Northeast Corridor New York to Philadelphia

Similar documents
The Dash 9 Locomotive Pack

Pennsylvania Railroad GG1 Electric Locomotive

UPGRADING THE AMTRAK KEYSTONE CORRIDOR

SD70M Southern Pacific Pack

The Class 101 British Rail Pack

The Northeast Corridor Master Plan Amtrak s Next Generation High-Speed Rail and Northeastern Maryland

The Class 111 Diesel Multiple Unit

Meeting the Transportation Challenge in the Northeast

AMTRAK ENVISIONS WORLD CLASS HIGH-SPEED RAIL Washington to Boston in about three hours at up to 220 mph (354 kph)

Expanding Capacity for the Northeast Corridor The Gateway Program

Amtrak Signal and Train Control Systems PRACTICAL PTC. On Amtrak Owned Property. November 20, 2008

The Preferred Alternative: a Vision for Growth on the Northeast Corridor

1 LINE HISTORY...2. Falmouth Branch Line in Railworks ROLLING STOCK...4

An Overview of High Speed Rail. David Randall Peterman Congressional Research Service

The original concept for the FL9 was for the Santa Fe

NEC INFRASTRUCTURE PROJECTS OF RELEVANCE TO NEW JERSEY

GM Aerotrain for Train Simulator 2017 Owner s Manual

Eurailspeed Parallel Session C.3. Albrecht P. Engel Vice Chairman High Speed Ground Transportation Association Chicago, USA

Joseph H. Boardman President and CEO, Amtrak

A Guide to Key Railroad Terminology for the Northeast Corridor

Class 444 Electric Multiple Unit

Sand loader. Source: Southwestern Planning Commission

Poster book. by Marvin T. Broyhill. Copyright All rights reserved. May not be used in whole or in part without prior written consent.

DRAFT Subject to modifications

HRTPO Strategic Campaign. Passenger Rail. Agenda Item #11. Presentation To. May 19, Presentation By

Miami Commuter Rail F40PHL-2

Canadian National SD40-2 Wide Nose

Update of the Midwest Regional Rail Initiative. Tim Hoeffner Michigan Department of Transportation Director, Office of Rail Lansing, MI

2012 MULTIMODAL OPERATIONS WORKSHOP

ASSEMBLY RESOLUTION No. 57 STATE OF NEW JERSEY. 218th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2018 SESSION

How Fuel Cells Help Meet State Energy Goals

EMD SD45 for Train Simulator 2013 Owner s Manual

Amtrak Fleet Strategy

Guide to the Division of Transportation: Railroads' Engineering Data

HHP-8 Electric Locomotive

RDC-1. $325 DC/DCC/Sound, $225 DC

EMD SD45 for Train Simulator 2013 Owner s Manual

P.R.I.I.A. Section 224 Pennsylvania Feasibility Studies Report

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix

Baldwin RF-16 for Train Simulator 2015 Owner s Manual

TRAIN SIM WORLD : LONG ISLAND RAIL ROAD OPERATOR MANUAL

F40PH-2CAT New Jersey Transit

The full credit list can be accessed from the TSW Options menu.

MINUTES MATTER. Travel Time and Frequency of Train Service to Grand Central Terminal the Metro-North Railroad System Executive Summary

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program

Chicago Milwaukee Intercity Passenger Rail Corridor

North Jersey Coast Line

Presentation To HRTPO Passenger Rail Task Force. HRTPO Norfolk-Richmond Passenger Rail Operations Plan and Costs.

Commuter Rail in Connecticut: Present and Future. Robert Aloise H. James Boice Stephen Gazillo David Chase

Amtrak Overview. Marc Magliari. Indiana High Speed Rail Association. May 13, 2011

Integrating HSR Into Existing Regional Transportation Systems

ALP-46 New Jersey Transit

HO LRC Locomotives New Paint Schemes Added!!

Commuter Rail Update. October 25, 2018

is being pushed by the locomotive, which reduces the number of seats in that car.

Robert B. Watson professional papers

Southeastern Pennsylvania Transportation Authority

Charlotte Gateway Station A State & City Partnership June 24, 2015

Program. presented by: September 22, 2010

Opportunities for High Speed and Intercity Passenger Rail Development Midwest Projects Northeast Corridor (NEC) current & next generation

Baltimore & Ohio 1926 freight car fleet

ALAMEDA CORRIDOR. A A Project of National Significance. TRB Summer Conference MTS as a Component of the Nation s Transportation System June 25, 2002

A route for Train Simulator 2012

Proposed Canadian Locomotive Emissions Regulations STATEMENT OF ELECTRO-MOTIVE DIESEL, INC.

