Installation Instructions

Similar documents
Electrical Data Supplement

INSTALLATION INSTRUCTIONS TABLE OF CONTENTS

Installation Instructions

Electrical Data Supplement

Electrical Data Supplement

Installation Instructions Electric Heaters 5 20 kw

Electrical Data Supplement

Supplemental Installation Instructions -- August 2016

Supplemental Installation Instructions -- August 2016

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions Electric Heaters 5 20 kw

Owner s Information Manual

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

INSTALLATION MANUAL ELECTRIC DOUBLE OVEN RANGE

Installation Instructions

CRECOMZR054B00 CRECOMZR055B00. VERTICAL AND HORIZONTAL ECONOMI$ER2 ACCESSORY MEDIUM ROOFTOP UNITS 15 to 27 1/2 TONS WARNING TABLE OF CONTENTS

MicroMetl INSTALLATION INSTRUCTIONS FOR 0689ZJ36EC

Installation Instructions

Installation Instructions

SERVICE INSTRUCTIONS

Purpose Of This Document This manual provides the information to assemble and install Lighted Canopy Conduit Kits on The Advantage Series.

ibusway for Data Center

TECHNICAL SUPPORT MANUAL Split System Heat Pump H2H3, 3 Phase

OPERATION MANUAL. Automatic Endoscope Leak Tester. Model# ZUTR-10003

Electric Range installation manual

Installation Instructions

INSTALLATION INSTRUCTIONS

INSTALLATION AND OPERATING INSTRUCTIONS OF THE INTERNATIONAL ISOBOX SERIES ISOLATION TRANSFORMERS.

TECHNICAL SUPPORT MANUAL Split System Air Conditioner H4A3, 3 Phase

AHKD SERIES ELECTRIC RESISTANCE HEAT KITS INSTALLATION & OPERATING INSTRUCTIONS

Technical Manual. DLM Module. This manual should remain with the unit.

Operator's Manual. Storage System. Ultrasound Probe Cabinet. Manufactured by:

DC CCTV Power Supplies Installation Guide

Installation. Part A, Section 3. This section covers the following unit configurations. 3400V 3500V. Voltage 4. Pump Piston (E, F, or G)

IMPORTANT ATTENTION INSTALLERS:

INSTALLATION AND OPERATING INSTRUCTIONS OF THE INTERNATIONAL ISOBOX SERIES ISOLATION TRANSFORMERS.

Gree Genuine Accessories

Owner's/Installation Manual

READ AND SAVE THESE INSTRUCTIONS. ComfortBreeze UV360-1 SYSTEM 24V Ultra-Violet Air Cleaner. Trion

LED Exam Light. Service and Parts Manual. Model Numbers: FOR USE BY MIDMARK TRAINED TECHNICIANS ONLY Rev. (1/23/18)

Charcoal Filter Installation NOTE: The charcoal filters are preinstalled if you purchased the range hood with re-circulating kit from us. 1. Remove st

For Use with Model(s):all electric models

Installation. Part A, Section 3. This section covers the following unit configurations: 3400V 3500V Voltage 1, 2, 3 Pump Piston (E, F, G)

SYST0101ZP Ion Damper Control Installation and Start---Up Instructions

Model 436 V-Head Pipe Stand

INSTALLATION INSTRUCTIONS

Galaxy VM. Battery Breaker Box Installation 09/

Circa Ambient Interior Luminaire

Installation and Start Up Instructions

Easy/Tran TF STANDBY POWER FURNACE SWITCH TOOLS NEEDED FOR INSTALLATION. PARTS LIST for Easy / Tran TF FURNACE TRANSFER SWITCH

TECHNICAL SUPPORT MANUAL Split System Heat Pump N2H3**C (Coastal)

M-3025CB-AV Fuel Pump

PowerLogic High Density Metering System 4-Meter Enclosure Installation Guide

CONTENTS DESCRIPTION UNPACKING DIMENSIONS

TECHNICAL SUPPORT MANUAL Split System Air Conditioner N4A3, 3 Phase

Installation Instructions

TECHNICAL SUPPORT MANUAL Split System Air Conditioner N2A0, 3-Phase

Installation, Operation and Maintenance Manual

UL Listed CCTV Power Supplies. - 4 amp. - 4 amp. - Eight (8) Fuse Protected - Eight (8) PTC Protected

