Keynote Address. DPPS A Petrobras DP Safety Program

Similar documents
Risk. Analyzing Petrobras DP Incidents

Kevin Duffin - Martime Assurance & Consulting John Flynn- Stena Drilling

SEAGULL S GUIDE TO BALLAST WATER MANAGEMENT

Kongsberg Maritime Simulation and Training. The power to excel in Dynamic Positioning training

Thank you for your time today, I am Yoshio Kometani of Mitsui Infrastructure Projects Business Unit.

Jurisdictional Guidelines for the Safe Testing and Deployment of Highly Automated Vehicles. Developed by the Autonomous Vehicles Working Group

ABB's Energy Efficiency and Advisory Systems

Our Approach to Automated Driving System Safety. February 2019

EPRI HVDC Research. Gary Sibilant, EPRI. August 30, 2011

Doing business with Petrobras - Procurement Strategies and Local Content. Policy.

DOING BUSINESS WITH PETROBRAS: PROCUREMENT STRATEGIES

Risk Based Maintenance

The Benefits of Podded Propulsion in the Offshore Market

2001 GAS LIFT WORKSHOP

Asian paper mill increases control system utilization with ABB Advanced Services

To Our Business Partners

Optimization of Power and Station Keeping Installations by a Total System Design Approach

Low and medium voltage service. Power Care Customer Support Agreements

Brazilian O&G Industry: Forecast and opportunities

How do things run smoothly even in rough winds?

Western Alberta Transmission Line (WATL) HVDC Project

PROCUREMENT POLICY AND CRITICAL EQUIPMENT SUPPLY. July /

Northeast Autonomous and Connected Vehicle Summit

Vehicle Maintenance and Management Program The company focuses on the process as much as the outcome

E-Mobility Trainings. Handling electric drives safely. TÜV SÜD Akademie GmbH

Condition Based Maintenance for Maximized. October 13-14, 2009

Category V. Criterion 5H: Hazardous Materials (Hazmat)

Traction Systems GC01DTR01_C 08/2013. Ingeteam Traction

Guidelines for Safety Training of Overhead Crane Operators and Supervisors

Offshore Oil Exploration & Transportation Logistics

Ships in Operation Survey Requirements

GUI Customization with Abaqus. Abaqus 2017

AEP Utilities Presentation

From academia to industry Commercializing research on propulsion and hydrodynamics. Øyvind Smogeli Chief Operating Officer

Potential impacts on the production curve of Petrobras due to Operation Carwash

Wind Energy Unit EEE. Engineering and Technical Teaching Equipment PROCESS DIAGRAM AND UNIT ELEMENTS ALLOCATION. Electronic console

A new era in asset protection

Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016

Pão de Açúcar A sweet high-impact discovery! Pão de Açúcar = The Sugar Loaf Mountain

TEPCO NUCLEAR SAFETY REFORM PLAN PROGRESS REPORT 1 ST QUARTER FY 2014 EXECUTIVE SUMMARY

Navis NavDP 4000 Series

FURTHER TECHNICAL AND OPERATIONAL MEASURES FOR ENHANCING THE ENERGY EFFICIENCY OF INTERNATIONAL SHIPPING

A Day in the Life of a Smart Campus

THE PEP PARTNERSHIP ON ECODRIVING Goals, achievements and new projects November 2016

ABB FACTS Customer Service. FACTS Care Upgrades

LOUISIANA CAT OIL & GAS

RSPO Supply Chain Certification. OCTOBER 17-18, 2016

Regulatory frameworks for Dynamically Positioned vessels operating in closed bustie mode: the grey zone

CONCEPTUAL CAR DESIGN AT BMW WITH FOCUS ON NVH PERFORMANCE

National Conference on Latest Trends in Design & Testing of Transmission Line Components

UA Road Transport Safety. Rollover Bowtie

What is being done about CUI in Statoil

Ethanol Growth and Rail Safety

To improve operations, owners need to identify. EMMA Ship Energy Manager. Know, understand and change. Jukka Ignatius, Jan-Erik Räsänen,

RESPONSE TO THE DEPARTMENT FOR TRANSPORT AND DRIVER AND VEHICLE STANDARDS AGENCY S CONSULTATION PAPER

TRUCK MANUFACTURERS: BUSINESS MODEL RISKS FROM ALTERNATIVE DRIVETRAINS THE ROAD TOWARDS EMISSIONS REDUCTION. Joachim Deinlein and Romed Kelp

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

Increased Transmission Capacity

Model Tests for the DP System of a Drilling Semi-Submersible

City of Palo Alto (ID # 6416) City Council Staff Report

E-15 Uninterruptible Power Systems (UPS)

Microgeneration Installation Standard: MCS

State-of-the-Art and Future Trends in Testing of Active Safety Systems

VEDECOM. Institute for Energy Transition. Prénom - Nom - Titre. version

SAFETY ON EVERY CURVE

THE NEW GENERATION OF WEDGE LOCKING WASHERS PRODUCT GUIDE - SOLID-LOCK WASHERS

w w w. o n e r a. f r

Road Safety. Background Information. Motor Vehicle Collisions

Enhancing fleet performance by working in partnership You talk. We listen.

