B. Sc., Mechanical power science Engineering, May 1987, Monofia University. - Construction Safety Health 30 hours Administration Training by (OSHA).

Similar documents
ELE-OS-E-2002 Start-up Shift Operation Engineer & Permit Coordinator PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS

78-EL-CS-E-1994 Senior Electrical Engineer. PERSONAL DATA Nationality : Egyptian

ELE-MOS-E-2006 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ELE-CMS-E-2001 Electrical Manager PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ELE-CDGPS-E-1980 Senior Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

MEC-CM-E-2001 Lead Mechanical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

: Nubaria Module III - Egypt (2x250MW GE gas turbines frame 9 FA)

ICX-CMOS-S-2004 Senior I&C Technician PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ELE-CMOS-E-1987 Electrical Construction & Maintenance Manager PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS

ELE-CMOS-E-2001 Manager of Electrical Construction Dept. PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ELE-PT-E-2003 Senior Electrical Protection & Commissioning Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS

ELE-MPT-E-2009 Senior Maintenance & Protection Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ELE-CMS-E-2007 Electrical Project Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Approximately 13 years experience in H.V and L.V projects, 9 years in Egypt and two years in Emirates and two year in SAUDI ARABIA

ELE-CMOS-E-2004 Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ICX-CMOS-E-2000 Lead I&C System Engineer(Comm./ GT Controller) PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS

Engineers Ireland Site Visit 23 rd March 2010

P U B L I C T R A I N I N G

Control Systems. Power Generation and Distribution AUTOMATION. Hydro. Thermal. Gas/Diesel

ELE-COS-E-1986 Electrical Lead Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Retrofitting of Mitsubishi Low NOx System

Aswan high dam - Distributed control system AUTOMATION

ICX-CMOS-E-2004 Senior I&C Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Bayt.com Middle East Job Index. August 2013

SGT5-8000H / Irsching 4 Siemens H class gas turbine Pioneering efficiency with world class flexibility

Holds a B. Sc. in Communication Engineering and has about 21 years experience in testing and protection of several substations.

Guidelines on Bus Tendering & Specifications. Mohamed Mezghani Head of Middle-East and North Africa Office

NYISO Tariffs. New York Independent System Operator, Inc. Document Generated On: 2/27/2013

MHI-MME WHRS - STG. Environment friendly and economical solution MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

Mitsubishi Hitachi Power Systems America. Coal to Gas Conversions

USP&E Item # Manufacturer Model Year Hours Wattage(kW) Frequency Fuel Type Quantity Less Than Selling for Scope of Supply Notes

Tim Eastham BSc (Hons) CEng MIMechE ACILA

Making Electricity since December Melody Collis Facilities Engineering Assistant Manager Toyota Motor Manufacturing Canada

USP&E Item # Manufacturer Model Year Hours Wattage(kW) Frequency Fuel Type Quantity Less Than Selling for Scope of Supply Notes

Advanced gas turbine power cycles

Brief Introduction of The Selling Gen-set

Appendix G Examples and Recommended Methods

ELE-PT-E-2005 Electrical Testing & Protection Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Document Code: 1 (8) Issuing date: Status:

ANNEX A-5 GAS TURBINE JET ENGINE EXPANDER TURBINE STEAM TURBINE GENERATOR

MERS. MERS Presentation MITSUBISHI ENERGY RECOVERY SYSTEM FOR MOTOR VESSELS. Feb., Engineering Dept., Marine Machinery Div.

Steam Turbine performance improvement solutions for Indian fleets

GASCO Habshan SRUs - Challenges of Operation. Abdulkader Ahmed Al Kasem, Jumaa Al Marzouqi

Tim Eastham BSc (Hons) CEng MIMechE ACILA

CSP-gas hybrid plants: Cost effective and fully dispatchable integration of CSP into the electricity mix

Power Generation Flexibilisation Case Studies from Germany. By Ronald Rost & Arun Kumar Sarna

Organization Structure

OMAR - Power Generation AUTOMATION

LIST OF OPEN TRAINING TRAINING PLANNER 2016/2017 Course location: Lagos, Abuja, Port Harcourt.

