Government Of India Ministry of Power. Central Electricity Authority. New Delhi

Similar documents
Government Of India Ministry of Power Central Electricity Authority New Delhi. Executive Summary Power Sector February-16

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

Government Of India Ministry of Power Central Electricity Authority New Delhi

Executive Summary on Power Sector. Jul-18

भ र त स र क र क न र य व द य त प ध क र ण C E N T R A L E L E C T R I C I T Y A U T H O R I T Y

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

भ र उत प द स त लन रप टर LOAD GENERATION BALANCE REPORT

Employees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India

Government Of India Ministry of Power Central Electricity Authority New Delhi

Chapter 1 POPULATION

POPULATION. Chapter 1

04-Jun-08 FILE NAME : GSDPCRNS STATE SERIES

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

Description Rural Urban Combined. Weights June 18 Index (Final) July 18 Index (Prov.) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)

INDIAN HORTICULTURE PRODUCTION - AT A GLANCE ( and to )

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

Chapter 2 HEALTH. Women & Men In India

GOVERNMENT OF INDIA MINISTRY OF HOME AFFAIRS LOK SABHA UNSTARRED QUESTION NO. 2009

The Electric Power System

14.Storage Infrastructure

Gujarat Power Sector A Statistical Profile

Remote Village Electrification

Population and decadal change by residence -India: 2011 (Persons)

RPO-REC Framework: Emerging Challenges and way forward. Background Presentation

India Solar Market Update Q Executive Summary.

northeast group, llc India Smart Grid: Market Forecast ( ) January group.com

ECONOMIC SURVEY STATISTICAL APPENDIX

Meeting with Commissioner, Kendriya Vidyalaya Sangathan (KVS) New Delhi 11 April 2016

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018

Status Review Report on Implementation of Batteries (Management and Handling) Rules, 2001 (as amended thereof)

Unnat Jyoti by Affordable LEDs for All Conserve Electricity, Conserve Energy

Solutions for Full Length Test - 4

Frequently Asked Questions for Grid Connected Solar Rooftop Systems


CONTENTS. Table Subject. I Area under Rubber and Average Yield per hectare

India Power Generation March 2018


Title of the Presentation

Solar Regulations Grid Connected, Ground Mounted and Solar Roof Top स र ऊर ज ग र ड कन क ट ड जउ ड मजउ ट ड और स लर र फट प एव म टरर ग ववननयम

Deen Dayal Upadhyaya Gram Jyoti Yojana Creating Efficiency in Electricity Distribution

PRESENTATION ON STRATEGIC APPROACH TOWARDS WIND SOLAR HYBRID SYSTEMS (SWES) FOR REMOTE TELECOM SITES IN INDIA & CASE STUDY OF RAJASTHAN

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

Power Distribution Tariffs in India 2016 Discom Wise & Consumer Wise Comprehensive Track

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त. North Eastern Regional Power Committee

INDUSTRY SALES REVIEW. July 2017

Ph. No: Fax No: Website:

Issue 12. micrometer. data as of 31 st December 2014

Ph. No: Fax No: Website:

MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG, NEW DELHI

Ph. No: Fax No: Website:

Ph. No: Fax No: Website:

च च म ज च द य त कम पन च चमट ड प र व व क स, म क व कल सम ह, तह-७, र इवज व यर पदक प रवतय व त त मक वलव त पर क ष क प ठ यक रम

Ñf"k funsóky;] vameku rfkk fudksckj izóklu] gsmks] iksvz Cys;j

SOLAR PLANT PERFORMANCE IN INDIA

Doc: TED 7(743)W November 2009 Draft Indian Standard AUTOMOTIVE VEHICLES TUBES FOR PNEUMATIC TYRES SPECIFICATION (First Revision of IS 13098)

Comments, if any, may please be made in the enclosed format and mailed to the undersigned at the above address.

SOUTHERN REGIONAL POWER COMMITTEE

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.35 ANSWERED ON

Industry Performance Review Report of PPAC: May18

Ph. No: Fax No: Website:

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त. North Eastern Regional Power Committee

Enhancing Grid Stability in India

ईट ड 11/ ट

ETHANOL BLENDED PETROL PROGRAMME

HVDC Systems in India

File No.CEA-PS-13-22(13)/1/2018-PSPM Division

Government of India क ष एव ककस न कल य ण म त र लय, Ministry of Agriculture and Farmers Welfare (क ष, सहक ररत एव ककस न कल य ण षवभ ग)

Industry Consumption Review. July Industry Performance Review Report of PPAC: July18

Target October (Month) April-October (Cumulative) (Apr- Mar)

(URL: F /KV Damoh/ / Date:

INDRA MARSHAL POWER TILLER

Indian Power System Framework

INDUSTRY SALES REVIEW. October 2017

ईट ड 16/ ट

Session IV ESMAP Approach and Pilot Overview

Industry Sales Review March 2018

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 2003 क परभप लन ललए एस ट आई Doc: STI/12406/3, October 2017

Bangladesh s Power Sector : At a Glance

Indian Energy Exchange December For Public Use

Power Sector Trends: Focus on States

Unorganised Manufacturing Sector in India Its Size, Employment and Some Key Estimates

DOC: STI/10322(Part 5/Sec 3)/2, September 2016

ANNUAL REPORT

vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY

Rajasthan Public Service Commission 2016

Different Techniques of Loss Minimization in Distribution System

INSTITUTE FOR PLASMA RESEARCH. An Aided Institute of Department of Atomic Energy, Government of India

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 1998 क परभप लन ललए एस ट आई Doc: STI/14587/3, October 2017

Target December (Month) April-December (Cumulative) (Apr- Mar)

Unit-wise production details with reasons for shortfall have been given in following subsections:

File No.CEA-PS-13-17(14)/2/2018-PSPM Division. CEA /PS/PSPM/07/07/2018/ Dated:

LT ATUL KATARYA MEMORIAL SCHOOL. Affiliated to ICSE New Delhi (Affiliation No. HA023) Lt AtulKatarya Marg, Near Sheetla Mata Parisar, Gurgaon,

प 7 म, ज र करन क त र ख.., व ट क न च, न न ल खत अ त: थ पत

Report. the feasibility of

Transcription:

Government Of India Ministry of Power Central Electricity Authority New Delhi Power Sector Feb-217

Executive Summary for the Month of Feb, 217 Contents SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Feb 217 (BU) 1A & 1B 2 Generating Capacity Addition for Feb 217 (MW) 2 3 List of Projects Commissioned in Feb 217 3 4 All India Installed Capacity (MW) Region-wise as on 28.2.217 3 5 All India Installed Capacity (MW) Sector-wise as on 28.2.217 4 6 Transmission Lines Added during Feb 217 (Ckms) 5 7 Transformation Capacity Addition during Feb 217 (MVA) 6 8 Power Supply Position (Energy & Peak) in Feb 217 7 9 Peak Shortage of Power Supply (MW) in Different Regions 8-9 1 All India PLF Sector-wise for Feb 217 1 11 T & D and AT & C Losses (%) 12 All India Village Electrification & Pumpsets Energised as on 28.2.217 13 Average cost of Power & Average Realisation 11 14 All India per capita consumption of Electricity (KWh) 15 All India Coal consumption for Power Generation (MT) Section B - Capacity Addition 1 Capacity Addition Targets and Achievements in 12th Plan 12 2 Capacity Addition Targets & Achievements during Feb 217 13 3 Installed Capacity in various Regions including their shares. 14-19 Section C - Transmission Lines 1 Programme and Achievements of Transmission Lines in Feb 217 2 2 List of Transmission Lines Commissioned/Ready for commissioning during Feb 217 Section D - Sub Stations 1 Programme and Achievements of Sub-Stations in Feb 217 21 2 List of Sub Stations commissioned/ready for commisssioning during Feb 217 Section E - Electricity Generation 1 Electricity Generation (MU) Targets and Achievements for 216-17 22 Section F - Power supply position 1 Power Supply Position (Provisional) for Feb 217 23 2 Peak Demand and Peak Met (Provisional) for Feb 217 24 3 Power Supply Position (Revised) for Jan 217 25 4 Peak Demand and Peak Met (Revised) for Jan 217 26 5 Notified Power cuts / Restrictions on Industries during Feb 217 27 6 Power Supply to Agricultural Sector during Feb 217 28 Section G - Growth of Power Sector 1 Growth of Installed Capacity since 6th Plan 29 2 Growth of Transmission Sector since 6th Plan 3 3 All India Yearly Coal consumption for Power Generation (Utilities) 4 All India Annual Per Capita Consumption of Electricity since 26 31 5 Average cost of power supply & Average realisation (Paisa/kwh) 6 Growth of Rural Electrification & Pump Sets Energisation 32 7 Status of Hydro Schemes Cleared by the CEA upto Feb 217 Section H - Rate of sale of power for the year 214-215 1 Rate of sale of power for the year 214-215 33-41

Section A - Highlights of Power Sector SN Contents Page 1 Electricity Generation (Conventional Sources) for Feb 217 (BU) Electricity Generation (Conventional & Renewable Sources) for Jan. 217 (BU) 1A 1B 2 Generating Capacity Addition for Feb 217 (MW) 2 3 List of Projects Commissioned in Feb 217 3 4 All India Installed Capacity (MW) Region-wise as on 28.2.217 3 5 All India Installed Capacity (MW) Sector-wise as on 28.2.217 4 6 Transmission Lines Added during Feb 217 (Ckms) 5 7 Transformation Capacity Addition during Feb 217 (MVA) 6 8 Power Supply Position (Energy & Peak) in Feb 217 7 9 Peak Shortage of Power Supply (MW) in Different Regions 8-9 1 All India PLF Sector-wise for Feb 217 1 11 T & D and AT & C Losses (%) 12 All India Village Electrification & Pumpsets Energised as on 28.2.217 13 Average cost of Power & Average Realisation 14 All India per capita consumption of Electricity (KWh) 11 15 All India Coal consumption for Power Generation (MT)