Customer Service. Enjoy 24/7 peace of mind with flexible service offerings from Schneider Electric.

Autonomous Driving, Tohoku University Sendai - Review of the Excursion

ABB Marine Services 27 Sep Remote Diagnostic Services Helping partners maximize up-time

WESTERN INTERCONNECTION TRANSMISSION TECHNOLGOY FORUM

Centerwide System Level Procedure

DNV GL. Global maritime advisory group uses Simcenter STAR-CCM+ to increase hull efficiency by 36 percent without sacrificing capacity

THE PEP PARTNERSHIP ON ECODRIVING Goals, achievements and next steps November 2017

7. On-Board Computer Solution Focuses on Safer Drivers and Preventable Accidents. d. Partnership with Ft Worth, TX and Knights Waste

The Influence of Geology on the Development of Petrobras

Variable Speed Limit Pilot Project in BC

Afghanistan Energy Study

KONGSBERG MARITIME. Egil Haugsdal, President

Discovery of Design Methodologies. Integration. Multi-disciplinary Design Problems

Fleet Safety Initiative Status Summary

Robert Beckman Head, Ocean Law & Policy Programme NUS Centre for International Law

Ampl2m. Kamil Herman Author of Ampl2m conversion tool. Who are you looking at

THE A NONTECHNICAL GUIDE

Silent Danger Zone for Highway Users

Two-Stroke Diesel & X-DF Engines

Electrical Equipment and Safety: Operation, Control, Maintenance and Troubleshooting

July 2015 August 2017

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2

Protection & Control / Commissioning Engineer

Suppliers Qualification & Register

elearning PLATFORM 2018

2019 elearning Platform

Features of PSEC Educational Programs

Chevron s Fatality Prevention Team and Focus

13 th Military Airworthiness Conference 25 th September 2013 EASA Presentation. Pascal Medal Head Of Certification Experts Department EASA

A powerful alliance, System pro E part ner

At 6 AM on November 8, 2010, the second day of a voyage from Long Beach, CA to the

Transcription:

Keynote Address DPPS A Petrobras DP Safety Program Afonso André Pallaoro Petrobras/E&P Service 1 Return to Session Directory

DPC DYNAMIC POSITIONING CONFERENCE DPPS A Petrobras Dynamic Positioning Safety Program 2

Introduction DPPS A Petrobras Dynamic Positioning Safety Program 1. Petrobras Scenario 2. History of DPPS 3. DPPS Projects 3

Petrobras Scenario DP rigs, a successful tool used to drill, complete and carry out workovers in sub sea wells. 80% of the Brazilian oil and gas production is extracted from the sea. Several different working environments, some of them specific to the Brazilian offshore fields. 4

Petrobras Scenario Risk Contracts 1978 - Sedco 471 1980 - Ben Ocean Lancer 1981/1982 Pelerin 1982 - Sedco 472 First Petrobras Contract => Pelerin in 1984, which in 1985, discovered the giant Marlim field, in Campos Basin, at 853 m wd. 5

Number of DP vessels contracted by Petrobras 6

Black-out rate per 1000 operational days 7

Disconnection rate per 1000 operational days 8

DPPS History First period Great number of DP incidents mainly due to the following reasons: Poor operational procedures and lack of contingency plans; Inappropriate operational safety limits; Unfamiliarity of Petrobras technicians with DP rigs details. Petrobras started to carried out many DP rig studies. 9

DPPS History Second Period Increasing in the number of DP rigs 1992 => Creation of DPPS - Dynamic Positioning Safety Program In partnership with foreign contractors to avoid incidents or at least to minimize their consequences. using a proactive policy. 10

DPPS History Third Period 1996 => increase from 7 to 20 DP vessels Present DPPS structure One Petroleum Engineer focused on the operational area Two Equipment Engineers focused on equipment Four Electrical Technicians focused on DP audits & sea trials 11