MAN engines supporting Wind power EAPIC, Nairobi, 2 nd September 2010

Artesis MCM Case Studies. March 2011

Turbine Lubricant Varnish Removal Case Studies using SVR

ELE-GPT-E-1988 Protection & Control Consultant PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Energy Systems Service Pte Ltd

Supercritical Sliding Pressure Operation Once-Through Boiler

Increasing competitiveness of CCGT plants in a dynamic market: An owner s approach

Towerpak Boiler. The versatile boiler to burn virtually any fuel economically

Handbook. Proven, reliable, and efficient. For Powerplant Planning, Evaluation, Operation and Maintenance

LOUIS BERGER POWER 2018 CALENDAR. power.louisberger.com

Appendix B8 Combined Cycle Cogeneration Block Cause Codes

High-voltage Direct Inverter Applied to Induced Draft Fan Motor at Takehara Thermal Power Station No. 3 of Electric Power Development Co., Ltd.

Unit C of the Scholven Power Plant Automated with System 800xA

Interconnection between Arab countries

INTECH AUGUST QHSE PERFORMANCE

Electrical Equipment and Safety: Operation, Control, Maintenance and Troubleshooting

Covering Letter and CV to Chalmers

AE94.3A Flexibility Upgrade

A&WMA, CA SCAQMD, Diamond Bar, CA. Challenges for Meeting New Lower Air Emissions

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

Methanol As Low Cost Alternative Fuel For Emission Reduction In Gas Turbines and Utilities Boilers

PLANT HATCH FEEDWATER SYSTEM OPERATING EXPERIENCE. Significant events from 2015

Vasilikos Power Station

Intersel Dowding and Mills FZCO Company Profile - Aug 2015

Upcoming Public Training Courses in Sana a-yemen (July -Dec, 2013 )

Curriculum Vitae Dr. Mohamed A. Elgamil

Refurbishment Solutions

ISLANDING SCHEME FOR STATION DURING GRID BLACK-OUT

National Research Council

Macroeconomic Outlook. Presented by Dr. Bruce A. Scherr Chairman of the Board Chief Executive Officer Emeritus

SOAPP-CT.25 WorkStation 11/1/00. Equipment List Project: Sample Outputs Conceptual Design: Cogen, 1 x 27 MW, NG, Quarterly

Introducing the TM /

OPAL : Commissioning a New Research Reactor. IAEA Conference, Sydney, November 2007

Curriculum Vitae Fredrik Rüter 19 December 2013

PILOT PLANT DESIGN, INSTALLATION & OPERATION Training Duration 5 days

OVERHAULING JOBS (STG)

HRSG Operational Challenges and Siemens Solutions

Siemens BRI Summit 2018 Country Pavilion CC China

SEASONAL MAINTENANCE CHECKLISTS Johnson Controls

Resale List - December Power and Industrial Plants for sale

BOILER PM & INSPECTION

Energy Conservation Opportunities in Steam & Condensate Network. Forbes Marshall Pvt Ltd 1

Utilisation of High CO2- Content Flare Gas for Steam and Electricity Generation. Santiago Pástor Technical Manager PETROBRAS Ecuador December 2008

UPDATED LOW NOx COMBUSTION TECHNOLOGIES FOR BOILERS, 2003

QUALIFICATIONS AND CAREER ACHIEVEMENTS

Gas Turbine Technical Data

Power Generation Services Solutions for challenging Markets

Fuel Conveying System Steam Boiler Design Data: 45 tons per hour, 68 bar(a), 485 C Generator Capacity: 11 MW el

Lecture 7a: Large Scale Oxyfuel Demonstrations. G Hesselmann APP OFWG Capacity Building Course 5 th & 6 th February 2009, Daejeon, Korea

Commencement of the Commercial Operation of 600 MW Unit, "Hirono No. 5 Thermal Power Station of The Tokyo Electric Power Co., Inc.

YONGKWANG FLEXIBLE IND. CO., LTD.

Transcription:

