Installation and Maintenance Manual CEMLINE CORPORATION

Similar documents
Installation and Maintenance Manual CEMLINE CORPORATION

CEMLINE CORPORATION P. O. BOX 55 CHESWICK, PENNSYLVANIA Phone: (724) FAX (724)

CEMLINE CORPORATION P. O. BOX 55 CHESWICK, PENNSYLVANIA Phone: (724) FAX (724)

CEMLINE CORPORATION P. O. BOX 55 CHESWICK, PENNSYLVANIA Phone: (724) FAX (724)

JST Series. Cemline STONESTEEL Jacketed Storage Tanks

Installation, Operation, and Maintenance Manual CEMLINE CORPORATION

Submerged Heating Coil

Installation, Operation, and Maintenance Manual CEMLINE CORPORATION

EC4 SERIES CRYOGENIC VALVES 1/4 2 Sizes

2001 SERIES CRYOGENIC BAR STOCK BODY VALVES

GL Ludemann Y-Strainers

SMALL FLOW AIRMATE PRESSURE REDUCING VALVES AND AIR LOADERS CLASSES A-2, AG-2, AF-2, AFG-2, ETC.

SV HIGH VACUUM (Positive Relief) SEAL-OFF VALVE 1 Inch Size

Installation Manual DIAPHRAGM WELL TANK

TRAILER INSTALLATION INSTRUCTIONS

INSTRUCTION MANUAL AND PARTS LIST FOR 3E CANNED MOTOR PUMPS

BIG BLASTER XHV Air Cannon Retrofit with MARTIN TORNADO Exhaust Valve

INSTRUCTION MANUAL. Anchor Darling 1878 Swing Check Valves. Installation Operation Maintenance. Sizes 1/2 through 2 FCD ADENIM

Martin Tornado Retrofit Valve

Owner s Manual GLASSLINED PUMP TANK

Quick Opening Closure Operating Instructions

BIG BLASTER XHV Air Cannon Retrofit Kit Installation Instructions

MAINTENANCE GUIDELINES FOR NIBCO ¼ THROUGH 3 CLASS 125, 150, 200 & 300 BRONZE SWING CHECK VALVES FIGURE NUMBERS

LEVEL CONTROLS 313 IOM

ACHL Series Pump. Operation and Maintenance Manual Air Driven, Hand Operated High Pressure Liquid Pump

Installation, Operation, and Maintenance Manual

Installation, Operation, and Maintenance Manual

Bray/ VAAS Slurry Series Knife Gate Valve 760/762/765/766/767/768 Series Operation and Maintenance Manual

Full View Flow Indicator

Air Curtain. Installation, Operating and Maintenance Instructions

ATMOSPHERIC RELIEF VALVE

TECHNICAL SERVICE MANUAL

PRODUCT OBSOLETED 4Q16

TITAN FLOW CONTROL, INC.

Technical Manual. DLM Module. This manual should remain with the unit.

Pressure Relief Valve Maintenance Manual

1000-LB. MOTORCYCLE LIFT TABLE OWNER S MANUAL

APCO CRF-100A RUBBER FLAPPER SWING CHECK VALVES

OPERATIONS MANUAL MODEL MT-500

INSTALLATION MANUAL TBH/TBV BELT DRIVE BLOWER-COIL UNITS HORIZONTAL. Redefine your comfort zone.

BOILER FEED SYSTEM OPERATION AND MAINTENANCE MANUAL

Drilling Series SC Series Cellular Suction Stabilizers Instruction, Operating & Maintenance Manual

National Board Update

A. American National Standards Institute: 1. ANSI Z Relief Valves for Hot Water Supply Systems.

ORIGINAL INSTRUCTIONS G715A. Pneumatic-hydraulic Riveter E. Warner Ave Santa Ana, CA

APCO ASR-400/450 SEWAGE AIR RELEASE VALVES

Owner's Manual. GenReady Load Center and Transfer Switch. This manual should remain with the unit. Model Numbers. GenReady Basic Panelboard

Installation and Operation Manual

I-VIC300MS. Vic -300 MasterSeal Butterfly Valves WARNING SERIES 761

SD Bendix M-21 and M-22 AntiLock Modulator Assembly DESCRIPTION M-21 MODULATOR M-22 MODULATOR

IMPORTANT!!!! Read this manual before attempting any installation, wiring or operation.