Overview of Transit Funding and Planning in the PACTS Region

Bedford/Franklin Regional Rail Initiative (BFRRI) Rationale for a Bedford Amtrak Station June 30, 2015

Maryland Gets to Work

NEW HAVEN-HARTFORD-SPRINGFIELD LINE HIGH SPEED INTERCITY RAIL PROJECT

Overview of Regional Commuter Rail Webinar: Phoenix, Arizona December 18, 2013

N GE P42 Genesis Amtrak Heritage Units Phase I ~ Phase II ~ Phase III ~ Phase IV

04sk042. istorical. Calendar

Soldier Summit + Salt Lake City Route Extension Scenario Pack 01

Product Description. Lionel Locomotives compatible with LCS SensorTrack

MAGAZINE S. The U.S. and. Canada s. Top 50. Passenger Rail Projects for 2003

Roma McKenzie-Campbell Amtrak, Project Manager. Caroline Ducas VHB, Senior Transit Planner. Boston, Massachusetts

Evolution Of Tier 4 Regulations & Project Specific Diesel Engine Emissions Requirements

A Vision for High-Speed Rail in the Northeast Corridor

SMART INVESTMENTS IN INTERCITY PASSENGER TRAVEL FACILITIES: A BALANCED MULTI-MODAL APPROACH

ECP Passenger Brake System Light at the Tunnel End

Budd RDC (Rail Diesel Car) New York, New Haven & Hartford RDC-1, RDC-2, RDC-3, RDC-4 for DTG Train Simulator 2016/7 by VNHRR

High-Speed Intercity Passenger Rail

CLASS 377. Copyright RailSimulator.com 2012, all rights reserved Release Version 1.0

The Future of Rail in Maryland. Kevin B. Quinn, Jr. Administrator

1 BACKGROUND Deltic Prototype History Deltic Prototype Operation Technical Specification ROLLING STOCK...

HURRICANE SANDY: CONRAIL RESPONSE

Union Pacific Diesel Painting Guide

Class 45/46 Peak Diesel Locomotives 1 BACKGROUND...2

GoToBermuda.com. Q3 Arrivals and Statistics at September 30 th 2015

Rocky Mountain. Corridor Input Team. Alternatives Overview. TEMS, Inc. / Quandel Consultants, LLC TEMS, Inc. / Quandel Consultants, LLC

POTENTIAL NEW LOCATIONS TO USE DUAL-MODE LOCOMOTIVES TO SOLVE OPERATIONAL CONSTRAINTS

Passenger Rail Solar Electrification: A Primer. Oregon Department of Transportation Rail Division. June 2009

Modernising the Great Western railway

100 YEARS C H I C A G O, M I L W A U K E E, S T. P A U L A N D P A C I F I C R A I L R O A D C O M P A N Y

U.S. System Summary: ARIZONA/SOUTHWEST

Interoperability TSIs applicable to Railway vehicles. Innotrans, September, 2010

Backgrounder. Thoroughbreds Reborn: VIA s F-40 Fleet ABOUT THE LOCOMOTIVES

WhoWhatWhenWhereWhy. (lists only those in proposed Midwest-Northeast HSR Corridor) SOURCE: America 2050

MTA Long Island Rail Road (LIRR) and MTA Metro-North Railroad (MNR) System-wide Service Standards

Presentation To: HRTPO Passenger Rail Task Force

FP7 California Zephyr

Transcription:

Northeast Corridor New York to Philadelphia 1 INTRODUCTION...2 2 A HISTORY...3 3 ROLLING STOCK...4 3.1 EMD AEM-7 Electric Locomotive...4 3.2 Amtrak Amfleet Coaches...5 4 SCENARIOS...6 4.1 Go Newark...6 4.2 New Jersey Trenton...6 4.3 Spirit or Transportation...6 4.4 The Big Apple...6 4.5 Early Clocker...7 4.6 Evening Clocker...7 4.7 Northeast Regional...7 4.8 The Keystone...7 5 USING THE NEC TRAINS IN CUSTOM SCENARIOS...8 RailSimulator.com

1 Introduction The Northeast Corridor (NEC), the only premier high speed line in America, links Boston to Washington DC passing through New Haven, New York, Newark, Trenton, Philadelphia, Wilmington and Baltimore a total of 363 miles. The section represented is the 90 mile section between New York Pennsylvania Station and Philadelphia 30 th Street Station. RailSimulator.com

