MICROLOK II SYSTEM MAINTENANCE CHECK LIST

Similar documents
Orion BMS Purchasing Guide Rev. 1.2

INTER PLANT STANDARD - STEEL INDUSTRY THYRISTOR CONVERTORS FOR ARMATURE AND FIELD OF MAIN DRIVE MOTORS. Corresponding IS does not exist

TOWER MAXI T SINGLE CONVERSION ON LINE UPS SYSTEMS

PART NO CP-DOOR FRONT PANEL WINDOW PART NO CP-DOOR FRONT PANEL SECOND WINDOW PART NO CP-DOOR LOCK PART NO. 5026

Qualification UEE 30806/07 Cert III in Electrotechnology Electrician

ValveLink SNAP-ON Application

MAPNET II Transceiver Installation Instructions

PSU EN54-4 Power Supplies

Burden Fuse Rating Resistor SAF / SAK6 1NM 10mm M8 12NM SAF / SAK10 2NM 16mm M8 12NM

Power Conversion System The Best Technology for your photovoltaic and storage system

OPERATING AND MAINTENANCE MANUAL. Primary Current Injection Test Set. 750ADM-H mk2

AMS ValveLink SNAP-ON Applications

1291BL Series Technical Specification Single Axis Position and Rate Table System

Product Data Sheet. Damper Interface. Features

CENTROIDTM. AC Brushless Drive. Product Spec Sheet

Series 500. Liquid Level Transmitters. Instruction Manual

UNIT 3: GENErAL ELECTriCAL SySTEM DiAGNOSiS

Preventive maintenance kits

Installation & Operation Manual

1291BL Series Technical Specification Single-Axis Rate and Positioning Table System

Construction and Wiring Guidelines for Ergon Energy Substation Panels

Pretest Module 29 High Voltage Unit 1

DSL-220 MkIII Single Pass Opacity Monitor Measures 0-100% Opacity

KEOR HP. THREE-PHASE UPS from 100 to 800 kva GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES

MAGPOWR Spyder-Plus-S1 Tension Control

Technical Description

SECOND GENERATION Use this guide with unit serial number prefix beginning with BWF using Terra Power separator.

KEOR HP. THREE-PHASE UPS from 100 to 800 kva GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES

INTECH Micro 2300-RTD6

Fuel Cell Lab Manual. Non Conventional Energy Systems Facility. Non Conventional Energy Systems Facility. Boiler House

EVO AT SERIES BATTERY CHARGER

Electrical Safety. Presented By- C S Chakraverty. L&T Construction ( MMH ) Head- E&I Operation

Wind display type WSDI-2

N Daily Weekly Monthly Every 3 months. Every 6 months 1 Remove any materials not related

Installation, Operation and Maintenance Manual Stancor SSD & SL Series Pumps

EFI Harley Davidson 1340 EVO

AT SERIES EVO BATTERY CHARGER

EPS/ELA-Series User Manual EPS/ELA 250W

Application Specification Circular Plastic Connector (CPC) Series 45 System 05 AUG 14 Rev D

825-P Modular Protection System for motors Specification Guide

2O3D3-19A REVB MOUNTING

AFM500X Automatic Flashing Module

IRT 4000 AT-S/M/L. Technical Manual. quality IN MOTION. quality IN MOTION

IBER DISTRIBUTION FRAME (FDF) FOR EXCHANGE SIZE 900MM x 2200MM x 300 MM

POWERTRONIX QUASAR 5-40 KVA

2 Unit Petrol Engine Spare parts kits for 4 WD Nissan Patrol

MP24 Motorized Potentiometer

Sentinel Field Satellite Controller

Installing Power Components

CombiTac Overview. CombiTacline Industrial Connectors

Uninterruptible Power System

Static frequency converter couples US paper mill s 25-Hz and 60-Hz electricity grids

IB IL 24 PWR IN/F-D IB IL 24 PWR IN/F-D-PAC

S P E C I F I C A T I O N

Dispense interface converter NA-8 (RS-485/RS-232 to non-addressable RS-422/RS-485/RS-232 and backwards)

Standby Amper VOLTAGE

5001TCP SPEED CONTROLLER

US Models Only EFI Harley Davidson Twin Cam 88 Touring Models. Floppy Disc Request Form

HYDROVAR IncReAseD flexibility AnD control with new generation

EVO SERIES BATTERY CHARGER SERIES BATTERY CHARGER

This generator set has been designed to meet ISO 8528 regulation. This generator set is manufactured in facilities certified to ISO 9001.

This generator set has been designed to meet ISO 8528 regulation. This generator set is manufactured in facilities certified to ISO 9001.