LIL GATOR TYPE VLG CONTROL VALVE SIZES ½ THROUGH 2

UNIFLO Control Valve

Armstrong Double Duty 6 Steam Trap/Pump Combination Installation and Maintenance

TYPE 200 IOM - VACUUM BREAKER

Table of Contents General Information Safety Message Classifi cation...2 Safety Notes...3 Terminology...4 Coupler Lifting Lug...

Hydronic Corporation

GM WD P/U 6-LUG, AND ½ TON SUV S (CLASSIC BODY) W/ TORSION BARS SUSPENSION LIFT KIT KIT# TM106

Manifold-Mounted to Flange-Mounted Solenoid Valve Conversion

Includes electric operated valve Pressure gauge with siphon, vacuum breaker and air vent BOILER UNITS

Herpteraium SECTION VALVES GENERAL

Type 644 and 645 Differential Pressure Pump Governors

COOPER POWER SERIES. RTE EL-BAY-O-NET FUSE Re-Fusing Instructions. Fusing Equipment MN132024EN

SECTION GENERAL-SERVICE AIR COMPRESSOR PART 1 - GENERAL

Owner's/Installation Manual

Nor East. Instructions Safety Messages. Inspection. Parts. DeZURIK Service. Type 05 Pneumatic Actuator Used With Globe Valves

USER INSTRUCTIONS. Kämmer SmallFlow - Series / Low and Micro Flow Valves. Installation Operation Maintenance. Experience In Motion

Safety relief valves and double stop valves, type SFVL and DSVL REFRIGERATION AND AIR CONDITIONING. Technical leaflet

Installation and Operation Manual for VMAC Accessory A / A Air Receiver Tanks

INSTALLATION INSTRUCTIONS

TECHNICAL SERVICE MANUAL

Presoak & Tire/Engine Cleaner Systems (Air Pump) DU TC_A & DU PS_A

F-4600 INLINE ULTRASONIC FLOW METER Installation and Operation Guide

Instruction Manual. Keofitt Aseptic Membrane Sampling Valve IM70783-GB

YETTER MANUFACTURING CO. FOUNDED 1930 Colchester, IL Toll free: 800/ / (Fax) Website:

FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units

for ½" thru 2" 800 lb. Piston Lift Check Valves with Resilient Seat Option

DKLO D1 & D4 CONTROL VALVE Sizes ½ through 4 ANSI CLASS 125/250 TABLE OF CONTENTS

INSTALLATION AND OPERATION MANUAL

MODEL G300 BRAKE BLEEDER

4-Hour. Rapid Charger. for AA/AAA NiMH & NiCd Rechargeable Batteries. Owner's Manual

Slide Gates INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS. 295-E-002 Effective

Installation, Maintenance, & Repair Series 995 Reduced Pressure Zone Backflow Preventers

Baumann 24000C Carbon Steel Little Scotty Control Valve Instructions

Baumann Way Control Valve

Owner s Manual & Safety Instructions

PRODUCT SERVICE MANUAL. BK6DHZ(C)-250, 275, 312 and 400 PUMPS

Horizontal Pre-Piped Bladder Tanks with Proportioner

Universal Bevel Drives Service Manual

TITAN FLOW CONTROL, INC.

