BALANCER DOOR WITH GEARBOX TENSIONER

Similar documents
ARCHITECTURAL HARDWARE 'ALL-GLASS' ENTRANCE AND STOREFRONT SYSTEMS HEAVY GLASS DOOR SYSTEMS STRUCTURAL GLASS FITTINGS

EXTRUDED ALUMINUM TEMPERED GLASS BALANCED DOORS AND ENTRANCES

EXTRUDED ALUMINUM BALANCED DOORS AND ENTRANCES

LAGUNA SERIES SLIDING DOOR KITS

INSTALLATION INSTRUCTIONS CRL ESK2/ESP2

ROLL UP DOOR TRADITIONAL HANDLE BAR INSTALLATION INSTRUCTIONS

Features and Benefits

Hunter Automatics HA-8. Installation Manual

CONCEALED CLOSER SERIES

MODEL VBO-HV & VBO UPBLAST PROPELLER ROOF FANS

*24771* 4040SE DE Sentronic. 1 Voltage. 7 Regulation. 2 Track. 8 Door Closer Cover. 3 Spring Power. 4 Arm Installation. 5 Arm Screw.

PERMA ROLL 75. installation instructions Automatic Roll-up Door. note:

DEMOUNTABLE BODY INSPECTION PROCEDURE Follow Detailed Instructions Inside for Each Step

KAWNEER 1686 CONCEALED EXIT DEVICE

INSTALLATION INSTRUCTIONS CRL JACKSON P PANIC EXIT DEVICE

Installation Guide VHM Wall Mount Kit for Philips MX600/700/800 and MP60/70 IntelliVue

DOUBLE LEVER ARM DOUBLE LEVER ARM SINGLE LEVER ARM 5010 SINGLE LEVER ARM

9530 Series Senior Swing. Features. Special Templates. Fasteners Mounting. Certifications

INSTALLATION and OPERATION BALL WASHER MODEL NO: BW-001N

1st Generation K5 Blazer (1969 to 1972)

Overhead Concealed Door Closer DORMA RTS88

Shaver Industries. Assembly Instructions Spring-Assist Vertical Vinyl Curtain Door

CONCEALED CLOSER SERIES

Premium Dry Freight (Plywood) Door Installation REFERENCE FIGURE 1

9550 Series Senior Swing. Features. Special Templates. Certifications. Fasteners Mounting

Series 9540 J9540. Installation Instructions Multi-Sized 1 to 6 Non-Hold Open. Regular Arm Applications. Parallel Arm Applications

Installation Instructions Series 78-B/FHA Hold Open

Single and Bi-Parting Manual Sliding Doors. Installation. R-PLUS Cold Storage Doors

Heavy Duty Four Wheeled Walker

KAWNEER 1686 EL CONCEALED EXIT DEVICE

Installation Instructions

ROFU TJ 152-A. Y ALE SECURITY GROUP 50BC Series Door Closer. 50BC Series Door Closers. Sizing Chart for Installations. Ordering Information

INSTALLATION MANUAL. CNH 50, 60, 70 SERIES COMBINES 5000 Series Track Modules

*24213* 4040-SE Sentronic. 1 Voltage. 6 Adjusting Hold-Open Door Position. 7 Regulation. 2 Tracking. 8 Door Closer Cover.

INSTALLATION MANUAL COUPLED SHADE PRODUCT OVERVIEW. 1. Idle End Shade

Rollstar Shade Installation Instructions

SECTION FIRST RESPONDER SERIES HEAVY DUTY PERSONNEL LOCKERS DEBOURGH MFG. CO. 10/15/2013

INSTALLATION MANUAL. CNH 7,8,9 SERIES COMBINES 5000 Series Track Modules

9560 Series Senior Swing. Features. Special Templates. Cover Fasteners Mounting. Certifications

Jet Fans. Instruction Manual READ AND SAVE THESE INSTRUCTIONS WARRANTY

ASSA ABLOY Universal Door Closers

2000SR. Installation Instructions May Donovan Enterprises 3353 S.E. Gran Park Way Stuart, Florida