Uninterruptible Power System

This generator set has been designed to meet ISO 8528 regulation. Enclosed product is tested according to EU noise legislation 2000/14/EC

120V and 230V Modem Upgrade Instructions for AlphaEclipse StreetSmart Signs

CUSTOMIZED OPTIONS FOR 1-WEEK DELIVERY

DSL-240 MkIII Single Pass Dust Monitor Measures mg/m 3 using DDP

OutdoorXUPS-600AHV-8364

Product Guide: Series III Pump Control Board Set (RoHS)

Engineering the Future of Payment Solutions

Battery Monitoring Why Technology Matters. Mats Karlstrom V.P. Sales & Marketing, Alber

This generator set has been designed to meet ISO 8528 regulation. This generator set is manufactured in facilities certified to ISO 9001.

Sitras SCS, -RCI, -FFP, -TTU

LCD Annunciator Installation Instructions

The 4HR-UPS 220V ac output is provided via a Pure Sine Wave inverter, allowing it to be backed up by 2x 12V standby batteries.

AT EVO SERIES BATTERY CHARGER

INTER PLANT STANDARD STEEL INDUSTRY SPECIFICATION FOR STATIC EXCITATION CONVERTORS FOR SYNCHRONOUS MOTORS (FIRST REVISION)

Annexure B (1)- Engineering Instructions for Installation of Aerial OFC

TPM Fuse Panel Installation Guide. Document INS-727XXXXXXX This manual covers the following part numbers- Trimm 727XXXXXXX Family

One-Stop Service: Monitoring and Managing.

Cutler-Hammer. Instructions for Installation, Operation, and Maintenance of the AMPGARD Reduced Voltage Soft Starter

STANDARD OWNER S MANUAL

ACCESSORIES FOR LPOF, HPPT AND XLPE HIGH VOLTAGE CABLE SYSTEMS PRODUCT CATALOGUE

SkyHawk M1620 Satellite Modem. Installation and Setup Guide READ ME FIRST

INTELLITROL. scully. Scully s Intellitrol System. Intellitrol is a state of the art microprocessor based system that provides:

Wiring Harness 1. Remove left hand footwell trim panel from driver s footwell. Typically secured by several Philips head screws.

HIB Enclosed Inverter User Guide

INSTRUCTION MANUAL MODEL PS VDC POWER SUPPLY

INDIAN INSTITUTE OF TECHNOLOGY KANPUR

Switchgear Skid, C1192

Enclosed product is tested according to EU noise legislation 2000/14/EC. Voltage kva kw kva kw Amp 400/ ,00 880, ,00 824, ,00

Safety Precautions Product Contents Product PIN Diagram LED indicators Product Dimensions Installation of Panel with Casing Wire Legend Power Wiring

AT30 SERIES BATTERY CHARGER

Tender for procurement of Passive Components of LAN & Wi-Fi and their installation. Corrigenda. Annexure/Clause For Read

IB IL 24 SEG/F. Function. INTERBUS Inline Segment Terminal With Fuse. Data Sheet 5656B

INDUSTRIAL GENERATOR SERVICE

9-2 FAULT CODE DIAGNOSTICS AND REPAIR PROCEDURES

User Manual. Solar Charge Controller 3KW

TENDER FOR FOR 2 X 1010 KVA, 1500 RPM, 415 V DG SETS FOR CONSTRUCTION OF NEW CDRI CAMPUS AT SITAPUR ROAD, LUCKNOW (U.P.) SUMMARY OF PRICE BID

SPECIAL SPECIFICATION 6894 Communication Cabinet

Transcription:

STATION NAME: Date of commissioning: ZONAL RAILWAY: Date of visit: VISUAL CHECK 1 Check whether Tranzorb KP0A is provided across the card file fan supply 2 Check whether the card file fans are fed from External 2V Check whether there is no 20V AC electrical connections such as light or bulb connection is taken through EI ladder Check that there is no voltage potential between Positive to Earth and Negative to Earth [12V Card file, 2V I/O, 2V/12V Panel] ISOLATION 1 2 Check whether EI ladder (i.e. used for MLK II and Relay Rack wiring) is totally isolated from CT Rack, Data logger & walls Check whether MLK II Racks, Relay Racks & Termination Racks are isolated from floors & walls Check whether DC-DC convertors are isolated from MLK Rack & not connected to earth Check whether MLK signal ground (A2, E22 & C18) is isolated from earth ground Rev 2.0 Doc. No: ENGG/MLKII/MAINT/00001 Page 1 of 6

Check whether spare cores of serial communication cables are connected to signal ground at both ends & are isolated from earth 6 Check whether 20V power cable is isolated from MLK II area Check whether converter cum isolators/isolators provided for the serial communication are not bypassed SURGE PROTECTION DEVICE 1 Check whether Transzorb KP16A/6KZ16A is provided for MLK II card file supply 2 Check whether 110V/2V/12V OBO surge suppressor is provided 6 Check whether 20V OBO surge arrester is provided for 20V AC Maintenance/Operator PC s Check 9POP/TCC 82 (RS 22 Isolator) is provided for Maintenance/Operator PC/Data logger Ensure that for Converter/Isolator, if a shielded twisted pair cable is used, then shield should be connected to protective ground at one end only Check whether [Stage I, Stage II & Stage III] surge protections are provided wherever they are applicable Check whether Class B & C surge protections are provided wherever IPS supply is not available Rev 2.0 Doc. No: ENGG/MLKII/MAINT/00001 Page 2 of 6

