Top-of-Pole Mount for 1 Module (TPM1) For Module Types A, B, C, D, E, F, & G ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

Similar documents
Top-of-Pole Mount for 12 Modules (TPM12) For Module Types D, E, F, & G

Top-of-Pole Mount for 6 Modules (TPM6) For Module Types A, B, & C

Top-of-Pole Mount for 2 Modules (TPM2) For Module Types C, D, E, F, G, & H

Top-of-Pole Mount for 6 Modules (TPM6) For Module Type D

Top-of-Pole Mount for 12 Modules (TPM12) For Module Types D, E, F, & G When High Wind Version (HWV) or 6h x 2w, L

Top-of-Pole Mount for 6 Modules (TPM6) For Module Types A, B, & C ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

Top-of-Pole Mount for 1 Module (TPM1) For Module Type H ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

Top-of-Pole Mount for 4 Modules (TPM4) For Module Types D, E, F, & G

Top-of-Pole Mount for 8 Modules (TPM8) For Module Types D, E, F, G, & H ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

Top-of-Pole Mount for 15 Modules (TPM15) For Module Types E, F, & G ASSEMBLY INSTRUCTIONS

MULTI-POLE MOUNT MULTI-POLE MOUNT. Assembly Instructions. Assembly Instructions. step-by-step assembly and installation

MULTI-POLE MOUNT LARGE GROUND MOUNT. Assembly Instructions. Assembly Instructions. step-by-step assembly and installation

MULTI-POLE MOUNT - G2 ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D SP PCN

POWER RAIL P4 ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev A PCN

QUALITY MOUNTING HARDWARE SOLUTIONS FOR THE PV SOLAR INDUSTRY

TILT KIT - POWER RAIL P8 ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev E SP3436 PCN

POWER RAIL TM P8. Assembly Instructions. step-by-step assembly and installation. Version 2, Rev A SP PCN

3. WIRING AND INSTALLATION PROCEDURES 3.1 System wiring diagrams 4.LOCATION SELECTION 5. TOWER 6.1 SINGLE WIND GENERATOR 6.2CONTROLLER WIRING 6.

BXR5203 RBW Li l Rocker & X-16 Curt E16 Installation Instructions. PinLock. Serial Number

LIGHT DUTY ROLL UP DOOR

2,000 Lbs Heavy-Duty Engine Stand

Sunwize Power Ready Express Quick Start

Hitch Receiver OEM INSTALLATION MANUAL

Installation, Operation and Maintenance Instructions

PRODUCT: JK SportGate Tire Carrier READ INSTRUCTIONS IN FULL BEFORE INSTALLATION. QUESTIONS? CALL M-F 7:00 AM 5:00 PM PST

FAIRMOUNT INTERCHANGEABLE MACPHERSON STRUT COMPRESSOR

WARNING NOTICE CAUTION ASSEMBLY INSTRUCTIONS

INSTALLATION INSTRUCTIONS Horizontal Array Pole Clamp Models: KTA-220/225 and KTA-320/325

Nanometrics Solar Power System

OPERATOR S MANUAL EL EQUIPMENT LIFT. US 7514 Alabonson Road Houston, TX phone: fax:

MODEL NO & UP SAFETY INSTRUCTIONS. Keep this Operator s Manual in the plastic tube behind the operator seat.

Embedded Rack Slide-out System

Sunwize Water Pumping Kit Quick Start

400 Watt WIND TURBINE

Center Drive Tube. Gussets

INSTALLATION INSTRUCTIONS

INSTALLATION GUIDE. TCP STRD-07 Adjustable Strut Rods

TM INSTALLATION GUIDE TM 1

Universal Pitch Adjustable Wall Mount For Flat Panel Display UPM-2401

RollSeal 1733 County Road 68 Bremen, Alabama Part No Rev Owner s Manual RS-Divider Curtain

Installation Instructions

Installation Instructions

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Road / PO Box 186 Humboldt, KS P: F:

CHEVY SILVERADO CREW CAB RX3 Includes models equipped with DEF tank

LUF Series Unidirectional Electric Actuators

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Road / PO Box 186 Humboldt, KS P: F:

Wind Generator. FSH400 Instruction Manual. Serial number:

panelclaw.com Polar Bear III for 10 Degree

Important. Contents. Contact us:

PRODUCT: JK RockSport Steering Stabilizer Kit READ INSTRUCTIONS IN FULL BEFORE INSTALLATION. QUESTIONS? CALL M-F 7:00 AM 5:00 PM PST

On-A-Roll Lifter Instruction Manual for Standard Models Read Before Use!