2 A History Started during the 1830s, the NEC was not 'formed' until 1893 when the Pennsylvania Railroad (PRR) acquired the Old Colony Railroad, which included the Washington to New York section. The New York, New Haven and Hartford Railroad (NYNH&H) owned the lines linking New York to Boston. These lines were then known as the Philadelphia to Washington Main Line, the Philadelphia to New York Main Line and the Shore Line. In 1905 the PRR built New York Pennsylvania Station to serve the Long Island Rail Road (LIRR). This station opened to PRR with third rail powered locomotives in 1910. However due to the intervention of World War 1, the line from Philadelphia to Trenton was not electrified until mid 1930. Electric services between New York and New Brunswick began late in 1932 with the remaining section between New Brunswick and Trenton being completed early in 1933, facilitating a fully electrified intercity line between New York, Philadelphia and beyond to Wilmington. In 1968 the PRR and New York Central Railroad merged to form Penn Central Transportation. In 1969 the NYNH&H was amalgamated, bringing the Washington to Boston corridor under the control of one company. By 1971 all New York to Boston trains were rerouted from New York Grand Central through New York Pennsylvania Station. On May 1, 1971 Amtrak took over the running of Intercity services and in 1973 the Regional Rail Reorganization Act allowed Amtrak to purchase the Northeast Corridor. Penn Central Transportation declared bankruptcy in 1976, being taken over by Conrail who were granted full trackage rights for the entire line. When broken up in 1999, these rights were passed over to Norfolk Southern Railway in the south and CSX Transportation in the north. Also in 1976, the US Congress authorised the Northeast Corridor Improvement Project allowing a full overhaul of the track and signalling infrastructure between Washington and Boston. The introduction of Centralised Electrification and Traffic Control (CETC) was facilitated at Philadelphia, New York and Boston. These improvements allowed more trains to run faster and closer together and set the travel time goals of 2 and a half hours between Washington and New York and 3 hours between New York and Boston. To facilitate this, the successful AEM-7 electric locomotive was introduced. In the late 1990s the Northeast High Speed Rail Improvement Program (NHRIP) was implemented in preparation for the high speed Acela Express service. As a result of this, Amtrak rebuilt a number of bridges, eliminated grade crossings and rebuilt some of the route curves while replacing wooden track ties with concrete ties and continuous welded rail. The Acela Express service commenced December 11, 2000, finally achieving the proposed travel time goals. RailSimulator.com

RailWorks Northeast Corridor New York to Philadelphia 3 Rolling Stock The following items of rolling stock are provided with the NEC route. 3.1 EMD AEM-7 Electric Locomotive The EMD AEM-7 electric locomotives were produced by the Electro-Motive Division of General Motors between 1978 and 1988. In the mid-1970s Amtrak ordered 26 General Electrics E60 units as a replacement for their famous GG1 electric fleet. The E60s proved unable to safely attain speeds over 90mph and so existing European designs were looked at as alternatives. In 1977 a French CC 21000 numbered X996 and a Swedish Rc4 numbered X995 were trialled. The Swedish design won the day, resulting in 30 AEM-7 units being ordered by Amtrak. The bodies were produced in the US with all other items coming from ASEA in Sweden. Numbered 900, the first unit was delivered and in service in 1979. Between 1980 an 1982, units 901 through 946 went into service. The remaining 7 units were ordered in 1987, entering service the following year. Page 4

RailWorks Northeast Corridor New York to Philadelphia 3.2 Amtrak Amfleet Coaches The Amcoach is the mainstay of the Amtrak passenger fleet along the line For the long distances traversed by trains on the NEC, passengers can purchase refreshments from the Amcafe unit. Page 5

RailWorks Northeast Corridor New York to Philadelphia 4 Scenarios 4.1 Go Newark Date October 2011 Start Location Newark Penn 4.2 New Jersey Trenton Date September 2011 Start Location Trenton 4.3 Spirit or Transportation Date April 2011 Start Location Philadelphia 4.4 The Big Apple Date July 2011 Start Location New York Page 6

4.5 Early Clocker Date June 1999 Rating Hard Duration 45mins Start Location Philadelphia RailWorks Northeast Corridor New York to Philadelphia Amtrak Clocker stopping service from Philadelphia to New York. Based on the 1999 timetable. 4.6 Evening Clocker Date July 2000 Rating Medium Duration 100mins Start Location New York Amtrak Clocker Service from New York to Philadelphia. 4.7 Northeast Regional Date October 2000 Rating Medium Duration 140mins Season Autumn Start Location Philadelphia Late Friday night Northeast-Direct service from Philadelphia to New York. Todays date is the 13th! Will it be unlucky for you? 4.8 The Keystone Date July 2000 Rating Easy Duration 50mins Start Location New York A simple Express Passenger service between New York and Philadelphia 30th Street, stopping at Newark. Page 7

RailWorks Northeast Corridor New York to Philadelphia 5 Using the NEC Trains in Custom Scenarios Before you are able to use the AEM-7 or any other assets supplied in this addon in your own scenarios you must enable it in the object set filters. When you make your own scenarios, only the default object sets are enabled for that route (for example the Kuju/Railsimulator assets for European routes and Kuju/RailsimulatorUS for North American routes). To enable additional object sets (which could be for any downloaded or freeware content) ready for use they must be checked in the object set filter list in the editors. When editing the scenario you wish to add the NEC assets to, click the small blue square on the middle left panel. This opens a new panel on the right hand side of the screen (you may need to move your mose over to the right hand side for the panel to fly out. You can pin it open if you wish). This new panel has a drop down list off providers (usually the company name which produced the add-on) and a list off all products by that provider. The NEC assets are produced by RSC so RSC needs to be selected as the provider. The rest of the panel is then populated by all other products made by RSC. To enable the content of the pack for use in this scenario, check the box next to NorthEastCorridor. Now the NEC assets will be available in the asset browser list for placement in the scenario. If you want the NEC assets to appear in the browser list for EVERY scenario on a route you must follow the same procedure but be in the World Editor and you can now check the first box. The slight disadvantage of having content enabled for all scenarios on a route, even when that content may not be used, is increased loading times. Page 8