DORMA INTERIOR. DORMA PURE FAMELESS SLIDING Glass Wall Systems

TS93 EMF T/PT/TDE. Surface applied door closer

Instruction Manual For DODGE. Airport Baggage Handling Systems Speed Reducers

Valtek Auxiliary Handwheels and Limit Stops

Shaver Industries. Assembly Instructions Spring Assist Vertical Vinyl Curtain Door Projection Mount

INSTALLATION DESCRIPTION

INSTALLATION GUIDE TCP RCKM-01

Adjustable Angled Incline Conveyor Owners Manual with Operating Instructions

Horizontal Shadings. Continuous Cord Loop Beaded Chain Loop Cordless Lift. Installation & Operating Instructions

CHEVROLET TAHOE/DENALI/AVALANCHE/YUKON/ SILVERADO/SIERRA 2007+

S-Drive Performance Trainer

Installation Instructions

Installation Guide. Philips MP20/30/40/50 IntelliVue VHM Wall Mount Kit

Top Down Rollstar Shade Installation Instructions

INSTALLATION, OPERATION AND MAINTENANCE MANUAL WALL EXHAUST FANS BELT & DIRECT DRIVE XB, HV, HVA, ADD, DDS, DDP

INSTALLATION, OPERATION AND MAINTENANCE MANUAL WALL EXHAUST FANS BELT DRIVE XBL FANS

OWNER S MANUAL. Sentry & Sentry CT THREE YEAR WARRANTY. Phone: ( ) Fax: (605) SAFETY INSTRUCTIONS

LINDGREN-PITMAN General Maintenance of Lindgren-Pitman Hydraulic Systems & Equipment

THE SERIES-E POWR Slider

PENBERTHY FROST PROOF EXTENSION INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

RTS88. Overhead Concealed Door Closer

Upper Class Grille Main grille INSERT - #54127 / #54131 / #54133 / #51127 / #51131 / 51133

ROLLING CURTAIN DOOR INSTALLATION, MAINTENANCE & PARTS MANUAL MODEL 944 WARNING

Instruction Manual AVTM for. Strip Chart Recorder Catalog Nos and

Flush Glaze-and Multiplane Frames. Standard Doors with. Fg Flush Glaze -1 3/4 x 4 1/2 Fg Flush Glaze -2 x 4 1/2

Instructions for MB832 Manual Barrier Ver0614

4040XPT Series Door controls

LINDGREN-PITMAN General Maintenance of Lindgren-Pitman Hydraulic Systems & Equipment

Installation Instructions Console Megashifter

Blue Jay Rodless Cylinder BC MS. Track Repair Manual 1996 & 2012 THE EASTMAN EASTMAN. All End Caps Black for Models

INSTALLATION, MAINTENANCE, & SAFETY INSTRUCTIONS

Sunroof / Moonroof: Service and Repair Repair Procedures

SW38PRE - 38 Tow Behind Lawn Sweeper

Technical Support Line: (952) Hanover Ave. Lakeville, MN

Lineman s Hoist. Operating, Maintenance & Parts Manual. Follow all instructions and warnings for LMST680-2

Solar & Roller Shades

INSTALLATION INSTRUCTIONS

SERIES A & AA ROLLER DOORS INSTALLATION GUIDE

On-A-Roll Lifter Instruction Manual for Standard Models Read Before Use!

401B/1KDB CoolRite/FreezeRite Installation Manual I003

9540 SERIES FEATURES SINGLE DOOR, SURFACE MOUNT (PUSH) OFFSET PIVOT/BUTT HINGE

INSTALLATION & OWNER S MANUAL

B) The University shall check the installation of finish hardware at the completion of the Project.