Installation Instructions

Installation Instructions

Renogy MTS-TM100. Flat Roof Tilt Mount E Philadelphia St, Ontario, CA Version: 1.1

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Road / PO Box 186 Humboldt, KS P: F:

INSTALLATION INSTRUCTIONS

INSTALLATION & OWNER S MANUAL

BOLT-ON AND WELD-ON FLUSH FLOOR SLIDEOUT SYSTEMS OPERATION AND SERVICE MANUAL

SERVICE PROGRAM SP NOVEMBER 2007 SERVICE MANAGERS / PARTS MANAGERS NOTE:

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

INSTALLATION INSTRUCTIONS

Motion Trek Spectrum Lane ~ Missoula MT ~ Rev A

Installation Instructions

INSTALLATION INSTRUCTION 88092

Albany RR1000. Mechanical Installation Manual. PN: 6410T0029 Version - Rev: 04/23/2014. ASSA ABLOY Entrance Systems

WARNING. it means the information that follows will help avoid damage to the steering gear.

INSTALLATION INSTRUCTIONS WHEEL-TO- WHEEL

OPERATOR S MANUAL REPAIR PARTS CATALOG. Models: SCP-51 & SCP-71 SCP-52 & SCP-72 SCP-91 & SCP-111 SCP-92 & SCP-112 BRILLION FARM EQUIPMENT

AGM Series. Installation Manual AGM Series Modular Battery Systems

SwayPro. NOTE: A minimum tongue weight of 200 lbs. is required THANK YOU

HYDRAULIC TROLLEY JACK K Distributed by Kincrome Tools and Equipment:

Model 289F. Operator s Manual for Morse Model 289F. MORStak TM Forklift-Mounted Drum Racker. The Specialist In Drum Handling Equipment

90CM KA-BAND TYPE 9013 ANTENNA SYSTEM with Factory Assembled Az/El Mount

Installation Instructions

OPERATOR S MANUAL 2200 SERIES LIFT - LIL HOISTER. July 2017

2000-LB. ENGINE STAND

Important. Contents. Contact us:

OWNER'S MANUAL MODEL NO Safety Assembly Operation Maintenance Repair Parts. Read Rules for Safe Operation and Instructions Carefully

INSTALLATION INSTRUCTIONS MOUNTING KIT FOR ELITE SERIES

INSTALLATION INSTRUCTIONS

74CM KU-BAND TYPE 743 ANTENNA SYSTEM with Factory Assembled Az/El Mount

Non Penetrating Mast Mount for 2.4M Antennas

Walker Loader Bucket OPERATOR S AND PARTS MANUAL

VANGUARD Series 36" Slant Wall and Cone Direct Drive Fans Installation & Operator s Instruction Manual

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Rd / PO Box 186 Humboldt, KS P: F:

Turning Point Pin Box. by Trailair OWNER'S MANUAL

Universal Anchoring. Serrated Double Bolt Jaw Users Manual. April 2016 by Vehicle Service Group. All rights reserved. CO9722.1

Contents. Section 5: Adjustments Ball Detect Adjustment Transport Band Tension Adjustment

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Rd / PO Box 186 Humboldt, KS P: F:

INSTALLATION INSTRUCTIONS WHEEL-TO- WHEEL

PRODUCT: TJ Front Bump Stop Kit READ INSTRUCTIONS IN FULL BEFORE INSTALLATION. QUESTIONS? CALL M-F 7:00 AM 5:00 PM PST

INSTALLATION INSTRUCTIONS

MODEL BA735QC. Instruction Manual. Qwik Change Extension Arm

Wheel Angle Sensor Kit Installation

FRONT STABILIZER BAR KIT

LOCKN LOAD MOUNTING KIT

PRODUCT: Sway Bar Drop Spacer READ INSTRUCTIONS IN FULL BEFORE INSTALLATION. QUESTIONS? CALL M-F 7:00 AM 5:00 PM PST

PSX2 (Power Stabilizing System) OWNER'S MANUAL

INSTALLATION INSTRUCTIONS HD BUMPER AND WINCH MOUNTING KIT Part Number: 74777, Application: 08-NEWER FORD SUPER DUTY WARNING

Transcription:

Top-of-Pole Mount for 1 Module (TPM1) For Module Types A, B, C, D, E, F, & G ASSEMBLY INSTRUCTIONS step-by-step assembly and installation YOUR DISTRIBUTOR SOLIGENT 800-967-6917 www.soligent.net Version 2, Rev D PCN 121712-1