1. Electricity Generation for Feb, 217 (BU) Type Achievement Targets Achievement % Change Feb-16 Feb-17 Feb-17 w.r.t. 216 Thermal 79.893 81.624 79.455 Hydro 6.87 7.37 6.6 Nuclear 2.999 3.543 2.839 Bhutan Import.32.156.7 All India 89.11 92.63 88.964 -.5 93. 92. 92.63 BU 91. 9. 89. 88. 89.11 87. Feb-16 Feb-17 Electricity Generation During April 215 to Feb 216 & April 216 to Feb. 217 (BU) Type Thermal Hydro Nuclear Bhutan Import All India Apr '15 - Feb'16 Apr '16 - Feb '17 % Change 857.92 114.391 93.694 114.33 5.34 -.5 33.826 34.136.92 5.191 5.585 7.59 111.31 157.745 4.59 12. 1. 111.31 157.745 8. BU 6. 4. 2.. Apr '15 - Feb'16 Apr '16 - Feb '17 1A

Month Generation (April-January, 217) Generation Generation from from Conventional Sources Renewable Sources Electricity Generation (Conventional & Renewable Sources) April-January, 217 vis-à-vis April- January, 216 Total Generation (April- January, 216) Generation from Conventional Sources Generation from Renewable Sources Total Growth in Conventional Generation % Growth Growth in Renewable Generation Growth in Total Generation (MU) (MU) (MU) (MU) (MU) (MU) (%) (%) (%) Apr-16 99,345 5,157 14,52 86,695 4,553 91,247 14.59 13.28 14.53 May-16 99,93 6,863 16,766 95,42 5,143 1,545 4.72 33.45 6.19 Jun-16 97,326 8,11 15,436 89,98 6,9 95,998 8.25 33.17 9.83 Jul-16 94,66 9,544 14,15 93,142 8,872 12,13 1.57 7.58 2.9 Aug-16 95,237 9,634 14,871 95,122 7,529 12,651.12 27.96 2.16 Sep-16 98,72 8,313 16,385 95,741 5,485 11,226 2.43 51.55 5.1 Oct-16 99,71 6,272 15,982 98,631 4,354 12,985 1.9 44.5 2.91 Nov-16 93,569 5,2 98,571 85,96 4,141 9,47 8.92 2.79 9.47 Dec-16 95,252 5,445 1,697 95,123 4,976 1,99.14 9.43.6 Jan-17 95,69 5,789 11,479 92,129 4,377 96,56 3.87 32.26 5.15 Total 968,711 7,129 1,38,84 74,546 55,519 786,713 3.81 26.31 32.5 Source-Wise All India Generation from Renwables Wind Solar Biomass Bagasse Small Hydro Others Total Electricity Generation From Renewable (source wise) April-January, 217 vis-à-vis April-January, 216 Jan., 217 For the Month of Jan., 216 238.45 156.32 1187.55 545.43 364.86 355.51 1575.54 1948.47 31.53 449.34 5.77 21.43 5788.7 4376.5 Apr., 216 to Jan., 217 41159.91 1565.9 3437.3 7427.66 722.6 336.54 7129.1 Commulative for the period 29486.97 5726.53 341.22 9559.8 7485.11 219.41 55518.32 All Figure in MU Apr., 215 to Jan.,216 1B

2. Generating Capacity Addition for Feb, 217(MW) Type Achievement Targets Achievement Feb-16 Feb-17 % Change w.r.t. 216 Thermal 62 66 93 5. Hydro 4 398.5 224 46. Nuclear All India 66 158.5 1154 74.85 14 12 1,154. 1 8 6 66. 4 2 Feb-16 1 Feb-17 Generating Capacity Addition during April '15 to Feb 16 & April '16 to Feb 17 (MW) Apr '15 - Feb '16 Apr '16 - Feb '17 % Change Thermal 12745.6 895.75-36 Hydro 1436 1594 11 Nuclear NA All India 14181.6 9689.8-32 16 14 14181.6 12 1 9689.8 8 6 4 2 1 Apr '15 - Feb '16 Apr '16 - Feb '17 2

3. List of Projects Commissioned During Feb 217 (i) Thermal Sembcorp Gayatri TPP U-2( 66) MW was Commisioned on 15.2.217 Nasik TPP PH-I (27) MW was Commisioned on 15.2.217 (ii) Hydro Teesta -III U-4 ( 2MW ) was Commisioned on 16.2.217 Chanju -I U-1 ( 12 MW ) was Commisioned on 17.2.217 Chanju-I U-2 ( 12 MW ) was Commisioned on 1.2.217 (iii) Nuclear NIL 4. All India Installed Capacity (MW) Region-wise as on 28.2.217 Thermal Nuclear Hydro RES Grand Total Region Coal Gas Diesel Total Northern 46524.5 5781.26. 5235.76 162. 19246.78 1246.98 83419.52 Western 72713.1 1123.41. 83916.42 184. 7447.5 16861.14 1165.5 Southern 39652.5 6473.66 761.58 46887.74 232. 11739.3 21721.42 82668.19 Eastern 29847.87 1.. 29947.87. 4738.12 896.63 35582.62 North-East 31. 1771.5 36. 2117.5. 1242. 28.44 3639.49 Islands.. 4.5 4.5.. 11.4 51.45 ALL INDIA 18947.88 25329.38 837.63 215214.89 578. 44413.43 518. 315426.32 35. 3. Total = 315426.32 315426.32 25. 2. 215214.89 15. 1. 5.. 44413.43 518. 4726 578. Thermal Nuclear Hydro RES Total Captive Thermal Nuclear Hydro RES Total Captive Note: Captive Genaration is not included in the total. RES as on 31.12.216. 3

5. All India Installed Capacity (MW) Sector-wise as on 28.2.217 Sector THERMAL Coal Gas Diesel Total Nuclear Hydro RES Grand Total State 63975.5 7257.95 363.93 71597.38. 29618. 1976.9 13192.28 Private 73142.38 158.6 473.7 84196.68. 3144. 4841.1 135381.78 Central 5193. 749.83. 5942.83 578. 11651.43. 76852.26 All India 18947.88 25329.38 837.63 215214.89 578. 44413.43 518. 315426.32 RES as on 31.12.216 All India Installed Capacity(MW) as on 28-2-217 (Sector-Wise) Central, 76852.26, 24% State, 13192.28, 33% State 13192.28 Private 135381.78 Central 76852.26 Private, 135381.78, 43% 4

6. Transmission Lines Added during Feb, 217 (Ckms) Voltage Level +/- 5 KV HVDC +/- 8 KV HVDC 765 KV 4 KV 22 KV All India Feb-16 759 417 1176 Feb-17 738 769 157 ckms 16 14 12 1 8 6 4 2 157 1176 Feb-17 Feb-16 Feb-17 Transmission Lines Added during Apr '15 to Feb '16 & Apr '16 to Feb'17 (Ckms) Voltage Level +/- 5 KV HVDC +/- 8 KV HVDC 765 KV 4 KV 22 KV All India Apr '15 - Feb '16 Apr '16 - Feb '17 356 2574 5429 575 159 112 6727 5292 25721 23583 ckms 27 25 23 21 19 17 15 13 11 9 25721 23583 Apr '15 - Feb '16 Apr '16 - Feb '17 5

7. Transformation Capacity Addition During Feb, 217 (MVA) Voltage Level +/- 8 KV HVDC +/- 5 KV HVDC 765 KV 4 KV 22 KV All India Feb-16 Feb-17 815 738 13 769 2115 157 Transformation Capacity Addition during Feb, 217 25 2 2115 157 MVA 15 1 5 Feb-16 Feb-17 All India Transformation Capacity Addition during Apr '15 to Feb '16 & Apr '16 to Feb '17 (MVA) Voltage Level +/- 8 KV HVDC +/- 5 KV HVDC 765 KV 4 KV 22 KV All India April' 15 to Feb '16 April '16 to Jan'17 15 2574 135 575 11785 17171 112 5292 43956 23583 7452 MVA 43956 23583 April' 15 to Feb '16 1 April '16 to Jan'17 6

8. Power Supply Position (Energy & Peak) in Feb 217 Region Energy (MU) Deficit (%) Requirement Availability Feb'16 Feb '17 Feb '16 Feb'17 Jan.16 Jan '17 Northern 25122 24,6 23933 24,222-4.7-1.5 Western 28611 27,355 2864 27,352.. Southern 2477 24,61 24495 24,69 -.9. Eastern 9544 9,224 9443 9,214-1.1 -.1 North Eastern 1111 1,89 187 1,71-2.2-1.6 All India 8995 86,879 87562 86,468-1.7 -.5 Power (MW) Region Deficit (%) Peak Demand Peak Met Feb 16 Feb 17 Feb '16 Feb '17 Jan16 Jan. '17 Northern 42794 43262 41195 42723-3.7-1.2 Western 4511 47962 4571 47789 -.1 -.4 Southern 3799 41275 3737 41155-1.6 -.3 Eastern 17239 17174 1761 1729-1. -.8 North Eastern 241 2243 2328 2234-3. -.4 All India 142924 14913 1448 148169-1.8 -.6 7