AUTO REWIND AIR HOSE REEL

(Refer to qualified personnel)

Installation Instructions HURST COMP STICK KIT Dodge Challenger (with AUTO-STICK)

F130T FLEX-SELECT Tow Spreader For the Adaptable Broadcast Spreader Assembly and Operating Instructions

Mega-Flow External Damper Fans

The H-MAC Heavy Metal Articulating Chassis Construction Guide

SENIOR SWING UNIQUE FEATURES

C24HD & C24HDS Broadcast Spreader Assembly and Operating Instructions

HAYWARD FLOW CONTROL TBH SERIES TRUE UNION BALL VALVE INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

INSTALLATION & OWNER S MANUAL

9550 SERIES FEATURES OPERATOR MOUNTS SIMULTANEOUS PAIR, SURFACE MOUNT *PULL SIDE PUSH SIDE DOUBLE EGRESS

Installation Instructions for the EVO3 Height-Adjustable Ultimate Short Shifter

AlumaView AV200. A. Section Metal Fabrications: Miscellaneous for steel supports.

Floating Headers - 4-1/8, 4-1/2, 6. with RTS88 and PT21 for double doors ONLY. Installation instructions

ATV TRACK KIT. Operator s Manual Installation Instructions Service Instructions Replacement Parts List. Effective Date: October, 2012

Transcription:

INSTALLATION INSTRUCTIONS BALANCER DOOR WITH GEARBOX TENSIONER Phone: (800) 421-6144 Fax: (800) 587-7501 crlaurence.com usalum.com crl-arch.com 11M0219_REV_A

ORDER OF ASSEMBLY AND INSTALLATION INTRODUCTION... 3 STEP 1: CONFIRM YOUR SHIPMENT...3 STEP 2: CHECK ROUGH OPENING...3 STEP 3: VERIFY FLOOR CONDITION...3 STEP 4: ASSEMBLE THE FRAME... 3-4 STEP 5: INSTALL THE FRAME...5 STEP 6: INSTALL THE HINGE TUBE... 6-7 STEP 7: INSTALL THE GUIDE TRACK...7 STEP 8: INSTALL DOOR PANEL... 8-9 STEP 9: ADJUST CLOSING FORCE... 10 STEP 10: ADJUST CLOSER SPEED... 10 STEP 11: ADJUST PIVOT BLOCK...11 MAINTENANCE...12 JOB SITE ESSENTIALS...13 IMPORTANT: READ THIS MANUAL THOROUGHLY BEFORE BEGINNING INSTALLATION. C.R. Laurence, Inc. (CRL) warrants all products manufactured by it and supplied hereunder to be free from defects in material and workmanship in accordance to our contract. This warranty shall not apply to any products not manufactured by CRL, nor to any products which have been repaired or altered by others without CRL's written consent. This warranty shall not include failure of parts and materials due to improper installation, inadequate support of surrounding structures, and/or lack of proper maintenance. 2