Owner s Manual. For Automatic Transfer Switch. 100 Amp. Model Number RTG16EZA3 MODEL NUMBER: SERIAL NUMBER: DATE PURCHASED:

Installation Guide Smart-UPS 1200/1500 VA 100/120/230 Vac Rack-Mount 1U

CCTV Rack Mount Power Supplies

Preparation Advanced Preparations: Be familiar with the controls of the range hood by reading through Range Hood Operations, Page 12. Place the range

TECHNICAL SUPPORT MANUAL Split System Heat Pump (C,H,T)XH5

Electrical Installation

TECHNICAL SUPPORT MANUAL Split System Heat Pump R2HM, R2H3, WCH3**2

Rated for use on 110/120VAC 60Hz and 220/240VAC 60Hz applications

INSTALLATION INSTRUCTIONS

Installation Instructions

GRAIN CART RETROFIT J-M TRACK SLIDE IN HITCH SCALE SYSTEM

Monicon Instruments Co., Ltd. CHR-1285/2485 CHR-1285/2485 BATTERY CHARGER

(31 ) ZEON CONTROL PACK RELOCATION KIT

MaxLite StaxMax LED Flood Lights

GWI Rev. 1 October 2007 Supersedes Rev. 0 Dated February 2004

Installation Instructions For Motor Control Center (MCC) Units

Installation Instructions

ALWAYS SAVE THIS BOOK FOR FURE REFERENCE.

M-150S Series 12-Volt Fuel Pump M-150S-B100-MU Manual Nozzle & M-150S-B100-AU Automatic Nozzle Owner s Manual

User s Manual Power Supply. IM E 2nd Edition. Yokogawa Electric Corporation

S&C Vista Underground Distribution Switchgear

Pro Island Ventilation Hoods

Transcription:

265V Subbase Receptacle Accessory Kit For Use With Packaged Terminal Air Conditioner Installation Instructions INTRODUCTION These instructions cover the installation of the 265V Subbase Receptacle Accessory Kit for a non-electrical subbase. SAFETY CONSIDERATIONS Installing and servicing air-conditioning equipment can be hazardous due to system pressures and electrical components. Only trained and qualified personnel should install or service air-conditioning equipment. When working on air-conditioning equipment, observe the precautions provided in literature, tags, and labels attached to the unit. Follow all safety codes. Wear safety glasses, protective clothing, and work gloves. Use quenching cloth for brazing operations. Have fire extinguisher available. Read these instructions thoroughly and follow all warnings or cautions included in literature and attached to the unit. Consult local building codes and current editions of the National Electrical Code (NEC) NFPA 70. In Canada, refer to current editions of the Canadian electrical code CSA 22.1. Recognize safety information. This is the safety-alert symbol. When you see this symbol on the unit and in instructions or manuals, be alert to the potential for personal injury. Understand these signal words: DANGER, WARNING, and CAUTION. These words are used with the safety-alert symbol. DANGER identifies the most serious hazards which will result in severe personal injury or death. WARNING signifies hazards which could result in personal injury or death. CAUTION is used to identify unsafe practices which may result in minor personal injury or product and property damage. NOTE is used to highlight suggestions which will result in enhanced installation, reliability, or operation. Catalog No. FAP100-2049-02 Printed U.S.A Form 265V Receptacle Kit 7/23/2012 pg. 1

PACKAGE CONTENTS FIELD SUPPLIED MATERIAL REQUIRED 265V Receptacle Receptacle Junction Box Receptacle Cover (incl Screws 2) Plug Head Cover Cord Strain Relief Clamp Cord Conduit Cover Attachment Screws (Junction Box) 4 Attachment Screws (Receptacle) 2 Attachment Screws (Plug Head Cover) 3 Black * NOTE : Extra screws are provided Figure 1 Package Contents Power Source Conduit and Wire Wire nut or Butt Slices Grounding Screw or clip GENERAL The 265V Subbase Receptacle Accessory Kit can be field installed to convert a non-electrical subbase, to an electrical subbase with a receptacle, for corded packaged terminal air conditioner (PTAC) units. See Figs. 1 & 2. The 265v Subbase Receptacle Accessory Kit is available with 15, 20 or 30 amp ratings. Figure 2 Non-Electric Subbase Catalog No. FAP100-2049-02 Printed U.S.A Form 265V Receptacle Kit 7/23/2012 pg. 2