9. Peak Shortage of Power Supply (MW) in Different Regions Chandigarh Delhi Haryana HP J&K Punjab Rajasthan UP Utrakhand Feb '16 4 363 95 Feb '17 524 25 MW 12 8 4 Northern States (MW) Feb '17 Feb '16 524 363 25 95 Chandi garh Delhi 4 Haryan a HP J&K Punjab Rajasth an UP Utrakh and 4 Western States (MW) Feb '17 Feb '16 Chattisgarh Gujarat MP Maharashtra Daman & Diu Dadar Nagar Haveli Goa 3 Feb '16 369 9 6 21 2 Feb '17 8 5 12 76 1 MW 8 Chattisgarh 369 5 Gujarat 9 12 MP 6 76 Maharashtra 21 Daman & Diu Dadar Nagar Haveli Goa Southern State (MW) Feb '17 Feb '16 7 61 6 AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep Feb 5 '16 7 3 61 4 19 4 Feb '17 14 13 61 2 3 2 1 7 3 14 13 4 61 19 2 AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep 8

Bihar DVC Jharkhand Odisha Eastern West States Bengal (MW) Sikkim A&N Island Feb '17 Feb '16 Feb '16 35 93 27 29 8 Feb '17 2 15 8 15 1 5 MW 15 Bihar 35 DVC 93 Jharkhand 27 Odisha 29 West Bengal Sikkim 8 A&N Island 8 8 North-Eastern States (MW) 6Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura Feb '16 4 4 6 1 2 1 Feb '17 2 4 2 2 1 MW 4 4 2 1 Arunachal Assam Manipur Meghalay a Mizoram Nagaland Tripura 2 2 1 1 9

1. All India PLF* Sector-wise for Feb. 217 %PLF Sector Feb '16 Feb '17 Central 74.63 74.46 State 57.99 54.13 Private 65.2 59.35 ALL INDIA 65.21 61.83 Sector-Wise Plant Load Factor for Jan, 216 and Jan, 217 % PLF 8. 7. 6. 5. 4. 3. 2. 1.. 74.63 74.46 57.99 54.13 65.2 59.35 65.21 61.83 Central State Private ALL INDIA Feb '16 Feb '17 All India PLF Month-wise Month 215-16 216-17 April 62.5 67.83 May 64.16 62.24 June 59.43 6.87 July 58.36 54. August 58.1 52.3 September 64.18 58.13 October 66.86 6.9 November 6.75 6.74 December 61.75 6.46 January 63.2 6.37 February 64.95 61.83 March 63.89 All India PLF Month-wise 8 6 4 2 62.5 67.83 64.16 62.24 59.43 6.87 58.36 54. 58.1 52.3 64.18 58.13 66.86 6.9 6.75 6.74 61.75 6.46 63.2 6.37 64.95 61.83 63.89 April May June July 215-16 216-17 August September October November December January February March * For Coal and Lignite based Power Plants 1

11. T & D and AT&C Losses (%) 21-11 211-12 212-13 213-15 214-15 T&D Losses 23.97 23.65 23.4 21.46 22.77(P) AT&C Losses 26.35 26.63 25.48 22.58 24.62(P) Note: As per PFC for utilities selling directly to consumers P: Provisional 12. All India Village Electrification & Pumpsets Energised as on 31.1.217 Total Number of Villages Villiages Electrified (Nos.) as on 31.1.17 597464 59898 * Pump sets Energised Pump sets Energised as on 31-1-17 as on 31-3-216 243418 2648398 Figures are based on the data available in DDUGJY website. % Villages electrified 98.75 *Disclaimer: The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as Indicated in all the reports. The data in the report prior to October, 215 was Updated every month based on the information received from states/distribution utilities as and when reported but the data for all the states for a particular month was generally not made available simultaneously to reflect the countrywide picture for a particular month. Number of total villages and number of electrified villages have also been adjusted for changes observed from Census 211 data. As such, each monthly report of Village electrification of CEA is independent of the earlier published reports Note: From the year 24-5 onwards Definition of Village Electrification:- A village would be declared Electrified if i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality as well as Dalit Basti / hemlet where it exists. (For electrification through Non-Conventional Energy Sources a Distribution Transformer mat not be necessary) ii) Electricity is provided to Public places like Schools, Panchayat Office, Health Centre, Dispensaries, Community Centres etc. and iii) The number of households electrified should be at least 1% of the total number of households in the village iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be obtained. 13. Average cost of Power & Average Realisation Average Revenue Realization(paise/unit) Gap ACS- Year verage cost of supply(acs) (paise/un Gap ACS- ARR( Without ARR (on subsidy booked Gap ACS- ARR (on subsidyrece Without Subsidy Subsidy) Paise/unit basis) paise/unit ived basis) paise/unit 213-14 518 4 118 76 77 214-15 52 412 18 58 6 Source:- PFC Reports on the performance of State Power Utilities 14. All India per capita consumption of Electricity ( KWh) # 214-15 11 215-16 175* # (Gross Generation+Net Import) / Mid Year Population, * Provisional 15. All India Coal consumption for Power Generation (MT) 213-14 489.4 214-15 53.4 215-16 545.9* * Actual 11

Section B - Capacity Addition SN Contents Page 1 Capacity Addition Targets and Achievements in 12th Plan 12 2 Capacity Addition Targets & Achievements during Feb 217 and April 216 to Feb 217 13 3 Installed Capacity in various Regions including their shares. 14-19

1. Capacity Addtion Targets and Achievements in the 12th Plan (i) Targets (MW) Type/Sector Central State Private Total Thermal 14,878. 13,922. 43,54. 72,34. Hydro 6,4. 1,68. 3,285. 1,897. Nuclear 5,3... 5,3. Total 26,182. 15,53. 46,825. 88,537. (ii) Achievements upto Feb, 217 during the 12th Plan (MW) Type/Sector Central State Private Total Thermal 13,463.6 21,151.35 53,66.5 88,275.45 Hydro 2,584.2 2,211. 619. 5,414.2 Nuclear 1,... 1,. Total 17,47.62 23,362.35 54,279.5 94,689.47 Acievement % 65.11 15.43 115.92 16.95 Achievement of Capacity Addition during the Current Plan upto Feb 217 9,. 8,. 7,. 6,. 5,. 4,. 3,. 2,. 1,.. 12th Plan Target 88,537 MW, Achieved so far 94689.47 MW 72,34. 88,275.45 1,897. 5,414.2 5,3. 1,. Thermal Hydro Nuclear Target Achievement 12

2. Capacity Addition Targets / Achievements During Feb 217 & April 216 to Feb 217 Schemes Sector (MW) Target Feb-17 April '16 - Feb '17 Deviation 216-17 Target* Achievement Target* Achievement (+) / (-) Central 273.5 275 825.5-1879.5 Thermal State 391 85 2752 192 Pvt. 68 66 93 339 4698 138 Total 1344.5 66 93 6945 8275.5 133.5 Central 49 15 3 8-22 Hydro State 395 2 2 85 149 64 Pvt. 829 48.5 24 169 24-145 Total 1714 398.5 224 1319 1594 275 Nuclear Central 15 Central 472.5 15 35 95.5-299.5 All India State 435 2 2 17 4242 2542 Pvt. 7629 78.5 954 3559 4722 1163 Total 16654.5 158.5 1154 8264 9869.5 165.5 12 1 8 6,945 8,276 Targets and Achievement during 216-17 8,264 9,87 Target Achievement MW 6 4 2 1,319 1,594 Thermal Hydro Nuclear Total Capacity Addition Targets/Achievements during the Month of Feb 217 MW 1 9 8 7 6 5 4 3 2 1 Targets and Achievement during Feb 217 66 93 398.5 224 158.5 1154 Thermal Hydro Nuclear Total Target Achievement 13