INTRODUCTION Thank you for choosing the Premium Balanced Door System by C.R. Laurence. We have made every effort to assure the utmost quality in materials and craftsmanship. Each unit has been fully assembled and factory tested prior to shipping. Please read this manual thoroughly before beginning installation. STEP 1: CONFIRM YOUR SHIPMENT Carefully open the shipping container and look for any damaged parts. Most orders are shipped knocked down and will require on-site assembly. Confirm that the height and width of the door(s) are approximately the same as the rough opening. Your package should include: Fully Glazed Door(s) Hinge Tube with Top and Bottom Pivot Arms Header Assembly Floor Mounted Gearbox Threshold and Side Jambs Refer to your packing list for details. If any parts are missing or damaged, call the C.R. Laurence Technical Sales Department immediately at (800) 421-6144. Refer to the order number on the packing list. STEP 2: CHECK ROUGH OPENING Verify that the rough opening is square and plumb. Refer to C.R. Laurence shop drawings to confirm rough opening dimensions. It should be slightly larger than the finished door frame (including header and threshold). If automatic door options are required, make sure that all electrical wiring is completed to the rough opening and NOT ENERGIZED. Refer to the C.R. Laurence "Site Preparation" drawing and/or your job drawings to confirm all required electrical connections. STEP 3: VERIFY FLOOR CONDITION The floor directly below the rough opening should be clean and in good condition. It is critical that the floor be sound and level. The Premium Balanced Door threshold and pivot Gearbox mounts directly to the floor or sub floor surface. It must be able to support the system's weight and firmly hold the fasteners in place for the lifetime of the installation. It is also necessary for the floor to be level and square to the jambs to allow a smooth operation of the Balanced Door. STEP 4: ASSEMBLE THE FRAME Note: Medium to heavy usage of specified components may cause critical fasteners to loosen over time. C.R. Laurence recommends the use of Cat. No. 24221 Loctite 242 Threadlocker. It is designed for the locking and sealing of threaded fasteners which require normal disassembly with standard hand tools. The product cures when confined in the absence of air between close fitting metal surfaces and prevents loosening and leakage from shock and vibration. Suitable for applications on less active substrates such as plated surfaces, where disassembly with hand tools is required for servicing. 3

STEP 4: ASSEMBLE THE FRAME (CONTINUED) Lay the frame component parts on the floor and assemble with the fasteners specified below. Although the illustration shows a single door frame with Exposed Hinge Tube Jambs, the assembly is similar for Double Door Frames and Concealed Hinge Tube versions. NOTE: All fasteners for Frame Assemblies are included. A Vertical Jamb C D Door Header Lock Jamb A Brackets 1224X12FMS Hinge Jamb Threshold Lock Jamb Base Plate 1/4-20X3/4 PHP B Exposed Frame Shown Threshold 1/4-20X1/2 FMS EXPOSED HINGE TUBE VERSION CONCEALED HINGE TUBE VERSION 1224X12FMS B 1/4-20X3/4 PHP Vertical Jamb Gearbox Or Hex Wrench Adjusting Hole Pawl Tool Adjusting Slot 1224X12FMS 1/4-20X1/2 FMS Concealed Vertical Jamb Brackets with 1/4-20X3/4 PHP Gearbox Hex Wrench Adjusting Hole Pawl Tool Adjusting Slot 1/4-20X1/2 FMS 832X12FMS Threshold 832X12FMS Threshold SHEAR BLOCK CORNER CONNECTION TOP HINGE PIVOT ASSEMBLY 1224X12FMS D C Narrow Arm Angle Track 10-32X1-1/2 SHCS 1224X12FMS Pivot Pin Or Wide Arm Spring Bumper Exposed Frame Shown 4

STEP 5: INSTALL THE FRAME Dry fit fabricated frame into the opening to test for size and sill flatness, also allowing for shim space. Remove frame and clean substrate. Apply Cat. No. 95C Silicone Building Sealant to the floor substrate leaving two 1" gaps on the exterior side as shown below. Reposition frame back into opening and press threshold into wet silicone. Shim sill as needed. Silicone Sealant ALUMINUM Cat. No. 95C Silicone Building Sealant 1" (25 mm) gap Exposed Hinge Tube Jamb shown. Concealed version requires similar procedures. 1" (25 mm) gap Attach the Cat. No. BDPS105 Magnetic Plumb Bob to the Pivot Pin of the assembly in the header. Lower the Plumb Bob until it is just above the Gearbox Key. Adjust the Hinge Jamb, Head and Threshold until the Pivot Pin and Gearbox Key are vertically aligned. Attach the Hinge Jamb to the opening with the appropriate fasteners. Using a spirit level or the Cat. No. 406065 Digital Level, square and plumb the remaining frame members. Shim and permanently mount the frame to the opening with the appropriate fasteners. Installation Screws CRL Plumb Bob Cat. No. BDPS105 Attach Plumb Bob to the Pivot Pin of the AE-LE assembly Installation Screws Gearbox Hex Wrench Adjusting Hole Pawl Tool Adjusting Slot 0.1 0.0 0.0 CRL Digital Level Cat. No. 406065 Gearbox Key 5