PM-SOM-E-0137-1987 Mechanical Commissioning Manager He is an expert in fossil fuel power generating plants operation and commissioning. He has 23 years of experience in this field (in Egypt, KSA, Syria and Iran) and a B.Sc. in Mechanical Engineering. He also has the complete knowledge and experience in power plants electrical and Control systems. Besides his technical capabilities, he is a field leader in power plants operation, troubleshooting and commissioning phases. NATIONALITY: Egyptian EDUCATION: B. Sc., Mechanical power science Engineering, May 1987, Monofia University. YEAR OF BIRTH: 1965 TRAINING COURSES: - Construction Safety Health 30 hours Administration Training by (OSHA). - GE Turbine Generator and Boiler Feed water Pump Advanced Operation & Maintenance, for El-Kureimat Thermal Power Station. Schenectady, New York August 1996 to Nov 1996 - Mitsubishi and Toshiba, safe and efficient operation and maintenance of Boiler, Turbine, Generator and Auxiliaries, Assiut Thermal Power Plant Unit No. 1 (1 x 325 MW). Japan, October 1990 to January 1991 - Bechtel Advanced Operation Training, Shobra El-Kheima Thermal Power Plant, Cairo (4 x325mw) Ansaldo Front & Rear Natural Gas: HFO fuel, Natural Circulation Boiler, Westinghouse T/G. Cairo, August 1989 to May 1990 COMPUTER SKILLS: - Windows, Microsoft office LANGUAGE CAPABILITIES: - Arabic (native language) - English (good) EGYPTROL 1/5 PM-SOM-E-0137-1987

CHRONOLOGICAL EXPERIENCE RECORD: Date: Oct. 2008 Present (July 2010) Employer: EGYPTROL Job title: Mechanical Commissioning Manager - Prepare commissioning procedure for mechanical systems. - Plan for and supervise companies commissioning team activities in different job sites. - Participate in offers preparation in bidding phase. - Participate in electromechanical systems engineering work. Date: Jan. 2008 - August 2008 Employer: KOCH/MAN Consortium Company - Iran Job title: Commissioning Coordinator Project: Petrochemical Fajr 1- Power Plant - Two gas turbines General Electric (GE) frame 9E.125MW each. - The control mark5. - Generator (ALSTOM). - Responsible for cold and hot function tests of the unit. - Conducted the water and oil systems flushing. - Participate in conducting the reliability run test. - Conducted Client Training on behalf of GE. Date: Feb. 2007 - Dec. 2007 Employer: KOCH/SEIMENS Consortium Job title: Leader of the Boiler and Auxiliaries Start-up In-charge Shift Engineers Project: Al Naserria power plant extension - SYRIA Converting the plant to Combined Cycle operation - Existing 3 Fiat Avio gas turbines, 115 MW each. - Siemens 150 MW Steam Turbine/ air cooled Generator, bypass system, direct contact jet condenser cooled through a dry air cooling tower. - NEM HRSG with HP & LP drums and forced recirculation pumps. - All other BOP auxiliaries such as RO Demi plants, condensate polisher, raw and sanitary water systems, etc. - Responsible for cold and hot function tests of the unit. - Conduct the water systems flushing and boiler chemical cleaning. - Conduct the boiler and steam piping blowout. - Participate in conducting the reliability run test. - Prepare the operation instructions documents for each plant s alarm Signal Date: Dec. 2006 - Feb. 2007 Employer: ALSTOM PEMCO (Power Equipment & Materials Co. LTD.) EGYPTROL 2/5 PM-SOM-E-0137-1987

Job title: Project: PTW & Coordinator Eng. Rabigh Power Plant - Overhaul for units 2 and 4 (2 X 260 MW each) Crude /HFO fired CE, drum type forced circulation reheat boiler, with IDF /FDF /GRF, ESP, Ash handling plant, MHI STG with HP/LP Bypass system, H2 cooled Generator. - Define units existing problems to be corrected during the overhaul by analyzing all the units operating parameters before shutdown. - Responsible for issuing all plant permits to work during the overhaul. - Leading all coordination meetings between the Client and the overhaul Contractor Team. - Responsible for conducting Boiler performance tests prior and following the overhaul. Date: Oct. 2005 - July 2006 Employer: ALSTOM POWER-SAUDI ARABIA Job title: Shift Leader Project: Shoaiba Power Station Stage 2 (6Units) 6 x 400 MW Crude /HFO fired CE, drum type forced circulation reheat boiler, with IDF /FDF /GRF, ESP, Ash handling plant, ABB/KWU condensing steam turbine consisting of HP cylinder, IP cylinder and LP cylinder. ADVANT ABB control system, 5X6MW Emergency & Black start diesel Generators, auxiliary boiler system, hydrogen production system. - Coordinate and monitor systems flushing procedures, steam blows - Coordinate and monitor systems pneumatic and hydrostatic testing. - Supervise the operational testing, commissioning and startup of the plant. - Perform isolation and safety tag out of equipment. - Equipment operation training for the Client personnel. - Developed, proved success by implementing for the first time the unit cold start up curves. - Participate in the Reliability and Performance testing hot start-up operation demonstration) Date: Oct. 2004 - Oct. 2005 Employer: PGESCo. (Power Generation & Engineering and Service Company) Job title: Lead Mechanical Start-up engineer Projects: Nubaria power station (2 Units) 2 x 750 MW (Combined Cycle) consists of:- - 4 x 250 MW SEIMENS Gas Turbine - ALSTOM Heat Recovery & DCS - MITSUBISHI Heavy Industry Steam Turbine - METITO Water treatment - CONSIS Switchyard live line wash system - INITEC Balance of Plant - Support engineering, operation by scoping for drawings to finish the simple cycle at the target date. - Participate in preparing the plant construction Contract Packages. EGYPTROL 3/5 PM-SOM-E-0137-1987