Region Northern Region Western Region Southern Region Eastern Region North Eastern Region Islands ALL INDIA ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS Modewise breakup Ownership/ Thermal RES * Sector Nuclear Hydro Coal Gas Diesel Total (MNRE) Grand Total State 16598. 2879.2. 19477.2. 8478.55 663.56 28619.31 Private 17926. 558.. 18484.. 252. 9583.42 3569.42 Central 12.5 2344.6. 14344.56 162. 8266.23. 2423.79 Sub Total 46524.5 5781.26. 5235.76 162. 19246.78 1246.98 83419.52 State 2292. 2993.82. 25913.82. 548.5 311.19 3175.51 Private 36895. 4676.. 41571.. 447. 16549.95 58567.95 Central 12898.1 3533.59. 16431.6 184. 152.. 19791.6 Sub Total 72713.1 1123.41. 83916.42 184. 7447.5 16861.14 1165.5 State 17372.5 791.98 287.88 18452.36. 11739.3 512.55 373.94 Private 959. 5322.1 473.7 15385.8.. 2128.87 36594.67 Central 1269. 359.58. 1349.58 232... 15369.58 Sub Total 39652.5 6473.66 761.58 46887.74 232. 11739.3 21721.42 82668.19 State 725. 1.. 7125.. 3537.92 225.11 1888.3 Private 8731.38.. 8731.38. 195. 671.52 9597.9 Central 1491.49.. 1491.49. 15.2. 1596.69 Sub Total 29847.87 1.. 29947.87. 4738.12 896.63 35582.62 State 6. 492.95 36. 588.95. 382. 259.25 123.2 Private. 24.5. 24.5.. 21.19 45.69 Central 25. 1253.6. 153.6. 86.. 2363.6 Sub Total 31. 1771.5 36. 2117.5. 1242. 28.44 3639.49 State.. 4.5 4.5.. 5.25 45.3 Private...... 6.15 6.15 Central........ Sub Total.. 4.5 4.5.. 11.4 51.45 State 63975.5 7257.95 363.93 71597.38. 29618. 1976.9 13192.28 Private 73142.38 158.6 473.7 84196.68. 3144. 4841.1 135381.78 Central 5193. 749.83. 5942.83 578. 11651.43. 76852.26 Total 18947.88 25329.38 837.63 215214.89 578. 44413.43 518. 315426.32 Figures at decimal may not tally due to rounding off (As on 28.2.217) (UTILITIES) Abbreviation:-SHP=Small Hydro Project ( 25 MW), BP=Biomass Power, U&I=Urban & Industrial Waste Power, RES=Renewable Energy Sources Note : - 1.RES include SHP, BP, U&I, Solar and Wind Energy. Installed capacity in respect of RES (MNRE) as on 31.12.216 (As per latest information available with MNRE) *Break up of RES all India as on 31.12.216 is given below (in MW) : Small Bio-Power Total Wind Power Solar Power Hydro Power BM Power/Cogen. Waste to Energy Capacity 4333.86 287.44 7856.94 114.8 912.69 518. 1. SGPL TPP U-2 (66 MW) has been added to the Private sector of Andhra Pradesh 2. NASIK (P) TPS U-2 (27 MW) has been added to the Private sector of Maharashtra. 3. CHANJU-I HPS U-1&2 (2x12 MW) have been added to the Private sector of Himachal Pradesh. 4. D.P.L. TPS U-3,4&5 (7,75,75 MW) have been retired from the State sector of West Bengal. 5. TROMBAY TPS U-4 (15 MW) has been retired from the Private sector of Maharashtra. 6. TEESTA-III HPS U-4(2 MW) has been added to the State sector of Sikkim. 7. TEESTA-III HPS (12MW) tie-up of power is as under: Sikkim 36 MW Punjab 34 MW Haryana 2 MW U.P. 2 MW Rajasthan 1 MW 14

State Delhi Haryana Himachal Pradesh Jammu & Kashmir Punjab Rajasthan Uttar Pradesh Uttrakhnad Chandigarh INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN NORTHERN REGION Ownership/ Sector Central - Unallocated Total (Northern Region) INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Hydro (Renewable) (As on 28.2.217) Grand Total Coal Gas Diesel Total Nuclear RES (MNRE) State 135. 18.4. 1935.4... 1935.4 Private 445.5 18.. 553.5.. 54.78 68.28 Central 4421.37 27.61. 4628.98 122.8 762.64. 5513.7 Sub-Total 51.87 2116.1. 7117.88 122.8 762.64 54.78 857.38 State 272. 15.. 287.. 184.51 59.3 413.81 Private 2165.5.. 2165.5.. 163.87 2329.37 Central 122.3 535.29. 1737.32 19.16 61.13. 2456.61 Sub-Total 687.53 685.29. 6772.82 19.16 1694.64 223.17 8799.79 State..... 529.6 256.61 786.21 Private..... 1772. 542.53 2314.53 Central* 152.2 61.88. 213.9 34.8 1288.94. 1536.92 Sub-Total 152.2 61.88. 213.9 34.8 359.54 799.14 4637.66 State. 175.. 175.. 123. 18.3 1513.3 Private...... 51. 51. Central 329.32 129.14. 458.46 77. 144.35. 1579.81 Sub-Total 329.32 34.14. 633.46 77. 2274.35 159.3 3143.84 State 263. 15.. 278.. 257.23 127.8 5478.3 Private 514... 514... 659.78 5673.78 Central 66.88 263.92. 924.8 28.4 921.65. 254.49 Sub-Total 834.88 413.92. 8718.8 28.4 3491.88 787.58 1326.3 State 519. 63.8. 5793.8. 187.96 23.85 695.61 Private 3196... 3196... 5653.61 8849.61 Central 114.72 221.23. 1235.95 573. 741.53. 255.48 Sub-Total 94.72 825.3. 1225.75 573. 1829.49 5677.46 1835.7 State 5923... 5923.. 724.1 25.1 6672.2 Private 76... 76... 2177.37 9183.37 Central 299.95 549.97. 3459.92 335.72 166.65. 5456.29 Sub-Total 15838.95 549.97. 16388.92 335.72 2384.75 222.47 21311.86 State..... 1252.15 62.87 1315.2 Private 99. 45.. 549.. 73. 264.28 1543.28 Central 3.5 69.35. 369.85 22.28 469.24. 861.37 Sub-Total 399.5 519.35. 918.85 22.28 2451.39 327.15 3719.67 State........ Private...... 16.2 16.2 Central 32.54 15.32. 47.86 8.84 62.74. 119.44 Sub-Total 32.54 15.32. 47.86 8.84 62.74 16.2 135.64 977.19 29.35. 1267.54 129.8 74.36. 211.7 State 16598. 2879.2. 19477.2. 8478.55 663.56 28619.31 Private 17926. 558.. 18484.. 252. 9583.42 3569.42 Central 12.5 2344.6. 14344.56 162. 8266.23. 2423.79 Grand Total 46524.5 5781.26. 5235.76 162. 19246.78 1246.98 83419.52 15

State Goa Daman & Diu Gujarat Madhya Pradesh INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN WESTERN REGION INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES (As on 28.2.217) Modewise breakup Ownership/ Thermal Hydro Sector Nuclear RES (MNRE) Coal Gas Diesel Total (Renewable) Grand Total State.......5.5 Private. 48.. 48....5 48.5 Central 338.6.. 338.6 25.8.. 364.4 Sub-Total 338.6 48.. 386.6 25.8..1 412.5 State........ Private...... 4. 4. Central 43.38 4.2. 47.58 7.38.. 54.96 Sub-Total 43.38 4.2. 47.58 7.38. 4. 58.96 State 498. 2321.82. 731.82. 772. 8. 881.82 Private 8642. 46.. 1272... 5673.97 18375.97 Central 2888.62 424.27. 3312.89 559.32.. 3872.21 Sub-Total 1651.62 686.9. 23316.71 559.32 772. 5681.97 333. State 48... 48.. 173.66 83.96 5867.62 Private 5389... 5389... 3227.58 8616.58 Central 249.5 257.18. 2747.23 273.24 152.. 454.47 Sub-Total 11959.5 257.18. 12216.23 273.24 3223.66 3311.54 1924.67 Chhattisgarh Maharashtra Dadra & Nagar Naveli Central - Unallocated Total (Western Region) State 328... 328.. 12. 11.5 3411.5 Private 1948... 1948... 428.64 11376.64 Central 1574.54.. 1574.54 47.52.. 1622.6 Sub-Total 1582.54.. 1582.54 47.52 12. 439.69 1649.75 State 158. 672.. 11252.. 2884.84 28.13 14344.97 Private 11916. 568.. 12484.. 447. 7215.11 2146.11 Central 3712.26 2623.93. 6336.19 69.14.. 726.33 Sub-Total 2628.26 3863.93. 372.19 69.14 3331.84 7423.24 41517.41 State........ Private.......6.6 Central 54.22 27.1. 81.32 8.46.. 89.78 Sub-Total 54.22 27.1. 81.32 8.46..6 9.38 1796.35 196.91. 1993.26 228.14.. 2221.4 State 2292. 2993.82. 25913.82. 548.5 311.19 3175.51 Private 36895. 4676.. 41571.. 447. 16549.95 58567.95 Central 12898.1 3533.59. 16431.6 184. 152.. 19791.6 Grand Total 72713.1 1123.41. 83916.42 184. 7447.5 16861.14 1165.5 16

State Andhra Pradesh Telangana Karnataka Kerala Tamil Nadu INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN SOUTHERN REGION Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Coal Gas Diesel Total Nuclear Hydro (Renewable) (As on 28.2.217) RES (MNRE) Grand Total State 385.91 235.4. 3321.31. 188.87 89.5 5219.68 Private 431. 374.11 16.97 741.8.. 366.99 1162.7 Central 154.3.. 154.3 127.16.. 1667.46 Sub-Total 8936.21 339.51 16.97 12262.69 127.16 188.87 375.49 17949.22 State 546.59.. 546.59. 2245.66. 7652.25 Private 27. 157.89 19.83 186.72.. 123.21 39.93 Central 1799.88.. 1799.88 148.62.. 1948.5 Sub-Total 7476.47 157.89 19.83 967.19 148.62 2245.66 123.21 12691.68 State 422.. 127.92 4347.92. 3599.8 155.33 813.5 Private 26.. 25.2 285.2.. 5949.21 834.41 Central 228.46.. 228.46 475.86.. 254.32 Sub-Total 838.46. 153.12 8461.58 475.86 3599.8 614.54 18641.78 State.. 159.96 159.96. 1881.5 145.2 2186.48 Private. 174.. 174... 119.36 293.36 Central 173.69 359.58. 1433.27 228.6.. 1661.87 Sub-Total 173.69 533.58 159.96 1767.23 228.6 1881.5 264.38 4141.71 State 466. 524.8. 5184.8. 223.2 122.7 759.98 Private 295. 53.1 411.7 3864.8.. 1249.7 14113.87 Central 4255.1.. 4255.1 986.5.. 5241.6 Sub-Total 11865.1 127.18 411.7 1333.98 986.5 223.2 1371.77 26865.45 NLC State........ Private........ Central 1.17.. 1.17... 1.17 Sub-Total 1.17.. 1.17... 1.17 Puducherry Central - Unallocated Total (Southern Region) State. 32.5. 32.5... 32.5 Private.......3.3 Central 249.32.. 249.32 52.78.. 32.1 Sub-Total 249.32 32.5. 281.82 52.78..3 334.63 1643.8.. 1643.8 3.48.. 1943.56 State 17372.5 791.98 287.88 18452.36. 11739.3 512.55 373.94 Private 959. 5322.1 473.7 15385.8.. 2128.87 36594.67 Central 1269. 359.58. 1349.58 232... 15369.58 Grand Total 39652.5 6473.66 761.58 46887.74 232. 11739.3 21721.42 82668.19 17