STEP 6: INSTALL THE HINGE TUBE 1. Remove the top pivot assembly before proceeding. This will ease the installation of the hinge tube. Top Pivot Assembly The Hinge Tube Assembly carries the full weight of the glazed door and acts as an intermediate hinge for the Balanced Door System. It is very important to install and adjust it properly to achieve free and unrestricted movement. If double doors are supplied, use the shape of the Pivot Arms to identify the left and right Hinge Tubes as depicted below. Left Hand Top Pivot Arm TOP VIEW Right Hand Top Pivot Arm EXTERIOR SIDE EXTERIOR SIDE 2. Orient the Gearbox Key and the Hinge Tube Spindle Slot the same direction. HINT: The offset lobe of the pivot arm always faces the exterior. Bottom Arm Top Pivot Arm Hinge Tube Spindle Slot Gearbox Key Gearbox Hex Wrench Adjusting Hole Pawl Tool Adjusting Slot Hinge Tube 3. Swing the top arm of the Hinge Tube into the cutout for the Top Pivot Arm Assembly. NOTE: Hinge Tube Spindle Slot must line up with Gearbox Key upon installation. Key can be rotated to align with Spindle Slot with 1/2" (13 mm) Hex Wrench (Not provided). 4. Lower Hinge Tube onto Gearbox NOTE: Hinge Tube Spindle Slot will straddle the Gearbox Key and drop into place when properly aligned. Bottom Pivot Arm EXTERIOR SIDE 6

STEP 6: INSTALL THE HINGE TUBE (CONTINUED) Top Pivot Arm Assembly Screws Hinge Tube Narrow Arm Angle Track 5. Re-Install The Top Pivot Assembly by dropping the pivot pin down through the hole in the frame head and into the top of the Hinge Tube. This creates a top pivot point for the Hinge Tube. Attach with the four fasteners as before with the addition of Cat. No. 24221 Loctite 242 Threadlocker. Do not attach the screws to the two holes closest to the cutout. These holes are used to accommodate the installation of the Guide Track Assembly. Wide Arm Spring Bumper NOTE: it is advisable to use a #3 Phillips driver when attaching the four small screws provided. A screwgun with a #5 torque setting should be used if possible. STEP 7: INSTALL THE GUIDE TRACK Top Pivot Arm Hinge Tube Check Spindle Guide Track 1. Install Guide Track Assembly with four short screws provided. Insert the assembly up into the head at an angle and drop back down onto the fastener holes. The Guide Track should be oriented so that the Check Spindle is farthest from the Hinge Tube. Because the Guide Track is handed but will fit on either side, you must verify it is installed correctly. NOTE: it is advisable to use a #3 Phillips driver when attaching the four small screws provided. A screwgun with a #5 torque setting should be used if possible. LCN Concealed Door Closer Cylinder always faces the exterior side of the door on either Left or Right Handed Guide Tracks Left Handed Guide Track Shown 7