EARTHING 1 Verify that all earth pits are visible and measure the ring earth resistance as per the maintenance schedule 2 Check whether MLK front and back doors are earthed or not Check whether shields of all communication cables are properly connected to earth ground at one end only Check whether proper earth connection is provided for Data logger 6 8 9 Check whether surge suppressors (110V, 12V, 2V & 20V ) used are connected to the respective REB & protective fitting Check whether 20V OBO surge arrester is connected to the respective REB & protective fitting Check whether NV Filter box connections are done as per the NV-FLT BO installation check list Check whether painted surface are scraped to the clean metal surface where grounding connections are to be made Check whether the earth connection between REB and the racks earth point are as short and there is no bend or any loose in the earth wire (Green) 10 Check that Armoured Cables used for Control Panel are Connected to REB 11 Check whether all joints are being mechanically and electrically effective (Example. clamped, screwed, bolted, riveted or welded) 12 Check that there are no loose connections in any of the earthing terminations 1 Check that there is no damage to earth wire 1 Earth pits are wetted on regular basis (This is applicable only to non maintenance free earth pit sites) Rev 2.0 Doc. No: ENGG/MLKII/MAINT/00001 Page of 6

FIBER 1 Check the db loss for every fiber core using optical power meter 2 Check whether the db loss is within the specified limit of the fiber equipment Check whether redundant path arrangement is working properly (i.e., seamless transfer of one fiber path to the other fiber path) Check whether all fiber loops are neatly dressed with in the splice tray Check whether OFC equipment power supply & LED status is proper 6 Check whether the one end of the armored OFC cable is earthed Check whether the modem is isolated from the metal body of the mounting frame/rack MAINTENANCE ACTIVITY (This shall be performed by Railway Engineer on weekly basis) Ensure there is no dust in MLK II Rack, Operator VDU, Maintenance PC and any other 1 equipment such as Data Logger, IPS etc Check card file cooling fans are properly working & also check for its direction of air flow 2 (i.e., away from card file) Check that cooling fan of DC-DC converters are working properly Check that the glowing of healthy indication in surge suppressors Check that both Input & Output LED indication in DC-DC converter 6 Check that there is no failure indication for the communication link (fiber cut/ modem/server/switching device failure) Rev 2.0 Doc. No: ENGG/MLKII/MAINT/00001 Page of 6

Measure the voltages of MLK II card file, I/O & Panel, 110AC, 2V ET and 110V Point supplies 8 Check all the fuses visually for its proper working 9 10 Switch ON the OFF LINE system in diagnostic mode and ensure that both date & time are synchronized to PC time Ensure Back-up of MLK II system logs (event, error & data logs) are taken on regular basis 11 Ensure that EI room is well protected MAINTENANCE ACTIVITY (Monthly) 1 Measure the RING EARTH RESISTANCE VALUE (i.e., less than 1 ohm) 2 Ensure that all the DC-DC converters are working properly in the n+1 configuration Check the healthiness of the change over system by make it ON LINE from OFF LINE (i.e., system A B or system B A ) Switch ON the OFFF LINE system in diagnostic mode and enable the CPS CLEAR mode if required Rev 2.0 Doc. No: ENGG/MLKII/MAINT/00001 Page of 6

MISCELLANEOUS 1 Verify whether spare fuses/terminals of all types are readily available at site 2 Check whether Operator VDU, Maintenance PC and Data Logger are working fine Check whether communication between Maintenance and Operator PC s is proper Check whether the LATEST APPLICATION. Program s CRC, CHECKSUM, INSTALLATION ADDRESS, EECUTIVE VERSION, APPL. VERSION are available in the MPC Ensure that both operator VDU & Maintenance PC are provided with latest ANTI VIRUS software 6 Check whether the all display boards related MLK II system are provided in the EI room 8 Check whether the Maintenance Register is properly maintained, as per the UM-6800C Rev1.2 Minimum tools required at site for the proper maintenance of Microlok II system (i.e., Crimping tool 8/96 Pin, Insertion tool 8/96 Pin, Removal tool 8/96 Pin, Locator tool 8/96 Pin, Digital multimeter, Earth meggering meter, Screw drivers, spanners, etc. And Optical power meter, OTDR meter for OFC, if applicable) Special comments (if any): ASTS Engineer Signature: Date: Customer Signature: Date: Next Maintenance visit date: Name: Name: Rev 2.0 Doc. No: ENGG/MLKII/MAINT/00001 Page 6 of 6