State Bihar Jharkhand West Bengal DVC Odisha INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN EASTERN REGION Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Hydro (Renewable) (As on 28.2.217) Grand Total Coal Gas Diesel Total Nuclear RES (MNRE) State 21... 21... 7.7 28.7 Private...... 188.41 188.41 Central 2531.24.. 2531.24. 129.43. 266.67 Sub-Total 2741.24.. 2741.24. 129.43 259.11 3129.78 State 875... 875.. 13. 4.5 19.5 Private 9... 9... 17.51 917.51 Central 314.93.. 314.93. 7.93. 385.86 Sub-Total 289.93.. 289.93. 2.93 21.56 2312.42 State 552. 1.. 562.. 986. 91.95 6697.95 Private 1781.38.. 1781.38.. 329.62 2111. Central 922.45.. 922.45. 431.3. 1353.75 Sub-Total 8223.83 1.. 8323.83. 1417.3 421.57 1162.7 State........ Private 15... 15.... 15. Central 695.66.. 695.66. 193.26. 7143.92 Sub-Total 8.66.. 8.66. 193.26. 8193.92 State 42... 42.. 261.92 6.3 2488.22 Private 5... 5... 135.97 5135.97 Central 1683.4.. 1683.4. 15.1. 1788.5 Sub-Total 713.4.. 713.4. 2166.93 142.27 9412.24 Sikkim Central - Unallocated Total (Eastern Region) State..... 36. 52.11 412.11 Private..... 195..1 195.1 Central 92.1.. 92.1. 75.27. 167.37 Sub-Total 92.1.. 92.1. 63.27 52.12 774.49 1597.7.. 1597.7... 1597.7 State 725. 1.. 7125.. 3537.92 225.11 1888.3 Private 8731.38.. 8731.38. 195. 671.52 9597.9 Central 1491.49.. 1491.49. 15.2. 1596.69 Grand Total 29847.87 1.. 29947.87. 4738.12 896.63 35582.62 18

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN NORTH-EASTERN REGION State Assam Arunachal Pradesh Meghalaya Tripura Manipur Nagaland Mizoram Central - Unallocated Total (North- Eastern Region) Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Hydro (Renewable) (As on 28.2.217) Grand Total Coal Gas Diesel Total Nuclear RES (MNRE) State 6. 323.45. 383.45. 1. 3.1 513.46 Private. 24.5. 24.5.. 15.28 39.78 Central 127. 435.6. 562.6. 329.72. 892.32 Sub-Total 187. 783.55. 97.55. 429.72 45.29 1445.56 State...... 14.61 14.61 Private.......27.27 Central 12.35 46.83. 59.18. 97.57. 156.75 Sub-Total 12.35 46.83. 59.18. 97.57 14.88 261.63 State..... 282. 31.3 313.3 Private.......1.1 Central 17.7 19.79. 127.49. 74.58. 22.7 Sub-Total 17.7 19.79. 127.49. 356.58 31.4 515.11 State. 169.5. 169.5.. 16.1 185.51 Private...... 5.2 5.2 Central 18.7 338.96. 357.66. 62.37. 42.3 Sub-Total 18.7 58.46. 527.16. 62.37 21.3 61.56 State.. 36. 36... 5.45 41.45 Private.......1.1 Central 15.7 71.61. 87.31. 8.98. 168.29 Sub-Total 15.7 71.61 36. 123.31. 8.98 5.46 29.75 State...... 3.67 3.67 Private.......5.5 Central 1.7 48.91. 59.61. 53.32. 112.93 Sub-Total 1.7 48.91. 59.61. 53.32 31.17 144.1 State...... 41.47 41.47 Private.......1.1 Central 1.35 4.54. 5.89. 34.31. 85.2 Sub-Total 1.35 4.54. 5.89. 34.31 41.57 126.77 37.5 161.36. 198.86. 127.15. 326.1 State 6. 492.95 36. 588.95. 382. 259.25 123.2 Private. 24.5. 24.5.. 21.19 45.69 Central 25. 1253.6. 153.6. 86.. 2363.6 Grand Total 31. 1771.5 36. 2117.5. 1242. 28.44 3639.49 State Andaman & Nicobar lakshadweep Total (Islands) INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN ISLANDS Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Coal Gas Diesel Total Nuclear Hydro (Renewable) (As on 28.2.217) RES (MNRE) Grand Total State.. 4.5 4.5.. 5.25 45.3 Private...... 5.4 5.4 Central........ Sub-Total.. 4.5 4.5.. 1.65 5.7 State........ Private.......75.75 Central........ Sub-Total.......75.75 State.. 4.5 4.5.. 5.25 45.3 Private...... 6.15 6.15 Central........ Grand Total.. 4.5 4.5.. 11.4 51.45 19

Section C - Transmission Lines SN Contents Page 1 Programme and Achievements of Transmission Lines in Feb 217 and during April 216 to Feb. 217 2 2 List of Transmission Lines Commissioned/Ready for commissioning during Feb 217

(Figs. in ckms) Voltage Level Programme Feb '17 Apr '16 to Feb17 /Sector 216-17 Programme Achievement Programme Achievement +/- 8 kv HVDC Central Sector 2597 2597 2574 State Sector +/- 5 kv HVDC Total 2597 2597 2574 Central Sector JV/Private Sector 765 kv Total Central Sector 3123 3123 441 State Sector 75 75 337 JV/Private Sector 1313 1133 1327 4 kv 1. Programme and Achievementsof Transmission Lines in Feb 217 and during April 216 to Feb 217 Total 5186 56 575 Central Sector 3953 34 3695 3377 State Sector 5799 284 45 5797 3464 JV/Private Sector 762 659 942 3171 Total 1514 284 738 1434 112 22kV Central Sector 78 28 State Sector 59 162 79 4479 5184 JV/Private Sector 6 8 Total 587 162 769 4479 5292 Grand Total 23384 446 157 22516 23583 Transmission Works (22 kv and above) for Transmission Lines Commissioned/Ready for commissioning During FEB-17 As on 28-FEB-217 Voltage Level (kv) Name of the Transmission Line Type Executing Agency Line Length (CKM) CENTRAL Sector: 4 PVT Sector: LILO of One Ckt Parbati Pooling Station - Amritsar at Jalandhar D/C PGCIL 34 4 Ajmer - Deedwana S/C 4 Bikaner - Deedwana S/C 4 Hindaun - Alwar S/C 4 JP Nigri TPP - Satna (PG) D/C 22 Sujangarh - Deedwana D/C APL 111 APL 129 APL 97 JAL 322 APL 6 STATE Sector: 4 Koradi II to Koradi -III line (ckt.ii) D/C 4 LILO of Jeerat - KTPS 4 kv S/C at N. Chanditala D/C+S/C 23 Kamudhi s/s - Tiruchulis/s (Muthuramlingapuram) - Ckt-I D/C 22 Bechraji - Maruti Suzuki line D/C 22 Chandrayanagutta - 22KV Imlibun GIS (UG Cable) D/C 22 HSR Layout - Nimhans S/S (UG Cable) UG Cable 22 Harsh Vihar - Patparganj line (U/G cable link) D/C 22 Interconnection of one ckt. of GSEG - Kosamba line with Essar - Ichhapore line 22 Karad - Koyna (Loc. 8-144) line S/C on D/C 22 LILO on one ckt of Nelamangala - Anchepalya line at Magadi D/C 22 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet S/S D/C 22 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet S/S D/C 22 LILO of Bakreswar - Gokarna at Sadaipur D/C 22 LILO of Ghanapur - Malkaram at Moulali D/C 22 LILO of Wanaparthy - Ragimanagadda at Singotam X Road SS 22 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet S/S D/C 22 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar D/C 22 Mitha - Becharji D/C 22 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) D/C D/C D/C MSETCL 38 WBSETCL 7 TANTRANSCO 69 GETCO 2 TSTRANSCO 1 KPTCL 11 DTL 29 GETCO 1 MSETCL 44 KPTCL 31 TSTRANSCO 48 TSTRANSCO 42 WBSETCL 13 TSTRANSCO 9 TSTRANSCO 1 TSTRANSCO 24 RVPNL 33 GETCO 59 TSTRANSCO 14

Section D - Sub Stations SN Contents Page 1 Programme and Achievements of Sub-Stations in Feb. 217 and during Apr 216 to Feb. 217 2 List of Sub Stations commissioned/ready for commisssioning during Feb. 217 21