DPPS Projects Petrobras independently developed a number of concepts, norms and procedures establishing an integrated "operational philosophy" for f DP rigs The principal challenges with DPPS are the following: exploration in deep and ultra deep water; coexistence of several units in close proximity and crowded seabed. ed. DP operations in shallow water. There are currently 14 projects in progress that aim to tackle each e one of the challenges described above. 12

DPPS Projects 1. Weather Forecasts: Objective provide all rigs with precise, reliable information and build up a data bank for our research center. Present Situation - wind and wave bulletins being delivered twice a day. Future Plans Petrobras sea currents forecast project will be on line in the next few months. 13

14

DPPS Projects 2. DP incidents data bank (BDIP): Objective learn from incidents to improve reliability. Present Situation - recently revised after software change. Future Plans increased use of statistics and development of links with other software. 15

INCIDENTS SINCE 1978 Operational Degradation Yellow Alarm Status Red Alarm Status Degraded Operational Status Immediate Red Alarm Status Emergency Disconnections Black-outs Total Number of Operational Days Mean Time Between Disconnections Number 31 106 90 376 53 128 56 71040 555 Mean Time Between Black-outs 1269 16

25 20 15 10 5 0 24 19 17 PETROBRAS / E&P-SERVICES Red Alarm - Basic Cause - 1992/2004 15 11 9 4 2 1 17 Human Error Weather Condition Failure/Lack of Maintenance Protection System Project and Commissioning Control Software Lack of Procedures Technological Limitation Acts & Nature PETRÓLEO BRASILEIRO S.A. PETROBRAS

16 14 12 10 8 6 4 2 0 15 8 PETROBRAS / E&P-SERVICES Red Alarm - Basic Cause - 2000/2004 6 6 4 4 3 2 18 Human Error Failure/Lack of Maintenance ProtectionSystem Weather Condition Control Software Lack of Procedures Project and Commissioning Technological Limitation PETRÓLEO BRASILEIRO S.A. PETROBRAS

14 12 10 8 6 4 2 0 14 PETROBRAS / E&P-SERVICES Blackout - Basic Cause - 1992/2004 12 9 6 2 19 Protection System Human Error Fail / Lack of Maintenance Project and Commmisioning Lack of Procedures PETRÓLEO BRASILEIRO S.A. PETROBRAS

10 9 8 7 6 5 4 3 2 1 0 10 PETROBRAS / E&P-SERVICES Blackout - Basic Cause - 2000/2004 6 4 3 1 20 Human Error Protection System Fail / Lack of Maintenance Project and Commissioning Lack of Procedures PETRÓLEO BRASILEIRO S.A. PETROBRAS

DPPS Projects 3. Restriction Diagram: Objective minimize consequences in case of black-outs, using a tool called a restriction diagram that demonstrates a volume centered on the DP rig where no obstacles are permitted. Present Situation - second generation diagram (2G) being used and information collection for 3G. Future Plans implementation of 3G. 21

Restriction Diagram MARLIM - SS-43 TMEF = 1500 dias; TDP/LDA = 2,5 1200 0 330 1000 30 800 300 600 60 400 270 200 0 90 drive-off superfície sub-superfície 240 120 210 150 180 22

DPPS Projects 4. Procedure Prior to Arrival on Location: Objective safe working conditions at new well locations. Present Situation procedure describes escape routes, acoustic interference, nearby obstacles, etc. Future Plans 3 rd dimension visualization of sea obstacles. 23

DPPS Projects 5. Position Reference System: Objective reliability based on state of the art technology. Present Situation permanent use of two DGPS and two independent acoustic systems. Future Plans seek alternatives for the next scintillation period, which starts in 2008. 24

DPPS Projects 6. EDS and Degraded Status Criteria: Objective to perform successful disconnections in all situations. Present Situation - guidelines for all operations as well as Degraded Status Criteria for all DP rigs. Future Plans - guidelines updating and new format for Degraded Status Criteria document. 25

If the WSOG is not established, the following graph sums up our guidelines to work with DP rigs safely. WARNING START NO OFF SETS With OFF SETS NORMAL STATUS DEGRADED STATUS 3% WD - Rig 6% WD - Rig YELLOW ALARM STATUS RED ALARM STATUS CAUSE Loss of Redundancy Progressive loss of station keeping capability Sudden loss of station keeping capability (black-out) EFFECTS Degraded Yellow alarm/ red alarm Immediate red alarm CONSEQUENCE Without loss of position - Possible cease of operations (Critical Operation) Loss of position with control preparation for disconnection => disconnection Loss of position without control => Immediate disconnection 26