Railroad Ball Valves Series 5REB3

A. This Section includes general duty valves common to several HVAC piping systems.

INSTRUCTION MANUAL RECTANGULAR BUTTERFLY VALVE 3-SIDED SEAT

TStrainers. Applications. Pressures to 3705 PSIG Temperatures to 800ºF FEATURES MATERIALS END CONNECTIONS SIZES RATINGS

DRAIN WATER TEMPERING KIT

IMPORTANT ATTENTION INSTALLERS:

THE WARRANTY SET FORTH HEREIN IS GIVEN EXPRESSLY AND IS THE ONLY WARRANTY GIVEN BY THE COMPANY WITH RESPECT TO THE PRODUCT.

1. Contents 1. CONTENTS INTRODUCTION SAFETY WARNINGS POWER TILT STANDARD OPERATING INSTRUCTIONS... 5.

Vertical Pre-Piped Bladder Tanks with Proportioner

Biogas safety control equipment

Transcription:

$5.00 Installation and Maintenance Manual CEMLINE CORPORATION STONESTEEL Tanks Horizontal STONESTEEL Tanks Vertical STONESTEEL Tanks CEMLINE CORPORATION P. O. Box 55, Cheswick, PA, 15024 Phone: (724) 274-5430 FAX (724) 274-5448 www.cemline.com

Table of Contents Section Page Disclaimers...1 General Information...1 Construction...1 Contact Information...2 General Notes and Warnings...2 Notes...2 Warnings...3 Installation...4 Transporting and Unpacking the Tank...4 Examining the Tank...4 Mounting the Tank...4 Connecting a Pressure Relief Valve...5 Connecting Components to the Tank...5 Inspection...5 Maintenance...6 Removal of Sediment Buildup in the Tank...6 Repairing Leaking Fittings...6 Inspection of the Interior of the Tank and Lining...7 2005 Cemline Corporation. All Rights Reserved. All trademarks in this manual are property of Cemline Corporation, unless otherwise noted or in any other way set forth as a third party rights. Unauthorized use of these trademarks, as well as the materials presented in this manual, is expressly prohibited and constitutes a violation of the intellectual property rights of Cemline Corporation. I

Disclaimers This Installation and Maintenance Manual is intended to be as complete and up to date as possible. It covers the installation and maintenance procedures for CEMLINE CORPORATION's STONESTEEL Tanks. CEMLINE reserves the right to update this manual and other product information, concerning installation and maintenance, at any time and without obligation to notify product owners of such changes. CEMLINE is not responsible for damage to the tank as a result of improper installation or maintenance of the tank. In addition, CEMLINE is not responsible for damage to the tank caused by the improper installation, maintenance, or operation of components connected to the tank by the owner. All add-on components should be verified for operation within tank design specifications before installation and utilization. CEMLINE CORPORATION is not responsible for injury to personnel or product damage due to the improper installation or maintenance of CEMLINE STONESTEEL Tanks. All installation and maintenance procedures should only be performed by trained / certified personnel. All personnel performing these procedures should completely and carefully read and understand all supplied materials before attempting the procedures detailed in this manual. All personnel should pay strict attention to all Notes, Cautions, and Warnings that appear within this manual. CEMLINE CORPORATION welcomes user input as to suggestions for product or manual improvement. General Information This Installation and Maintenance Manual is designed as a procedural guide for all CEMLINE CORPORATION STONESTEEL Tanks. Covered in this manual are: STONESTEEL Horizontal Tanks; and STONESTEEL Vertical Tanks. Construction All CEMLINE STONESTEEL Tanks are constructed from superior materials and utilize only the highest quality materials. Each STONESTEEL Tank meets or exceeds all applicable American Society of Mechanical Engineers (A.S.M.E.) Code regulations. Each STONESTEEL Tank is designed and constructed in strict accordance with the latest A.S.M.E. Code regulations, stamped in accordance with the applicable section of the A.S.M.E. Code, and accompanied by the applicable Certificates. Each tank is manufactured using pressure vessel quality plate and welded by certified welders. All tanks are registered with the National Board of Boiler and Pressure Vessel Inspectors. STONESTEEL Tanks are lined with hydraulic cement, using the exclusive CEMLINE patented process. This time proven process prevents rust and corrosion, common to metal tanks, and helps guarantee exceptionally long life. 1

