hoisting device is not available, a forklift may be used, provided the forks rest against the steel angles and not the screen. I-Gard Neutral Grounding (Earthing) Resistor may be mounted on a concrete pad, support brackets, support stands or directly on top of the transformer. In all cases the resistor must be mounted horizontally. PHOTO #10: 11/16 holes provided at each enclosure frame leg The unit should be bolted to the mounting surface using the 11/16 holes provided at each enclosure frame leg. NOTES: It is recommended that all the bracing material inside the enclosure remain intact until the unit is installed Ensure that the enclosure is securely bonded to ground through the 9/16 hole provided on one of the enclosure legs. Should you require a special dimension or a different mounting arrangement I-Gard may customize the equipment to suit your specific needs. 5

4. INSPECTION Once the unit has been mounted and grounded, proceed to remove any of the side covers (except covers supporting an entrance bushing) for inspection and wiring. All the bracing material inside the resistor bank (if used) and other packing material, such as envelopes containing drawings and test reports, must be removed. With all the packing material and envelopes removed, carefully proceed to inspect for insulators, bushings and other parts that may have been damaged in transit. Should the resistor show damage during transportation, a claim should be processed with the transportation company immediately. I-Gard should be advised to rush and order for substitute parts. Ensure that all the electrical connections are torqued as follows: SOCKET SIZE (across flats, in torque) TIGHTENING NEWTON (metres) inches mm Foot-Pound Newton-Metres 5/32 3.97mm 0.96 ft-lb 1.3 N-m 3/16 4.76mm 10.03 ft-lb 13.6 N-m 7/32 5.56mm 12.54 ft-lb 17.0 N-m 1/4 6.35mm 14.60 ft-lb 19.8 N-m 5/16 7.94mm 20.87 ft-lb 28.3 N-m 3/8 9.52mm 29.13 ft-lb 39.5 N-m 1/2 12.7mm 37.47 ft-lb 50.8 N-m 9/16 14.29mm 50 ft-lb 67.8 N-m If the neutral bushing was shipped in a separate packaged, it should be installed at this point. NOTE: Do not energize the unit if damaged parts are found, in order not to damage the resistor and cause shock hazard to personnel. 6

5. NEUTRAL CONNECTION Ensure that the unit is disconnected, according to local safety procedures. The neutral wire from the transformer or generator may be connected to the resistor as follows: A. By way of entrance bushing mounted on top or side of resistor enclosure. The bushing may have an eyebolt connector or a two hole or four hole NEMA pad type connector. (See Fig. A ) B. By way of tin plated copper bus mounted on standoff placed on the resistor bank frame or enclosure bottom. (See Fig. B ) C. Through a current transformer primary. With the other primary connected at the factory to the resistor N. The Current Transformer could be mounted inside the enclosure housing the resistor or in a separate connection box. (See Fig. C ) All connections are to be labeled accordingly N Neutral, G Ground (Earth). 6. GROUND CONNECTION The ground wire from the resistor to ground may be connected as follows: D. By way of tin plated copper bus mounted on standoffs placed on the resistor frame or enclosure bottom. (See Fig. D ) E. By way of two hole NEMA pad mounted on one leg of the resistor enclosure with one side connected to the resistor element at factory. (See Fig. E ) F. By way of entrance bushing mounted on top or side of resistor enclosure. (See Fig. F ) All connections are to be labeled accordingly N Neutral, G Ground (Earth). 7. MAINTENANCE Periodic inspections for cleaning and detecting any damage are needed to ensure that the resistor will perform to protect the electrical system. Damage may occur from lightning, storms, earthquakes, wildlife, overloads or extended service life. I. The following procedure is recommended for periodic inspection: 1. Disconnect and Isolate the electrical system being grounded through the Neutral Grounding (Earthing) Resistors and open the connection between the system neutral and Neutral Grounding Resistor. 2. Remove all the side covers (except covers supporting an entrance bushing) to allow a visual inspection of all the parts. 3. Check for cracked insulators or bushings. A Megger or Hi-Pot Test is the most reliable method of ensuring the integrity of electrical insulation. 7

I-Gard standard Hi-Pot test is performed at two times the rated voltage plus1000 volts during 60 seconds. 4. Check the resistive element for continuity. An ohmmeter reading between the neutral and ground side of the resistor should be within 10% of nameplate value. If reading found to be higher or lower than 10%, the resistor must be changed. 5. Check all the internal connections for tightness. 6. Check the wiring for signs of damage from heat or overloads. 7. Check the enclosure for signs of damage from weather or rodents. 8. In environments where there may be excessive or metallic dust, a yearly power wash is recommended. IF THE UNIT IS POWER WASHED, THE UNIT MUST BE DISCONNECTED FROM THE POWER SOURCE FIRST. Safety glasses should be worn while cleaning. In addition the unit must be completely dry before reconnecting to the power source. 9. For replacement or further information, call I-Gard Corp. toll free at 1 888 737-4787, or visit our web site www.i-gard.com to find your closest I-Gard representative. 8. FIGURES 8 Figure A. Neutral Grounding Resistor to Transformer Neutral Connection Using Entrance Bushing

Figure B. Neutral Grounding Resistor to Transformer Neutral Connection Using Internally Mounted Copper Bus Figure C. Neutral Grounding Resistor to T6A sensor 9

Figure D. Neutral Grounding Resistor to Ground Connection Using Internally Mounted Copper Bus Figure E. Neutral Grounding Resistor to Ground Connection 10

Figure F. Neutral Grounding Resistor to Ground Connection Using Entrance Bushing Figure G. Standard Low Voltage, Neutral Grounding resistor drawing (sample) 11

Phone: 905-673-1553 Toll Free: 1-888-737-4787 Fax: 905-673-8472 sales@i-gard.com www.i-gard.com