Top-of-Pole Mount for 1 Module (TPM1) For Module Types A, B, C, D, E, F, & G A few words about the product The TPM1 for module types A, B, C, D, E, F, & G is designed to mount on 2 inch SCH40/80 galvanized steel pipe (installer supplied). Pipe size and foundation requirements are based on several factors including the array surface area, maximum design wind speed, exposure category, soil type, steepest expected tilt angle, and above-ground clearance. For foundation and pipe size recommendations on a specific installation please contact us at: Phone: 800-260-3792 Email: info@power-fab.com WARNING: Follow the procedures and precautions in these instructions carefully. About these Assembly Instructions These instructions... Are intended to be used by individuals with sufficient technical skills for the task. Knowledge and use of hand tools, measuring devices and torque values is also required. Include various precautions in the forms of Notes, Cautions, and Warnings. These are to assist in the assembly process and/or to draw attention to the fact that certain assembly steps may be dangerous and could cause serious personal injury and/or damage to components. Following the step-by-step procedures and these precautions should minimize the risk of any personal injury or damage to components while making the installation not only safe but an efficient process. Required Tools 7/16 inch wrench or socket for 1/4 inch module hardware 9/16 inch wrench or socket for 3/8 inch hardware 3/4 inch wrench or socket for 1/2 inch hardware Torque wrench Ratchet wrench Ratchet extension bar 3 to 6 foot level Tape Measure Square 1 of 7

1 7 2 3 6 5 4 Top-of-Pole Mount for 1 Module for Module Types A, B, C, D, E, F, & G Parts Identification 2 of 7

CAUTION: Use care while working around the structure during assembly. There could be components that create hazards or obstruct free movement, causing serious bodily injury. Many of these are at head/eye level. Move slowly and with care around the work area. Step 1: Install the Mounting Sleeve on Vertical Pipe Before installing the Mounting Sleeve, verify that the Mounting Pole is plumb to the ground and hasn't shifted or leaned while the concrete footing has cured. The Mounting Sleeve slips on top of the Mounting Pole and has two 3/8 Set s which are used to secure it to the Mounting Pole. A. Slip the Mounting Sleeve on top of Mounting Pole and slide it down until it rests/bottoms out on top of Mounting Pole. B. Rotate the Mounting Sleeve so the Vertical Tower is leaning south. C. Secure the Mounting Sleeve by tightening the two 3/8 Set s. Torque each Set to 32-34 ft.-lbs. (See Figure 1-1) E S N W Mounting Sleeve Mounting Pole Vertical Tower Leaning South Set s pointing North Set s Figure 1-1: Installing the Mounting Sleeve NOTE: Although this system offers six elevation set points, it is recommended to set the angle to its lowest setting of 5-degrees for ease of assembly. Optimum tilt setting of the rack will take place later in these instructions. Step 2: Install the to the Mounting Sleeve The gets attached to the Mounting Sleeve using a Pivot that passes thorough the Vertical Tower of the Mounting Sleeve and the Pivot Plate of the. Additionally, a 5/16 x 1 is used to set the elevation and further secure the to the Mounting Sleeve Vertical Tower. The system provides elevation set points of 5, 15, 25, 35, 45, or 55 and does so by the combination of two Locations and three Points. The Locations are the threaded holes on the Vertical Tower and accept the 5/16 x 1. The Points are located on the Pivot Plate. Figure 2-1 shows the combinations of Location to Point and desired Elevation Set Point. As the is installed, the elevation is also temporarily set for purposes of assembly. Once assembly is complete, the elevation angle will be reset based on the preferred elevation angle of your particular installation. Setting the Elevation Set Point For ease of assembly and safety, it is recommended that the elevation be set at 5. The table in Figure 2-1 shows that for a 5 elevation the Location would be A and the Point would be 3. 3 of 7

CAUTION: This is a two person activity. The must be held in place by one person while the second person aligns it and secures it to the Mounting Sleeve using the Pivot and the 5/16 Anchor. Failure to do so could lead to serious personal injury. Elevation Set Points Point Pivot Plate Points Location A B 1 45 55 2 25 35 3 5 15 1 2 3 Location A Mounting Sleeve Figure 2-1: Setting Elevation Angle Vertical Tower Location B A. Remove the Pivot and 5/16 x 1 and washers from the Mounting Sleeve Vertical Tower. B. Position the to the Mounting Sleeve Vertical Tower as shown in Figure 2-2. C. Insert the Pivot along with one flat washer thru the Pivot Plate and Vertical Tower. Secure with the flat washer, lock washer and hex nut. For now, finger tighten only to allow movement for the next step. D. Pivot the and align Location A with Point 3. Secure position by inserting 5/16 x 1, lock and flat and washers into Point 3. Torque to 12-14 ft.-lbs. E. Tighten the Pivot. The Pivot cannot be left loose - the Mounting Sleeve Vertical Tower must be firmly clamped to the side of the eliminating any gaps between the Vertical Tower and the. Torque to 75-85 ft.-lbs. (See Figure 2-3) Mounting Sleeve Vertical Tower ½ Hex Nut Flat Washer Washer 1/2 x 3/4 Pivot 5/16 x 1 Washer Flat Washer Figure 2-2: Installing the 4 of 7