Contact Information For information concerning warranty information, or for questions pertaining to the installation or maintenance of CEMLINE STONESTEEL Tanks, contact: Notes CEMLINE CORPORATION P. O. Box 55 Cheswick, PA 15024 www.cemline.com USA Phone: (724) 274-5430 Toll Free: (800) 245-6268 USA Fax: (724) 274-5448 General Notes and Warnings This manual is intended to detail installation and maintenance procedures for CEMLINE CORPORATION STONESTEEL Tanks. Since each unit is built to meet customer specifications, instructions may seem general in nature at times. If questions are not answered by this manual, or if specific installation or maintenance procedures are not clearly understood, contact CEMLINE CORPORATION for clarification before proceeding. All installation and maintenance procedures should be performed only by experienced, trained, and certified personnel. Personnel should be trained in correct piping procedures and methods, and should be experienced in working with steam, boiler water, high temperature water, and high pressure systems. CEMLINE CORPORATION has no control over the use of STONESTEEL Tanks or the type of system into which they may be integrated. Depending on the system in which the tank has been installed, the possibility for bodily injury or death may be present if the system is not properly prepared for maintenance procedures. If any of the following elements apply to the system, follow all accepted / recommended practices, and use common sense before attempting any maintenance procedures. 1. Steam 2. High Temperature or Boiler Water 3. Connected Energy Source 4. Connected Power Source 5. Pressurized System 6. Any Combination of the Above CEMLINE STONESTEEL Tanks are designed for indoor use only, unless otherwise required by design specifications. Each unit requires at least two feet (2') of clearance around and above the unit. It should be located on a level surface (no more than one-half degree [½º] of slope), capable of supporting the total weight of the unit when filled to capacity. The tank should be mounted to the floor following applicable architectural and local code requirements for the specific installation site. 2

In areas prone to seismic activity, it is recommended that the tank be mounted to the floor according to recommended procedures and codes for the site / location, to make it less susceptible to seismic damage. Inspection procedures and periodic maintenance, as well as suggested intervals, are detailed on pages 5 to 8 of this manual. CEMLINE STONESTEEL Tanks are available in a wide range of operating pressures. For the specific design range for your tank, refer to the design specifications. The maximum rated working pressure is also stamped on the tank for quick reference. If the tank is damaged during installation or maintenance, contact CEMLINE CORPORATION for instructions. For all piping connections, the use and / or type of joint compound or sealer should be determined by referring to local codes, accepted standards, and / or the requirements of the installing contractor. An A.S.M.E. approved pressure, or pressure / temperature relief valve, rated higher than the maximum heat in Btu / hr must be installed. The valve should have a pressure setting no higher than the maximum design pressure of the tank. Warnings As with any tank designed for use as a pressure vessel, the potential exists for severe personal injury if proper installation and maintenance procedures are not followed. Listed below are specific warnings pertaining to CEMLINE STONESTEEL Tanks. In addition, throughout this manual, warnings are restated when procedures are described pertaining to areas of potential danger. All warnings should be carefully read and understood. All precautions contained in the warnings should be carefully followed to reduce the chance of injury. Throughout this manual, warnings will be denoted by the symbol. In addition, most components which will be connected to the tank by the purchaser, will be accompanied by their own documentation. This documentation may contain warnings specific to the component. It is strongly recommended that each document be reviewed before attempting any installation or maintenance procedures. Areas of potential danger: 1. all inlet and outlet lines, joints, and valves; 2. all pressure regulators; 3. all power connections and cables; 4. all energy lines, joints, and valves; and 5. all pneumatic (instrument air) lines and joints. Before attempting any installation or maintenance procedure: 1. assure that any energy source connected to the system has been turned off; 3