A degraded status signals a threat of an emergency disconnection.. It means loss of redundancy of equipment or systems responsible for the station keeping capability of the unit. Redundancy is understood as: numerical, configuration, load rate and failure mode. When a degraded status is configured the staff must meet immediately to find the best solution for the well. The document Degraded Status Criteria is one of the most important results of a Petrobras inspection, done when a new rig is received ed or updated. It describes the minimum equipment and system configuration necessary for normal station keeping and also the general limit values for alarms in each stage of position loss, including all kinds of operations performed by the rig. 27

DPPS Projects 7. Contingency Plans for Uncontrolled Drift (black-out situation): Objective prepare key DP personnel for emergency situations. Present Situation - black-out tests performed each semester for all DP rigs. Future Plans establish goals for black-out time recovery, with or without simulated failures. 28

DPPS Projects 8. DP Rig Audit: Objective audit technical specification, procedures and personnel behavior using a multi-disciplinary work team in charge of rig inspections. Main focus find and eliminate potential single point failures. Present Situation conduction of vessel acceptance and annual trials. Future Plans develop new software that automates audits, uses a tablet PC and interconnects with other software. 29

The flow chart describes the steps to be followed before acceptance trials are carried out on a new DP rig: FAT Sea Trials CAT - Commissioning Tuning and Debugging Manufacturer Reports Diagrams, Schemes, Tables, Manuals, Capability Plots Construction, Conversion, Upgrade Theoretical FMEA DP Trials, Field FMEA and Recommendations DPPS Inspections Classification Society Inspections and Auditing Procedures, Maintenance Plans and Owner Company Certificates Non-conformances List / Recommendations / Degraded Status Criteria 30

DPPS Projects 9. Non-conformances Data Bank (SPS): Objective software to manage and control non-conformances. Present Situation comprehensive status report on all non- conformances, including: software alerts Petrobras staff about the time remaining to confirm non conformances solutions carried out by contractors. % solved in a stipulated period of time historical trends for its solution, etc. Future Plans continuous improvements such as alerts Petrobras staff about the time spent by contractors to solve non-conformances. classification of non-conformances according the time spent for solution, etc. 31

DPPS Projects 10. Bid Requirements: Objective keep technical specifications updated using cost / benefit analyses of new technology and/or lessons learned from incidents. Present Situation - last update conducted in 2004 at a seminar with the participation of contractors. Future Plans continuous improvement of bid requirements taking into account feedback from periodic meetings with contractors. 32

DPPS Projects 11. Key DP Personnel Log Book: Objective software to reduce human errors by registering and confirming employee s professional qualification / expertise. Present Situation employee data bank software being developed to register all key personnel. Future Plans to meet not only international requirements but those of Petrobras as well, which in fact are more detailed and demanding than international ones. 33

DPPS Projects 12. On Board Petrobras Representative Training: Objective improve Petrobras representatives DP knowledge Present Situation all on board Petrobras representatives attend training courses. Future Plans to constantly improve aforementioned courses. 34

PETROBRAS REPRESENTATIVE KIT \\sbcfs01a\us-ss\cpse\gestão\06- Gestão das Informações\Diversos\DPPS\Kit Fiscal DPPS Section A DP Rigs Characteristics. Section B DP Incidents Data Bank (BDIP). Section C DP Rigs Emergency Disconnections on WCT/ PAB. Section D DP Rigs Moving Between Wells Procedure. Section E Well Stimulation Vessel Procedure. Section F Acoustic Interference Procedure. Section G Emergency Disconnection Procedure. Section H Operational Limits in Accordance with Environmental Conditions. Section I Degraded Status Criteria. Section J Guidelines for Emergency Disconnections. Section K Weather Forecast and DP Status. Section L Restrictions Diagram. Section M Black-out Simulation Test Procedure. 35

DPPS Projects 13. DPPS Quality Control: Objective satisfy Petrobras quality control guidelines. Present Situation- an indicator named TSODP (DP Operations Safety Rate), registers black-out or emergency disconnections. For 2005 the goal is less than five incidents. There have been two t incidents so far this year. Future Plans - focus on human errors. 36

DPPS Projects 14. New Projects: Objective improve reliability on other DP vessels working for Petrobras. Present Situation acceptance trials for 10 DP shuttle tankers, 4 well stimulation vessels and other DP vessel types. Future Plans our operational policy implemented on all DP vessels. 37

Thank You 38