Press Release. Conductix-Wampfler Electrifies Colombian Container Terminal TCBuen

Similar documents
E-RTG TM RTG Electrification

E-RTG TM RTG Electrification

Energy & Data Transmission Systems for Container Handling Equipment

Press Release. 12-meter Electric Bus in Regular Service with Inductive Opportunity Charging

1 Product Description Check of the supplied Parts Notes Intended Use Current Collector... 3

Cost Efficient Conductor Bar Solutions for Port Equipment

Press release. Field Test on Wireless Charging of Electric Vehicles by Daimler and Conductix-Wampfler

ELECTRIFICATION OF RTG CRANES

ertg DRIVE IN / OUT System STEMMANN - APPLICATIONS ELECTRIFICATION OF RUBBER-TYRED GANTRY CRANES

ZPMC Lanka Company (Pvt) Ltd

Product Overview Festoon-Systems for I-Beams

Product Overview Conductor Rails

1 Product Description System Layout Safety Instructions Intended Use Installation... 3

PowerGuard Electrification Isolation Solutions

ELECTRIP: DEUTZ demonstrates electric drive systems in actual use

GPA s ertg Demonstration Project

Energy Supply Systems

The future starts here - Proven solutions for smart buildings and intelligent infrastructure. June 16, 2015

AVL S NEW APPROACH FOR ELECTRIFIED UTILITY VEHICLES Solution Portfolio. Public

Off-Highway Drive and Motion Technologies Deck Cranes. Brevini motion systems from Dana for deck crane applications

A BRAND-NEW LIFT FOR YOUR BUILDING

KALMAR E-ONE UNCOMPROMISING, GREEN AND PRODUCTIVE

Kalmar Crane Upgrades a way to extend port cranes life

Product Overview Inductive Power Transfer IPT

ZF TRW Highlights Why Automated Driving Starts with Safety at the Tokyo Motor Show

We move your business!

ZF shows the latest innovations of the wind industry at the Hanover Fair 2015

Energy Supply Systems

STEMMANN APPLICATIONS ENGLISCH

QuickBridge TM. Modern Overhead Crane Bridge Electrification

Product Overview I-Beam Festoon Systems

Joslyn Clark Controls, Inc. Simple, Safe, Retrofit Programs to Significantly Extend Life of Existing Circuit Breakers

1 Product Description System Layout Safety Instructions Intended Use Installation... 3

The path to electrification. April 11, 2018

Charge up in Control MENNEKES Load Management. Intelligent charge and load management for operational safety and cost control

ABB in primary aluminium From mine to market

Underwater Remotely Operated Vehicles (ROV) Drive & Dive Motion Solutions

Pillar and wall-mounted slewing jibs and cranes. Workplace efficiency improvement with the Demag crane range

Multipole Conductor Rail MultiLine Program 0831

Welded Cap Conductor Rail. for 3rd Rail Mass Transit Systems

SMA Utility Power System

Product Overview Compressed Air and Electric Supply

A COMBINATION OF POWER AND FUNCTIONALITY DIESEL-ELECTRIC MODEL 6 MOBILE HARBOR CRANES

Power Voltage Transformers for Air Insulated Substations

VersaReel Commercial Duty Cable Reel

Volkswagen Group Capital Markets Day 2017 Volkswagen Truck & Bus

Charging Contacts for AGVs, Shuttles and more

LIFT your PRODUCTIVITY

YOUR SPECIALIST AROUND CABLE AND WIRE. Catalog

UPS Multi Power 1-28 x 42 kw up to 1MW

Flexible energy and data transmission

Reliability is our profession

SOLAR POWER SOLUTIONS

KEOR HP. THREE-PHASE UPS from 100 to 800 kva GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES

Aircraft Cable Management Systems

Say hello to better web control.

Innovative electric road freight transport. siemens.com/mobility

Mill Duty Electrification Systems

LIFT YOUR PRODUCTIVITY

Keynote from Andreas Renschler, CEO Volkswagen Truck & Bus GmbH and Yoshio Shimo, President & CEO Hino Motors Ltd.