2. if the unit has been in operation, allow the water in the tank, as well as all components and surfaces, to cool before starting the procedure; 3. assure that all power has been shut off / disconnected before attempting any procedures; and 4. assure that all inlet and outlet lines have been turned off at the manual shutoff valves. If the tank will be used for holding hot water, it can present a very dangerous situation due to the fact it is under pressure and at very high temperatures. To avoid possible injury or death, use common sense and follow all accepted / recommended procedures when performing installation and maintenance procedures. If both electricity and water / steam are to be used in the system, the combination can pose a very dangerous situation. Assure that all power has been shut off and disconnected before attempting any installation or maintenance procedures. Installation Transporting and Unpacking the Tank Most CEMLINE CORPORATION STONESTEEL Tanks are not crated at the factory. Larger tanks are shipped with lifting lugs attached to provide a safe means for lifting and moving the unit. The tank should only be lifted by the lifting lugs provided. Improper lifting of the tank may result in damage to the unit. Care should be taken not to "drop" or damage the tank during transport and unpacking. This could result in damage to the hydraulic cement lining of the tank. Location Requirements CEMLINE STONESTEEL Tanks are designed for indoor use only, and require at least two feet (2') of clearance around and above the unit, unless otherwise required by the design specifications. The tank should be located on a level surface (no more than one-half degree [½º] of slope), capable of supporting the total weight of the tank when filled to capacity. Examining the Tank After the tank has been set in place and uncrated (if necessary), it should be carefully examined to assure that it was not damaged during shipping. If any evidence of damage is detected that could affect the tank, contact CEMLINE CORPORATION, or your authorized sales representative, to report the damage and to receive instructions on how to proceed. Mounting the Tank The tank should be mounted to the floor, following applicable architectural / local code requirements, or accepted standards for the specific installation site and for the tank purchased. In areas prone to seismic activity, it is recommended that the tank be mounted to the floor, according to recommended procedures for the site, to make it less susceptible to damage from seismic activity. 4

Connecting a Pressure Relief Valve Each STONESTEEL Tank has been built to exact customer specifications. An A.S.M.E. approved pressure or pressure / temperature relief valve must be installed in the tank. While the pressure rating of the valve can be lower, it must not exceed the working pressure of the tank. The working pressure of each tank is listed on the Submittal Sheet and stamped on the data plate attached to the tank for reference. Installing a pressure relief valve that is rated for a higher pressure then the working pressure of the tank will create a potentially dangerous situation. The pressure relief valve must not exceed the working pressure of the tank and should be installed following all accepted / recommended procedures to avoid possible injury or death. For all piping connections, the use and / or type of joint compound or sealer on the joint should be determined by referring to local codes, accepted practices, or the requirements of the installing contractor. Connecting Components to the Tank Care should be taken when connecting any component(s) to the tank. Each component should be carefully mounted to the appropriate fitting and properly aligned before tightening. For all piping connections, the use and / or type of joint compound or sealer on the joint should be determined by referring to local codes, accepted practices, or the requirements of the installing contractor. After the tank is filled, each fitting should be examined to assure that no leaks are present. Leakage at fittings can cause the outside of tank to rust, effectively shortening the life of the tank. Inspection Because of the superior design and construction of CEMLINE STONESTEEL Tanks, very little is required in the way of inspection or maintenance. The following table identifies the three (3) inspections that are recommended and their suggested frequency. Recommended Inspections To Be Inspected Sediment Buildup in Tank Leaks at Fittings Tank Interior and Lining Time Interval Each Month. Every Three (3) Years If any problems are detected during inspections, refer to the Maintenance section (page 6) for specific actions and instructions. 5