1. Programme & Achievement of sub- stations in Feb 217 and during April 216 to Feb 217 (Fig. in MVA) Voltage Level /Sector Programme Feb-17 Apr '16 - Jan '17 216-17 Programme Achievement Programme Achievement ± 8 kv HVDC Central Sector 15 15 15 State Sector JV/Private Sector Total 15 15 15 765 kv Central Sector 15 15 135 State Sector 15 15 15 45 JV/Private Sector 2 2 25 Total 14 15 14 25 4 kv Central Sector 989 35 5 9575 1435 State Sector 1315 63 1 11515 1925 JV/Private Sector 2 126 2 326 Total 2495 413 276 239 2462 22 kv Central Sector State Sector 4783 26 25 4783 14925 JV/Private Sector Total 4783 26 25 4783 14925 Grand Total 45188 439 676 43373 61545

Transmission Works (22 kv and above) for Sub-Stations Commissioned/Ready for commissioning During FEB-17 As on 28-FEB-217 Voltage Level (kv) Name of Sub-Station Type Executing Agency Capacity Added (MW/MVA) CENTRAL Sector: 4 Extn. at Hyderabad S/s 4/22 PGCIL 5 PVT Sector: 4 Alwar S/S 4/22 APL 63 4 Deedwana S/S 4/22/132 APL 63 22 4 KV Gonda S/s 22/132 SEUPPTCL 2 STATE Sector: 765 Agra (UP) S/S (ICT-II) 765/4 UPPTCL 15 4 Gr. Noida (Aug.) (5-315) 4/22 UPPTCL 185 4 Kamavarapukota s/s (ICT-1) 4/22 APTRANSCO 315 4 Kosamba (ICT addition) 4/22 GETCO 5 23 Tiruchuli (Near Muthuramalingap 23/11 TANTRANSCO 1 22 Amberi S/S 22/132 RVPNL 16 22 Badaun (Aug.) ICT-II (2-15) 22/132 UPPTCL 5 22 Botad (Aug.) 22/132 GETCO 15 22 Chilakalaguda GIS (Osmania 22/132 TSTRANSCO 16 22 Dohna, Bareily (Aug.) ICT -I (16 22/132 UPPTCL 6 Page 1 of 2 Voltage Level (kv) Name of Sub-Station Type Executing Agency Capacity Added (MW/MVA) 22 Gondal (Aug.) 22/132 GETCO 5 22 Haldarwa (Aug.) 22/66 GETCO 1 22 Himmatpura S/s (Trf. 22/132 PSTCL 6 22 Imlibun (GIS) 22/132 TSTRANSCO 32 22 Khanpur (Aug.) 22/66 GETCO 1 22 Kheralu (Aug.) 22/66 GETCO 6 22 Magadi S/S 22/66 KPTCL 2 22 Panandhro (KLTPS) (Aug.) 22/66 GETCO 5 22 Preet Vihar GIS (ICT-I) 22/33 DTL 1 22 Ranasan (Aug.) 22/132 GETCO 5 22 Sawaimadhopur S/s (Aug.) (16-22/132 RVPNL 6 22 Shamli (Aug.) ICT -II (2-16) 22/132 UPPTCL 4 22 Singotam X Roads S/s 22/33 TSTRANSCO 4 22 Sircilla S/s (Karimnagar 22/132 TSTRANSCO 3 22 Sultanpur (Aug.) ICT-I (2-16) 22/132 UPPTCL 4 22 Wagra (Aug.) 22/66 GETCO 5 21

Section E - Electricity Generation SN Contents Page 1 Electricity Generation (MU) Targets and Achievements for 216-17 22

1. Electricity Generation (MU) Targets and Achievememts for 216-17 Thermal Programme Achievement* % Ach. Programme Achievement* % Ach. Central Sector 33,632. 26,587. 26,721.6 1.51 31,44. 36,22.51 11.59 State Sector 316,697. 26,254. 23,585.1 89.83 288,17. 272,6.42 94.62 Pvt.IPP Sector 331,859. 27,347. 27,752.94 11.48 32,659. 37,613. 11.64 Pvt.UTL Sector 19,812. 1,436. 1,395.59 97.19 18,55. 17,277.71 95.69 Hydro Total 999,. 81,624. 79,455.23 97.34 91,225. 93,693.64 99.28 Central Sector 53,4. 2,476. 2,727.75 11.17 49,987. 54,853.18 19.73 State Sector 67,751. 4,479. 3,529.63 78.8 62,55. 46,783.12 74.79 Pvt.IPP Sector 11,399. 257. 243.89 94.9 11,58. 11,356.6 12.7 Pvt.UTL Sector 1,45. 95. 99.55 14.79 1,33. 1,337.18 1.54 Nuclear Sector Target (216-17) Feb '17 April '16 to Feb '17 Total 758,71.9 7,37. 6,6.82 388.66 124,925. 114,33.8 91.52 Central Sector 4,. 3,543. 2,839.21 8.14 36,427. 34,136.44 93.71 Total 4,. 3,543. 2,839.21 8.14 36,427. 34,136.44 93.71 Bhutan Import 5,. 156. 69.81 44.75 4,859. 5,585.15 114.94 Central Sector 424,32. 32,66. 32,288.56 99.3 387,818. 395,192.13 11.9 State Sector 384,448. 3,733. 27,114.73 88.23 35,657. 319,383.54 91.8 Pvt. Sector 364,52. 29,135. 29,491.97 11.23 333,12. 337,584.49 11.35 Total 1,178,. 92,63. 88,965.7 96.4 1,76,436. 1,57,745.31 98.26 * Provisional based on actual-cum-assesment All India Energy Generation During April 216 to Feb 217 (MU) 12 176436 157745 Programme Achievement 1 91225 93694 8 6 4 2 124925 11433 36427 34136 Thermal Hydro Nuclear Total Renewable Energy Generation Figs in MU Achievement Cummulative Cummulative Achievement Achievement Jan-17 Jan-16 Upto Jan-17 Upto Jan-16 5789 4377 7129 55518 22

Section F - Power supply position SN Contents Page 1 Power Supply Position (Provisional) for Feb. 217 and April 217 to Feb. 217 23 2 Peak Demand and Peak Met (Provisional) for Feb. 217 and April 216 to Feb 217 24 3 Power Supply Position (Revised) for Jan 216 25 4 Peak Demand and Peak Met (Revised) for Jan 216 26 5 Notified Power cuts / Restrictions on Industries during Feb 217 27 6 Power Supply to Agricultural Sector during Feb 217 28

ऊज व य त आप त थ त रप ट (प व वल कन) /Energy Power Supply Position Report (Provisional) (Page 1 of 2) र य/State आ कड़ म लयन य नट न ट / Figures in MU net फ़रवर, 217 /February,217 अ ल,216 - फ़रवर,217/ April,216 to February,217 ऊज आव यकत ऊज उपल धत ऊज प त म कम ऊज आव यकत ऊज उपल धत ऊज प त म कम ण ल / System Energy Requirement Energy Supplied Energy not Supplied Energy Requirement Energy Supplied Energy not Supplied / Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % ) च ड गढ़/ Chandigarh 93 93. 1,541 1,541. द ल / Delhi 1,71 1,79-1. 28,862 28,831-31 -.1 ह रय ण / Haryana 3,253 3,253. 45,324 45,324. हम चल द श / Himachal Pradesh 71 699-2 -.3 8,87 8,37-5 -.6 ज म क म र / Jammu & Kashmir 1,469 1,188-281 -19.1 15,929 12,887-3,42-19.1 प ज ब / Punjab 2,915 2,915. 49,659 49,659. र ज थ न / Rajasthan 5,689 5,663-26 -.5 62,282 61,862-42 -.7 उ र द श / Uttar Pradesh 7,786 7,724-62 -.8 98,619 96,816-1,83-1.8 उ र ख ड / Uttarakhand 985 979-6 -.6 12,13 11,937-76 -.6 उ र / Northern Region 24,6 24,222-378 -1.5 322,317 316,897-5,42-1.7 छ सगढ़ / Chhattisgarh 1,681 1,681. 21,193 21,14-53 -.3 ग जर त / Gujarat 8,55 8,55. 94,366 94,365-1. म य द श / Madhya Pradesh 5,67 5,67. 6,52 6,519-1. मह र / Maharashtra 11,12 11,9-3. 126,561 126,53-58. दमन और दउ / Daman & Diu 194 194. 2,19 2,19. द दर व नगर हव ल / Dadra & Nagar Haveli 499 499. 5,544 5,544. ग व / Goa 38 38. 3,971 3,969-2 -.1 प चम / Western Region 27,355 27,352-3. 314,343 314,232-111. आ द श / Andhra Pradesh 4,451 4,451. 49,283 49,242-41 -.1 त ल ग न / Telangana 4,752 4,752. 47,61 47,591-1. कन टक / Karnataka 5,866 5,866. 6,472 6,117-355 -.6 क रल / Kerala 1,87 1,869-1 -.1 22,18 21,984-34 -.2 त मल न ड / Tamil Nadu 7,496 7,496. 95,36 95,17-19. प ड च र / Puducherry 175 175. 2,316 2,313-3 -.1 ल - प / Lakshadweep # 4 4 44 44 द ण / Southern Region 24,61 24,69-1. 276,729 276,265-464 -.2 बह र / Bihar 1,754 1,744-1 -.6 23,616 23,15-466 -2. द म दर घ ट नगम / DVC 1,514 1,514. 17,43 16,99-134 -.8 झ रख ड / Jharkhand 611 61. 7,274 7,223-51 -.7 ओ डश / Odisha 1,919 1,919. 24,343 24,341-2. प चम ब ग ल / West Bengal 3,379 3,379. 44,342 44,214-128 -.3 स कम / Sikkim 47 47. 436 436. अ डम न- नक ब र/ Andaman- Nicobar # 2 15-5 -25 22 165-55 -25. प व / Eastern Region 9,224 9,214-1 -.1 117,57 116,277-78 -.7 अ ण चल द श / Arunachal Pradesh 58 57-1 -1.4 66 646-14 -2.1 असम / Assam 625 611-14 -2.3 8,387 8,88-299 -3.6 म णप र / Manipur 6 59-1 -1.5 693 67-23 -3.3 म घ लय / Meghalaya 159 159. 1,565 1,565. मज़ रम / Mizoram 42 42-1 -1.5 466 455-11 -2.4 न ग ल ड / Nagaland 49 48-1 -1.6 687 675-12 -1.7 प र / Tripura 96 95-1 -.6 1,423 1,43-2 -1.4 उ र-प व / North-Eastern Region 1,89 1,71-18 -1.6 13,879 13,493-386 -2.8 स प ण भ रत / All India 86,879 86,468-41 -.5 1,44,325 1,37,163-7,162 -.7 # Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability. 23