STEP 8: INSTALL DOOR PANEL 1. Place a Shim Washer on the Bottom Pivot Pin for proper gap spacing. Turn the Bottom Pivot Arm 45 degrees to the interior side of door jamb. Adjust the spring tension at the gearbox if necessary. Have an assistant hold the Bottom Pivot Arm to keep the Hinge Tube stationary while installing the door. Lift the door at an angle and set the bottom cup of the pivot block onto the Pivot Arm Pin as shown. Hold the top of the door at an angle so it clears the header. Make sure the door is securely seated onto the Bottom Pivot Arm by gently rocking it. IMPORTANT STEP VIEW FROM EXTERIOR Pivot Block Shim Washer Bottom Pivot Pin Guide Roller into Track Gearbox Bottom Pivot Arm NOTE: A Shim Washer MUST ALWAYS be used on the Bottom Pivot Pin. Door failure may result without it. The spacing between the Pivot Block and the Pivot Arm is 3/32"-1/8" (2-3 mm). REF222.031" Shim Washer REF221.062" Shim Washer REF22 1/16" Shim Washer Top Pivot Block Guide Roller 2. Swing the door upwards as you maneuver the Guide Roller into the track. If necessary, pry the Top Pivot Arm up slightly until it clears the Pivot Block. Have an assistant hold the door vertical while you align the Top Pivot Arm with the Top Pivot Block. 3. Insert the Top Pivot Arm Shaft into Top Pivot Arm as shown. The set screw fits into the groove to hold the Top Pivot Arm Shaft in place. Apply Cat. No. 24221 Loctite 242 Threadlocker to set screw and tighten securely. Top Pivot Arm Shaft Groove Top Pivot Arm Cat. No. 24221 Loctite 242 Threadlocker 4. Make sure the closing speed and latching speed valves are FULLY OPENED to allow the door to swing unrestricted. (See page 10, Step 9.) Set Screw 8

BALANCER DOOR WITH GEARBOX STEP 8: INSTALL DOOR PANEL (CONTINUED) Check Spindle 90º REF111 Guide Roller 5. Place the REF190 Hub and REF197 LH Guide Arm onto the Check Spindle, align and hold in place with your hand. Using the Guide Arm, turn the Spindle until it is 90 degrees with the head. Remove the Guide Arm and Hub before continuing to the next step. REF190 Hub REF197 LH Guide Arm 6. Insert the Guide Roller into the Guide Track on top of the door. The bend in the Guide Arm always points back towards the door frame. Roll the Guide Arm back and forth in the track a few times to make sure it's free of obstructions. Check Control Track REF197 LH Guide Arm 7. Attach the Guide Arm and Hub to the Check Spindle once again by opening or closing the door until the oval slots align. Secure arm with the 1/4"-20 X 1" FHMS using Cat. No. 24221 Loctite 242 Threadlocker. Check Control Track REF197 LH Guide Arm with REF111 Guide Roller 1/4"-20 X 1" FHMS 9

Adjusting the door's closing characteristics require back-and-fourth changes to the Gearbox Tensioner and the LCN Concealed Closer attached to the top of the Check Track. You will need to set a medium amount of spring force at the Gearbox before making adjustments to the LCN closer. As you increase the hydraulic closing resistance, you will also need to increase the spring tension of the Gearbox. STEP 9: ADJUST CLOSING FORCE Pawl Tool (Included) View from Interior With the Balancer Door centered over the threshold or against the door stop, release any tension by using the Pawl Tool. Pushing forward on the Pawl Tool while holding the Hex Wrench allows the spring tension to relax in a controlled manner. Without the Hex Wrench in place the torsion spring could rapidly unwind to zero force. Remove the Pawl Tool and use the Hex Wrench to ratchet up the torsion spring force to the desired level. For our left handed door used in this illustration, turn the Hex Wrench counterclockwise. The door will begin to move towards you or tighten against the door stop. As you increase the resistance of the LCN device in Step 9, you will need to increase the spring tension slightly at the Gearbox. 1/2" (13 mm) Hex Wrench (Not Included) Gearbox Tensioner STEP 10: ADJUST CLOSING SPEED Backcheck Adjuster General Speed Adjuster Latching Speed Adjuster The LCN Overhead Concealed Closer serves as a speed check device with three adjustments. 1. Backcheck Adjustment: Adjust slightly to obtain a very light Backcheck Setting. It should not be noticeable under average slow opening but should resist rapid opening movement that could occur during high winds CW = Slower and CCW = Faster. 2. Closing Speed Adjustment: Adjust as desired. CW = Slower and CCW = Faster. Use 5/16" (8 mm) Hex Wrench (Not Included) to adjust Damper Valves. (Loosen = Counterclockwise) 3. Latch Speed Adjustment: Adjust so that the door does not "bounce" off of the jamb when it closes. CW = Slower and CCW = Faster. NOTE: Adjusting the screws too far open (CCW) can result in oil leakage. Use a 5/16" (8 mm) T-Handle Hex Wrench (Not Included) to make all adjustments. 10