- Review the commissioning procedures and support the contractors to meet the project schedule. - Review, approve and accept all plant cold & hot function tests. - Prepare for flushing, chemical cleaning and steam blow-out. Date: Apr. 2001 - July 2004 Employer: ALSTOM POWER Job title: Shift Charge Engineer Project: Shoaiba Power Station Stage 1 (5Units) 6 x 400 MW Crude /HFO fired CE, drum type forced circulation reheat boiler, with IDF /FDF /GRF, ESP, Ash handling plant, ABB/KWU condensing steam turbine consisting of HP cylinder, IP cylinder and LP cylinder. ADVANT ABB control system, 5X6MW Emergency & Black start diesel Generators, auxiliary boiler system, hydrogen production system. - Coordinate and monitor systems flushing procedures, steam blows - Coordinate and monitor systems pneumatic and hydrostatic testing. - Supervise the operational testing, commissioning and startup of the plant. - Perform isolation and safety tag out of equipment. - Equipment operation training for the Client personnel. - Developed, proved success by implementing for the first time the unit cold start up curves. - Participate in the Reliability and Performance testing hot start-up operation demonstration) Date: Jan. 2000 - April 2001 Employer: Power Genration Engineering and Services Company (PGESCO) Job title: Start up & Shift Charge Engineer Projects: Ayoun Moussa Thermal Power Station 2 x 320 MW - Review the commissioning procedures and support the contractors to meet the project schedule. - Review, approve and accept all plant cold & hot function tests. - Prepare for flushing, chemical cleaning and steam blow-out. - Participate in the Reliability and Performance testing. hot start-up operation demonstration). EGYPTROL 4/5 PM-SOM-E-0137-1987

Date: July 1999 Nov. 1999 Employer: ABB SIM- Jorf Lasfar Energy Company (JLEC), Morocco Job title: Commissioning & Start-up Engineer Project: Jorf Lasfar Thermal Power Station Units 3 & 4 2 x 345 MW Forced Circulation, Coal / HFO Fired, ABB (Combustion Engineering) design boiler, ABB (Power Generation Limited) Turbine / Generator & DCS, ABB (Sae Sadelmi) B.O.P., Aquatech Water Treatment System. Date: May 1999 - July 1999 Employer: Babcock Wilcox (B & W) Job Title: Commissioning Engineer Project: Ayoun Moussa Thermal Power Station 2X320 MW Natural circulation boilers (2 boilers and auxiliary boilers) Forced draft fans and Gas recirculation fans and 18 burners. Date: May 1996 - May1999 Job title: In-Charge Shift Engineer Project: North Upper Egypt Zone, El-Kurimat Thermal Power Station 2 x 627 MW Natural Circulation, Natural gas / HFO Fired B&W "El Paso" design boiler, GE T/G with Mark V control, Fisher HP/LP Bypass System and Westinghouse WDPF (DCS). Bamag Water Treatment System. Date: April 1990 - May 1996 Job title: In-Charge Shift Engineer Project: North Upper Egypt Zone, Assiut Thermal Power Station 2 x 325 MW Mitsubishi (CE designed) forced circulation / Natural gas HFO Fired Boiler with ABC Control, Toshiba T/G and its auxiliary HP/LP Bypass System, Toshiba DAS, Mitsubishi BoP. Date: 1988 - April 1990 Job title: Operation Engineer Project: Cairo zone, Shobra El-Kheima Thermal Power Plant 4 x 325 MW Ansaldo natural circulation front & rear NG / HFO Fired Boiler, Westinghouse T/G, HP/LP Bypass System. EGYPTROL 5/5 PM-SOM-E-0137-1987