अ धकतम व य त आप त थ त रप ट (प व वल कन) /Peak Power Supply Position Report (Provisional) आ कड़ म ग व ट न ट / Figures in MW net र य/State फ़रवर, 217 /February,217 अ ल,216 - फ़रवर,217/ April,216 to February,217 अ धकतम म ग अ धकतम उपल ध म ग क प त म कम अ धकतम म ग अ धकतम उपल ध म ग क प त म कम ण ल / System Peak Demand Peak Met Demand not Met Peak Demand Peak Met Demand not Met / Region ( MW ) ( MW ) ( MW ) ( % ) ( MW ) ( MW ) ( MW ) ( % ) च ड गढ़/ Chandigarh 189 189. 361 361. द ल / Delhi 3,882 3,882. 6,342 6,261-81 -1.3 ह रय ण / Haryana 6,556 6,556. 9,262 9,262. हम चल द श / Himachal Pradesh 1,479 1,479. 1,492 1,492. ज म क म र / Jammu & Kashmir 2,622 2,98-524 -2. 2,675 2,14-535 -2. प ज ब / Punjab 6,723 6,723. 11,48 11,48. र ज थ न / Rajasthan 1,527 1,322-25 -1.9 1,613 1,348-265 -2.5 उ र द श / Uttar Pradesh 14,133 14,133. 17,183 15,51-1,682-9.8 उ र ख ड / Uttarakhand 1,973 1,973. 2,37 2,37. उ र / Northern Region 43,262 42,723-539 -1.2 53,372 52,612-76 -1.4 छ सगढ़ / Chhattisgarh 3,397 3,389-8 -.2 3,875 3,851-25 -.6 ग जर त / Gujarat 13,36 13,31-5. 14,724 14,78-16 -.1 म य द श / Madhya Pradesh 1,915 1,94-12 -.1 11,512 11,51-11 -.1 मह र / Maharashtra 21,281 21,24-76 -.4 21,281 21,24-76 -.4 दमन और दउ / Daman & Diu 281 281. 327 327. द दर व नगर हव ल / Dadra & Nagar 671 671. 784 784. Haveli ग व / Goa 515 515. 531 531. प चम / Western Region 47,962 47,789-173 -.4 47,962 47,844-119 -.2 आ द श / Andhra Pradesh 7,51 7,51. 7,969 7,965-4 -.1 त ल ग न / Telangana 8,927 8,927. 8,927 8,927. कन टक / Karnataka 1,257 1,242-14 -.1 1,257 1,242-14 -.1 क रल / Kerala 3,72 3,688-13 -.4 4,132 3,996-135 -3.3 त मल न ड / Tamil Nadu 13,71 13,64-61 -.4 14,823 14,823. प ड च र / Puducherry 364 344-2 -5.5 371 368-3 -.7 ल - प / Lakshadweep # 8 8 8 8 द ण / Southern Region 41,275 41,155-12 -.3 42,52 41,61-442 -1.1 बह र / Bihar 3,619 3,469-15 -4.1 3,883 3,759-125 -3.2 द म दर घ ट नगम / DVC 2,58 2,58. 2,721 2,721. झ रख ड / Jharkhand 1,35 1,35. 1,498 1,498. ओ डश / Odisha 3,345 3,345. 4,12 4,12. प चम ब ग ल / West Bengal 7,177 7,177. 7,931 7,886-45 -.6 स कम / Sikkim 91 91. 112 112. अ डम न- नक ब र/ Andaman- Nicobar # 4 32-8 -2 4 32-8 -2 प व / Eastern Region 17,174 17,29-145 -.8 18,79 18,596-194 -1. अ ण चल द श / Arunachal Pradesh 139 135-4 -2.9 148 14-8 -5.4 असम / Assam 1,398 1,396-2 -.1 1,673 1,633-4 -2.4 म णप र / Manipur 163 162-1 -.6 163 163 -.2 म घ लय / Meghalaya 3 3. 331 331. मज़ रम / Mizoram 95 93-2 -2.1 98 98. न ग ल ड / Nagaland 148 147-1 -.7 148 147-1 -.7 प र / Tripura 223 223. 284 284. उ र-प व / North-Eastern Region 2,243 2,234-9 -.4 2,487 2,475-12 -.5 स प ण भ रत / All India 149,136 148,169-968 -.6 159,542 156,934-2,68-1.6 # Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability 24

ऊज व य त आप त थ त रप ट (स श धत) /Energy Power Supply Position Report (Revised) (Page 1 of 2) आ कड़ म लयन य नट न ट / Figures in MU net र य/State जनवर, 217 /January,217 अ ल,216 - जनवर,217/ April,216 to January,217 ऊज आव यकत ऊज उपल धत ऊज प त म कम ऊज आव यकत ऊज उपल धत ऊज प त म कम ण ल / System Energy Requirement Energy Supplied Energy not Supplied Energy Requirement Energy Supplied Energy not Supplied / Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % ) च ड गढ़/ Chandigarh 113 113. 1,448 1,448. द ल / Delhi 1,938 1,937-1 -.1 27,152 27,122-3 -.1 ह रय ण / Haryana 3,449 3,449. 42,71 42,71. हम चल द श / Himachal Pradesh 779 764-15 -1.9 7,386 7,338-48 -.6 ज म क म र / Jammu & Kashmir 1,599 1,284-315 -19.7 14,46 11,699-2,761-19.1 प ज ब / Punjab 3,13 3,13. 46,744 46,744. र ज थ न / Rajasthan 6,11 6,62-48 -.8 56,593 56,199-394 -.7 उ र द श / Uttar Pradesh 8,747 8,673-74 -.8 9,833 89,92-1,741-1.9 उ र ख ड / Uttarakhand 1,98 1,77-21 -1.9 11,28 1,958-7 -.6 उ र / Northern Region 26,846 26,373-474 -1.8 297,717 292,675-5,42-1.7 छ सगढ़ / Chhattisgarh 1,939 1,939. 19,512 19,459-53 -.3 ग जर त / Gujarat 8,496 8,495. 86,311 86,31-1. म य द श / Madhya Pradesh 6,295 6,295. 54,913 54,912-1. मह र / Maharashtra 1,963 1,953-1 -.1 115,549 115,494-55. दमन और दउ / Daman & Diu 195 195. 1,996 1,996. द दर व नगर हव ल / Dadra & Nagar 51 51. 5,45 5,45. Haveli ग व / Goa 319 319. 3,663 3,661-2 -.1 प चम / Western Region 28,77 28,697-1. 286,988 286,88-18. आ द श / Andhra Pradesh 4,447 4,447. 44,832 44,791-41 -.1 त ल ग न / Telangana 4,783 4,783. 42,849 42,839-1. कन टक / Karnataka 5,961 5,961. 54,66 54,251-355 -.7 क रल / Kerala 2,14 2,14. 2,148 2,115-33 -.2 त मल न ड / Tamil Nadu 8,136 8,136. 87,54 87,521-19. प ड च र / Puducherry 189 189. 2,141 2,138-3 -.1 ल - प / Lakshadweep # 4 4 4 4 द ण / Southern Region 25,531 25,531. 252,119 251,656-463 -.2 बह र / Bihar 2,19 1,967-51 -2.5 21,862 21,46-456 -2.1 द म दर घ ट नगम / DVC 1,698 1,647-52 -3. 15,529 15,395-134 -.9 झ रख ड / Jharkhand 692 679-13 -1.9 6,663 6,613-5 -.8 ओ डश / Odisha 2,29 2,29. 22,424 22,422-2. प चम ब ग ल / West Bengal 3,495 3,486-9 -.3 4,963 4,835-128 -.3 स कम / Sikkim 44 44. 389 389. अ डम न- नक ब र/ Andaman- Nicobar # 2 15-5 -25 2 15-5 -25. प व / Eastern Region 1,158 1,33-125 -1.2 17,833 17,63-77 -.7 अ ण चल द श / Arunachal Pradesh 68 67-1 -1.7 62 589-13 -2.2 असम / Assam 693 684-9 -1.3 7,762 7,477-285 -3.7 म णप र / Manipur 76 75-1 -1.6 633 611-22 -3.5 म घ लय / Meghalaya 151 151. 1,46 1,46. मज़ रम / Mizoram 5 49-1 -2.1 424 413-11 -2.6 न ग ल ड / Nagaland 66 66-1 -1.4 638 627-11 -1.7 प र / Tripura 184 183 -.2 1,327 1,38-19 -1.4 उ र-प व / North-Eastern Region 1,289 1,275-14 -1.1 12,79 12,422-368 -2.9 स प ण भ रत / All India 92,531 91,98-623 -.7 957,446 95,695-6,751 -.7 # Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability. 25.