STEP 11: ADJUST PIVOT BLOCK The Adjustable Pivot Blocks located on the top and bottom of each door can be used to reduce small gaps and misalignments. The Retaining Screws are easily accessible without removing the door. Open the door 45 degrees and block the bottom outside stile up off the floor with tapered wood shims. Only adjust one Pivot Block at a time. Loosen but DO NOT REMOVE the retaining screws. Adjust to the desired gap by adding or removing shims. Tighten the Retaining Screws, close door and check gaps. Misalignments up to 1/4" can be corrected with this procedure. WARNING: Do not attempt this procedure without an assistant. Heavy, uncontrolled doors can cause serious injuries. DO NOT REMOVE the Retaining Screws. TOP PIVOT ARM Pivot Block Adjustment Retaining Screws NOTE: After adjusting door alignment, remove one screw at a time, apply Cat. No. 24221 Loctite 242 Threadlocker to threads and re-insert. 11

MAINTENANCE Proper maintenance is critical to the life and operation of the Balancer Door System. It is important to regularly clean environmental debris from areas adjacent to moving parts such as bearings, roller tracks and gear assemblies. DO NOT LUBRICATE MOVING PARTS. Each component is shipped from the factory with ample lubrication which, if kept clean, will provide a long service life. Compressed air, soft clean towels, and a small brush are recommended for most cleaning and maintenance procedures. TOP PIVOT ARM (Check Monthly)* Wipe debris from arm and pivot block. Blow away any dirt between block and arm joint. TOP ROLLER TRACK (Check Monthly)* Wipe dirt and debris from inside track with a damp cloth. Check for smooth operation. DOOR GLASS (Check Regularly)* Clean with conventional glass cleaners. Avoid build up of grime and hand prints. WEATHERSTRIPS (Check Monthly)* Blow dirt from pile and wipe off any excess moisture. GEARBOX ADJUSTMENT (Check Regularly)* Blow away dirt. Brush or wipe grime away from surrounding area. Dry excessive moisture. BRUSHED STAINLESS (Check Regularly)* Wipe down with a damp towel on a regular basis. Remove any build up of salt and grime. BOTTOM PIVOT ARM (Check Regularly)* Wipe debris from arm and pivot block. Blow away any dirt between block and arm joint. *Inspection intervals are suggestions. Inspection and maintenance should be based on actual cycle levels and environmental conditions. 12

ALUMINUM JOB SITE ESSENTIALS Helpful Tools and Supplies for Installing CRL U.S. Aluminum Entrances, Storefronts, Windows, and Curtain Wall Systems CRL Digital Laser Level Tool CAT. NO. 406065 CRL Plumb Bob Alignment Tool for Premium Balanced Doors CAT. NO. BDPS105 CRL.34 Fl. Oz. (10 ml) Bottle Loctite 242 Threadlocker CAT. NO. 24221 CRL Glass Cleaner CAT. NO. 1973 CRL Glass Wipes CAT. NO. 1550 CRL 95C Silicone Building Sealant CRL PHS Series Plastic Horseshoe Shims CRL Sure-Grip Vacuum Lifter CAT. NO. S338 CRL 12:1 Ratio Strap Frame Caulking Gun CAT. NO. GA1203 CRL M64 Modified Smooth Polyurethane Construction Sealant CRL M66 Modified Grainy Polyurethane Construction Sealant CRL Door Jack CAT. NO. DJ1 CRL 18 Volt Cordless Variable Speed Impact Driver/Drill Kit CAT. NO. LD147 13