Maintenance The information contained in this section will detail maintenance procedures suggested for all CEMLINE STONESTEEL Tanks. Remember, this manual serves all CEMLINE STONESTEEL Tanks. Therefore, the maintenance procedures may be general in some instances. If there are any questions concerning maintenance procedures that are not clearly explained in this manual, contact CEMLINE CORPORATION. Be sure to have the serial number of the tank available before making contact. CEMLINE CORPORATION has no control over the use of STONESTEEL Tanks or the type of system into which they may be integrated. Depending on the system in which the tank has been installed, the possibility for bodily injury or death may be present if the system is not properly prepared for maintenance procedures. If any of the following elements apply to the system, follow all accepted / recommended practices, and use common sense before attempting any maintenance procedure. 1. Steam 2. High Temperature or Boiler Water 3. Connected Energy Source 4. Connected Power Source 5. Pressurized Systems 6. Any Combination of the Above Removal of Sediment Buildup in the Tank Each month, it is recommended that the tank be "drained down" to remove any sediment that has accumulated in the tank. To drain down the tank, follow the steps detailed below. 1. Be sure the drain line is piped to floor drain and that any water from the tank will go into the floor drain. If the system is under pressure, relieve the pressure from the tank via the pressure relief valve. 2. After assuring that step 1 has been completed, and any other special circumstances present within the system have been addressed in an accepted / recommended manner, open the drain valve on the bottom of the tank. 3. Allow the contents of the tank to drain until no evidence of sediment is present. 4. Close the drain and return it to operation within the system. Repairing Leaking Fittings If leaks are detected at any of the fittings in the tank, follow the steps detailed below to correct the leak. 1. Isolate the tank from the system in which it is installed. 2. If the system is under pressure, relieve the pressure from the tank via the pressure relief valve. 3. If the system operates at a high temperature, allow time for the tank, its contents, and all components to cool. 6

4. After assuring that steps 1 through 3 above, have been completed, and any other special circumstances present within the system have been addressed in an accepted / recommended manner, open the drain valve on the bottom of the tank. 5. Allow the contents of the tank to drain until the fluid level is below the level of the leaking fitting. 6. Break the joint at the fitting. 7. Inspect both the threads of the fitting and the pipe for signs of damage. If damage is found, either rethread or replace the damaged component. 8. If no damage is detected, thoroughly clean the threads of both the fitting and pipe. 9. Insert the pipe into the fitting and carefully tighten. For all piping connections, the use and / or type of joint compound or sealer on the joint should be determined by referring to local codes, accepted practices, or the requirements of the installing contractor. 10. Close the drain and refill the tank. As the tank is filling, inspect the fitting for any signs of leakage. 11. If no signs of leakage are detected, return the tank to operation within the system. After the tank has been returned to operation, and the system has had time to return to normal operation, reinspect the fitting for leakage. Inspection of the Interior of the Tank and Lining It is recommend that every three (3) years the interior of the tank and lining be inspected. On larger STONESTEEL Tanks, a "manhole" is supplied to allow this inspection. To inspect the interior of the tank and lining, follow the steps detailed below. 1. Isolate the tank from the system in which is installed. 2. If the system is under pressure, relieve the pressure from the tank via the pressure relief valve. 3. If the system operates at a high temperature, allow time for the tank, its contents, and all components to cool. 4. After assuring that steps 1 through 3 above, have been completed, and any other special circumstances present within the system have been addressed in an accepted / recommended manner, open the drain valve on the bottom of the tank. 5. Allow the contents of the tank to drain completely. 6. Break the bolts securing the manhole cover to the tank. Do not allow the manhole to fall into the tank. If the manhole falls into the tank during removal or replacement, the interior and lining of the tank may be damaged. 7. Remove the manhole cover from the tank. 7

8. Inspect the interior of the tank and lining. If any damage or corrosion is detected, contact CEMLINE CORPORATION to arrange for on-site repairs. If no damage or corrosion is detected, continue with the following steps. 9. Thoroughly clean the mounting surfaces of both the manhole cover and mounting ring. 10. Install a new gasket. Gaskets for all STONESTEEL Tanks are available from CEMLINE CORPORATION. 11. After assuring that the manhole is correctly aligned, proceed with tightening the bolt(s) holding the manhole cover to the tank. 12. Fill the tank and check for leaks at the manhole cover. 8