अ धकतम व य त आप त थ त रप ट (स श धत) /Peak Power Supply Position Report (Revised) आ कड़ म ग व ट न ट / Figures in MW net र य/State जनवर, 217 /January,217 अ ल,216 - जनवर,217/ April,216 to January,217 अ धकतम म ग अ धकतम उपल ध म ग क प त म कम अ धकतम म ग अ धकतम उपल ध म ग क प त म कम ण ल / System Peak Demand Peak Met Demand not Met Peak Demand Peak Met Demand not Met / Region ( MW ) ( MW ) ( MW ) ( % ) ( MW ) ( MW ) ( MW ) ( % ) च ड गढ़/ Chandigarh 246 246. 361 361. द ल / Delhi 4,168 4,168. 6,342 6,261-81 -1.3 ह रय ण / Haryana 6,815 6,815. 9,262 9,262. हम चल द श / Himachal Pradesh 1,492 1,492. 1,492 1,492. ज म क म र / Jammu & Kashmir 2,675 2,14-535 -2. 2,675 2,14-535 -2. प ज ब / Punjab 5,954 5,954. 11,48 11,48. र ज थ न / Rajasthan 1,348 1,348. 1,613 1,348-265 -2.5 उ र द श / Uttar Pradesh 14,344 14,344. 17,183 15,51-1,682-9.8 उ र ख ड / Uttarakhand 2,37 2,37. 2,37 2,37. उ र / Northern Region 44,985 44,447-538 -1.2 53,372 52,612-76 -1.4 छ सगढ़ / Chhattisgarh 3,38 3,11-197 -6. 3,875 3,851-25 -.6 ग जर त / Gujarat 13,188 13,174-14 -.1 14,724 14,78-16 -.1 म य द श / Madhya Pradesh 11,353 11,353. 11,512 11,51-11 -.1 मह र / Maharashtra 2,315 2,3-15 -.1 2,499 2,462-37 -.2 दमन और दउ / Daman & Diu 312 312. 327 327. द दर व नगर हव ल / Dadra & Nagar 743 743. 784 784. Haveli ग व / Goa 482 432-5 -1.4 531 531. प चम / Western Region 47,881 47,844-37 -.1 47,881 47,844-37 -.1 आ द श / Andhra Pradesh 7,372 7,367-5 -.1 7,969 7,965-4 -.1 त ल ग न / Telangana 8,47 8,391-16 -.2 8,47 8,391-16 -.2 कन टक / Karnataka 9,577 9,53-47 -.5 1,61 9,871-191 -1.9 क रल / Kerala 3,594 3,594. 4,132 3,996-135 -3.3 त मल न ड / Tamil Nadu 13,75 13,685-2 -.1 14,823 14,823. प ड च र / Puducherry 329 329. 371 368-3 -.7 ल - प / Lakshadweep # 8 8 8 8 द ण / Southern Region 4,88 4,744-64 -.2 42,52 41,61-442 -1.1 बह र / Bihar 3,81 3,71-19 -2.9 3,883 3,759-125 -3.2 द म दर घ ट नगम / DVC 2,721 2,721. 2,721 2,721. झ रख ड / Jharkhand 1,211 1,211. 1,498 1,498. ओ डश / Odisha 3,72 3,72. 4,12 4,12. प चम ब ग ल / West Bengal 6,63 6,64-26 -.4 7,931 7,886-45 -.6 स कम / Sikkim 91 91. 112 112. अ डम न- नक ब र/ Andaman- Nicobar # 4 32-8 -2 4 32-8 -2 प व / Eastern Region 17,569 17,438-13 -.7 18,79 18,596-194 -1. अ ण चल द श / Arunachal Pradesh 122 12-2 -1.7 148 14-8 -5.4 असम / Assam 1,466 1,464-1 -.1 1,673 1,633-4 -2.4 म णप र / Manipur 163 163 -.2 163 163 -.2 म घ लय / Meghalaya 331 331. 331 331. मज़ रम / Mizoram 98 98. 98 98. न ग ल ड / Nagaland 122 121-1 -.8 13 13. प र / Tripura 224 223-1 -.5 284 284. उ र-प व / North-Eastern Region 2,33 2,32-1 -.4 2,487 2,475-12 -.5 स प ण भ रत / All India 148,245 147,94-1,151 -.8 159,542 156,934-2,68-1.6 # Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability 26

फ़रवर, 217 म इ ड ज पर व य त कट त क ववरण / Notified Power Cuts/Restrictions on Industries during February,217 र य / / State/ Region ऊज /म ग कट त / Energy/Demand Cut उ र / Northern Region च ड गढ़/ Chandigarh* द ल / Delhi ह रय ण / Haryana हम चल द श / Himachal Pradesh No Notified Cuts No Notified Cuts No Notified Cuts ज म क म र / Jammu & Kashmir* प ज ब / Punjab र ज थ न / Rajasthan उ र द श / Uttar Pradesh उ र ख ड / Uttarakhand No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts प चम / Western Region छ सगढ़ / Chhattisgarh ग जर त / Gujarat म य द श / Madhya Pradesh मह र / Maharashtra ग व / Goa No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts द ण / Southern Region आ द श / Andhra Pradesh त ल ग न / Telangana कन टक / Karnataka क रल / Kerala त मल न ड / Tamil Nadu प ड च र / Puducherry प व / Eastern Region बह र / Bihar झ रख ड / Jharkhand ओ डश / Odisha प चम ब ग ल / West Bengal No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts * Data not received. 27

HPSEBL has only 2% agriculture consumers and uninterrupted power is being supplied to agriculture sector र य / / State/ Region औसत व त आप त घ ट म / Average Hours of Supply उ र / Northern Region च ड गढ़/ Chandigarh* द ल / Delhi ह रय ण / Haryana There is no agricultural load in Delhi. 9:25 hrs/day हम चल द श / Himachal Pradesh HPSEBL has only 2% agriculture consumers and uninterrupted power is being supplied to agriculture sector ज म क म र / Jammu & Kashmir* प ज ब / Punjab र ज थ न / Rajasthan 5:1 hrs/day 6:45 hrs/day उ र द श / Uttar Pradesh 18:5 hrs/day उ र ख ड / Uttarakhand 23:13 hrs/day प चम / Western Region छ सगढ़ / Chhattisgarh 18 hrs/day ग जर त / Gujarat 8 hrs/day म य द श / Madhya Pradesh मह र / Maharashtra ग व / Goa Three-Phase Supply(Irrigation)- 9:51hrs /day, Three-Phase (Mixed) Supply - 23:15 hrs /day 9 hrs/day No restriction द ण / Southern Region आ द श / Andhra Pradesh 7 hrs/day. त ल ग न / Telangana 9 hrs/day. कन टक / Karnataka क रल / Kerala त मल न ड / Tamil Nadu प ड च र / Puducherry 6 hrs/day No Restrictions 9 hrs/day (6 hrs during day time and 3 hrs during night time) No Restrictions प व / Eastern Region बह र / Bihar झ रख ड / Jharkhand ओ डश / Odisha प चम ब ग ल / West Bengal About 18 hrs About 2 hrs 24 hrs About 23 hrs 28

Section G - Growth of Power Sector SN Contents Page 1 Growth of Installed Capacity since 6th Plan 29 2 Growth of Transmission Sector since 6th Plan 3 3 All India Yearly Coal consumption for Power Generation (Utilities) 4 All India Annual Per Capita Consumption of Electricity since -26 31 5 Average cost of power supply & Average realisation (Paisa/kwh) 6 Growth of Rural Electrification & Pump Sets Energisation 32 7 Status of Hydro Schemes Cleared by the CEA in Feb. 217

Plan / Year 1. Growth of Installed Capacity Since 6th Plan (In MW) Thermal Nuclear Hydro RES (MNRE) Total Coal Gas Diesel Total End of 6th Plan 2631.83 541.5 177.37 2729.7 195 1446.2 42584.72 End of 7th Plan 41237.48 2343. 165.9 43745.57 1565 1837.63 18.14 63636.34 End of 8th Plan 54154.48 6561.9 293.9 611.28 2225 21658.8 92.1 85795.37 End of 9th Plan 6213.88 11163.1 1134.83 74428.81 272 26268.76 1628.39 1545.96 End of 1th Plan 71121.38 13691.71 121.75 8614.84 39 34653.77 776.6 132329.21 End of 11th Plan 11222.38 18381.5 1199.75 13163.18 478 3899.4 2453.45 199877.3 End of Feb 217 18947.88 25329.38 837.633 215214.89 578 44413.43 518. 315426.32 Captive Generation Capacity in Industries having demand of 1 MW and above, grid interactive (as on 31-3-16) = 48279 MW* *Provisional All India Generating Installed Capacity ( MW ) (As on 28.2.217 ) Total Installed Capacity 315426.32 MW Coal Gas Diesel Nuclear Hydro Res Coal Gas Diesel Nuclear Hydro Res Total 18947.88 25329.38 837.633 578. 44413.4 518 229251.74 29