KEOR HP. THREE-PHASE UPS from 100 to 800 kva GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES

EXTRA LARGE VALUE IN CARGO HANDLING DIESEL-ELECTRIC MODEL 5 MOBILE HARBOR CRANES

High Efficiency Drives. Systems Integration State-of-the-art solutions for any system

TM4 A VISION REALIZED OUR MISSION. UP TO ANY CHALLENGE. TM4 employs over 300

Product Overview Compressed Air and Electric Supply

Thank you for your time today, I am Yoshio Kometani of Mitsui Infrastructure Projects Business Unit.

igus the-chain moving energy made easy Modular toolbox for almost every application and industry light & quick for heavy-weights

Tarak Mehta, President of Electrification Products division, ABB Group

HomeCap: Residential Power Factor Correction

CONSISTENT TOP PERFORMANCE DIESEL-ELECTRIC MODEL 8 MOBILE HARBOR CRANES

Cable Trolleys for C-Rails Program

ABM Greiffenberger supplies AC Induction Motors for electric shuttles and autonomous shuttles from NAVYA

Start of Volume Production: New Generation of the ZF 8-Speed Automatic Transmission in the BMW 5 Series

PRESS RELEASE (long version)

The World of Automatic Lubrication. perma Lubrication Systems for. Recycling Plants

Drainage control the easy way. Emotron DCM control unit

Volkswagen Truck & Bus and Navistar enter into a strategic alliance. September 6, 2016

Everything under control Thanks to reliable power grids

Trends & practices in Tandem 40 Crane Operations

Heavy-Duty Conductor Rail CopperHead

Power Conversion System for ESS 100 kw to 30 MW Bi-directional Inverters

1 Product Description Check of the supplied Parts Notes Intended Use Current Collector... 3

CONTAINER CRANE UPGRADE AND RELOCATION: THREE CASE STUDIES ARUN K. BHIMANI 1, M. ASCE

BENEFIT FROM MOBILE HARBOR CRANES WITH EXTERNAL POWER SUPPLY. Presented by: Michael Green KONECRANES

Wireless Charger. Inductive charging system for AGVs

The new monorail trolley hoist YGK. Yale Industrial Products GmbH

CONTROLLER & HOISTING MODERNISATION FOR LOW AND MID-RISE LIFTS. KONE ReGenerate 200 and 400

A car-free world? Name:... Date:... Car-free Day comprehension. The Development of Cars

Wind is our Element. siemens.com/loher-windgenerators. Answers for industry.

PRODUCT DATA. Tower system. The tower system can be. Higher loads per parking. upon request

Advancing Electric Solutions

Please read and observe

FENEBUS POSITION PAPER ON REDUCING CO2 EMISSIONS FROM ROAD VEHICLES

Arc flash solutions catalogue Australia. Safety solutions - Protecting employees and the enterprise

APPENDIX J V90 3.0MW Turbine Specifications

Conductor Bar Series 831

A FLEXIBLE ALL-ROUNDER DIESEL-ELECTRIC MODEL 4 MOBILE HARBOR CRANES

FORD AND AZURE DYNAMICS COLLABORATE ON TRANSIT CONNECT ELECTRIC FOR EUROPE

Siemens PLM Software develops advanced testing methodologies to determine force distribution and visualize body deformation during vehicle handling.

About LMC Automotive. LMC Automotive the company. Global Car & Truck Forecast. Automotive Production Forecasts

Transcription:

Conductix-Wampfler Electrifies Colombian Container Terminal TCBuen Steel structure, conductor rail system with a total length of more than 10 kilometers and electrification of 25 container blocks with seven existing and six new container cranes with Drive-In L solution Buenaventura/Weil am Rhein, May 2016. Conductix-Wampfler, the world's leading manufacturer of systems for energy and data transmission to mobile consumers, has successfully realized another major project for electrifying Rubber Tyred Gantry cranes (RTGs). The company modified seven diesel powered RTGs manufactured by Shanghai Zhenhua Port Machinery (ZPMC) at TCBuen at the Colombian terminal belonging to the Spanish Grup TCB, and has also supplied six Drive-In L units for new RTGs manufactured by Konecranes as part of the terminal's expansion. Conductix-Wampfler installed the steel structure and overall 10,400 meters of conductor rail systems. The project took 19 months and was completed in the fall of 2015. "We fitted a total of 25 blocks with the E-RTG Drive-In L solution, each of which was between 100 meters and 130 meters long. The Single-Side and Back-to-Back systems translated into more than ten kilometers of conductor rails, 50 Drive-In zones, and 25 pillar boxes fitted over a total system length of 2,900 meters", explained Andreas Burkart, who is in charge of the project at Conductix-Wampfler. In order to convert the 440V voltage to the 400V required by the ZPMC RTG's, each RTG had to be fitted with two transformers. As well as installing the Drive-In L units, the RTGs also had to be equipped with a switch cabinet, control system, auto-steering system and reinforcement for the sill beam for holding the Drive-In L units and transformers. Reduction of maintenance and downtime Thanks to its compact design, the Drive-In L regardless of the model of RTG and the position of the diesel assembly can be installed on both sides of the RTG under the sill beam of the RTG. This makes the solution the most

flexible of its kind currently on the market. The entry and exit times of the RTG are less than 20 seconds with Drive-In L. The short entry zone also makes it possible to supply the RTG with power right from the first row of containers. Compensation is also ensured for tolerances that occur during travel of the RTG in container blocks or due to lifting and lowering. Coupling into the conductor rail with Drive-In L is entirely automatic and controlled exclusively from the cabin of the RTG. This eliminates the need for any ground personnel to switch blocks, which significantly increases safety at the terminal. "Conductix-Wampfler's system has proven to be the best alternative to using diesel-operated systems, especially given the challenging climatic conditions of the Colombian coast", emphasizes Eduardo Montero from Grup TCB. Apart from being the perfect answer to the terminal's needs, the system is also extremely flexible, which means that it can be further expanded as the need arises. "In addition to the system's countless benefits, we have also found Conductix-Wampfler to be a highly reliable partner with extensive experience in the crane industry and an efficient global service structure." Challenges Mastered with Success The complex electrification project in Buenaventura presented a number of challenges for Conductix-Wampfler. Since the ECO RTGs manufactured by ZPMC are fitted with Siemens ECO1 controls and ELFA drives, the conversion could only be realized with direct collaboration with Siemens. "The electrification work often had to be put on hold due to the heavy rainfall, extremely high humidity and temperatures, and concurrent work to expand the terminal", remembers Christian Nunez, Conductix-Wampfler's Sales Manager for Latin America. The construction of the steel structure, and installation and conversion work was performed under the supervision of Conductix-Wampfler Weil am Rhein. The two local partner companies who performed the steel construction work and RTG modifications received active support from Conductix-Wampfler Brazil. "For us, the project in Buenaventura was a great example of efficiency and perfect for preparing us for our other E- RTG project for the Brazilian terminal of Portonave", comments José Roberto, Conductix-Wampfler Brazil's Service Supervisor.

Higher productivity and climate protection "Thanks to the electrification, we have been able to significantly reduce both our energy consumption and noise pollution at the container terminal TCBuen since October last year. This has enabled us to make significant progress concerning our responsibility to protect both the environment and our personnel as best we can", further explains Montero. However, the company is also recording an increase in productivity, which is due in part thanks to a decrease in incidents and waiting times. Conductix-Wampfler assumes that, thanks to the many advantages of E-RTGs, diesel-operated cranes will only be employed in areas where it is not technically possible to supply electricity in future. "The completion of this large project in Columbia has enabled us to further consolidate our position as a pioneer and leader in the market", concludes Burkart. Photos: Caption: RTG in the Buenaventura Container Terminal (TCBuen) before (left) and after modification (right)

Caption: E-RTG with Drive-In L-Unit, connected to the conductor rail system Caption: Pillar Boxes and E-RTG Drive-in L systems in back-to-back arrangement Caption: Construction site in Colombia: construction works for the extension of the terminal was happening parallel to the installation of the conductor rail systems and the modification of the RTGs

Reprint free of charge, sample copy requested. For more information, please contact: Conductix-Wampfler GmbH Marketing Communications Michael Kusch Rheinstrasse 27 + 33 79576 Weil am Rhein Phone +49(0) 7621 / 662-492 Fax +49(0) 7621 / 662-284 michael.kusch@conductix.com