INSTALLATION Mechanical Assembly NOTES: - IF SWITCH KIT OR FUSE-KIT Accessories will also be installed, refer to those installation instructions first. - IF subbase is already installed on PTAC unit, remove to simplify installation of receptacle kit accessory. Step 1 Disconnect all power to the unit. Step 2 Remove knockout A from non-electrical subbase as shown in figure 3. Figure 3 Knockout A in Subbase Step 3 Remove knockout 1 from one side of the Receptacle junction box as shown in Figure 4. Figure 4 Junction Box Knockout Catalog No. FAP100-2049-02 Printed U.S.A Form 265V Receptacle Kit 7/23/2012 pg. 3

Step 4 Insert Receptacle junction box into subbase hole A and secure with factory supplied screws as shown in figure 5. Wiring Assembly Figure 5 Junction Box Installed Figure 6 Wiring Diagram Catalog No. FAP100-2049-02 Printed U.S.A Form 265V Receptacle Kit 7/23/2012 pg. 4

Step 5 Attach field supplied conduit (from power source), to knockout hole 1 on Receptacle junction box. Using field supplied conduit nuts, tighten conduit to Receptacle junction box as shown in figure 7. Figure 7 Attach Conduit to Junction Box Step 6 Connect Power Source wiring to Receptacle as shown in figure 8. Power source wiring and receptacle must be properly grounded to the Receptacle Junction Box using a field supplied ground wire and grounding screw or clip. Refer to wiring diagram in Figure 6 above. NOTE: Terminate all Ground Wires per code and acceptable trade practices. Figure 8 Wire Power Source to Receptacle Catalog No. FAP100-2049-02 Printed U.S.A Form 265V Receptacle Kit 7/23/2012 pg. 5

Step 7 Use factory supplied screws to fasten Receptacle to junction box onn the subbase as shown in figure 9. Figure igure 9 Fasten Receptacle to Junction Box Step 8 Use factory supplied screws to fasten Receptacle cover plate to Receptacle on the subbase as shown in figure 10. Figure 10 Install Receptacle Cover Step 9 Install subbase on PTAC wall sleeve per the installation instructions for a non electric subbase. See figure 11 for a completed installation. Figure 11 Attach Subbase to Wall Sleeve Catalog No. FAP100-2049-02 Printed rinted U.S.A Form 265V Receptacle Kit 7/23/201 /23/2012 pg. 6

IMPORTANT: Steps 10 through 13 are required per UL safety code. Step 10 Install power cord in Flexible Conduit 1. Separate Flexible Conduit into 2 pieces. 2. Insert power cord into 1 piece of the Flexible Conduit. 3. Add 2nd piece of Flexible Conduit on top of 1st piece of conduit and power cord as shown in Figure 12. Figure 12 Install Power Cord in Conduit Step 11 Plug power cord into subbase receptacle as shown in figure 13. Figure 13 Plug Power Cord into Receptacle Step 12 Position Flexible Conduit so that it s tight to the plug head as shown in figure 13. Remove power cord Strain relief attached to base pan. Save the screw for new strain relief. Next approximately an 1-inch down from the top of the Flexible Conduit add new strain relief and fasten to the side of the base pan as shown in figure 14. Coil excess power cord and store under or along side of the control box and behind the front panel. Figure 14 Install Conduit Strain Relief Catalog No. FAP100-2049-02 Printed U.S.A Form 265V Receptacle Kit 7/23/2012 pg. 7

Step 13 Fasten Plug Head Cover to subbase using factory supplied black screws as shown in figure 15. Figure 15 Install Plug Head Cover Step 14 Turn on power to unit and verify operation. Catalog No. FAP100-2049-02 Printed U.S.A Form 265V Receptacle Kit 7/23/2012 pg. 8