WRONG CORRECT Pivot Visible Gap Vertical Tower No Gap Vertical Tower Visible Gap No Gap Figure 2-3: Tighten and Torque the Pivot CAUTION: This is a two person activity. Module Rails are unstable before they are fully secured to the Support Angles. Module Rails must be held in place by one person while the second person aligns and secures them to the Support Angles. Failure to do so could lead to serious personal injury. NOTE: Finger-tighten the Module Rails to the Support Angles while installing. After the Modules are installed, go back and tighten to specified torque values. Step 3: Attach the Module Rails to the Support Angles Module Rails run in an E-W direction and are secured to the two Support Angles of the (these are welded to the ) using 3/8 x 1 bolts and hardware. There are two Module Rails to install. A. Align the Module Rail mounting holes with the holes of the Support Angle and secure with 3/8 x 1 bolts and hardware. Finger-tighten for now. (See Figure 3-1) B. Continue in this manner and install the next Module Rail. Module Rail Support Angle 3/8 x 1 3/8 Hex Nut Washer Figure 3-1: Attaching Module Rails 5 of 7

CAUTION: This is a two person activity. PV Modules are heavy and unstable before they are fully secured to the Module Rails. PV Modules must be held in place by one person while the second person aligns and secures them to the Module Rails. Failure to do so could lead to serious personal injury and damaged components. Step 4: Installing PV Modules to Module Rails PV Modules are secured to the Module Rails using 1/4 x 3/4 bolts and hardware. A. Place the PV Module on the Module Rails. Align the mounting holes and secure with 1/4 x 3/4 bolts and hardware. Each Module has four attachment points. Finger-tighten for now. (See Figure 4-1) B. Continue in this manner and install the second PV Module. Module 1/4 Nut Washer 1/4 x 3/4 Module Rail Figure 4-1: Installing PV Modules to Module Rails CAUTION: Be certain to go back and tighten all Module Rail and PV Module mounting hardware and torque to the specified values. Failure to do so could lead to structural failure, damaged components and/or serious personal injury. Step 5: Return and tighten mounting hardware. A. Return and tighten each set of the 3/8 mounting hardware, securing the Module Rails to the Support Angles. Torque all at 32-34 ft.-lbs. B. Return and tighten each set of 1/4 mounting hardware, securing the PV Modules to the Module rails. Torque all at 6-8 ft.-lbs. Step 6: Adjust the Tilt Angle of the Rack Use great care as it can be dangerous if the procedure is not done as described and done with a minimum of two people. Adjust the tilt angle by loosening the Pivot hardware and removing the 5/16 x 1 from the Pivot Plate. A. While one person holds the south edge of rack, the other loosens the Pivot and removes the 5/16 from the Pivot Plate. (see Figure 6-1) B. Refer to Figure 6-2 and tilt the rack to the desired elevation angle (5, 15, 25, 35, 45, or 55 ). Re-insert the 5/16 in the appropriate hole to match the desired elevation. Torque to 12-14 ft.-lbs. C. After changing the tilt angle and tightening the, the Pivot must be re-tightened. The Pivot cannot be left loose - the Mounting Sleeve Vertical Tower must be firmly clamped to the Pivot Plate. Torque Pivot to 75-85 ft.-lbs. (see Figure 6-3) 6 of 7

CAUTION: Do not attempt to remove the Pivot during tilt adjustments. Removal could lead to serious personal injury or death. Adjustments are made with the Pivot hardware loosened but in place. 5/16 x 1 Washer Loosen Pivot (do not remove) CAUTION: This is a two person activity. As the Pivot is loosened and the 5/16 hardware is removed, the rack is heavy and unstable. It must be held in place by one person while the second person loosens and removes the hardware and then re-installs/tightens the hardware back in place. Failure to do so could lead to serious personal injury and damaged components. Elevation Set Points Point Figure 6-1: Preparing to Adjust the Tilt Angle Pivot Plate Points Location A B 1 45 55 2 25 35 3 5 15 WRONG 1 2 3 Location A Mounting Sleeve Figure 6-2: Setting the Elevation Angle CORRECT Vertical Tower Location B Pivot Visible Gap Vertical Tower No Gap Vertical Tower Visible Gap No Gap Figure 6-3: Re-Tighten and Torque the Pivot 7 of 7

Direct Power & Water Corporation 4000-B Vassar Drive NE Albuquerque, New Mexico 87107 USA Telephone: 800.260.3792 Fax: 505.889.3548 Web Site: www.dpwsolar.com E-mail: info@power-fab.com Preformed Line Products (Canada) Limited 1711 Bishop St. E Cambridge, ON N1T 1N5 Telephone: 519.740.6666 Fax: 519.740.7917 Web Site: www.preformed.on.ca E-mail: sales@preformed.on.ca 2012 Preformed Line Products PCN 121712-1 Version 2, Rev D